Preliminary_Site_Layout.pdf

PDF 925 KB Posted

Attached to
Architectural Design Services for Escambia County Area Transit (ECAT) Facility- CDBG-DR HS004
Solicitation number
PD 25-26.042
Issued by
Escambia County, Florida

About this file

This document is a preliminary site layout for the Escambia County Area Transit (ECAT) facility design update discussion dated February 9, 2026, prepared for the Escambia County Board of County Commissioners in Pensacola, Florida. The layout outlines the comprehensive program components for a new approximately 55,000 square-foot complex at 100 Clarinda Lane, including an Administration Building, Bus Wash, Fuel Depot, and Maintenance Building with a Transit Hub Fleet Maintenance section containing 4 bus bays and 14 van bays. The facility design incorporates multiple functional areas: a fleet parking section, private vehicle parking, administration and support areas with open and private offices, dispatch facilities, driver/operator facilities with lockers and training areas, and technical support spaces for electrical, mechanical, and IT systems. The site layout addresses program verification factors including route management, frequency, bus capacity, ridership patterns, schedule coordination, and signalization requirements based on APTA LOS Guidelines and FTA Guidance.

The document details facility capacity metrics and maintenance activity requirements, specifying a throughput of 27 buses per hour with 5-hour fueling operations at 4 stations averaging 24 buses per hour on a 10-minute cycle, bus washing of the entire 135-bus fleet daily, and interior cleaning operations. Maintenance activities are categorized by type including daily tasks (lubrication, wiper and bulb replacement), periodic services (tire service, inspections), and unscheduled work (warranty service, bodywork, collision repair, brake repair, diagnosis and repair, and component overhaul). The facility design includes provisions for expansion or phasing capability and site access points for both pedestrians and vehicles, with support infrastructure for parts storage including brakes and tires, and dedicated spaces for county vehicle maintenance operations within the overall complex program.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Escambia County Area Transit (ECAT)

Design Update Discussion 02.09.2026

New ECAT Facility

Program Verification

• Detailed Fleet Information

• APTA LOS Guidelines

• FTA Guidance

• Throughput of Fueling, Wash and Daily Service Functions (cleaning, cash)

• Program Components

• Fleet Parking

• Private Vehicle Parking

• Administration and

Support Areas

• Expansion or Phasing

Capability

• Site Access Points for Pedestrians and Vehicles

• Route Management

• Frequency

• Capacity of Buses

• Ridership

• Direction of Travel

• Connections

• Schedule

• Cross Streets

• Signalization

Factors in Right-Sizing the Facility

Program Verification

Fleet Maintenance Activities

MAINTENANCE ACTIVITIES

UNSCHEDULEDPERIODICDAILY

Warranty Service

Bodywork and Collision

Brake Repair

Other Diagnosis and Repair

Recommended Interval Inspection

Tire Service

Lubrication Service

Wiper Replacement

Bulb Replacement

Component Overhaul

Painting

ECAT

CAPACITY

METRICACTIVITY

27/ hour

= 5 hours

4 stations @ 24 per hour avg. (10 min.)

Buses per Hour

Fueling and Fare

Collection

--(30?)Buses per Hour

Bus Washing

Entire Fleet135 Buses Per Day

Interior Cleaning

Facility Design

Administration

Open Office

Private Office

Dispatch

Training

Driver/Operator

Facilities

Lockers

Changing

Showers

Lounge

Training

Building Support

Electrical

Mechanical

IT

Maintenance Bays

Large Fleet

Vehicles

Vans

Parts, Brakes, Tires, Storage

TRANSIT HUB

FLEET MAINT.

(4 BUS BAYS, 14 VAN BAYS)

ADMINISTRATION

FUEL WASH

COUNTY

VEHICLE

MAINT.

Facility Design