This is a preliminary bid results spreadsheet for the Oregon Military Department's PANG B320 Parachute Tower Repair project, an Invitation to Bid for renovation work on Building 320 located at 6801 N.E. Cornfoot Rd. in Portland, Oregon. The project involves multiple construction tasks including mobilization, temporary work zone traffic control, erosion and pollution control, general excavation, stone embankment installation, HDPE culvert pipe placement, pipe anchors, abandoned structure filling, aggregate base, and commercial asphalt concrete pavement. The solicitation included a mandatory pre-bid conference scheduled for August 29th, 2024, at 8:00 AM PT, with bid submissions due by September 12th, 2024, at 1:30 PM PT. Two contractors submitted bids for evaluation: Coastal Construction Services and Tidewater Contractors. The contract award will be made to the lowest responsive and responsible bidder, with the successful contractor required to achieve substantial completion within 120 calendar days and final completion within 180 calendar days from the Notice to Proceed.

The preliminary results dated August 28, 2024, show Coastal Construction Services submitted a total bid of $218,190.00, while Tidewater Contractors submitted $265,080.00. Coastal Construction Services submitted the lower bid across multiple line items, including general excavation at $9.00 per cubic yard compared to $45.00, stone embankment at $75.00 per ton compared to $60.00, and culvert pipe installation at $225.00 per foot compared to $175.00. The project estimate range is between $100,000 and $150,000 for bonding purposes, with state funding designated for the project. Bidders are required to provide bid security equal to 10% of the total bid amount, prevailing wage compliance documentation, certificates of insurance, performance and payment bonds, and a certificate of pay equity training within 15 calendar days of award notification. Oregon goods and services preferences apply, with reciprocal preferences available for non-resident bidders.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

S-73000-00011343August 28, 2024 2:00 PM
Preliminary Results*Coastal Construction ServicesTidewater Contractors
DescriptionEst
QTYUNITUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL

PRICE

Mobilization1LS$30,000.00$30,000.00$20,000.00$20,000.00
Temporary Work Zone Traffic Control, Complete1LS$20,000.00$20,000.00$30,000.00$30,000.00
Erosion Control1LS$500.00$500.00$500.00$500.00
Pollution Control Plan1LS$500.00$500.00$500.00$500.00
General Excavation2300CUYD$9.00$20,700.00$45.00$103,500.00
Stone Embankment800TON$75.00$60,000.00$60.00$48,000.00
24 Inch - HDPE Double Wall - Culvert Pipe, 10 ft Depth with Downslope Pipe240FT$225.00$54,000.00$175.00$42,000.00
Pipe Slope Anchors, Metal, 24 Inch10EA$700.00$7,000.00$750.00$7,500.00
Filling Abandoned Structures1EA$10,000.00$10,000.00$2,500.00$2,500.00
Aggregate Base44TON$80.00$3,520.00$70.00$3,080.00
Commercial Asphalt Concrete Pavement (CACP)30TON$399.00$11,970.00$250.00$7,500.00
TOTAL$218,190.00$ 265,080.00
*Preliminary Results are not an indicator of Award