Price_Schedule.pdf

PDF 141 KB Posted

Attached to
Concrete Federal contract opportunity
Solicitation number
140P6426Q0070
Issued by
Department of the Interior National Park Service Midwest Region

About this file

This is a Price Schedule for a concrete supply contract with the U.S. Department of Interior, National Park Service at Canyonland National Park in Moab, Utah.

The contract requires the vendor to supply concrete in two types: 110 cubic yards (CY) of colored concrete and 10 CY of grey concrete, both in accordance with specifications. The schedule includes optional admixtures available at the Park's discretion on the day of concrete order placement, including ice at 15 lbs., delay set at 2 hours, fly ash (10-25%), fiber mesh (1.5lb/ft³), hot water, and calcium chloride (0.5-2%). The total cost for all optional additives shall not exceed $6,225.00 without Contracting Officer approval. The vendor must also provide pricing for unloading services, with an allowance of 6 minutes per cubic yard at no additional cost. Any unloading time exceeding 6 minutes per cubic yard will be charged at the vendor's documented hourly rate, not to exceed 120 total minutes without Contracting Officer approval. The price schedule requires vendors to provide unit prices and subtotals for each line item, with a final total cost to be calculated based on quoted rates.

View the file

Other files for this federal contract opportunity

Other files attached to Concrete, newest first.
File Type Posted
Clause_Package_-_Revised_0001.pdf PDF
Sol_140P6426Q0070_Amd_0001.pdf PDF
Specifications.pdf PDF
Sol_140P6426Q0070.pdf PDF
Price_Schedule.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Qty Unit Price / Unit Subtotal

110 CY $

10 CY $

* CY

* CY

* CY

* CY

* CY

* CY

6,225.00$

2 HR

Subtotal*

U.S. Department of Interior Canyonland National Park National Park Service Moab, Utah

Calcium Chloride (0.5-2%)

Delay Set at 2 hours Ice at 15 lbs.

Concrete - Grey

Optional Admixtures IAW Specifications.*

Fiber Mesh (1.5lb/ft^3)

Subtotal

Hot Water

Price Schedule

Concrete IAW Specifications.

Concrete - Colored

Fly Ash (10-25%)

Subtotal**

* Additional concrete Admixtures are optional. The Park will determine if these additives are required on the day that the concrete order is placed. Payment will be made according to actual usage and will be based on quoted price per Cubic Yard in price schedule for each additive.

Total additive usage shall not exceed $6,225.00 dollars total without approval from Contracting Officer.

Hourly Rate for Unloading Time in Excess of 6 Minutes per Cubic Yard.** Hourly Rate for Unloading Time**

** The Vendor shall allow 6 minutes per cubic yard unloading time with no additional costs. The Vendor may charge the Park for unloading time in excess of 6 minutes per cubic yard, at the Vendor’s documented hourly rate. Total excess time shall not exceed 120 minutes total without approval from Contracting Officer.

Total

Base