About this file

This document contains the preliminary bid results for the OR241: Chandler (Coos River) Bridge Operators House Project, a state and local contract opportunity involving the Oregon Department of Transportation (ODOT) and Coos County. The project aims to modify the Chandler Bridge Operators House to allow for safe operation and maintenance of the control panel. The bid items include mobilization, temporary work zone traffic control, temporary work access and containment, bridge removal, and modification of the operators house. The preliminary bid results show that HP CIVIL submitted a total bid of $210,303.76 for this project. This document is intended to provide initial information and is not an indicator of the final award.

The bid items and their respective quantities, units, and unit prices are detailed in the document. Pricing terms, funding requirements, and other salient information are not explicitly stated. As this is a preliminary result, further details regarding the contract term, any set-asides, incumbents, or other relevant information are not provided in this particular document.

View the file

Other files

File Type Posted
35797 ITB.docx DOCX document
ATT B Plans~12.pdf PDF
Attachment 1_System Requirements.pdf PDF
ATT A Special Provisions and Specifications~19.pdf PDF
Analytical Report.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ODOT BID ITEMS

PRELIMINARY RESULTS OR241: CHANDLER (COOS RIVER) BRIDGE OPERATORS HOUSE PROJECT S-73000-00007928
Bidder name:HP CIVIL
QTYUNITUnit PriceTotal
1Mobilization1LS22,803.76$22,803.76
2Temporary Work Zone Traffic Control, Complete Erosion control1LS35,000.00$35,000.00
3Temporary Work Access and Containment1LS55,000.00$55,000.00
4Bridge Removal1LS5,000.00$5,000.00
5Hand Rail (Included in Item 6)
6Modify Operator House (Includes Item 5)1LS92,500.00$92,500.00
TOTAL$210,303.76
Preliminary results are not an indicator of Award.

File details come from the government source that posted it. Updated .