Preliminary Results~11.xlsx
XLSX spreadsheet 13 KB Posted
- Solicitation number
- S-63500-00003613
- Issued by
- Baker County, Oregon
About this file
This file contains preliminary bidding results for ITB S-73000-00003614, however there is a significant mismatch between the file content and the related contract opportunity provided. The preliminary results spreadsheet documents bids for a wastewater infrastructure rehabilitation project involving pipe lining, video inspection, and erosion control work, with estimated quantities including 152 feet of 48-inch pipe rehabilitation, 304 feet of mainline video inspection, and 50 roughness blocks. Two bidders submitted proposals: Whitaker Construction Company from Brigham City, Utah (CCB# 201797) and Iron Horse LLC from Fairview, Oregon (CCB# 213253), with bid totals of $283,838.00 and $284,088.00 respectively. The related contract opportunity, by contrast, pertains to the Oregon Department of Fish and Wildlife's procurement of approximately 900 tons of second crop alfalfa hay for winter elk feeding in Baker and Union Counties, with bids accepted in 50-ton lots and a bid closing date of August 10, 2022, at 2:00 pm PST.
The preliminary results sheet does not include pricing term details, set-asides, incumbent information, or funding sources relevant to the infrastructure project it documents. The alfalfa hay procurement referenced in the related opportunity indicated four bidders with proposed prices ranging from $275.00 to $370.00 per ton, with total lump sum bids between $48,125.00 and $128,000.00, and an anticipated total procurement value of approximately $300,000. The hay was required to be produced within 150 miles of the Elkhorn Wildlife Area, delivered in 3x4 bales weighing up to 2,000 pounds, and be weed-free, with ODFW offering to pick up hay located within 30 miles of North Powder, Oregon. The file appears to contain documentation for a different project than the contract opportunity with which it has been associated.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ITB Alfalfa Hay for Elkhorn Wildlife Area 2022.pdf | ||
| ITB S-63500-00003613 Bid Tally Sheet.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| PRELIMINARY RESULTS ITB S-73000-00003614 | |||||||
| Bidder Name: | Whitaker Construction Company | Iron Horse LLC | |||||
| City, State: | Brigham City, UT | Fairview, OR | |||||
| CCB# | 201797 | 213253 | |||||
| Item | Description | Est Qty | Unit | Unit Price | Total | Unit Price | Total |
| 1 | Mobilization | 1 | LS | $ 70000.00 | $70,000.00 | $ 25000.00 | $25,000.00 |
| 2 | Temporary Work Zone Traffic Control, Complete | 1 | LS | $ 20,000.00 | $20,000.00 | $ 20,000.00 | $20,000.00 |
| 3 | Temporary Water Management Facility at MP 22.35 | 1 | LS | $ 15,000.00 | $15,000.00 | $ 25,000.00 | $25,000.00 |
| 4 | Bypass Pump Monitoring | 10 | DAY | $ 500.00 | $5,000.00 | $ 3,000.00 | $30,000.00 |
| 5 | Erosion Control | 1 | LS | $ 9,500.00 | $9,500.00 | $ 8,000.00 | $8,000.00 |
| 6 | Pollution Control Plan | 1 | LS | $ 2000.00 | $2,000.00 | $ 4000.00 | $4,000.00 |
| 7 | Turbidity Monitoring | 1 | LS | $ 1000.00 | $1,000.00 | $ 5000.00 | $5,000.00 |
| 8 | Removal of Debris | 1.0 | LS | $ 20,000.00 | $20,000.00 | $ 25,000.00 | $25,000.00 |
| 9 | Rehabilitate, 48 Inch x 48 Inch Pipe (CIPP/SAPL Liner) | 152.0 | FT | $ 700.00 | $106,400.00 | $ 595.00 | $90,440.00 |
| 10 | Mainline Video Inspection | 304.0 | FT | $ 22.00 | $6,688.00 | $ 12.00 | $3,648.00 |
| 11 | Culvert Drainage Markers, Type 1 | 2 | EACH | $ 500.00 | $1,000.00 | $ 1,000.00 | $2,000.00 |
| 12 | Culvert Drainage Markers, Type 2 | 1 | EACH | $ 1,000.00 | $1,000.00 | $ 1,000.00 | $1,000.00 |
| 13 | Roughness Blocks | 50 | EACH | $ 525.00 | $26,250.00 | $ 900.00 | $45,000.00 |
| BID TOTAL | $283,838.00 | $284,088.00 |