I-5 Bear Creek Scour ER
Solicitation number
S-73000-00007365
Issued by
Jackson County, Oregon

About this file

This document is a set of Special Provisions and Specifications for the I-5 Bear Creek Scour ER state and local contract opportunity in Oregon. The work consists of placing riprap scour protection between Bear Creek Greenway and Bear Creek to prevent further erosion, as well as rebuilding a section of pathway impacted by the construction. The estimated quantities include 100 cubic yards each of fill and removal volume in waters of the U.S. or State, 113 cubic yards of loose riprap, 820 cubic yards of keyed riprap, and 425 square yards of filter blanket. The in-water work period is from June 15th to September 15th. The contractor is required to submit a Temporary Water Management Plan at least 5 days before beginning work in regulated areas. A pre-work meeting with the Agency, Contractor, and other stakeholders is required at least 8 days prior to implementation of the water management work.

The contract will be paid on a lump sum basis, with no separate measurement or payment for certain items like temporary access roads, turbidity monitoring, and temporary water management facilities. The Agency's NPDES 1200-CA permit is not applicable to this project, but the contractor must comply with all applicable environmental regulations and permits. Funding sources are not specified, but the contractor must meet any relevant requirements.

View the file

Other files

File Type Posted
ITB_PW.docx DOCX document
ATT D Project Wage Rates.pdf PDF
Att C_Bid Pricing Form~34.xlsx XLSX spreadsheet
Preliminary Results~43.xlsx XLSX spreadsheet
ATT A Plans~3.pdf PDF
Procurement Information~41.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT B

SPECIAL PROVISIONS AND SPECIFICATIONS

SECTION 00210 - MOBILIZATION

Comply with Section 00210 of the Standard Specifications.

SECTION 00220 - ACCOMMODATIONS FOR PUBLIC TRAFFIC

Comply with Section 00220 of the Standard Specifications modified as follows:

00220.03(a) Over-Dimensional Vehicle Restrictions - Replace this subsection, except subsection number and title, with the following:

When the Project restricts the width, length, height, or weight of vehicles through a work zone or detours trucks around a work zone, fill out and submit a completed copy of the "Highway Restriction Notice - Size and/or Weight" form (Form No. 734-2357), available from the ODOT Oregon Trucking Online website (see 00110.05(e)), at least 35 Calendar Days before the restriction or detour takes effect.

00220.40(e)(1) Closed Lanes - Replace this subsection, except for the subsection number and title, with the following:

Traffic Lanes may be closed on the Pacific Highway I-5 when allowed, shown, or directed during the following periods of time except as specified in 00220.40(e)(2):

Single Lane Closures – One Traffic Lane on the Pacific I-5 may be closed during the following times:

Nightly, Sunday night through Friday morning, between 7:00 p.m. and 7:00 a.m.

SECTION 00221 - COMMON PROVISIONS FOR WORK ZONE TRAFFIC CONTROL

Comply with Section 00221 of the Standard Specifications modified as follows:

00221.03 Traffic Safety and Operations - Replace the bullet that begins “When paving operations create…” with the following bullet:

When paving operations create an abrupt or sloped edge drop off greater than 1 inch, protect traffic by installing signing according to the "2 Lane, 2 Way Roadway Overlay Area" detail shown on the Standard Drawings. Protect longitudinal and transverse Pavement joints by placing and maintaining an asphalt concrete wedge according to 00221.07(c)(1).

00221.06 (c) Tourist-Oriented Directional and Business Logo Signs ‑ Replace this subsection, except for the subsection number and title, with the following:

Submit one of the following for approval, at least 5 Calendar Days before the preconstruction conference:

(1) No Signs ‑ If there are no tourist-oriented directional (TOD) or business logo signs on the Project, a written notification that no TOD or business logo signs exist within the Project limits or

(2) Signs ‑ Submit one copy of a sketch map of the Project showing all existing TOD and business logo signs and a written narrative describing how these signs will be kept in service and protected throughout all the construction stages. If modifications are necessary, submit updated information to the Engineer for approval at least 21 Calendar Days before the change is needed.

00221.07(c)(1) Paving - Replace this subsection, except subsection number and title, with the following:

When the longitudinal joint is greater than 1 inch in height, install additional TCD according to 00221.03. Complete the placing of ACP and construction of paving joints according to 00735.48, 00735.49, 00743.45, 00744.44, 00744.45, 00745.47, and 00745.48, as applicable.

00221.90(b) Temporary Protection and Direction of Traffic ‑ Delete the bullet that begins “Moving temporary barrier to and from Contractor’s stockpile areas”.

Replace the bullet that begins "When the Schedule of Items does not include …" with the following bullet:

Preparing and signing the daily “Traffic Control Inspection Report”, when a TCS is not included in the Schedule of Items or when a TCS is not onsite for a work shift.

SECTION 00222 – TEMPORARY TRAFFIC CONTROL SIGNS

Comply with Section 00222 of the Standard Specifications modified as follows:

00222.40(e) Temporary Sign Placement ‑ Add the following to the end of the bullet list:

At least ten Calendar Days before closing a pedestrian pathway at the Project site, place a “SIDEWALK CLOSED, Full Time” (CW11‑4) sign in advance of each future closure point. Locate the sign so it is legible from the nearest alternate pedestrian pathway facing incoming pedestrian traffic. The sign may be mounted between the panels of a Type II barricade or on a single-post TSS. Do not place the sign or sign support such that it narrows the pedestrian pathway to a width of less than 4 feet.

Before opening the TPAR, place TPAR signing and other TCM as shown, or as directed. Maintain the “SIDEWALK CLOSED, Full Time” (CW11‑4) signs while the TPAR is open to pedestrian traffic.

Install a 54-inch "TRUCKS LEAVING HIGHWAY XXXX FT" sign in advance of each entrance point to the Work Area at sign spacing “A” from the “TCD Spacing Table” shown on the Standard Drawings. Install a 54-inch "TRUCKS ENTERING HIGHWAY XXXX FT" sign in advance of each exit point from the Work Area at sign spacing “A” from the “TCD Spacing Table” shown on the Standard Drawings.

Install "ROAD WORK AHEAD" (W20‑1‑48) signs with a 36 by 24-inch "FINES DOUBLE" (R2‑6aP) rider on the Pacific Highway, according to the "TCD Spacing Table" shown on the Standard Drawings or as modified by the Plans except do not install the "FINES DOUBLE" rider on concrete barrier mounted signs.

Install beyond each end of the Project, facing outgoing traffic, an "END ROAD WORK" (CG20‑2A‑24) sign a distance of (A ÷ 2) according to the "TCD Spacing Table" shown on the Standard Drawings or as modified by the Plans.

00222.80(a) Area Basis - Add the following sentence to the end of the paragraph that begins "Temporary signs will…":

No measurement of quantities will be made for “CONSTRUCTION VEHICLE DO NOT FOLLOW” (CW23-14) signs.

00222.90 Payment - Add the following to the end of this subsection:

No separate or additional payment will be made for furnishing, installing, and maintaining 72 by 24-inch "CONSTRUCTION VEHICLE DO NOT FOLLOW" (CW23‑14) signs. Payment will be included in 00221.90(b).

00222.91 Payment, Lump Sum or Incidental Basis ‑ Replace this subsection, except for the subsection number and title, with the following:

When the Contract indicates payment for Work under 00221.98 Payment, Method “B” - Lump Sum Basis or 00221.99 Payment, Method “C” - Incidental Basis, no separate or additional payment will be made for Work performed under this Section. Payment will be included in payment according to 00221.98 or 00221.99.

SECTION 00224 - TEMPORARY TRAFFIC CHANNELIZING DEVICES

Comply with Section 00224 of the Standard Specifications modified as follows:

00224.46 Pavement Edge Delineation - Replace the paragraph that begins “Place tubular or conical markers…” with the following paragraph:

Place tubular or conical markers to delineate the edge of Pavement immediately after construction Work or paving operations create an abrupt or sloped edge drop-off greater than 1 inch in height along the right hand or left hand Shoulder.

00224.91 Payment, Lump Sum or Incidental Basis ‑ Replace this subsection, except for the subsection number and title, with the following:

When the Contract indicates payment for Work under 00221.98 Payment, Method “B” - Lump Sum Basis or 00221.99 Payment, Method “C” - Incidental Basis, no separate or additional payment will be made for Work performed under this Section. Payment will be included in payment according to 00221.98 or 00221.99.

SECTION 00226 - TEMPORARY ROADSIDE BARRIERS AND IMPACT ATTENUATORS

Comply with Section 00226 of the Standard Specifications modified as follows:

00226.91 Payment, Lump Sum or Incidental Basis ‑ Replace this subsection, except for the subsection number and title, with the following:

When the Contract indicates payment for Work under 00221.98 Payment, Method “B” - Lump Sum Basis or 00221.99 Payment, Method “C” - Incidental Basis, no separate or additional payment will be made for Work performed under this Section. Payment will be included in payment according to 00221.98 or 00221.99.

SECTION 00228 - TEMPORARY PEDESTRIAN AND BICYCLIST ROUTING

Comply with Section 00228 of the Standard Specifications modified as follows:

00228.00 Scope - Replace this subsection, except subsection number and title, with the following:

In addition to the requirements of Section 00221, this Work consists of furnishing, installing, operating, maintaining, inspecting, and removing temporary devices for accommodating pedestrians and bicyclists through a work zone.

00228.13 Temporary Curb Ramps ‑ Add the following sentence to the end of this subsection:

Furnish truncated dome detectable warning surface for temporary curb ramps from the QPL according to 00759.12.

00228.43 Temporary Curb Ramps ‑ Add the following paragraph to the end of this subsection:

Install a minimum 2 foot wide truncated dome detectable warning surface on temporary curb ramps at pedestrian street crossings. Omit truncated dome detectable warning surfaces on temporary curb ramps that are not at a pedestrian street crossing.

00228.80(a) Length Basis ‑ Replace this subsection, except subsection number and title, with the following:

Pedestrian channelizing devices and bicycle channelizing devices will be measured on the length basis upon delivery to the Project. The quantities will be limited to those in the approved TCP.

00228.80(b) Unit Basis ‑ Replace this subsection, except for the subsection number and title, with the following:

Temporary curb ramps will be measured on the unit basis, at each location where a temporary curb ramp is constructed or placed.

00228.90 Payment ‑ Add the following paragraph after the paragraph that begins “In item (c), the type…”:

Item (c) includes furnishing and installing truncated dome detectable warning surfaces.

00228.91 Payment, Lump Sum or Incidental Basis ‑ Replace this subsection, except for the subsection number and title, with the following:

When the Contract indicates payment for Work under 00221.98 Payment, Method “B” - Lump Sum Basis or 00221.99 Payment, Method “C” - Incidental Basis, no separate or additional payment will be made for Work performed under this Section. Payment will be included in payment according to 00221.98 or 00221.99.

SECTION 00231 - TEMPORARY ACCESS ROAD

Section 00231, which is not a Standard Specification, is included in this Project by Special Provision.

Description

00231.00 Scope - This Work consists of constructing, maintaining, and removing temporary, unpaved access roads for the use of Contractor and Agency Equipment and personnel as needed, shown, or directed.

Materials

00231.11 Geotextile - Furnish subgrade geotextile, embankment geotextile, or riprap geotextile, at the Contractor’s option. Geotextile shall meet the requirements of Section 02320, with documentation according to 02320.10(c).

00231.12 Geogrid - Subgrade reinforcement geogrid, if used, shall meet the requirements of Section 02320.

00231.13 Road Material - Furnish crushed Aggregate Base, stone embankment, or other suitable granular material capable of supporting the weight of Equipment intended to use the temporary access road.

Construction

00231.41 Clearing - Clearing brush and vegetation for temporary access roads is allowed in the areas shown or where directed. Preserve and protect trees as shown or directed.

00231.42 Temporary Access Road - Construct temporary access roads to the width, grade, profile, and depth of base sufficient to support the weight of Equipment using the road. Install geotextile or geogrid prior to placement of road material.

00231.43 Not for Public Traffic - Do not direct or allow Public Traffic to use temporary access roads constructed according to this Section.

00231.44 Verification of Subgrade - In areas where permanent earthwork construction is required on ground that has been occupied by a temporary access road, rework or replace unstable Materials to avoid and correct, according to 00330.40(c), excessive stress or strain that could be detrimental to the subgrade.

00231.45 Verification of Original Ground - Test the density of the original ground according to TM 158, in the presence of the Engineer, before beginning construction of the temporary access road and after removing it. If post-removal density testing indicates that the original ground has been weakened by construction activities, or the presence or use of the temporary access road, correct the deficient condition in an approved manner and at no additional expense to the Agency.

Maintenance

00231.60 Surface Maintenance - Maintain temporary access roads so that the road surfaces remain firm, smooth, free of ruts or standing water, and are graded to prevent concentrations of runoff water. Promptly remove accumulations of mud or debris.

Finishing and Cleaning Up

00231.70 General - When a temporary access road is no longer needed, do the following:

Remove all Materials.

Restore areas occupied by the temporary access road to the original ground contours or as directed.

Apply permanent seeding to the area occupied by the temporary access road according to Section 01030.

Dispose of excess materials according to 00330.41(a)(5).

Measurement

00231.80 Measurement - Except for permanent seeding, no measurement of quantities will be made for Work performed under this Section.

Permanent seeding will be measured according to 01030.80.

Payment

00231.90 Payment - The accepted quantities of Work performed under this Section, except for permanent seeding work, will be paid for at the Contract Lump Sum amount for the item "Construct and Remove Temporary Access Road".

Payment will be payment in full for furnishing and placing all Materials, and for furnishing all Equipment, labor, and Incidentals necessary to complete the Work as specified.

No separate or additional payment will be made for removing and disposing of temporary access road materials or for restoring the areas to original ground contours.

Permanent seeding Work will be paid for according to 01030.90.

SECTION 00245 - TEMPORARY WATER MANAGEMENT

Section 00245, which is not a Standard Specification, is included in this Project by Special Provision.

00245.00 Scope - This Work consists of furnishing, installing, operating, maintaining, and removing temporary water management facilities in regulated Work areas.

00245.01 Abbreviations:

TWM-Temporary Water Management
TWMF-Temporary Water Management Facility
TWMP-Temporary Water Management Plan

00245.02 Definitions:

Temporary Water Management Facility - A TWMF that conveys water around or through Work areas, removes water from Work areas, and treats and discharges water at locations outside Work areas.

00245.03 Temporary Water Management Plan - The Agency TWMP is a concept plan. 5 Calendar Days before beginning Work in regulated Work areas, submit stamped Working Drawings of a Contractor-developed TWMP, according to 00150.35, based on either the Agency’s concept plan or an independent plan that meets water quality and environmental guideline requirements and does not negatively affect neighboring properties or water rights.

Include the following minimum information in the TWMP:

The sequence and schedule for dewatering and re-watering. This sequence and schedule must include when to contact the Engineer prior to dewatering and re-watering.

How the Work area is isolated from the active stream flow upstream, through, and downstream.

How the stream flow is routed and conveyed around or through the isolated Work area.

How fish passage is provided around the Work area, if required.

How the isolated Work area is de-watered.

How the pumped water is treated, if necessary, before it is discharged downstream.

Description of all construction stages, including appropriate contact points for each stage.

Description of fuel storage and spill containment materials. Fuel storage shall be at least 150-feet from the stream.

A list of on‑site backup Materials and Equipment.

Provide the name of the TWM Subcontractor (if applicable) and Contractor’s superintendent, and their 24‑hour contact phone number at the pre-Work meeting. If changes in the appointment of the TWM Subcontractor or Contractor’s superintendent occur during the term of the Contract, provide written notice to the Engineer within 5 Calendar Days of the change.

Calculations of water withdraw pump’s capacity.

Details of the proposed water intake screen used to isolate in-water Work area and how it meets the requirements of 00290.34(c)(3).

Any change to the TWMP during construction requires approval prior to implementation.

Obtain the Engineer's written approval before beginning Work in in‑water Work areas.

00245.04 Pre-Work Meeting ‑ Before beginning any TWM Work, attend a pre-work meeting at the Project Site with the Engineer no more than 8 Calendar Days prior to implementation of TWM. Required meeting attendees include:

Engineer Contractor TWM Subcontractor (if applicable) Agency Environmental Coordinator or their appointed representative

The pre-Work meeting agenda typically includes the method of TWM, the TWMP, fish salvage plan and strategy, describe environmental risks, turbidity monitoring, energy dissipation, dewatering and re-watering plan and strategy, site clean-up expectations, and the circumstances under which contacting the Engineer is required.

Materials

00245.10 Materials - Furnish Materials meeting the following requirements:

Pipe00445.11
Plastic Sheeting00280.14(a)
Riprap00390.11
Sandbags00280.15(a)
Temporary Energy Dissipator00280
Temporary Sediment Trap00280
Water Intake Screening00290.34(c)

Furnish pumps that are:

Self‑priming.

Equipped with a variable speed governor.

Equipped with a power source.

Able to pump water that contains soft and hard solid.

Construction

00245.40 Fish Removal - Qualified Agency, ODFW, or ODOT consultant biologists will remove fish and other aquatic organisms from the isolation Work areas. Coordinate fish removal with the Engineer at least 5 Calendar Days before beginning Work in regulated Work areas. Allow access into the isolation Work areas before, during and after installation of the TWMF to perform the specified tasks as follows:

Before Installation of TWMF - Before any in-water Work, including installing TWMF, qualified personnel will remove fish and other native aquatic organisms from within the proposed isolated Work area.

After Installation of TWMF - After installing TWMF and the reduction of the water level through the isolated Work area has begun, qualified personnel will remove all fish and aquatic organisms as the water level is reduced. Do not completely de‑water the isolation area until all fish and aquatic organisms have been removed.

00245.41 Installation - During installation of the temporary water management facility, maintain a downstream water flow rate of at least 50 percent of the upstream water flow rate.

00245.42 Operation - Operate temporary water management as follows:

Protect fish and fish habitat according to 00290.34.

Maintain and control water flow downstream of the isolated Work area for the duration of the diversion to prevent downstream de-watering.

Clean, maintain and repair water intake screening to ensure adequate flows and protection of aquatic organisms.

In the event of containment failure immediately notify the Engineer so arrangements can be made to remove fish and aquatic organisms from the isolation Work areas prior to the continuation of Work within the ordinary high water limits.

When using a pump for bypassing water during temporary water management, physically monitor the pump in‑person and maintain the pump at all times including non-work hours. Provide a back-up pump on-site and ready for use as necessary. Provide the Engineer with a daily report documenting monitoring activities.

Maintenance

00245.60 Maintenance - Monitor water turbidity according to 00290.30(a)(8).

Finishing and Cleaning Up

00245.70 Removal - Prior to removal of the TWMF, obtain approval from the Engineer after completion of all Work within ordinary high water limits. Remove the TWMF and re‑water and restore the stream flow. Maintain downstream water flow during removal of the facility. Staged or metered re-watering may be required and will be determined by the Engineer.

Measurement

00245.80 Measurement - No measurement of quantities will be made for temporary water management facilities.

The estimated quantities of Materials required for the temporary water management facility are:

Temporary Water Management Facility :

Pump2 Each
Pipe330 Feet

Sediment Settling Basin………………………………..1 Each

Plastic Sheeting323 Square Yard
Sandbags11,300 Each

The quantities of bypass pump monitoring will be measured on the time basis, of the actual number of Days the bypass pump is in operation and a daily monitoring report is received.

Turbidity monitoring will be measured according to 00290.80.

Payment

00245.90 Payment - The accepted quantities of temporary water management facilities will be paid for at the Contract lump sum amount for the item "Temporary Water Management Facility".

The accepted quantities of bypass pump monitoring will be paid for at the Contract unit price, per Day, for the item “Bypass Pump Monitoring”.

Payment will be payment in full for furnishing and placing all Materials, and for furnishing all Equipment, labor, and Incidentals necessary to complete the Work as specified.

Turbidity monitoring will be paid for according to 00290.90.

No separate or additional payment will be made for TWMP, maintaining, operating, monitoring, moving, or removing the facility.

SECTION 00280 - EROSION AND SEDIMENT CONTROL

Comply with Section 00280 of the Standard Specifications modified as follows:

00280.00 Scope - Replace the paragraph that begins "This Work also consists of providing temporary …" with the following paragraphs:

This Work also consists of providing temporary erosion and sediment control (ESC) measures and furnishing, installing, moving, operating, maintaining, inspecting, and removing ESC throughout the Project area according to the Standard Drawings, the erosion and sediment control plan (ESCP), the Specifications, or as directed, until the site is permanently stabilized. Included also is the monitoring of weather, of stormwater and receiving waters, the reporting of monitoring observations, the reporting of corrective actions (when necessary) and the updates and revisions of the ESCP, including ESCP cover sheet, necessary to keep it representative of current site conditions and compliant with the 1200-CA permit.

When contaminants, pollutants or hazardous materials are discovered in the Project location in soils or groundwater comply with 00290.30(f) and, provide an environmental management plan (EMP) as required by the 1200-CA permit.

The Agency’s NPDES 1200-CA permit is not applicable to this Project. Comply with all applicable conditions of this Section.

00280.02 Definitions ‑ Replace the sentence that begins “Temporary Stabilization” with the following sentence:

Temporary Stabilization ‑ Covering soil or other measures to prevent erosion until permanent stabilization measures are in place and established.

00280.04 Erosion and Sediment Control Plan on Agency Controlled Lands ‑ Replace the bullets with the following bullets:

When using the Agency’s ESCP with only modifications required to keep the ESCP current during construction, submit a written notification indicating the Agency’s ESCP is used without modifications prior to construction.

Prior to beginning construction, edit the ESCP to provide a list of all contractors working on the site.

Prior to beginning construction edit the ESCP cover sheet to list all personnel by name and position who are responsible for the installation and maintenance of stormwater control measures including their individual responsibilities and certifications. Keep list current for the duration of the project.

When using a Contractor modified version of the Agency’s ESCP, include the following:

Proposed ESCP showing all ESC Work, and quantities of Work.

An EMP that addresses pollution prevention and control of potentially contaminated sites or Materials when pollutants are known to be present.

Implementation schedules for the ESCP Plans for each phase of Contractor’s Work Names and positions of all personnel engaged in construction activities.

Names and positions of all personnel responsible for the installation and maintenance of stormwater control measures.

Information required under 1200-CA permit.

When using a Contractor developed ESCP, develop and stamp the ESCP by a professional with one of the following credentials. Include their name and credentials in the ESCP. The ESCP preparer shall be one of the following:

Oregon Registered Professional Engineer, Oregon Registered Landscape Architect; or Oregon Certified Engineering Geologist When using a Contractor developed ESCP where engineered facilities such as sedimentation basins or diversion structures for erosion and sediment control are required, prepare and stamp the ESCP by one of the following:

Oregon Registered Professional Engineer; or Oregon Registered Landscape Architect.

When using a Contractor developed ESCP, provide plans for each phase of Contractor’s work implementation schedule and information required under the 1200‑CA permit and as directed in ODOT’s Erosion Control Manual.

00280.16(i) Concrete Washout – Replace this subsection, except subsection number and title, with the following:

Furnish impermeable, spill resistant, leak proof concrete washout basin of sufficient size and quantity to retain all concrete wash water and concrete waste developed during construction, meeting the following requirements:

(1) Field fabricated washout basin as shown and consisting of the following:

Straw Bales - Standard rectangular straw bales, with straw Material according to 01030.15, except no certification is required.

Plastic Sheeting - Minimum 10‑mil thick polyethylene plastic sheeting.

Staples - 1/8‑inch diameter steel wire staples. 2‑inch "U" width with a length of 6 inches minimum

(2) Manufactured basins sufficiently durable to be removed intact, or cleaned of content without releasing concrete material or concrete washout water.

00280.41(a) Disturbance Limits - Replace this subsection, except for the subsection number and title, with the following:

Prior to any ground disturbing activity, delineate all construction site clearing limits with high visibility markings and do not disturb areas outside the clearing limits. Prior to beginning construction activities, delineate and protect riparian areas including trees, root zones and vegetation to be preserved and delineate and protect vegetated buffer zones according to 00280.41(e). Protect post-construction stormwater facilities, unless used during construction as sediment trap, in which case, repair according to 00280.46(h).

Add the following subsection

00280.41(e) Buffers ‑ Retain and preserve buffer zones of natural, undisturbed vegetation, 50 feet in width between Work and Waters of the State and sensitive areas including water bodies, wetlands, springs and seeps. Where 50 foot buffers are not attainable, provide erosion, runoff and sediment control BMPs as shown or directed.

Add the following subsection:

00280.41(f) Hauling Material ‑ Cover loads carrying soil or sediment when leaving Project Site. Drain saturated loads on site or haul in water tight beds.

00280.46(h) Temporary Sediment Trap ‑ Add the following paragraph to the end of this subsection:

Where location of Temporary Sediment Trap is used post-construction for water quality treatment, storage or infiltration, remove sediment and soil to a depth of 18” and replace to finish grade with material approved by engineer.

00280.46(i) Concrete Washout ‑ Add the following paragraph to the end of this subsection:

Locate concrete wash basins and concrete waste disposal to prevent stormwater that has been in contact with concrete wash or waste concrete from contaminating Waters of the State or stormwater inlets or conveyances. Handle wash water as waste. Do not dispose of concrete wash water or wash out concrete trucks or tools onto the ground, or into storm drains, open ditches, streets, or streams.

Add the following subsection:

00280.46(j) Access Routes ‑ Stabilize unpaved access and haul routes within the Project Site with Aggregate or as approved by Engineer.

00280.63(c) Paved Areas ‑ Replace this subsection, except for the subsection number and title, with the following subsection:

Keep all paved areas clean for the duration of the Project. Use cleaning methods that do not transport sediment-laden water to receiving streams. Remove sediment that has been tracked-out from the Project Site by the end of the same business day. If the sediment track-out occurs on a non-business day, remove the sediment by the end of the next business day.

Add the following subsection:

00280.64 Corrective Actions ‑ Initiate corrective actions when the following noncompliance occur:

A discharge from the Project Site causes an exceedance of applicable water quality standards, Sediment or turbidity are visible in discharge from the Project site in conveyance system leading to surface water or at the discharge point within surface water, BMP needs repair or replacement, beyond routine maintenance, BMP shown on ESCP was not installed or installed incorrectly, A prohibited discharge has occurred, When required by DEQ, As directed by Engineer

(a) Corrective Action Timelines ‑ Immediately initiate corrective actions to address noncompliance, including removing discharged material and repairing or replacing BMPs that do not provide Effective Functioning according to the following:

Mobilize resources to clean contaminated surfaces and address cause of discharge, Complete corrective actions by the close of the next business day for discharge clean-up and to restore Effective Functioning of installed BMPs, For more significant noncompliance of which require additional, replacement or modified BMPs to restore Effective Functioning, complete corrective action(s) no later than 24 hours after the discovery If completion of corrective action is not feasible within 24 hours, document the reasons why the time line cannot be met.

Provide a schedule for clean-up and corrective actions that restores Effective Functioning as soon as feasible. If schedule cannot be met document the reasons for the delay.

Provide all corrective action documentation and photographs to Agency within 24 hours of completion of corrective actions.

(b) Corrective Action Documentation ‑ Document corrective actions within 24 hours of implementations to provide:

The Project Site’s common name and 1200-CA permit identification number when applicable, Conveyance system discharge location(s) and outfalls that were out of compliance, Photographs of the discharge(s) before and after the implementation of corrective actions, or before and after NTU readings of the discharge, The period of noncompliance, Name(s), titles and contact information of personnel conducting inspections, The specific condition and the date and time the noncompliance was identified, Description of the noncompliance and BMP failure(s) that caused the noncompliance, Description of the actions taken to address the noncompliance and prevent a reoccurrence of the noncompliance, Where corrective actions change site conditions from what is shown on ESCP, revise the ESCP to represent the site conditions, Immediately upon completion of corrective action documentation, provide to Agency for signature and submittal to DEQ.

00280.90 Payment - Replace this subsection, except for the subsection number and title, with the following:

The accepted quantities of Work performed under this Section will be paid for at the Contract unit price, per unit of measurement, for the following items:

Pay Item Unit of Measurement

(a) Erosion Control Lump Sum

Item (a) includes:

mobilization furnishing, stockpiling, protecting, restocking, and removing emergency Materials preparing Project for a period of extended non-activity inspecting, maintaining, and removing erosion control devices restoring, mulching, tacking, and seeding all disturbed ground, Work, and storage areas not otherwise covered

Partial payment for items (a) will be made as follows:

When the initial Contractor developed ESCP, narrative, and schedule are complete and accepted, and the initial erosion control devices are installed 25% When 50 percent of the Contract is complete, excluding advances on Materials 25% When 75 percent of the Contract is complete, excluding advances

on Materials25%
At completion of the Work covered by this Section25%

Payment will be payment in full for furnishing and placing all Materials, and for furnishing all Equipment, labor, and Incidentals necessary to complete the Work as specified.

No separate or additional payment will be made for:

constructing and removing temporary slope berms erosion control for Work outside the construction limits including but not limited to limited to, Borrow pits, haul roads, disposal sites, and Equipment storage sites modifications or additions to the ESCP.

No separate or additional payment will be made for constructing laps, seams, joints, wraps, overlaps, joint overlaps, or patches unless the Engineer orders additional amounts in excess of the minimum. For laps, wraps, or overlaps that that have been ordered by the Engineer and exceed the minimum or specified length or width, payment will be made for the added lap, overlap, or wrap length or width at the Contract unit price.

Additional ESC devices required for permit compliance will be paid for according to 00195.20.

SECTION 00290 - ENVIRONMENTAL PROTECTION

Comply with Section 00290 of the Standard Specifications modified as follows:

Add the following subsection:

00290.30(a)(7) Water Quality:

· Do not discharge contaminated or sediment-laden water, including drilling fluids and waste, or water contained within a work area isolation, directly into any waters of the State or U.S. until it has been satisfactorily treated (using a best management practice such as a filter, settlement pond, bio-bag, dirt-bag, or pumping to a vegetated upland location).

· Do not use permanent stormwater quality treatment facilities to treat construction runoff unless prescribed by an ESCP approved under Section 00280.

· If construction discharge water is released using an outfall or diffuser port, do not exceed velocities more than 4 feet per second, and do not exceed an aperture size of 1 inch.

· Do not use explosives under water.

· Implement containment measures adequate to prevent pollutants or construction and demolition materials, such as waste spoils, fuel or petroleum products, concrete cure water, silt, welding slag and grindings, concrete saw cutting by-products and sandblasting abrasives, from entering waters of the State or U.S.

· Implement containment measures adequate to prevent flowing stream water from coming into contact with concrete or grout within the first 24 hours after placement.

· Do not end-dump riprap into the waters of the State or U.S. Place riprap from above the ordinary high water line.

· Cease Project operations under high flow conditions that may result in inundation of the Project area, except for efforts to avoid or minimize resource damage.

· The Engineer retains the authority to temporarily halt or modify the Work in case of excessive turbidity or damage to natural resources.

· If Work activities violate permit conditions or any requirement of this subsection, stop all in-water work activities and notify the Engineer.

· Do not cause a visible sediment plume in waters of the State or U.S.

Add the following subsection:

00290.30(a)(8) Meter Turbidity Monitoring - In addition to any turbidity monitoring required by 00280.62(c) to comply with NPDES 1200 series requirements, monitor turbidity using a turbidity meter every two hours during in-water work according to the following:

· Use a turbidity meter that has been maintained and calibrated according to the manufacturer’s specifications.

· Measure stream turbidity before beginning each day’s in-water work to establish pre-construction turbidity levels.

· Measure upcurrent and downcurrent turbidity at two-hour intervals during in-water work and perform work based on turbidity measurements according to the following:

· Take upcurrent samples at a location representative of background turbidity approximately 100 feet from the in-water work area.

· Take downcurrent samples at a location approximately 100 feet from the in-water work area at approximately mid-depth of the water body and within any visible turbidity plume.

· If the downcurrent reading is less than 5 nephelometric turbidity units (NTU) higher than the upcurrent reading, continue to work and take readings every two hours.

· If the downcurrent reading is greater than or equal to 5 and less than 30 NTU higher than the upcurrent reading, modify work procedures and repair or implement best management practices (BMP), continue work, and continue to take readings every two hours. If after four hours the downcurrent reading is still greater than or equal to 5 NTU higher than the upcurrent reading, stop all in‑water work and repair or implement additional BMP. Resume in‑water work activities only after the downcurrent reading is less than 5 NTU above the upcurrent reading.

· If the downcurrent reading is greater than or equal to 30 and less than 50 NTU higher than the upcurrent reading, modify work procedures, repair or implement BMP and continue work. If, at the subsequent two-hour reading, the downcurrent reading is still more than 30 NTU higher than the upcurrent reading, stop all in‑water work and repair or implement additional BMP. Resume in‑water work activities only after the downcurrent reading is less than 5 NTU above the upcurrent NTU reading.

· If the downcurrent reading is 50 NTU or more higher than the upcurrent reading, stop all in‑water work, repair or implement additional BMP, and inform the Agency. Resume in‑water work activities only after the downcurrent reading is less than 5 NTU above the upcurrent NTU, as determined by continued readings made at least every two hours, or the next day's initial turbidity reading.

· Document all turbidity monitoring observations on form 734-2755, “Turbidity Monitoring Report”, or another form approved by the Agency. Submit reports to the Engineer weekly during in-water work and keep copies of the reports at the Project Site.

00290.34 Protection of Fish and Fish Habitat - Add the following paragraph:

Meet with the Agency Biologist, Resource Representative, Engineer, and inspector on site, before moving equipment on-site or beginning any work, to ensure that all parties understand the locations of sensitive biological sites and the measures that are required to be taken to protect them.

00290.34(a) Regulated Work Areas - Add the following to the end of this subsection:

The regulated work area is the area at or below the ordinary high water (OHW) elevation shown on the plans.

Perform work within the regulated work area only during the in-water work period. The in‑water work period is from June 15th to September 15th.

The total volume of material filled or discharged into waters of the State and waters of the U.S. shall not exceed 100cubic yards.

The total volume of material excavated from the waters of the State and waters of the U.S. shall not exceed 100_ cubic yards.

Submit a schedule to complete all work within the regulated work area within the in-water work period at least 10 days prior to the preconstruction conference.

Add the following subsection:

00290.34(c) Aquatic Species Protection Measures Required by Environmental Permits:

(1) General Requirements:

· Do not install fish ladders (for example: pool and weirs, vertical slots, fishways) or fish trapping systems.

· Do not apply surface fertilizer within 50 feet of any stream channel.

Use heavy equipment as follows:

· Choice of equipment must have the least adverse effects on the environment (for example: minimally sized, low ground pressure).

· Secure absorbent material around all stationary power equipment (for example: generators, cranes, drilling equipment) operated within 150 feet of wetlands, waters of the State, waters of the U. S., drainage ditches, or water quality facilities to prevent leaks, unless suitable containment is provided to prevent spills from entering waters of the State or waters of the U.S.

· Do not cross directly through a stream for construction access, unless shown or approved. If shown or approved, cross perpendicular to the stream and do not block stream flow. When a crossing is no longer needed, completely remove the crossing and restore the soils and vegetation to the original condition.

· Store fuel and maintain all equipment in staging areas that are at least 150 feet away from any waters of the State, waters of the U.S., or storm inlet or on an impervious surface that is isolated from any waters of the State, waters of the U.S., or storm inlet.

· If temporary access roads are needed within 150 feet of any body of water, use existing routes unless new routes are shown or approved.

· Before beginning work on temporary access routes that are not shown, submit a proposal to the Engineer for approval.

(2) Work Area Isolation - Provide work isolation according to Section 00245. Provide safe passage around or through the isolated work area for adult and juvenile migratory fish unless passage did not previously exist.

(3) Water Intake Screening - Install, operate, and maintain fish screens on each water intake used for project construction, including pumps used to isolate an in-water work area. When drawing or pumping water from any stream, protect fish by equipping intakes with screens having a minimum 27 percent open area and meeting the following requirements:

· Perforated plate openings shall be 3/32 inch or smaller.

· Mesh or woven wire screen openings shall be 3/32 inch or smaller in the narrowest direction.

· Profile bar screen or wedge wire openings shall be 1/16 inch or smaller in the narrow direction.

Choose size and position of screens to meet the following criteria in Table 00290‑1:

Table 00290-1

Type
Approach Velocity 1

(Ft./Sec.)

Sweeping Velocity 2 (Ft./Sec.)

Wetted Area of Screen (Sq. Ft.)

Comments

Ditch Screen
≤ 0.4
Shall exceed approach velocity
Divide max. water flow rate (cfs) by

0.4 fps If screen is longer than 4 feet, angle 45° or less to stream flow

Screen with proven self-cleaning system
≤ 0.4
–
Divide max. water flow rate (cfs) by

0.4 fps

Screen with no cleaning system other than manual
≤ 0.2
–
Divide max. water flow rate (cfs) by

0.2 fps Pump rate 1 cfs or less

1 Velocity perpendicular to screen face at a distance of approximately 3 inches 2 Velocity parallel to screen

Provide ditch screens with a bypass system to transport fish safely and rapidly back to the stream.

(4) Site Restoration - Restore damaged streambanks to a natural slope, pattern, and profile suitable for establishment of permanent woody vegetation unless precluded by pre‑project conditions (for example: natural rock substrate):

· Stabilize all disturbed soils, including obliteration of temporary access roads, following any break in work unless construction will resume in 4 Calendar Days.

(5) Surface Water Diversions - Surface water may be diverted to meet construction needs other than work area isolation, consistent with Oregon law, only if water from sources that are already developed, such as municipal supplies, small ponds, reservoirs, or tank trucks, is unavailable or inadequate, and meeting the following conditions:

· When alternative surface sources are available, divert from the stream with the greatest flow.

· Install, operate, and maintain a temporary fish screen.

· Do not exceed a pumping rate and volume of 10 percent of the available flow. For streams with less than 5 cubic feet per second, do not exceed drafting of 18,000 gallons per day. Do not use more than one pump for each site.

(6) Temporary Power, Communication and Water Lines - Before installing temporary power, communication, or water lines across streams or bodies of water, submit a proposed plan to the Engineer for approval. Do not begin installation before receiving approval from the Engineer. Proposed plans for installation of temporary power, communication, and water lines and stream crossings shall utilize the following design methods in the listed order of priority:

1. Aerial lines, including lines hung from existing bridges.

2. Directional drilling, boring and jacking that spans the channel migration zone and any associated wetland.

3. Trenching, which is restricted to intermittent streams and may only be used when the stream is naturally dry. For all sections of trenches below the ordinary high water line, backfill with native material and cap with clean gravel suitable for fish use in the project area.

Align each crossing as perpendicular to the watercourse as possible. For drilled, bored, or jacked crossings, ensure that the line is below the total scour prism. Return any large wood displaced by trenching or plowing as nearly as possible to its original position, or otherwise arranged to restore habitat functions.

(7) Injured Fish Notification - If a dead or injured fish is found in the project area, immediately notify the Agency. If the injured fish is in a location where further injury or stress may take place, attempt to move the fish to a safer location, if one is available, near the capture site while keeping the fish in the water and reducing its stress as much as possible. Do not disturb the fish after it has been moved. If the fish is dead or dies while being captured or moved, save the fish and any tags. The Agency will notify appropriate regulatory agencies about the injured or dead fish and provide additional direction to the Contractor.

00290.41 Protection of Waters of the U.S. or State - Add the following to the end of this subsection:

Permits have been obtained for this project from the US Army Corps of Engineers (Corps) and the Department of State Lands (DSL). Keep a copy of Corps and DSL permits at the project site during construction. Changes to the project that may increase the amount of fill placed or material removed in waters of the U.S. or State, or the acreage of waters impacted are not authorized. The following waters of the U.S. or State are present and have been determined to be unavoidable as indicated in Table 00290-2:

Table 00290-2

Impact Waters of the US or State
Removal Volume

(cu yds.)

Fill Volume (Cu yds)

Station
Duration of Impact (Temporary or Permanent)
Area of impact (Acres)
Bear Creek
100
100
Permanent
0.06

00290.51 Protection of Sensitive Cultural Sites - Add the following to the end of this subsection:

An Inadvertent Discovery Plan (IDP) has been developed for this project. The IDP is available from the Engineer.

00290.90 Payment - Add the following paragraph(s) to the end of this subsection:

Payment will be payment in full for furnishing all Materials, Equipment, labor, and Incidentals necessary to complete the Work as specified. Payment includes providing and updating the Work Containment Plan.

The accepted quantities of turbidity monitoring will be paid for at the Contract lump sum amount for the item "Turbidity Monitoring".

Payment for turbidity monitoring will be payment in full for furnishing and placing all Materials and for furnishing all Equipment, labor, and Incidentals necessary to complete the Work as specified.

No separate or additional payment will be made for work zone fencing.

SECTION 00305 - CONSTRUCTION SURVEY WORK

Comply with Section 00305 of the Standard Specifications modified as follows:

00305.05 3D Engineered Models ‑ Replace the bullet that begins “A detailed outline and list of…” with the following bullet:

An automated machine guidance (AMG) work plan containing a detailed outline, list of the Pay Items and Work that will be controlled by the 3D Construction Models, and a narrative outlining any differences between the Agency prepared 3D Engineered Models and the 3D Construction Models.

Delete the bullet that begins “A narrative outlining…”

SECTION 00310 - REMOVAL OF STRUCTURES AND OBSTRUCTIONS

Comply with Section 00310 of the Standard Specifications modified as follows:

00310.90 Payment ‑ Add the following to the end of this subsection:

No separate or additional payment will be made for removal or disposal Work included in Section 00330 according to 00310.02.

SECTION 00320 - CLEARING AND GRUBBING

Comply with Section 00320 of the Standard Specifications.

SECTION 00330 - EARTHWORK

Comply with Section 00330 of the Standard Specifications modified as follows:

00330.03 Basis of Performance - Add the following paragraph to the end of this subsection:

Perform all earthwork under this Section except for Stone Embankment on the excavation basis.

00330.14 Selected Granular Backfill ‑ Delete the sentence that begins “Reclaimed glass meeting the requirements of Section 02695…”.

00330.15 Selected Stone Backfill ‑ Delete the sentence that begins “Reclaimed glass meeting the requirements of Section 02695…”.

00330.41(a)(4) Excess Materials - Replace this subsection, except for the subsection number and title, with the following:

If the quantities of excavated materials are greater than required to construct embankments and to do all filling and backfilling, the Contractor may use the remaining materials to uniformly widen embankments or to flatten slopes in a manner satisfactory to the Engineer.

00330.41(a)(5) Waste Materials - Replace this subsection, except for the subsection number and title, with the following:

Unless otherwise specifically allowed and subject to the requirements of Section 00280, dispose of materials, classed as waste materials in 00330.41(a)(3), outside and beyond the limits of the Project and Agency controlled property according to 00290.20. Do not dispose of materials on Wetlands, either public or private.

00330.42(c)(3) Embankment Slope Protection - Add the following paragraph to the end of this subsection:

Construct the outer 12 inches of embankments with suitable materials to establish slope stabilization through permanent seeding. If suitable material is not available, provide suitable materials from a Contractor-provided source which conforms to the requirements of 00330.11 or 00330.13 and provides favorable conditions for germination of seed and growth of grass.

Excess material used to widen embankments or flatten…