Price Matrix.xlsx

XLSX spreadsheet 12 KB Posted

Attached to
Y1DA--NRM (PROJ: 516-15-105) BB Renovate Kitchen - Building 100 (PLUS-UP)
Solicitation number
36C24821R0064
Issued by

About this file

This document contains a price matrix and related federal contract opportunity solicitation. The price matrix provides a cost breakdown by division for renovating sections of the first floor of Building 100 at the C.W. Bill Young Medical Center in Bay Pines, Florida. The total proposed price is blank. The related federal contract opportunity is solicitation number 36C24821R0064 to renovate the main Kitchen areas of Building 100 per the provided design documents and specifications. The project number is 516-15-105. The estimated target completion period is 550 calendar days after Notice to Proceed. The magnitude of the project is between $5 million and $10 million. The solicitation will use a trade-off source selection process and be issued on or around April 7, 2021. All information will be posted at https://beta.sam.gov. Offerors must be registered in SAM at time of proposal submission. This 100% Service-Disabled Veteran-Owned Small Business set-aside procurement is being conducted by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8.

View the file

Other files

File Type Posted
36C24821R0064 0004.docx DOCX document
36C24821R0064 0003.docx DOCX document
36C24821R0064 0002.docx DOCX document
36C24821R0064 0001.docx DOCX document
516-15-105 Renovate Kitchen Pre-Bid Sign-In.pdf PDF
Q_A Template.xlsx XLSX spreadsheet
FL20210222 7May21.pdf PDF
36C24821R0064.docx DOCX document
Drawings and Specs.docx DOCX document
Limitations on Subcontracting Certification Renovate Kitchen.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Base Offer Cost Breakdown

Project Number:Date:
Project Title
Project Location
Offeror Name
Offeror Street
Offeror CityStateZip
ItemDescriptionLabor CostMaterial CostTotal Cost
Division 1General Requirements$-$-$-
Division 2Existing Conditions---
Division 3Concrete---
Division 4Masonry---
Division 5Metals---
Division 6Wood and Plastic---
Division 7Thermal & Moisture Protect---
Division 8Doors and Windows---
Division 9Finishes---
Division 10Specialties---
Division 11Equipment---
Division 12Furnishings---
Division 13Special Construction---
Division 14Conveying Equipment---
Division 21Fire Suppression---
Division 22Plumbing---
Division 23HVAC---
Division 26Electrical---
Division 27Communications---
Division 28Electronic Safety & Security---
Division 31Earthwork---
Division 32Exterior Improvements---
Division 33Utilities---
Division 34Transportation Subtotal---
Division Subtotals :$-$-$-
Overhead %0.00%-
Profit %0.00%-
Bond %0.00%-
Overhead/Profit Subtotals :$-

Total Price $- $- $-

File details come from the government source that posted it. Updated .