Preliminary Results~43.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- I-5 Bear Creek Scour ER
- Solicitation number
- S-73000-00007365
- Issued by
- Jackson County, Oregon
About this file
This document appears to be a preliminary bid results spreadsheet for the I-5 Bear Creek Scour ER project, a state and local contract opportunity in Oregon. The project involves placing riprap scour protection between Bear Creek Greenway and Bear Creek to prevent further erosion, as well as rebuilding a section of the pathway impacted by the construction of the riprap armoring. The bid results show that Laduke Construction, LLC of Central Point, OR submitted the apparent low bid of $813,823.90 for the 33 line items, which include mobilization, traffic control, earthwork, concrete, and other related work. The bid was due on July 24, 2023 at 2:00 PM. The project will be located in Jackson County, Oregon.
The bid pricing details various unit costs and quantities for the required work, including temporary traffic control devices, erosion control, concrete work, and streambed enhancement. No information is provided regarding any set-asides, incumbents, funding sources, or contract term and renewal options.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ATT D Project Wage Rates.pdf | ||
| ATT B Special Provisions and Specifications.docx | DOCX document | |
| ITB_PW.docx | DOCX document | |
| Att C_Bid Pricing Form~34.xlsx | XLSX spreadsheet | |
| ATT A Plans~3.pdf | ||
| Procurement Information~41.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Bid Results - | I-5 Bear Creek Scour ER S-73000-00007365 | ||
| July 24, 2023 @ 2:00 PM | Bidder name: | Laduke Construction, LLC | |
| City, State: | Central Point, OR |
| Item | Description | Unit | Est. Qty | Unit Price | Total |
| 1 | MOBILIZATION | LS | 1 | $ 81000.00 | $81,000.00 |
| 2 | TEMPORARY PROTECTION AND DIRECTION OF TRAFFIC | LS | 1 | $ 30000.00 | $30,000.00 |
| 3 | TEMPORARY SIGNS | SQFT | 260 | $ 35.00 | $9,100.00 |
| 4 | SEQUENTIAL ARROW SIGNS | EACH | 1 | $ 4,500.00 | $4,500.00 |
| 5 | TEMPORARY BARRICADES, TYPE II | EACH | 10 | $ 100.00 | $1,000.00 |
| 6 | TEMPORARY BARRICADES, TYPE III | EACH | 2 | $ 240.00 | $480.00 |
| 7 | TEMPORARY PLASTIC DRUMS | EACH | 104 | $ 120.00 | $12,480.00 |
| 8 | TEMPORARY IMPACT ATTENUATOR, TRUCK MOUNTED | EACH | 1 | $ 18000.00 | $18,000.00 |
| 9 | REPAIR TEMPORARY IMPACT ATTENUATOR, TRUCK MOUNTED | EACH | 1 | $ 400.00 | $400.00 |
| 10 | PEDESTRIAN CHANNELIZING DEVICES | FOOT | 20 | $ 200.00 | $4,000.00 |
| 11 | CONSTRUCT AND REMOVE TEMPORARY ACCESS ROAD | LS | 1 | $ 24,466.00 | $24,466.00 |
| 12 | TEMPORARY WATER MANAGEMENT FACILITY | LS | 1 | $ 84,700.00 | $84,700.00 |
| 13 | BYPASS PUMP MONITORING | DAY | 20 | $ 100.00 | $2,000.00 |
| 14 | EROSION CONTROL | LS | 1 | $ 5,800.00 | $5,800.00 |
| 15 | MATTING, TYPE E | SQYD | 45 | $ 18.00 | $810.00 |
| 16 | CONCRETE WASHOUT FACILITY | EACH | 1 | $ 1,200.00 | $1,200.00 |
| 17 | POLLUTION CONTROL PLAN | LS | 1 | $ 3,000.00 | $3,000.00 |
| 18 | TURBIDITY MONITORING | LS | 1 | $ 3,800.00 | $3,800.00 |
| 19 | CONSTRUCTION SURVEY WORK | LS | 1 | $ 18,000.00 | $18,000.00 |
| 20 | REMOVAL OF STRUCTURES AND OBSTRUCTIONS | LS | 1 | $ 4,000.00 | $4,000.00 |
| 21 | CLEARING AND GRUBBING | ACRE | 1 | $ 12,000.00 | $12,000.00 |
| 22 | GENERAL EXCAVATION | CUYD | 630 | $ 29.00 | $18,270.00 |
| 23 | STONE EMBANKMENT | CUYD | 90 | $ 140.00 | $12,600.00 |
| 24 | SUBGRADE GEOTEXTILE | SQYD | 350 | $ 3.00 | $1,050.00 |
| 25 | REINFORCEMENT, GRADE 60 | LB | 1317 | $ 2.70 | $3,555.90 |
| 26 | FOUNDATION CONCRETE, CLASS 3300 | CUYD | 19 | $ 1,200.00 | $22,800.00 |
| 27 | AGGREGATE BASE | TON | 140 | $ 38.00 | $5,320.00 |
| 28 | LEVEL 2, 1/2 INCH ACP MIXTURE | TON | 18 | $ 270.00 | $4,860.00 |
| 29 | 6 INCH CONCRETE SURFACING | SQFT | 1811 | $ 19.00 | $34,409.00 |
| 30 | PERMANENT SEEDING | ACRE | 1 | $ 18,000.00 | $18,000.00 |
| 31 | 6 FOOT CHAIN LINK FENCE | FOOT | 255 | $ 44.00 | $11,220.00 |
| 32 | METAL HANDRAIL, 3 RAILS | FOOT | 150 | $ 90.00 | $13,500.00 |
| 33 | STREAMBED ENHANCEMENT | LS | 1 | $ 347,503.00 | $347,503.00 |
| BID TOTAL | $813,823.90 |
Attachment C - Bid Pricing Form Page &P of &N