This document is a preliminary site layout for the Escambia County Area Transit (ECAT) facility design update discussion dated February 9, 2026, prepared for the Escambia County Board of County Commissioners in Pensacola, Florida. The layout outlines the comprehensive program components for a new approximately 55,000 square-foot complex at 100 Clarinda Lane, including an Administration Building, Bus Wash, Fuel Depot, and Maintenance Building with a Transit Hub Fleet Maintenance section containing 4 bus bays and 14 van bays. The facility design incorporates multiple functional areas: a fleet parking section, private vehicle parking, administration and support areas with open and private offices, dispatch facilities, driver/operator facilities with lockers and training areas, and technical support spaces for electrical, mechanical, and IT systems. The site layout addresses program verification factors including route management, frequency, bus capacity, ridership patterns, schedule coordination, and signalization requirements based on APTA LOS Guidelines and FTA Guidance.
The document details facility capacity metrics and maintenance activity requirements, specifying a throughput of 27 buses per hour with 5-hour fueling operations at 4 stations averaging 24 buses per hour on a 10-minute cycle, bus washing of the entire 135-bus fleet daily, and interior cleaning operations. Maintenance activities are categorized by type including daily tasks (lubrication, wiper and bulb replacement), periodic services (tire service, inspections), and unscheduled work (warranty service, bodywork, collision repair, brake repair, diagnosis and repair, and component overhaul). The facility design includes provisions for expansion or phasing capability and site access points for both pedestrians and vehicles, with support infrastructure for parts storage including brakes and tires, and dedicated spaces for county vehicle maintenance operations within the overall complex program.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Escambia County Area Transit (ECAT)
Design Update Discussion 02.09.2026
New ECAT Facility
Program Verification
• Detailed Fleet Information
• APTA LOS Guidelines
• FTA Guidance
• Throughput of Fueling, Wash and Daily Service Functions (cleaning, cash)
• Program Components
• Fleet Parking
• Private Vehicle Parking
• Administration and
Support Areas
• Expansion or Phasing
Capability
• Site Access Points for Pedestrians and Vehicles
• Route Management
• Frequency
• Capacity of Buses
• Ridership
• Direction of Travel
• Connections
• Schedule
• Cross Streets
• Signalization
Factors in Right-Sizing the Facility
Program Verification
Fleet Maintenance Activities
MAINTENANCE ACTIVITIES
UNSCHEDULEDPERIODICDAILY
Warranty Service
Bodywork and Collision
Brake Repair
Other Diagnosis and Repair
Recommended Interval Inspection
Tire Service
Lubrication Service
Wiper Replacement
Bulb Replacement
Component Overhaul
Painting
ECAT
CAPACITY
METRICACTIVITY
27/ hour
= 5 hours
4 stations @ 24 per hour avg. (10 min.)
Buses per Hour
Fueling and Fare
Collection
--(30?)Buses per Hour
Bus Washing
Entire Fleet135 Buses Per Day
Interior Cleaning
Facility Design
Administration
Open Office
Private Office
Dispatch
Training
Driver/Operator
Facilities
Lockers
Changing
Showers
Lounge
Training
Building Support
Electrical
Mechanical
IT
Maintenance Bays
Large Fleet
Vehicles
Vans
Parts, Brakes, Tires, Storage
TRANSIT HUB
FLEET MAINT.
(4 BUS BAYS, 14 VAN BAYS)
ADMINISTRATION
FUEL WASH
COUNTY
VEHICLE
MAINT.
Facility Design
File details come from the government source that posted it. Updated .