Price Breakdown 36C26127Q0026_2 B650 3rd and 2nd Flooring.xlsx

XLSX spreadsheet 12 KB Posted

Attached to
Z2DA--612A4-27-018 | Replace B650 3rd and 2nd Flooring
Solicitation number
36C26127Q0026
Issued by

About this file

This is a Price Breakdown document for VA Northern California Health Care System solicitation 36C26127Q0026, Project #612A4-27-018, which covers the replacement of flooring and related finishes on the 3rd and 2nd floors of Building 650 at Sacramento Veterans Affairs Medical Center in Mather, California. The price breakdown is structured to capture all costs associated with the demolition and replacement project, organized by standard construction divisions including General Requirements (Division 01), Existing Conditions/Demolition (Division 02), and Finishes (Division 09).

The scope of work requires contractors to furnish all labor and materials for demolition, replacement, and installation of flooring, resilient base, stainless steel corner guards, and paint throughout the specified floors. Pricing categories include material, equipment, and labor line items for project management, quality control, superintendence, safety, mobilization, shop drawings, safety requirements, quality control, construction waste management, and sustainable construction. The finishes section itemizes costs for subsurface preparation, gypsum board, resilient base and accessories, resilient sheet flooring, resilient tile flooring, carpeting, and painting. Additional pricing includes bonds, insurance, home office overhead, and profit, with the template designed to produce subtotals and a project grand total. All work must be performed outside normal working hours (7:30 AM to 4:00 PM, Monday-Friday), with no contractor staging areas available within the facility and strict parking restrictions enforced.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment A - Price Breakdown 36C26127Q0026_2 - Project # 612A4-27-018, Replace B650 3rd and 2nd Flooring Attachment A - PRICE BREAKDOWN Description Material Equipment Labor Total

Project Manager/QC
Superintendent/Safety
Mobilization
Division 01 - General Requirements
General Requirements
Shop Drawings, Product Data, and Samples
Safety Requirements
Reference Standards
Quality Control
Construction Waste Management
Sustainable Construction Requirement
Division 02 - Existing Conditions
Demolition
Division 09- Finishes
Subsurface Preparation for Floor Finishes
Schedule for Finishes
Gypsum Board
Resilient Base and Accessories
Resilient Sheet Flooring
Resilient Tile Flooring
Carpeting
Painting
Bonds
Insurance
Home Office Overhead
Profit

SUB-TOTAL

PROJECT GRAND TOTAL