Preliminary Bid Results~72.xlsx

XLSX spreadsheet 17 KB Posted

Attached to
Rebid NB Boone Bridge (I-5 Over Willamette River at MP 283. 11) Joint Rehabilitation Project
Solicitation number
S-73000-00015864
Issued by
Clackamas County, Oregon

About this file

This is a preliminary bid results tabulation for the Oregon Department of Transportation's Rebid NB Boone Bridge Joint Rehabilitation Project (ITB #S-73000-00015864), a construction procurement for critical bridge infrastructure work on the northbound Boone Bridge spanning the Willamette River at Interstate 5 milepost 283.11 in Clackamas County, Oregon. The scope of work includes constructing temporary and permanent bridge joints; constructing a premixed polymer concrete overlay on 468 square yards; removing 468 square yards of existing polymer concrete; performing 25 square yards of Class 2 deck preparation; furnishing and installing modular bridge expansion joint systems; pressure washing; performing structural steel coping work on 16 units; repairing 36 support bars; installing 10 white pavement markers; and completing 210 linear feet of methyl methacrylate surface profiling. Bids closed on February 18, 2026, with six contractors submitting bids: Lee Contractors, LLC; HP Civil Inc.; Wildish Standard Paving Co.; MJ Hughes Construction; Legacy Contracting Inc.; and K&M 2.0 Construction L.L.C. One bidder (K&M 2.0 Construction L.L.C.) did not submit a pricing form and is indicated as no bid. The project requires substantial completion by October 8, 2026, and final completion by October 16, 2026.

The five responsive bids ranged from $1,754,435.00 (Lee Contractors, LLC—low bid) to $2,098,972.00 (Legacy Contracting Inc.—high bid), with intermediate bids from HP Civil Inc. at $1,894,678.05, Wildish Standard Paving Co. at $1,960,450.25, and MJ Hughes Construction at $2,049,790.00. The project is subject to prevailing wage rate requirements established by the Oregon Bureau of Labor and Industries for Clackamas BOLI Region 2 and State Buy America requirements under ORS 279C.303. Bid security equal to 10% of the total bid amount is required, and the awarded contractor must provide performance and payment bonds each equal to 100% of the contract price. The estimated project cost for bonding purposes ranges from $2,000,000 to $2,500,000, with funding anticipated from State sources. Award is contingent upon the Agency's receipt of sufficient funding. Liquidated damages of $1,100 per calendar day are assessed for failure to meet the Substantial Completion deadline, and traffic lane closures on I-5 are restricted to specified nighttime windows with limited full road closure opportunities.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Date Issued:2/18/26
ITB No.S-73000-00015864BIDDER
NAME:Lee Contractors, LLCHP Civil Inc.Wildish Standard Paving Co.MJ Hughes ConstructionLegacy Contracting IncK&M 2.0 Construction L.L.C
Bid Closing:February 18, 2026CITY/STATE:
Description:Rebid NB Boone Bridge (I-5 Over Willamette River at MP 283.11) Joint Rehabilitation ProjectNo bid pricing form submitted
This bid tabulation is not an indicator of award. It is only a tabulation of the bids submitted for consideration.
Bid Item #DescriptionEst
QTYUNITUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL

PRICE

1MOBILIZATION1LS$ 175,000.00$ 175,000.00$ 189,467.80$ 189,467.80$ 176,000.00$ 176,000.00$ 190,000.00$ 190,000.00$ 209,147.00$ 209,147.00$ - 0
2TEMPORARY WORK ZONE TRAFFIC CONTROL, COMPLETE1LS$ 130,000.00$ 130,000.00$ 347,500.00$ 347,500.00$ 288,000.00$ 288,000.00$ 325,000.00$ 325,000.00$ 288,564.00$ 288,564.00$ - 0
3MOBILE BARRIER30DAY$ 1.00$ 30.00$ 1.00$ 30.00$ 250.00$ 7,500.00$ 2,650.00$ 79,500.00$ 1.00$ 30.00$ - 0
4TEMPORARY WORK ACCESS AND CONTAINMENT1LS$ 130,000.00$ 130,000.00$ 61,500.00$ 61,500.00$ 159,000.00$ 159,000.00$ 140,000.00$ 140,000.00$ 147,202.00$ 147,202.00$ - 0
5POLLUTION CONTROL PLAN1LS$ 1,000.00$ 1,000.00$ 500.00$ 500.00$ 3,000.00$ 3,000.00$ 600.00$ 600.00$ 1,419.00$ 1,419.00$ - 0
6WORK CONTAINMENT PLAN1LS$ 1,000.00$ 1,000.00$ 5,000.00$ 5,000.00$ 5,000.00$ 5,000.00$ 600.00$ 600.00$ 17,127.00$ 17,127.00$ - 0
7BRIDGE REMOVAL WORK1LS$ 100,000.00$ 100,000.00$ 140,000.00$ 140,000.00$ 100,000.00$ 100,000.00$ 65,000.00$ 65,000.00$ 103,705.00$ 103,705.00$ - 0
8CLASS 2 PREPARATION25SQYD$ 1.00$ 25.00$ 0.01$ 0.25$ 0.01$ 0.25$ 200.00$ 5,000.00$ 1,182.00$ 29,550.00$ - 0
9PPC REMOVAL468SQYD$ 150.00$ 70,200.00$ 55.00$ 25,740.00$ 25.00$ 11,700.00$ 50.00$ 23,400.00$ 78.00$ 36,504.00$ - 0
10FURNISH PREMIXED POLYMER CONCRETE12CUYD$ 4,500.00$ 54,000.00$ 4,500.00$ 54,000.00$ 2,000.00$ 24,000.00$ 3,700.00$ 44,400.00$ 4,500.00$ 54,000.00$ - 0
11CONSTRUCT PPC OVERLAY468SQYD$ 110.00$ 51,480.00$ 130.00$ 60,840.00$ 50.00$ 23,400.00$ 155.00$ 72,540.00$ 140.00$ 65,520.00$ - 0
12PRECOMPRESSED FOAM SILICONE JOINT SEAL1LS$ 30,000.00$ 30,000.00$ 7,500.00$ 7,500.00$ 20,000.00$ 20,000.00$ 20,000.00$ 20,000.00$ 30,978.00$ 30,978.00$ - 0
13MODULAR BRIDGE JOINT SYSTEMS1LS$ 854,000.00$ 854,000.00$ 750,000.00$ 750,000.00$ 800,000.00$ 800,000.00$ 600,000.00$ 600,000.00$ 556,940.00$ 556,940.00$ - 0
14TEMPORARY JOINT SYSTEM1LS$ 120,000.00$ 120,000.00$ 200,000.00$ 200,000.00$ 300,000.00$ 300,000.00$ 274,500.00$ 274,500.00$ 545,429.00$ 545,429.00$ - 0
15PRESSURE WASHING1LS$ 15,000.00$ 15,000.00$ 22,000.00$ 22,000.00$ 30,000.00$ 30,000.00$ 12,000.00$ 12,000.00$ 8,670.00$ 8,670.00$ - 0
16COPE EXISTING STEEL16EACH$ 1,000.00$ 16,000.00$ 800.00$ 12,800.00$ 300.00$ 4,800.00$ 2,600.00$ 41,600.00$ 1.00$ 16.00$ - 0
17SUPPORT BAR REPAIR36EACH$ 100.00$ 3,600.00$ 400.00$ 14,400.00$ 100.00$ 3,600.00$ 4,200.00$ 151,200.00$ 1.00$ 36.00$ - 0
18MONO-DIRECTIONAL WHITE TYPE IAR MARKERS10EACH$ 100.00$ 1,000.00$ 25.00$ 250.00$ 25.00$ 250.00$ 25.00$ 250.00$ 25.00$ 250.00$ - 0
19METHYL METHACRYLATE, EXTRUDED, SURFACE, PROFILED210FOOT$ 10.00$ 2,100.00$ 15.00$ 3,150.00$ 20.00$ 4,200.00$ 20.00$ 4,200.00$ 18.50$ 3,885.00$ - 0
TOTAL$ 1,754,435.00$ 1,894,678.05$ 1,960,450.25$ 2,049,790.00$ 2,098,972.00$ - 0