Prevailing_Wage_-_CTDOL_Poster_(1)_(1).pdf

PDF 566 KB Posted

Attached to
SLUDGE TANK REHABILITATION AT HRWPCF RE-BID
Solicitation number
26/27-8
Issued by
Hartford County, Connecticut

About this file

This is a Prevailing Wage Notice issued by the Connecticut Department of Labor (CTDOL) for a public works project covered under Connecticut General Statutes Section 31-53. The notice pertains to the Sludge Tank Rehabilitation at Hockanum River Water Pollution Control Facility (HRWPCF) re-bid project being solicited by the Town of Manchester Water and Sewer Department. The project involves the rehabilitation and recoating of one sludge tank located at the facility. Contractors and subcontractors performing work on this project must comply with prevailing wage requirements as determined by the Connecticut Labor Commissioner.

Section 31-55 of the Connecticut State Statutes mandates that all contractors and subcontractors performing work for the state post prevailing wage rates in a prominent location at the job site. Inquiries regarding wage determinations and compliance can be directed to the Connecticut Department of Labor at (860) 263-6790. As a public works project, this contract opportunity is subject to prevailing wage law requirements, which establish minimum compensation standards for workers employed on the project.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

THIS IS A PUBLIC WORKS PROJECT

Covered by the

PREVAILING WAGE LAW

CT General Statutes Section 31-53

If you have QUESTIONS regarding your wages

CALL (860) 263-6790

Section 31-55 of the CT State Statutes requires every contractor or subcontractor performing work for the state to post in a prominent place the prevailing wages as determined by the Labor Commissioner.

File details come from the government source that posted it. Updated .