Price List.xlsx
XLSX spreadsheet 80 KB Posted
- Solicitation number
- W9127N25BA008
About this file
This file is a Price List for the U.S. Army Corps of Engineers (USACE) Portland District's Dredge Vessel Essayons Overhaul project. The comprehensive pricing document details two primary work categories (Category A and Category B) with 58 specific line items covering vessel maintenance and repair tasks, ranging from transportation and crane services to electrical system maintenance, hull repairs, and equipment inspections. The pricing structure includes granular work items referenced to specific Performance Work Statement (PWS) paragraphs, with quantities and units specified for each task.
The pricing document also includes an "Over & Above Work" section with a schedule of labor rates and extension costs. The total budgeted amount for over and above work is $920,000, which covers 13,000 labor hours and materials. The associated federal contract opportunity involves a firm fixed-price job order for a complete dredge vessel overhaul, with work to be performed at the contractor's facility after a mandatory site visit in Portland, Oregon. Potential contractors must attend a site visit and comply with safety requirements, with site visits scheduled around the vessel's current operational dredging season.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation - W9127N25BA008.pdf | ||
| Essayons Overhaul PWS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CAT A
| Category A Work Item Description | PWS Paragraph | Qty | Unit | Unit Price | Amount |
| Transportation | 5.1.1 | 4 | Each | $ - 0 | |
| Crane Services | 5.1.3 | 75 | Hour | $ - 0 | |
| Connection/Disconnection of Services | 5.1.4 | 1 | Job | $ - 0 | |
| Field Office | 5.1.5 | 1 | Job | $ - 0 | |
| Parking | 5.1.6 | 1 | Job | $ - 0 | |
| Drydocking Lift Day | 5.2.1 | 1 | Job | $ - 0 | |
| Drydock Lay Day | 5.2.2 | 60 | Day | $ - 0 | |
| Wet Berth | 5.2.3 | 15 | Day | $ - 0 | |
| Electricity | 5.2.4 | 1 | Job | $ - 0 | |
| Steam/Chill Water | 5.2.5 | 75 | Day | $ - 0 | |
| Marine Chemist Certifications | 5.3.1 | 1 | Job | $ - 0 | |
| Fire Suppression Services | 5.4.1 | 1 | Job | $ - 0 | |
| Galley Hood and Fire Suppression Replacement | 5.4.2 | 1 | Job | $ - 0 | |
| Procure and Install 1ea 6” Fire Pump Suction Valve | 5.4.3 | 1 | Job | $ - 0 | |
| Bilge Maintenance and Cleaning | 5.5.1 | 1 | Job | $ - 0 | |
| Hull Surface Prep and Coat | 5.6.1 | 1 | Job | $ - 0 | |
| Irathane 155 Urethane Coating Repair | 5.6.4 | 1 | Job | $ - 0 | |
| Hopper Jetting Gate Valve (16”) Replacement | 5.8.4 | 1 | Job | $ - 0 | |
| Replace Chloropac Power Supply | 5.8.8 | 1 | Job | $ - 0 | |
| Drag Arm Sheave Inspection | 5.10.3 | 1 | Job | $ - 0 | |
| Port Swell Compensator Removal and Overhaul | 5.10.8 | 1 | Job | $ - 0 | |
| Discharge Piping Inspection | 5.11.1 | 1 | Job | $ - 0 | |
| Discharge Pipe Epoxy Repairs | 5.11.2 | 1 | Job | $ - 0 | |
| Hopper Jetting System Clean | 5.13.2 | 1 | Job | $ - 0 | |
| Weir Seal Inspection | 5.13.3 | 1 | Job | $ - 0 | |
| Hopper Inspection Staging | 5.14.1 | 1 | Job | $ - 0 | |
| Tower Staging | 5.14.3 | 50 | Each | $ - 0 | |
| Port & Stbd Rudder Stock Upper Bearing and Packing Gland Inspection | 5.15.1 | 1 | Job | $ - 0 | |
| Propeller Blade Inspection | 5.16.1 | 1 | Job | $ - 0 | |
| Propeller Blade and Blade Seal Replacement | 5.16.2 | 1 | Job | $ - 0 | |
| Stern Tube Shaft Seal Replacement | 5.16.5 | 1 | Job | $ - 0 | |
| Temporary Electric Motor Heaters | 5.19.2 | 1 | Job | $ - 0 | |
| Sewage Pipe Repairs | 5.21.6 | 1 | Job | $ - 0 | |
| Drag Arm Winch Motor Overhaul | 5.22.3 | 2 | Each | $ - 0 | |
| ABS Support | 5.24.0 | 1 | Job | $ - 0 | |
| Audio Gauge Reading | 5.24.1 | 1 | Job | $ - 0 | |
| Internal Tank Inspection | 5.24.4 | 1 | Job | $ - 0 | |
| Anchor Chain and Chain Locker Inspection for Vessel General Permit | 5.26.3 | 1 | Job | $ - 0 | |
| Life Raft Annual Service | 5.28.1 | 1 | Job | $ - 0 | |
| Sludge Tanks Annual Maintenance | 5.29.1 | 1 | Job | $ - 0 | |
| Strut and Stern Tube Bearing Inspection | 5.31.1 | 1 | Job | $ - 0 | |
| Rudder Bushing Clearance Documentation | 5.31.2 | 1 | Job | $ - 0 | |
| Dock and Sea Trials | 5.33.1 | 1 | Job | $ - 0 | |
| Well Deck Hatch Staple and Handle Installation | 5.44.1 | 1 | Job | $ - 0 | |
| Upper Hopper Steel Repairs | 5.44.2 | 1 | Job | $ - 0 | |
| Hopper Door Repairs | 5.44.3 | 1 | Job | $ - 0 | |
| Pump Room Wire Flat Deck Plating and Hatch | 5.44.4 | 1 | Job | $ - 0 | |
| #1 U Void Safe Access and Jetting Valve Platforms | 5.44.5 | 1 | Job | $ - 0 | |
| Lifting Eye Inspection and Testing | 5.44.6 | 1 | Job | $ - 0 | |
| Hopper Deck Steel Repairs | 5.44.7 | 1 | Job | $ - 0 | |
| Fan S10, E10, T/A 1, E08 Overhaul and Ducting Replacement | 5.46.1 | 1 | Job | $ - 0 | |
| Switchboard Gauges and Breaker Maintenance | 5.46.2 | 1 | Job | $ - 0 | |
| Deck Shack MSC Approval | 5.46.3 | 1 | Job | $ - 0 | |
| Center Saltwater Pump Overhaul | 5.47.1 | 1 | Job | $ - 0 | |
| Port and STBD CFW Pump Overhaul | 5.47.2 | 1 | Job | $ - 0 | |
| Main Heat Exchanger Clean and Reseal | 5.47.3 | 1 | Job | $ - 0 | |
| Centerline Collection Valve Flushing Water Piping Removal | 5.47.4 | 1 | Job | $ - 0 | |
| Gland Seal and Sluice Valve Flushing Pump Discharge Piping | 5.47.5 | 1 | Job | $ - 0 | |
| Main Salt Water Header Vent Line & Fore Peak Ballast Vent | 5.47.6 | 1 | Job | $ - 0 | |
| Steam Heating Pipe Insulation | 5.47.7 | 1 | Job | $ - 0 | |
| Deck Drain Installation, Repair, and Clearing | 5.47.8 | 1 | Job | $ - 0 | |
| Galley Grease Trap Replacement | 5.47.9 | 1 | Job | $ - 0 | |
| Port and Stbd C280 Major Overhauls | 5.48.1 | 1 | Job | $ - 0 | |
| Port & Stbd 600V Kato Generator Bearing Replacement | 5.48.2 | 2 | Job | $ - 0 | |
| Fuel Oil Purifier Overhaul | 5.48.5 | 1 | Job | $ - 0 | |
| Propulsion Reduction Gear Inspection | 5.48.6 | 1 | Job | $ - 0 | |
| Rescue Boat, Launch, and Lifeboat Davit Inspections | 5.53.1 | 1 | Job | $ - 0 | |
| Essayons Launch Service | 5.53.2 | 1 | Job | $ - 0 | |
| Navigation Equipment Annual Service | 5.54.1 | 1 | Job | $ - 0 | |
| Furnish and Install Public Address System | 5.54.2 | 1 | Job | $ - 0 | |
| Total Category A Work Items | $ - 0 |
CAT B
| Category B Work Item Description | PWS Paragraph | Qty | Unit | Unit Price | Amount |
| Tug Service | 5.1.2 | 1 | Job | $ - 0 | |
| Deep Cleaning of Vessel Hotel Spaces | 5.1.7 | 1 | Job | $ - 0 | |
| Sluice Valve Replacement | 5.8.1 | 1 | Job | $ - 0 | |
| Hopper Jetting Valve (10") Replacement | 5.8.3 | 1 | Each | $ - 0 | |
| Drag Arm Sheave Overhaul, Sheave Guide | 5.10.4 | 1 | Each | $ - 0 | |
| Drag Arm Sheave Overhaul, Single Sheave Water Block | 5.10.5 | 1 | Each | $ - 0 | |
| Drag Arm Sheave Overhaul, Single Sheave | 5.10.6 | 1 | Each | $ - 0 | |
| Drag Arm Sheave Overhaul, Swell Comp Single Sheave | 5.10.7 | 1 | Each | $ - 0 | |
| Weir Seal Replacement | 5.13.4 | 1 | Job | $ - 0 | |
| Rudder Stock Replacement | 5.15.2 | 1 | Job | $ - 0 | |
| Tailshaft Replacement | 5.16.4 | 1 | Job | $ - 0 | |
| Bow Thruster - Lower Gearbox (LGB) / Pod Change Out | 5.17.4 | 1 | Job | $ - 0 | |
| Jetting Pump Repairs | 5.21.5 | 1 | Job | $ - 0 | |
| OSDP Bell Housing Replacement | 5.46.4 | 1 | Job | $ - 0 | |
| Total Category B Work Items | $ - 0 |
Over & Above Work
| Over & Above Work | |||||
| SCHEDULE OF PRICES/RATES: SHIP REPAIR LABOR RATE (FULLY BURDENED) | |||||
| Over & Above Work | |||||
| Item Description | PWS | ||||
| Paragraph | Required Level | ||||
| Of Effort Hours | Materials | Fully Burdened | |||
| Labor Rate | Material Burden Rate | Total Cost | |||
| Ship Repair Labor Rate | 6.1 | 13,000 | $0.00 | ||
| Materials & Subcontractor | 6.1 | $ 920,000.00 | $ 920,000.00 |
| SCHEDULE OF PRICES/RATES FOR THE PURPOSES OF A GOVERNMENT REQUIRED EXTENSION: DAILY RATES FOR PIER SIDE AND DRY-DOCKING (FULLY BURDENED) | ||||||
| Over & Above Work | ||||||
| Item Description | PWS | |||||
| Paragraph | Qty | Unit | Unit Price | Total Cost | ||
| Dry-Docking Extension Cost | 6.1 | 10 | Days | $ - 0 | ||
| Pier Side Extension Costs | 6.1 | 14 | Days | $ - 0 | ||
| Total Over & Above Work Items | $920,000.00 |