ID FLAP BONNER 841(1), Trestle Creek Road, MP 100 to 103. 7
Solicitation number
69056725R000015
Issued by

About this file

This Notice to Prospective Offerors from the Western Federal Lands Highway Division outlines a highway reconstruction project in Bonner County, Idaho. The project involves reconstructing and paving Trestle Creek Road (US Forest Service Route 275) from Highway 200 to the Idaho Panhandle National Forest snowmobile parking lot, spanning approximately 3.7 miles. Key project specifications include creating a single-lane road with strategic turnouts, paving with asphalt to create an all-weather roadway, implementing drainage improvements through culvert replacements, performing limited stream bank restoration in coordination with the Idaho Department of Fish and Game, and enhancing roadside safety through improved signage and pavement markings.

The solicitation documents will be available during Fall/Winter 2025 and will be posted on SAM.gov. Prospective offerors are advised to view the project site as soon as possible, noting that access may be weather-dependent after November 25th. A special notice requires that all material sources must be certified as free from noxious weeds, with potential fall weed inspections necessary. Technical questions should be emailed to wfl.plansspec@dot.gov, and general questions can be directed to wfl.contracts@dot.gov or 360-619-7520. The solicitation number is 69056725R000015, and interested parties are encouraged to monitor SAM.gov for the exact release date.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Western Federal Lands Highway Division 610 E. Fifth Street

Vancouver, WA 98661 Phone 360-619-7700

Fax 360-619-7846

August 21, 2025

NOTICE TO PROSPECTIVE OFFERORS

RE: ID FLAP BONNER 841(1)

Trestle Creek Road, MP 100 to 103.7 Solicitation No. 69056725R000015

The attached preliminary plans are being furnished to aid prospective Bidders in identifying the location and type of work for this project. The project will be advertised during a period when viewing of the project may not be possible due to snow. Therefore, prospective Offerors are encouraged to view the project as soon as possible during fall as conditions permit. After November 25th, access will be weather dependent; contact the Bonner County Public Works Department for current road conditions at https://www.bonnercountyid.gov/public-works or 208- 263-9469. No Federal Highway Administration personnel will be available for show-me tours.

Additionally, we are providing the following information regarding the project site:

• Google street view link (below). The Google Street View does provide an overall view of the project site, however, it might not be an accurate reflection of current conditions as the Google images are from 2021.

https://www.google.com/maps/dir/48.2837164,-116.3501366/48.3037302,- 116.2781948/@48.2924622,- 116.3273099,5754m/data=!3m1!1e3!4m2!4m1!3e0!5m1!1e1?authuser=0&entry=ttu&g_ep=Ego yMDI0MTAwMi4xIKXMDSoASAFQAw%3D%3D

Project Location and Type of Work - All project work is located in Bonner County, Idaho. The proposed project is along Trestle Creek Road (US Forest Service Route 275), beginning at the intersection of Highway 200 and ending at the Idaho Panhandle National Forest (IDPF) snowmobile parking lot at approximate MP 103.75 (approximately 3.7 miles). This project is located at approximate coordinates 48.28375 N, 48.302721 W.

The purpose of the project is to reconstruct and pave Trestle Creek Road to a single lane road with turnouts. Specifically;

• The roadway will be reconstructed to match the existing width and, in strategic locations where topography allows, the roadway will be widened to provide vehicle turnouts.

• The roadway will be paved with asphalt and configured with structure sufficient for an all-weather roadway to provide year-round access to the Kaniksu National Forest.

• Work includes paving, associated intersection improvements, strategic turnouts, drainage improvements, stream bank restoration, and roadside safety improvements.

https://www.bonnercountyid.gov/public-works https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.google.com%2Fmaps%2Fdir%2F48.2837164%2C-116.3501366%2F48.3037302%2C-116.2781948%2F%4048.2924622%2C-116.3273099%2C5754m%2Fdata%3D!3m1!1e3!4m2!4m1!3e0!5m1!1e1%3Fauthuser%3D0%26entry%3Dttu%26g_ep%3DEgoyMDI0MTAwMi4xIKXMDSoASAFQAw%253D%253D&data=05%7C02%7Crebekah.webb%40dot.gov%7C8a02ac94f9e8419117cd08dce6f1b145%7Cc4cd245b44f04395a1aa3848d258f78b%7C0%7C0%7C638639172935434775%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C0%7C%7C%7C&sdata=KmbFAjdicmgyxwk4Bu4RD%2B6qHVlyUVXxx%2B69RR3VygM%3D&reserved=0 https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.google.com%2Fmaps%2Fdir%2F48.2837164%2C-116.3501366%2F48.3037302%2C-116.2781948%2F%4048.2924622%2C-116.3273099%2C5754m%2Fdata%3D!3m1!1e3!4m2!4m1!3e0!5m1!1e1%3Fauthuser%3D0%26entry%3Dttu%26g_ep%3DEgoyMDI0MTAwMi4xIKXMDSoASAFQAw%253D%253D&data=05%7C02%7Crebekah.webb%40dot.gov%7C8a02ac94f9e8419117cd08dce6f1b145%7Cc4cd245b44f04395a1aa3848d258f78b%7C0%7C0%7C638639172935434775%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C0%7C%7C%7C&sdata=KmbFAjdicmgyxwk4Bu4RD%2B6qHVlyUVXxx%2B69RR3VygM%3D&reserved=0 https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.google.com%2Fmaps%2Fdir%2F48.2837164%2C-116.3501366%2F48.3037302%2C-116.2781948%2F%4048.2924622%2C-116.3273099%2C5754m%2Fdata%3D!3m1!1e3!4m2!4m1!3e0!5m1!1e1%3Fauthuser%3D0%26entry%3Dttu%26g_ep%3DEgoyMDI0MTAwMi4xIKXMDSoASAFQAw%253D%253D&data=05%7C02%7Crebekah.webb%40dot.gov%7C8a02ac94f9e8419117cd08dce6f1b145%7Cc4cd245b44f04395a1aa3848d258f78b%7C0%7C0%7C638639172935434775%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C0%7C%7C%7C&sdata=KmbFAjdicmgyxwk4Bu4RD%2B6qHVlyUVXxx%2B69RR3VygM%3D&reserved=0 https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.google.com%2Fmaps%2Fdir%2F48.2837164%2C-116.3501366%2F48.3037302%2C-116.2781948%2F%4048.2924622%2C-116.3273099%2C5754m%2Fdata%3D!3m1!1e3!4m2!4m1!3e0!5m1!1e1%3Fauthuser%3D0%26entry%3Dttu%26g_ep%3DEgoyMDI0MTAwMi4xIKXMDSoASAFQAw%253D%253D&data=05%7C02%7Crebekah.webb%40dot.gov%7C8a02ac94f9e8419117cd08dce6f1b145%7Cc4cd245b44f04395a1aa3848d258f78b%7C0%7C0%7C638639172935434775%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C0%7C%7C%7C&sdata=KmbFAjdicmgyxwk4Bu4RD%2B6qHVlyUVXxx%2B69RR3VygM%3D&reserved=0

Preliminary Plans letter

• Drainage improvements will be made by way of culvert replacements. Limited stream bank restoration will be undertaken in coordination with stream rehabilitation work completed by Idaho Department of Fish and Game (IDFG).

• Roadside safety improvements will be made through improved signage, pavement markings and limited use of delineators.

Technical Questions – All technical questions must be submitted by email wfl.plans-spec@dot.gov .

General Questions - Contact our office at wfl.contracts@dot.gov or at 360-619-7520.

Special Notice - Fall Weed Inspection May be Necessary

All material sources and materials incorporated into the work must be certified to be free from noxious weeds, invasive plants, and other deleterious materials by a federal, state or local public agency.

Commercial certifications may be acceptable if materials have been certified through the North American Weed Free Forage Program standard or a similarly recognized certification process. To determine if a source is acceptable, contractors must arrange for a weed inspection this Fall.

Solicitation documents - Documents will be available during the Fall/Winter of 2025. Please monitor the SAM site (www.sam.gov) for actual date of solicitation release. To receive automatic notification through SAM, you must be logged in and select the “Follow” feature. For more information go to How do I follow items on SAM.gov?.

Thank you for your interest in this project.

mailto:plans-spec@dot.gov mailto:plans-spec@dot.gov mailto:wfl.contracts@dot.gov http://www.sam.gov/ https://www.fsd.gov/gsafsd_sp?id=gsafsd_kb_articles&sys_id=ad9c8da01bfbe1502fe5ed7ae54bcbc8

RE: ID FLAP BONNER 841(1)

File details come from the government source that posted it. Updated .