Prevailing Wage 240110 Jackson County 21364 (1).pdf
PDF 632 KB Posted
- Attached to
- 171/21364. DPL; Jackson SOB - Window Replacement
- Solicitation number
- RFQ - 171 - 240000000181
- Issued by
- Jackson County, Michigan
About this file
This document contains the Prevailing Wage Rates for a state-funded construction project in Jackson County, Michigan. The project, titled "Jackson SOB - Window Replacement", is being requested by the MCSA Group and has an official request number of 397 and project number of 171/23164.DPL. The contract must be awarded by 4/9/2024. The project involves the replacement of windows at a state office building in Jackson County. The document provides detailed wage rates and classifications for various trades and labor categories that must be adhered to, including overtime provisions and apprentice rates.
The prevailing wage rates cover a wide range of classifications such as boilermakers, bricklayers, carpenters, cement masons, electricians, iron workers, laborers, operating engineers, plumbers, pipefitters, roofers, and sheet metal workers, among others. The wage rates are specific to the Jackson County region and outline the straight time, time-and-a-half, and double-time pay requirements. The document also includes provisions for make-up days, four-ten-hour work schedules, and other project-specific requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
State of Michigan
Requestor: MCSA Group
Project Description: Jackson SOB - Window Replacement
Jackson County
Official Request #: 397
Project Number: 171/23164.DPL
Straight Hourly
Time and a Half
Double Time
Contract must be awarded by: 4/9/2024 Issue Date: 1/10/2024
Name
Classification Overtime ProvisionDescription
Official Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
Boilermaker
H H H H H H H D$72.47 $107.55 $142.63
BO169
Boilermaker Y
12/13/2021
Apprentice Rates:
1st Period $53.53 $79.15 $104.75
2nd Period $55.14 $81.56 $107.97
3rd Period $56.73 $83.94 $111.15
4th Period $58.31 $86.31 $114.31
5th Period $59.85 $88.62 $117.39
6th Period $63.03 $93.39 $123.75
7th Period $66.17 $98.10 $130.03
8th Period $69.32 $102.83 $136.33
Bricklayer
H H H H H H H D$53.52 $67.86 $82.19
BR2-31-BS
Brick Masonry, Stone Masonry, Artificial Masonry N
11/8/2021
Apprentice Rates:
0-749 hours $42.05 $50.65 $59.25
750-1,499 hours $43.49 $52.81 $62.13
1,500-2,249 hours $44.92 $54.95 $64.99
2,250-2,999 hours $46.35 $57.10 $67.85
3,000-3,749 hours $47.79 $59.26 $70.73
3,750-4,499 $49.22 $61.41 $73.59
4,500-5,249 hours $50.65 $63.55 $76.45
5,250 hours $52.09 $65.71 $79.33
Requestor: MCSA Group
Project Description: Jackson SOB - Window Replacement
JacksonCounty:
397 Official Request #:
Project Number: 171/23164.DPL
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevai ling wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .
Straight Hourly
Time and a Half
Double Time
Contract must be awarded by: 4/9/2024 Issue Date: 1/10/2024
Name
Classification Overtime ProvisionDescription
Official Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
MAKE UP DAY DUE TO INCLEMENT WEATHER
make up day allowedcomment
H H H H H H H D$53.52 $67.86 $82.19
BR2-31-PCC
Pointing, Caulking and Cleaning N
11/8/2021
Apprentice Rates:
0-749 hours $43.49 $52.81 $62.13
750-1,499 hours $44.92 $54.95 $64.99
1,500- 2,249 hours $46.35 $57.10 $67.85
2.250 -2,999 hours $47.79 $59.26 $70.73
3,000-3,749 hours $24.37 $36.56 $48.74
3,750-4,499 hours $50.65 $63.55 $76.45
4,500 hours $53.52 $67.85 $82.19
Carpenter
X X H H H H H D$49.49 $64.19 $78.89
CA1004FL
Resilient floorlayer N
8/4/2023
Apprentice Rates:
1st Year $38.95 $48.46 $57.97
2nd Year $40.31 $50.50 $60.69
3rd Year $43.02 $54.57 $66.11
4th Year $45.74 $58.65 $71.55
Saturday make up day allowedcomment
X X H H H H H D$50.02 $64.59 $79.15
CA1004J
Carpenter 4- 10s allowed Monday-Thursday. Friday make up day for inclement weather. Hours worked on Friday except for inclement weather make up shall be paid at time and one half.
Y
8/4/2023
Apprentice Rates:
1st Year $41.28 $51.48 $61.67
2nd Year $42.74 $53.67 $64.59
3rd Year $45.65 $58.03 $70.41
4th Year $48.56 $62.40 $76.23
Requestor: MCSA Group
Project Description: Jackson SOB - Window Replacement
JacksonCounty:
397 Official Request #:
Project Number: 171/23164.DPL
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevai ling wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 4/9/2024 Issue Date: 1/10/2024
Name
Classification Overtime ProvisionDescription
Official Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
Saturday make up day allowedcomment
Cement Mason
X H H H H H H D$47.16 $60.76 $74.36
BR2-31-CM
Cement Mason N
11/8/2021
Apprentice Rates:
0-749 hours $37.64 $46.48 $55.32
750-1,499 hours $39.00 $48.52 $58.04
1,500-2,249 hours $40.36 $50.56 $60.76
2,250-2,999 hours $41.72 $52.60 $63.48
3,000-3,749 hours $43.08 $54.64 $66.20
3,750-4,499 hours $44.44 $56.68 $68.92
4,500 hours $47.16 $60.76 $74.36
H H H H H H H D$47.09 $61.77 $76.45
CE514-L
Cement Mason Y
11/29/2021
Apprentice Rates:
1st Year $36.81 $46.35 $55.89
2nd Year $39.75 $50.76 $61.77
3rd Year $42.69 $55.17 $67.65
Communication Technician
H H H H H H H D$67.89 $98.24 $128.58
IBEW 876 & IBEW 17 -
Roadway
Y
12/14/2023
Project Description: Jackson SOB - Window Replacement
StatewideCounty:
397 Official Request #:
Project Number: 171/23164.DPL
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevai ling wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 4/9/2024 Issue Date: 1/10/2024
Name
Classification Overtime ProvisionDescription
Official Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
Drywall
H H H H H H H D$51.86 $67.66 $83.46
CE514-DF
Drywall Finishers Y
12/9/2021
Apprentice Rates:
1st period $39.22 $48.70 $58.18
2nd period $40.80 $51.07 $61.34
3rd period $43.96 $55.81 $67.66
4th period $48.70 $62.92 $77.14
H H D H D D D D$45.91 $59.74 $73.56
PT-22-D
Drywall Taper Four 10s allowed Monday-Thursday Y
8/25/2016
Apprentice Rates:
First 3 months $32.08 $38.99 $45.90
Second 3 months $34.85 $43.14 $51.44
Second 6 months $37.62 $47.30 $56.98
Third 6 months $40.38 $51.44 $62.50
4th 6 months $41.76 $53.51 $65.26
Friday make-up day for bad weather or holidays make up day allowedcomment
Electrician
H H D H D D D D$77.98 $100.47 $122.96
EC-252-IW
Inside wireman N
8/9/2023
Apprentice Rates:
1st Period $44.21 $51.51 $59.94
2nd Period $50.44 $62.70 $74.95
3rd Period $55.95 $69.44 $82.94
4th Period $61.46 $77.21 $92.95
5th Period $66.96 $84.95 $102.94
6th Period $72.47 $92.71 $112.95
Project Description: Jackson SOB - Window Replacement
JacksonCounty:
397 Official Request #:
Project Number: 171/23164.DPL
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevai ling wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 4/9/2024 Issue Date: 1/10/2024
Name
Classification Overtime ProvisionDescription
Official Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
H H D H D D D D$51.10 $66.96 $83.79
EC-252-SC
Sound and Communications Installer Technician BICSI certified & 6,000 OJT Straight time Rate $54.32 Time and Half $73.16 Double Time $91.99
N
1/7/2022
Apprentice Rates:
Period 1 $33.56 $40.49 $48.72
Period 2 $35.31 $43.02 $52.07
Period 3 $37.07 $45.56 $55.43
Period 4 $38.82 $48.11 $58.80
Period 5 $40.57 $50.63 $62.14
Period 6 $44.09 $55.70 $68.85
Period 7 $47.59 $60.76 $75.56
Period 8 $49.34 $63.29 $78.92
Technician BICSI certification &
6,000 OJT
$54.32 $73.16 $91.99
Elevator Constructor
D D D D D D D D$96.72 $152.57
EL-85
Elevator Constructor Mechanic Y
11/30/2021
Apprentice Rates:
1st year $68.96 $99.68
2nd year $74.88 $111.18
3rd year $77.85 $116.95
4th year $84.65 $129.33
4 tens allowed M-TH comment
Fiber Optic Splicer
H H H H H H H D$67.89 $98.24 $128.58
IBEW 876 & IBEW 17 -
Roadway
Project Description: Jackson SOB - Window Replacement
StatewideCounty:
397 Official Request #:
Project Number: 171/23164.DPL
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevai ling wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 4/9/2024 Issue Date: 1/10/2024
Name
Classification Overtime ProvisionDescription
Official Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
Foreman
H H H H H H H D$75.47 $109.61 $143.74
IBEW 876 & IBEW 17 -
Roadway
Glazier
H H H H H H H D$49.84 $67.73 $85.62
GL-826
Glazier 4 tens allowed on consecutive days Y
12/9/2021
Apprentice Rates:
1st level $31.62 $40.40 $49.18
2nd level $35.12 $45.66 $56.18
3rd Level $40.38 $53.54 $66.70
4th level $45.66 $61.46 $77.26
Heat and Frost Insulator
X X X H H H H H$25.29 $36.51
AS25S
Spray Insulation N
6/2/2016
Heat and Frost Insulator and Asbestos Worker
X X X H H H H D$52.00 $68.89 $85.77
AS47
Heat and Frost Insulators and Asbestos Workers Y
12/20/2021
Apprentice Rates:
1st year $26.38 $33.69 $40.99
2nd year $30.15 $38.92 $47.68
3rd year $33.92 $44.15 $54.37
4th year $37.70 $49.39 $61.08
5th year $41.48 $54.63 $67.78
Friday for cancelled work in a 4 10 schedule make up day allowedcomment
Requestor: MCSA Group
Project Description: Jackson SOB - Window Replacement
JacksonCounty:
397 Official Request #:
Project Number: 171/23164.DPL
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevai ling wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 4/9/2024 Issue Date: 1/10/2024
Name
Classification Overtime ProvisionDescription
Official Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
IBEW 252
H H H D
EC-252-sc
Installor Technician N
Apprentice Rates:
Period 1 $33.56 $40.49 $48.72
Period 2 $35.31 $43.02 $52.07
Period 3 $37.07 $45.56 $55.43
Period 4 $38.82 $48.11 $58.80
Period 5 $40.57 $50.63 $62.14
Period 6 $44.09 $55.70 $68.85
Period 7 $47.59 $60.76 $75.56
Period 8 $49.34 $63.29 $78.92
Technician BICSI certification &
6,000 OJT
$54.32 $73.16 $91.99
Ironworker
H H D H H D D D$69.51 $85.85 $102.19
IR-25-RF
Reinforced Iron Work N
8/15/2023
Apprentice Rates:
Level 8 $66.76 $82.48 $98.19
Level 7 $66.76 $82.48 $98.19
Level 1 $52.63 $64.23 $75.83
Level 2 $54.68 $66.77 $78.86
Level 3 $56.56 $68.98 $81.40
Level 4 $59.41 $72.65 $85.88
Level 5 $62.27 $76.32 $90.37
Level 6 $66.76 $82.48 $98.19 make up day allowed
Requestor: MCSA Group
Project Description: Jackson SOB - Window Replacement
JacksonCounty:
397 Official Request #:
Project Number: 171/23164.DPL
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevai ling wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 4/9/2024 Issue Date: 1/10/2024
Name
Classification Overtime ProvisionDescription
Official Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
H H D H H H D D$76.08 $92.93 $109.78
IR-25-RIG
Rigging Work N
8/15/2023
Apprentice Rates:
Level 8 $69.43 $84.94 $100.45
Level 1 $51.75 $62.38 $73.01
Level 2 $52.56 $63.54 $74.52
Level 3 $54.83 $66.33 $77.83
Level 4 $57.51 $69.71 $81.91
Level 5 $60.60 $73.67 $86.74
Level 6 $63.27 $77.04 $90.80
Level 7 $66.35 $80.99 $95.62
H H D H H H D D$76.21 $102.75 $129.29
IR-25-STR
Structural, ornamental, welder and pre-cast If bad weather, Friday may be a make up day. If holiday celebrated on a Monday, 4 10s may be worked Tuesday thru Friday.
Y
8/15/2023
Apprentice Rates:
Level 8 $69.43 $84.94 $100.45
Level 1 $51.25 $61.88 $72.51
Level 2 $52.56 $63.54 $74.52
Level 3 $54.83 $66.33 $77.83
Level 4 $57.51 $70.34 $83.17
Level 5 $60.60 $73.67 $86.74
Level 6 $63.27 $77.04 $90.80
Level 7 $66.35 $80.98 $95.62 make up day allowed
Journeyman Signal Technician
H H H H H H H D$67.89 $98.24 $128.58
IBEW 876 & IBEW 17 -
Roadway
Project Description: Jackson SOB - Window Replacement
StatewideCounty:
397 Official Request #:
Project Number: 171/23164.DPL
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevai ling wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 4/9/2024 Issue Date: 1/10/2024
Name
Classification Overtime ProvisionDescription
Official Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
Journeyman Specialist
H H H H H H H D$76.98 $111.87 $146.76
IBEW 876 & IBEW 17 -
Roadway
Labor Crew Foreman
H H H H H H H D$61.86 $89.19 $116.52
IBEW 876 & IBEW 17 -
Roadway
Laborer
X X H H H H H D$38.05 $50.48 $62.90
L499D
Laborer -- building and heavy construction craft laborer, portable concrete mixer operator, air, electric or gasoline tool operator, hot dope carrier, tar kettle tender, gasoline vibrators, concrete gas buggies, concrete saw, signal person and top person
Y
8/9/2023
Apprentice Rates:
0-1,000 Hours $31.84 $41.16 $50.48
1,001-2,000 Hours $33.08 $43.02 $52.96
2,001-3,000 Hours $34.32 $44.88 $55.44
3,001-4,000 Hours $36.81 $48.62 $60.42
Saturday make up day allowedcomment
X X H X X H H D$38.18 $50.67 $63.16
L499J
Ground burner N
12/14/2021
Saturday make up day allowedcomment
Requestor: MCSA Group
Project Description: Jackson SOB - Window Replacement
JacksonCounty:
397 Official Request #:
Project Number: 171/23164.DPL
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevai ling wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 4/9/2024 Issue Date: 1/10/2024
Name
Classification Overtime ProvisionDescription
Official Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
H H H H H H H D$45.39 $58.38 $71.36
MITA-RZ2-C1
Laborer Road Class 1: asphalt shoveler or loader, yard man, fence erector tender, dumper, joint filling, form setting, form stripper, pavement reinforcing, waterproofing, seal coating, bridge painting, sandblasting, pressure grouting, RC equipment
Y
8/9/2023
Apprentice Rates:
3,001-4,000 hours
2,001-3,000 hours
1,001-2,000 hours
0-1,000 hours
3,001-4,000 hours $44.09 $56.42 $68.76
2,001-3,000 hours $41.49 $52.52 $63.56
1,001-2,000 hours $40.20 $50.59 $60.98
0-1,000 hours $38.90 $48.64 $58.38
H H H H H H H D$45.59 $58.18 $71.26
MITA-RZ2-C2
Laborer Road Class 2: mixer operator, air or electric tool operator, spreader, boxman, concreter paddler, power chain saw operator, paving patch truck dumper, tunnel mucker, concrete saw operator, dry pack macine and roto-mill grounds person
Y
8/9/2023
Apprentice Rates:
3,001-4,000 hours $44.28 $56.21 $68.64
2,001-3,000 hours $41.66 $52.28 $63.40
1,001-2,000 hours $40.36 $50.33 $60.80
0-1,000 hours $39.05 $48.36 $58.18
H H H H H H H D$45.43 $58.64 $71.84
MITA-RZ2-C3
Laborer Road Class 3: tunnel miner, finish tenders, guard rail builder, median barrier installer, earth retention barrier and wall installer, fence erector, bottom man, powder man, wagon drill and air track operator, curb and side rail setter
Y
1/5/2022
Apprentice Rates:
3,001-4,000 hours $44.11 $56.66 $69.20
2,001-3,000 hours $41.47 $52.70 $63.92
1,001-2,000 hours $40.15 $50.72 $61.28
0-1,000 hours $38.83 $48.74 $58.64
Requestor: MCSA Group
Project Description: Jackson SOB - Window Replacement
JacksonCounty:
397 Official Request #:
Project Number: 171/23164.DPL
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevai ling wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 4/9/2024 Issue Date: 1/10/2024
Name
Classification Overtime ProvisionDescription
Official Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
H H H H H H H D$46.18 $59.56 $72.94
MITA-RZ2-C4
Laborer Road Class 4: asphalt raker Y
8/9/2023
Apprentice Rates:
3,001-4,000 hours $44.84 $57.55 $70.26
2,001-3,000 hours $42.17 $53.54 $64.92
1,001-2,000 hours $40.83 $51.54 $62.24
0-1,000 hours $39.49 $49.52 $59.56
H H H H H H H D$46.05 $59.37 $72.68
MITA-RZ2-C5
Laborer Road Class 5: pipe layers, oxy-gun Y
8/9/2023
Apprentice Rates:
3,001-4,000 hours $44.72 $57.37 $70.02
2,001-3,000 hours $42.06 $53.38 $64.70
1,001-2,000 hours $40.72 $51.37 $62.02
0-1,000 hours $39.39 $49.38 $59.36
H H H H H H H D$46.39 $59.88 $73.36
MITA-RZ2-C6
Laborer Road Class 6: line form setter for curb or pavement, asphalt screed checker/screw man on asphalt paving machines
Y
8/9/2023
Apprentice Rates:
3,001-4,000 hours $45.04 $57.85 $70.66
2,001-3,000 hours $42.34 $53.80 $65.26
1,001-2,000 hours $41.00 $51.79 $62.58
0-1,000 hours $39.65 $49.76 $59.88
Project Description: Jackson SOB - Window Replacement
JacksonCounty:
397 Official Request #:
Project Number: 171/23164.DPL
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevai ling wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 4/9/2024 Issue Date: 1/10/2024
Name
Classification Overtime ProvisionDescription
Official Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
H H H H H H H D$48.96 $63.73 $78.50
MITA-RZ2-C7
Laborer Road Class 7: concrete specialist - including finishing and trowling, cast in place or precast by any method
Y
1/5/2022
Apprentice Rates:
3,001-4,000 hours $47.48 $61.51 $75.54
2,001-3,000 hours $44.53 $57.08 $69.64
1,001-2,000 hours $43.05 $54.86 $66.68
0-1,000 hours $41.58 $52.66 $63.74
H H H X X X X D$50.60 $65.37 $80.13
MLDC
Asbestos & Lead Abatement Laborer 4 ten hour days @ straight time allowed Monday-Saturday, must be consecutive calendar days
Y
12/12/2023
Apprentice Rates:
Trainee 600 hours +1 year $34.07
Laborer - Hazardous
H H H H H H H D$38.05 $50.48 $62.90
LHAZ-Z4-A
Class A - performing work in conjunction with site preparation and other preliminary work prior to actual removal, handling, or containment of hazardous waste substances not requiring use of personal protective equipment required by state or federal regu
Y
12/14/2021
Apprentice Rates:
0-1,000 work hours $31.84 $41.16 $50.48
1,001-2,000 work hours $33.08 $43.02 $52.96
2,001-3,000 work hours $34.32 $44.88 $55.44
3,001-4,000 work hours $36.81 $48.62 $60.42
4 10s allowed M-Th or T-F; inclement weather makeup day Friday make up day allowedcomment
Requestor: MCSA Group
Project Description: Jackson SOB - Window Replacement
JacksonCounty:
397 Official Request #:
Project Number: 171/23164.DPL
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevai ling wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 4/9/2024 Issue Date: 1/10/2024
Name
Classification Overtime ProvisionDescription
Official Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
H H H H H H H D$39.05 $51.98 $64.90
LHAZ-Z4-B
Class B - performing work in conjunction with the removal, handling, or containment of hazardous waste substances when the use of personal protective equipment levels "A", "B" or "C" is required.
Y
8/9/2023
Apprentice Rates:
0-1,000 work hours $32.59 $42.28 $51.98
1,001-2,000 work hours $33.88 $44.22 $54.56
2,001-3,000 work hours $35.17 $46.16 $57.14
3,001-4,000 work hours $37.76 $50.04 $62.32
4 10s allowed M-Th or T-F; inclement weather makeup day Friday make up day allowedcomment
Laborer - Landscape
X X H X X X H D$32.40 $42.43 $52.95
LLAN-Z1-A
Class B1: Landscape Operator includes air, gas, and diesel equipment operator, lawn sprinkler installer,skidsteer, mini excavators, backhoe loaders, ride and walk behind trenchers, off road dump vehicle, articulated haulers, hydroseeder, wheel loaders
8/9/2023
X X H X X X H D$30.40 $39.93 $49.45
LLAN-Z1-B
Class B2: Skilled Landscape Laborer: small power tool operator, lawn sprinkler installers' tender, irrigation installers' tender, material mover
X X H X X X H D$32.40 $42.96 $53.48
LLAN-Z2-A
Class B1: Landscape Operatior includes air, gas, and diesel equipment operator, lawn sprinkler installer,skidsteer, mini excavators, ride and walk behind trenchers, backhoe loaders, off road dump vehicle, articulated haulers, hydroseeder, wheel loaders
X X H X X X H D$30.40 $39.93 $49.45
LLAN-Z2-B
Class B2: Skilled Landscape Laborer: small power tool operator, lawn sprinkler installers' tender, irrigation installers' tender material mover
H H H H H H H D$24.66 $33.27 $41.87
LLAN-Z2-C
Class C: landscape laborer with 90 or more calendar days worked N
1/7/2022
Project Description: Jackson SOB - Window Replacement
JacksonCounty:
397 Official Request #:
Project Number: 171/23164.DPL
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevai ling wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 4/9/2024 Issue Date: 1/10/2024
Name
Classification Overtime ProvisionDescription
Official Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
H H H H H H H D$15.54 $23.31 $31.08
LLAN-Z2-D
Class D: Inexperienced landscape laborer - individual who has worked less than 90 calendar days
N
1/7/2022
Laborer Underground - Tunnel, Shaft & Caisson
X X X X X X X D$38.97 $50.26 $61.54
LAUCT-Z2-1
Class I - Tunnel, shaft and caisson laborer, dump man, shanty man, hog house tender, testing man (on gas), and watchman.
Y
8/8/2023
Apprentice Rates:
0-1,000 work hours $32.85 $42.64 $52.43
1,001-2,000 work hours $33.97 $44.32 $54.67
2,001-3,000 work hours $35.08 $45.99 $56.89
3,001-4,000 work hours $37.31 $49.33 $61.35
X X X X X X X D$39.06 $50.39 $61.72
LAUCT-Z2-2
Class II - Manhole, headwall, catch basin builder, bricklayer tender, mortar man, material mixer, fence erector, and guard rail builder
Y
8/8/2023
Apprentice Rates:
0-1,000 work hours $32.92 $42.75 $52.57
1,001-2,000 work hours $34.04 $44.43 $54.81
2,001-3,000 work hours $35.16 $46.11 $57.05
3,001-4,000 work hours $37.39 $49.45 $61.51
X X X X X X X D$39.16 $50.54 $61.92
LAUCT-Z2-3
Class III - Air tool operator (jack hammer man, bush hammer man and grinding man), first bottom man, second bottom man, cage tender, car pusher, carrier man, concrete man, concrete form man, concrete repair man, cement invert laborer, cement finisher, con
Y
8/8/2023
Apprentice Rates:
0-1,000 work hours $32.99 $42.85 $52.71
1,001-2,000 work hours $34.12 $44.55 $54.97
2,001-3,000 work hours $35.24 $46.23 $57.21
3,001-4,000 work hours $37.49 $49.60 $61.71
Project Description: Jackson SOB - Window Replacement
JacksonCounty:
397 Official Request #:
Project Number: 171/23164.DPL
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevai ling wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 4/9/2024 Issue Date: 1/10/2024
Name
Classification Overtime ProvisionDescription
Official Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
X X X X X X X D$39.58 $51.17 $62.76
LAUCT-Z2-4
Class IV - Tunnel, shaft and caisson mucker, bracer man, liner plate man, long haul dinky driver and well point man.
Y
8/8/2023
Apprentice Rates:
0-1,000 work hours $33.11 $43.03 $52.95
1,001-2,000 work hours $34.25 $44.74 $55.23
2,001-3,000 work hours $35.38 $46.43 $57.49
3,001-4,000 work hours $37.64 $49.83 $62.01
X X X X X X X D$39.58 $51.17 $62.76
LAUCT-Z2-5
Class V - Tunnel, shaft and caisson miner, drill runner, keyboard operator, power knife operator, reinforced steel or mesh man (e.g. wire mesh, steel mats, dowel bars)
Y
8/8/2023
Apprentice Rates:
0-1,000 work hours $33.31 $43.33 $53.35
1,001-2,000 work hours $34.45 $45.04 $55.63
2,001-3,000 work hours $35.60 $46.77 $57.93
3,001-4,000 work hours $37.89 $50.20 $62.51
X X X X X X X D$39.34 $52.38 $65.41
LAUCT-Z2-6
Class VI - Dynamite man and powder man. Y
1/4/2022
Apprentice Rates:
0-1,000 work hours $33.54 $43.67 $53.81
1,001-2,000 work hours $34.70 $45.41 $56.13
2,001-3,000 work hours $35.86 $47.15 $58.45
3,001-4,000 work hours $38.18 $50.63 $63.09
Project Description: Jackson SOB - Window Replacement
JacksonCounty:
397 Official Request #:
Project Number: 171/23164.DPL
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevai ling wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 4/9/2024 Issue Date: 1/10/2024
Name
Classification Overtime ProvisionDescription
Official Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
X X X X X X X D$32.16 $40.04 $47.92
LAUCT-Z2-7
Class VII - Restoration laborer, seeding, sodding, planting, cutting, mulching and topsoil grading and the restoration of property such as replacing mail boxes, wood chips, planter boxes and flagstones.
Y
8/8/2023
Apprentice Rates:
0-1,000 work hours $27.75 $34.99 $42.23
1,001-2,000 work hours $28.52 $36.15 $43.77
2,001-3,000 work hours $29.29 $37.30 $45.31
3,001-4,000 work hours $30.84 $39.63 $48.41
Laborer -Underground Open Cut, Class I
X X X X X X X D$36.91 $47.01 $57.10
LAUC-Z3-1
Construction Laborer Y
8/8/2023
Apprentice Rates:
0-1,000 work hours $31.39 $40.40 $49.41
1,001-2,000 work hours $32.38 $41.88 $51.39
2,001-3,000 work hours $33.38 $43.38 $53.39
3,001-4,000 work hours $35.37 $46.37 $57.37
Laborer -Underground Open Cut, Class II
X X X X X X X D$37.05 $47.22 $57.38
LAUC-Z3-2
Mortar and material mixer, concrete form man, signal man, well point man, manhole, headwall and catch basin builder, guard rail builders, headwall, seawall, breakwall, dock builder and fence erector.
Y
8/8/2023
Apprentice Rates:
0-1,000 work hours $31.49 $40.55 $49.61
1,001-2,000 work hours $32.49 $42.05 $51.61
2,001-3,000 work hours $33.50 $43.56 $53.63
3,001-4,000 work hours $35.50 $46.56 $57.63
Project Description: Jackson SOB - Window Replacement
JacksonCounty:
397 Official Request #:
Project Number: 171/23164.DPL
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevai ling wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 4/9/2024 Issue Date: 1/10/2024
Name
Classification Overtime ProvisionDescription
Official Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
Laborer -Underground Open Cut, Class III
X X X X X X X D$37.17 $47.40 $57.62
LAUC-Z3-3
Air, gasoline and electric tool operator, vibrator operator, drillers, pump man, tar kettle operator, bracers, rodder, reinforced steel or mesh man (e.g. wire mesh, steel mats, dowel bars, etc.), cement finisher, welder, pipe jacking and boring man, wagon
Y
8/8/2023
Apprentice Rates:
0-1,000 work hours $31.58 $40.68 $49.79
1,001-2,000 work hous $32.59 $42.20 $51.81
2,001-3,000 work hours $33.60 $43.72 $53.83
3,001-4,000 work hours $35.61 $46.73 $57.85
Laborer -Underground Open Cut, Class IV
X X X X X X X D$37.22 $47.47 $57.72
LAUC-Z3-4
Trench or excavating grade man. Y
8/8/2023
Apprentice Rates:
0-1,000 work hours $31.62 $40.74 $49.87
1,001-2,000 work hours $32.63 $42.26 $51.89
2,001-3,000 work hours $33.64 $43.78 $53.91
3,001-4,000 work hours $35.66 $46.80 $57.95
Laborer -Underground Open Cut, Class V
X X X X X X X D$37.36 $47.68 $58.00
LAUC-Z3-5
Pipe Layer (including crock, metal pipe, multiplate or other conduits) Y
8/8/2023
Apprentice Rates:
0-1,000 work hours $31.73 $40.91 $50.09
1,001-2,000 work hours $32.74 $42.42 $52.11
2,001-3,000 work hours $33.76 $43.96 $54.15
3,001-4,000 work hours $35.79 $47.00 $58.21
Project Description: Jackson SOB - Window Replacement
JacksonCounty:
397 Official Request #:
Project Number: 171/23164.DPL
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevai ling wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 4/9/2024 Issue Date: 1/10/2024
Name
Classification Overtime ProvisionDescription
Official Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
Laborer -Underground Open Cut, Class VI
X X X X X X X D$34.66 $43.63 $52.60
LAUC-Z3-6
Grouting man, top man assistant, audio visual television operations and all other operations in connection with closed circuit television inspection, pipe cleaning and pipe relining work and the installation & repair of water service pipe & appurtenances
Y
8/8/2023
Apprentice Rates:
0-1,000 work hours $29.70 $37.86 $46.03
1,001-2,000 work hours $30.58 $39.18 $47.79
2,001-3,000 work hours $31.46 $40.50 $49.55
3,001-4,000 work hours $33.23 $43.16 $53.09
Laborer -Underground Open Cut, Class VII
X X X X X X X D$31.81 $39.36 $46.90
LAUC-Z3-7
Restoration laborer, seeding, sodding, planting, cutting, mulching and topsoil grading and the restoration of property such as replacing mail boxes, wood chips, planter boxes, flagstones etc.
Y
8/8/2023
Apprentice Rates:
0-1,000 work hours $27.56 $34.66 $41.75
1,001-2,000 work hours $28.30 $35.76 $43.23
2,001-3,000 work hours $29.04 $36.88 $44.71
3,001-4,000 work hours $30.52 $39.10 $47.67
Landscape Laborer x H
X H X X x H D$34.62 $46.26 $57.89
LLAN-Z1
Class A: Irrigation Foremen and Construction Foremen. Y
Subdivision of county Zones 1 & 2
Lanscape Laborer
X X H X X X X D$34.62 $46.26 $57.89
LLAN-Z1
Class A: Irrigation Foremen and Construction Foremen. Y
8/9/2023
Requestor: MCSA Group
Project Description: Jackson SOB - Window Replacement
StatewideCounty:
397 Official Request #:
Project Number: 171/23164.DPL
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevai ling wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 4/9/2024 Issue Date: 1/10/2024
Name
Classification Overtime ProvisionDescription
Official Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
Subdivision of county Zones 1 & 2
Operating Engineer x H x X X X X X D$82.82 $107.82 $132.82
EN-324-Statewide
Class I - diver/wet tender, engineer, blaster, leverman N
8/18/2023
X X X X X X X D$76.82 $98.82 $120.82
EN-324-Statewide-III
Class III - Deck equip. operator, maintenance of crane or excavator, tug/launch operator, loader/dozer on barge/deck machinery, truck-able tug, lead surveyor, ROV operator, AB deckhand, welder
H x
X X X X X X D$72.32 $92.07 $111.82
EN-324-Statewide-IV
Class IV - Deck equipment operator, machineryman/fireman, off road trucks, deck hand, tug engineer, assistant tug operator, blaster helper, deck hand, jet machine, subsea plow, trencher, tug engineer
H H D H H H D D$58.82 $73.32 $87.81
EN-324-SW
Oiler / pumps over 6" (applies to operators who have previously worked until this classification PRIOR to 06/01/2018)
X X X X D D D D$56.05 $69.32 $82.58
EN-AC
Compressor or Welding MachineFour 10 hour days may be scheduled Monday-Thursday or Tuesday-Friday. Work not performed due to weather, Monday-Thursday may be scheduled on Friday.
Y
8/18/2023
Friday make up day allowedcomment
X X X X D D D D$57.50 $71.40 $85.29
EN-F
Forklift or Straight Mast
Four 10 hour days may be scheduled M-Th or T-F. Work not performed due to weather on M-Th may be scheduled on Friday
Y
8/18/2023
Friday make up day allowedcomment
Requestor: MCSA Group
Project Description: Jackson SOB - Window Replacement
JacksonCounty:
397 Official Request #:
Project Number: 171/23164.DPL
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevai ling wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 4/9/2024 Issue Date: 1/10/2024
Name
Classification Overtime ProvisionDescription
Official Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
X X X X D D D D$55.02 $67.84 $80.65
EN-FO
Fireman or Oiler
Four 10 hour days may be scheduled Monday-Thursday or Tuesday- Friday. Work not performed due to weather, Monday-Thursday may be scheduled on Friday.
Y
8/18/2023
Friday make up day allowedcomment
X X H H D D D D$59.73 $77.09 $94.45 en-l
Lull or Extend-a-Boom ForkliftFour 10 hour days may be scheduled M- Th or T-F. Work not performed due to weather on M-Th may be scheduled on Friday
Y
12/10/2021
Friday make up day allowedcomment
X X H H D D D D$63.27 $82.40 $101.53 en-os120
Crane with main boom & jib 120' or longerFour 10 hour days may be scheduled Monday-Thursday or Tuesday-Friday. Worked not performed due to weather, Monday-Thursday may be scheuled Friday
Y
12/10/2021
Friday make up day allowedcomment
X X H H D D D D$64.38 $84.07 $103.75
EN-OSA
Crane w/ main Boom & Jib 220' or longerFour 10 hour days may be scheduled Monday-Thursday or Tuesday-Friday. Work not performed due to weather, Monday-Thursday may be scheduled on Friday.
Y
12/10/2021
Friday make up day allowedcomment
X X H H D D D D$65.89 $86.33 $106.77
EN-OSA3
Crane w/ main Boom & Jib 300' or longerFour 10 hour days may be scheduled Monday-Thursday or Tuesday-Friday. Work unabled to be performed due to weather, Monday-Thursday may be scheduled on Friday.
Y
12/10/2021
Friday make up day allowedcomment
X X X X X X X D$78.46 $101.49 $124.52
EN-OSA4
Crane w/ main Boom & Jib 400' or longerFour 10 hour days may be scheduled Monday-Thursday or Tuesday-Friday. Work not performed due to weather, Monday-Thursday may be scheduled on Friday.
Y
8/18/2023
Friday make up day allowedcomment
Requestor: MCSA Group
Project Description: Jackson SOB - Window Replacement
JacksonCounty:
397 Official Request #:
Project Number: 171/23164.DPL
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevai ling wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 4/9/2024 Issue Date: 1/10/2024
Name
Classification Overtime ProvisionDescription
Official Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
X X H H D D D D$64.09 $83.63 $103.17
EN-OSB
Crane with main boom and jib 140' or longerFour 10 hour days may be scheduled Monday-Thursday or Tuesday-Friday. Work unabled to be performed due to weather, Monday-Thursday may be scheduled on Friday.
Y
12/10/2021
Friday make up day allowedcomment
X X X X D D D D$66.04 $83.65 $101.26
EN-RC
Regular Crane Operator, Job Mechanic, Concrete Pump with BoomFour 10 hour days may be scheduled Monday-Thursday or
Tuesday-Friday. Work not performed due to weather, Monday-Thursday may be scheduled on Friday.
Y
8/18/2023
Apprentice Rates:
0-999 hours $51.13 $64.18 $77.22
1,000-1,999 hours $52.99 $66.96 $80.94
2,000-2,999 hours $54.86 $69.77 $84.68
3,000-3,999 hours $56.72 $72.56 $88.40
4,000-4,999 hours $58.59 $75.36 $92.14
5,000-5,999 hours $60.44 $78.15 $95.84
Friday make up day allowedcomment
X X X X D D D D$65.07 $82.26 $99.44 en-re
Regular Engineer, Hydro Excavator & Remote Controlled Concrete BreakerFour 10 hour days may be scheduled Monday-Thursday or
Tuesday-Friday. Work not performed due to weather, Monday-Thursday may be scheduled on Friday.
Y
8/18/2023
Apprentice Rates:
5,000-5,999 hours $63.09 $81.87 $100.64
4,000-4,999 hours $61.11 $78.90 $96.68
3,000-3,999 hours $59.13 $75.93 $92.72
2,000-2,999 hours $57.16 $72.97 $88.78
1,000-1,999 hours $55.19 $70.02 $84.84
1-999 hours $53.21 $67.02 $80.85
Friday make up day allowedcomment
Requestor: MCSA Group
Project Description: Jackson SOB - Window Replacement
JacksonCounty:
397 Official Request #:
Project Number: 171/23164.DPL
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevai ling wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 4/9/2024 Issue Date: 1/10/2024
Name
Classification Overtime ProvisionDescription
Official Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
X X X X X X X D$57.19 $71.14 $85.09
OE-324-Statewide
Journeyman - Class II Y
8/17/2023
Apprentice Rates:
31-36 months $62.01 $80.44 $98.88
25-30 months $60.08 $77.54 $95.01
19-24 months $58.13 $74.62 $91.13
13-18 months $56.19 $71.72 $87.24
7-12 months $54.25 $68.81 $83.36
0-6 months $48.21 $59.76 $71.29
Apprentice Rates:
31-36 months $62.01 $80.44 $98.88
25-30 months $60.08 $77.54 $95.01
19-24 months $58.13 $74.62 $91.13
13-18 months $56.19 $71.72 $87.24
7-12 months $54.25 $68.81 $83.36
0-6 months $48.21 $59.76 $71.29
Apprentice Rates:
31-36 months $62.01 $80.44 $98.88
25-30 months $60.08 $77.54 $95.01
19-24 months $58.13 $74.62 $91.13
13-18 months $56.19 $71.72 $87.24
7-12 months $54.25 $68.81 $83.36
0-6 months $48.21 $59.76 $71.29
Apprentice Rates:
31-36 months $62.01 $80.44 $98.88
25-30 months $60.08 $77.54 $95.01
19-24 months $58.13 $74.62 $91.13
13-18 months $56.19 $71.72 $87.24
7-12 months $54.25 $68.81 $83.36
0-6 months $48.21 $59.76 $71.29
Requestor: MCSA Group
Project Description: Jackson SOB - Window Replacement
StatewideCounty:
397 Official Request #:
Project Number: 171/23164.DPL
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevai ling wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 4/9/2024 Issue Date: 1/10/2024
Name
Classification Overtime ProvisionDescription
Official Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
Apprentice Rates:
31-36 months $62.01 $80.44 $98.88
25-30 months $60.08 $77.54 $95.01
19-24 months $58.13 $74.62 $91.13
13-18 months $56.19 $71.72 $87.24
7-12 months $54.25 $68.81 $83.36
0-6 months $48.21 $59.76 $71.29
Operating Engineer - Marine Construction
H H H H H H H D$52.81 $78.57 $104.32
GLF D
Diver/Wet Tender/Tender/Rov Pilot/Rov Tender N
12/16/2021
X X H H H H H D$78.97 $102.47 $125.97
GLF-1
Diver/Wet Tender, Engineer (hydraulic dredge) Y
1/7/2022
Subdivision of county all Great Lakes, islands therein, & connecting & tributary waters make up day allowed
X X H H H H H D$77.47 $100.22 $122.97
GLF-2
Crane/Backhoe Operator, 70 ton or over Tug Operator, Mechanic/Welder, Assistant Engineer (hydraulic dredge), Leverman (hydraulic dredge), Diver Tender
Y
1/7/2022
Subdivision of county All Great Lakes, islands therein, & connecting & tributary waters make up day allowed
X X H H H H H D$78.97 $102.47 $125.97
GLF-2B
Friction, Lattice Boom or Crane License Certification30 Y
1/7/2022
Subdivision of county All Great Lakes, islands, therein, & connecting & tributary waters make up day allowed
X X H H H H H D$72.92 $93.40 $113.87
GLF-3
Deck Equipment Operator, Machineryman, Maintenance of Crane (over 50 ton capacity) or Backhoe (115,000 lbs or more), Tug/Launch Operator, Loader, Dozer on Barge, Deck Machinery
Y
1/7/2022
Subdivision of county All Great Lakes, islands therein, & connecting & tributary waters make up day allowed
Requestor: MCSA Group
Project Description: Jackson SOB - Window Replacement
StatewideCounty:
397 Official Request #:
Project Number: 171/23164.DPL
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevai ling wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 4/9/2024 Issue Date: 1/10/2024
Name
Classification Overtime ProvisionDescription
Official Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
X X H H H H H D$66.72 $84.10 $101.47
GLF-4
Deck Equipment Operator, (Machineryman/Fireman), (4 equipment units or more), Off Road Trucks, Deck Hand, Tug Engineer, & Crane Maintenance 50 ton capacity and under or Backhoe 115,000 lbs or less, Assistant Tug Operator
Y
1/7/2022
Subdivision of county All Great Lakes, islands therein, & connecting & tributary waters make up day allowed
Operating Engineer Steel Work
H H D H H H D D$69.61 $88.88 $108.15
EN-324-ef
Extended boom forklift over 5,000 lb capacity, 1 Drum Hoist Y
8/18/2023
4 10s allowed M-Th with Friday makeup day because of bad weather make up day allowedcomment
H H D H H H D D$74.14 $95.24 $116.33
EN-324-SW120
Crane w/ 120' boom or longer Y
8/18/2023
4 10s allowed M-Th with Friday makeup day because of bad weather make up day allowedcomment
H H D H H H D D$75.01 $96.54 $118.07
EN-324-SW120-O
Crane w/ 120' boom or longer w/ Oiler Y
8/18/2023
4 10s allowed M-Th with Friday makeup day because of bad weather make up day allowedcomment
H H D H H H D D$75.19 $96.80 $118.41
EN-324-SW140
Crane w/ 140' boom or longer Y
8/18/2023
4 10s allowed M-Th with Friday makeup day because of bad weather make up day allowedcomment
H H D H H H D D$76.19 $98.24 $120.28
EN-324-SW140-O
Crane w/ 140' boom or longer W/ Oiler Y
8/18/2023
4 10s allowed M-Th with Friday makeup day because of bad weather make up day allowedcomment
H H D H H H D D$76.46 $98.62 $120.78
EN-324-SW220
Boom & Jib 220' or longer Y
8/18/2023
4 10s allowed M-Th with Friday makeup day because of bad weather make up day allowedcomment
H H D H H H D D$74.01 $95.11 $116.20
EN-324-SW220-O
Crane w/ 220' boom or longer w/ Oiler Y
8/18/2023
Requestor: MCSA Group
Project Description: Jackson SOB - Window Replacement
JacksonCounty:
397 Official Request #:
Project Number: 171/23164.DPL
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevai ling wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 4/9/2024 Issue Date: 1/10/2024
Name
Classification Overtime ProvisionDescription
Official Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
4 10s allowed M-Th with Friday makeup day because of bad weather make up day allowedcomment
H H D H H H D D$76.96 $99.34 $121.72
EN-324-SW300
Boom & Jib 300' or longer Y
8/18/2023
4 10s allowed M-Th with Friday makeup day because of bad weather make up day allowedcomment
H H D H H H D D$77.96 $100.78 $123.59
EN-324-SW300-O
Crane w/ 300' boom or longer w/ Oiler Y
8/18/2023
4 10s allowed M-Th with Friday makeup day because of bad weather make up day allowedcomment
H H D H H H D D$78.46 $101.49 $124.52
EN-324-SW400
Boom & Jib 400' or longer Y
8/18/2023
4 10s allowed M-Th with Friday makeup day because of bad weather make up day allowedcomment
H H D H H H D D$79.46 $102.93 $126.39
EN-324-SW400-O
Crane w/ 400' boom or longer w/ Oiler Y
8/18/2023
4 10s allowed M-Th with Friday makeup day because of bad weather make up day allowedcomment
H H D H H H D D$73.65 $94.59 $115.53
EN-324-SWCO
Crane Operator, Job Mechanic, 3 Drum Hoist & Excavator Y
8/18/2023
Apprentice Rates:
0-999 hours $59.16 $76.02 $92.88
1,000-1,999 hours $61.56 $79.63 $97.68
2,000-2,999 hours $63.96 $83.22 $102.48
3,000-3,999 hours $66.38 $84.18 $101.98
4,000-4,999 hours $68.78 $90.46 $112.12
5,000 hours $71.20 $91.09 $110.99
4 10s allowed M-Th with Friday makeup day because of bad weather make up day allowedcomment
H H D H H H D D$74.65 $96.03 $117.40
EN-324-SWCO-O
Crane Operator w/ Oiler Y
8/18/2023
4 10s allowed M-Th with Friday makeup day because of bad weather make up day allowedcomment
Requestor: MCSA Group
Project Description: Jackson SOB - Window Replacement
JacksonCounty:
397 Official Request #:
Project Number: 171/23164.DPL
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevai ling wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 4/9/2024 Issue Date: 1/10/2024
Name
Classification Overtime ProvisionDescription
Official Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
H H D H H H D D$37.03 $49.48 $61.92
EN-324-SWCW
Compressor or Welder Operator Y
12/10/2021
4 10s allowed M-Th with Friday makeup day because of bad weather make up day allowedcomment
H H D H H H D D$73.01 $93.67 $114.33
EN-324-SWHO
Hoisting Operator, 2 Drum Hoist, & Rubber Tire Backhoe Y
8/18/2023
4 10s allowed M-Th with Friday makeup day because of bad weather make up day allowedcomment
H H D H H H D D$53.42 $67.61 $81.80
EN-324-SWO
Oiler Y
12/10/2021
4 10s allowed M-Th with Friday makeup day because of bad weather make up day allowedcomment
H H D H H H D D$74.74 $96.16 $117.57
EN-324-SWTD50
Tower Crane & Derrick where work is 50' or more Y
8/18/2023
4 10s allowed M-Th with Friday makeup day because of bad weather make up day allowedcomment
H H D H H H D D$75.84 $97.69 $119.54
EN-324-SWTD50-O
Tower Crane & Derrick 50' or more w/ Oiler Y
8/18/2023
4 10s allowed M-Th with Friday makeup day because of bad weather make up day allowedcomment
Operating Engineer Underground
X X X X X X X D$66.39 $84.19 $101.98
EN-324A1-UC1
Class I Equipment Y
12/12/2023
Apprentice Rates:
0-999 hours $52.76 $67.08 $81.41
1,000-1,999 hours $54.80 $70.14 $85.49
2,000-2,999 hours $56.85 $73.22 $89.59
3,000-3,999 hours $58.90 $76.30 $93.69
4,000-4,999 hours $60.94 $79.35 $97.77
5,000-5,999 hours $62.99 $82.43 $101.87
Project Description: Jackson SOB - Window Replacement
StatewideCounty:
397 Official Request #:
Project Number: 171/23164.DPL
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevai ling wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 4/9/2024 Issue Date: 1/10/2024
Name
Classification Overtime ProvisionDescription
Official Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
X X X X X X X D$65.17 $82.61 $100.05
EN-324A2-UC1
Class I Equipment - Backfiller Tamper, Backhoe, Batch Plant Operator, Clamshell, Concrete Paver 2 drums or larger, Conveyor Loader Euclid type, Crane (crawler, truck type or pile driving), Dozer, Dragline, Elevating Grader, endloader, gradall, grader, hyd
Y
8/7/2023
Apprentice Rates:
0-999 hours $49.19 $61.74 $74.29
1,000-1,999 hours $50.99 $64.44 $77.89
2,000-2,999 hours $52.78 $67.12 $81.47
3,000-3,999 hours $54.58 $69.82 $85.07
4,000-4,999 hours $56.37 $72.51 $88.65
5,000-5,999 hours $58.16 $75.19 $92.23
X X X X X X X D$60.42 $75.80 $91.17
EN-324A2-UC2
Class II Equipment - Boom Truck, Crusher, Hoist, Pump 6 inch discharge or larger, side boom tractor, Tractor (pneu-tired other than backhoe or front end loader), Trencher 8 ft. digging capcity and smaller, Vac Truck
8/7/2023
X X X X X X X D$59.59 $74.61 $89.62
EN-324A2-UC3
Class III Equipment - Air Compressors 600 cfm or larger, Air Compressors 2 or more less than 600 dfm, Boom Truck non-swinging non-powered type boom, Concrete Breaker self-propelled or truck mounted, Concrete paver 1 drum 1/2 yd. or larger, Elevator other
X X X X X X X D$58.93 $73.66 $88.38
EN-324A2-UC4
Class IV Equipment - Boiler, Concrete Saw 40 hp or over, curing machine self propelled, end dumps, extend a boom forklift, farm tractor with attachment, finishing machine concrete, firemen, hydraulic pipe pushing machine, mulching equipment, oiler, pumps
Project Description: Jackson SOB - Window Replacement
JacksonCounty:
397 Official Request #:
Project Number: 171/23164.DPL
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevai ling wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 4/9/2024 Issue Date: 1/10/2024
Name
Classification Overtime ProvisionDescription
Official Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
Painter
H H H H H H H D$50.12 $64.80 $79.73
CE514-PT
Painter Y
12/9/2021
Apprentice Rates:
1st period $35.19 $42.41 $49.87
2nd period $38.18 $46.89 $55.85
3rd period $41.16 $51.36 $61.81
4th period $45.64 $58.08 $70.77
Pipe and Manhole Rehab
H H H H H H H H$28.20 $38.20
TM247
General Laborer for rehab work or normal cleaning and cctv work-top man, scaffold man, CCTV assistant, jetter-vac assistant
4/17/2015
H H H H H H H H$32.70 $44.95
TM247-2
Tap cutter/CCTV Tech/Grout Equipment Operator: unit driver and operator of CCTV; grouting equipment and tap cutting equipment
H H H H H H H H$31.45 $43.07
TM247-3
CCTV Technician/Combo Unit Operator: unit driver and operator of cctv unit or combo unit in connection with normal cleaning and televising work
H H H H H H H H$33.20 $45.70
TM247-4
Boiler Operator: unit driver and operator of steam/water heater units and all ancillary equipment associated
H H H H H H H H$33.20 $45.70
TM247-5
Combo Unit driver & Jetter-Vac Operator N
H H H H H H H H$34.20 $47.20
TM247-6
Pipe Bursting & Slip-lining Equipment Operator N
Project Description: Jackson SOB - Window Replacement
StatewideCounty:
397 Official Request #:
Project Number: 171/23164.DPL
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevai ling wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 4/9/2024 Issue Date: 1/10/2024
Name
Classification Overtime ProvisionDescription
Official Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
Plasterer
H H H H H H H D$45.00 $59.93 $74.85
CE514-P-L
Plasterer N
12/3/2021
Apprentice Rates:
1st Year $34.55 $44.25 $53.95
2nd Year $37.54 $48.73 $59.93
3rd Year $40.52 $53.21 $65.89
Plumber & Pipefitter
H H H H H H H D$63.77 $95.66 $127.54
PL-333-RI
Plumber, Pipefitter and HVACTech Four 10s allowed Monday thru Thursday. Friday not a makeup, considered OT, paid @ time & one-half.
Y
1/7/2022
Apprentice Rates:
1st 6 months $41.61 $62.42 $83.22
2nd 6 months $43.62 $65.43 $87.24
3rd 6 months $45.64 $68.46 $91.28
4th 6 months $47.65 $71.48 $95.30
5th 6 months $49.67 $74.50 $99.34
6th 6 months $51.68 $77.52 $103.36
7th 6 months $53.70 $80.55 $107.40
8th 6 months $55.71 $83.56 $111.42
9th 6 months $57.73 $86.60 $115.46
10th 6 months $59.74 $89.61 $119.48
Project Description: Jackson SOB - Window Replacement
JacksonCounty:
397 Official Request #:
Project Number: 171/23164.DPL
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevai ling wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 4/9/2024 Issue Date: 1/10/2024
Name
Classification Overtime ProvisionDescription
Official Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
Roofer
X x x X x x x D$51.18 $65.31 $79.43
RO-70-Z1
Commercial Roofer 4 consecutive tens allowed M-Th5 consecutive nine hour days M-F also allowed, time over forty hours per/week shall be at OT. Sat makeup day
Y
8/9/2023
Apprentice Rates: