Prevailing_Wage_-_CTDOL_Poster_(3)_(1).pdf
PDF 566 KB Posted
- Attached to
- SLUDGE TANK REHABILITATION AT HRWPCF RE-BID
- Solicitation number
- 26/27-8
- Issued by
- Hartford County, Connecticut
About this file
This is a Prevailing Wage poster issued by the Connecticut Department of Labor (CTDOL) in accordance with CT General Statutes Section 31-55, applicable to the Town of Manchester Water and Sewer Department's sludge tank rehabilitation project at the Hockanum River Water Pollution Control Facility. The poster serves as notice that this is a public works project subject to prevailing wage requirements under CT General Statutes Section 31-53, requiring all contractors and subcontractors performing work for the state to comply with prevailing wage determinations as established by the Labor Commissioner.
The poster mandates that prevailing wages be displayed in a prominent location at the project site and provides contact information for wage-related inquiries through the Connecticut Department of Labor at (860) 263-6790. All contractors and subcontractors bidding on or performing work for this sludge tank rehabilitation and recoating project must adhere to the prevailing wage rates determined by the Labor Commissioner, ensuring that workers on this public works project receive wages consistent with the statutory requirements set forth in Connecticut state law.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
THIS IS A PUBLIC WORKS PROJECT
Covered by the
PREVAILING WAGE LAW
CT General Statutes Section 31-53
If you have QUESTIONS regarding your wages
CALL (860) 263-6790
Section 31-55 of the CT State Statutes requires every contractor or subcontractor performing work for the state to post in a prominent place the prevailing wages as determined by the Labor Commissioner.
File details come from the government source that posted it. Updated .