Attachment C-1_Bid Reference Document for Bridge Removal~1.pdf
PDF 3 MB Posted
- Attached to
- Rebid NB Boone Bridge (I-5 Over Willamette River at MP 283. 11) Joint Rehabilitation Project
- Solicitation number
- S-73000-00015864
- Issued by
- Clackamas County, Oregon
About this file
This is a bid reference document memo from the Oregon Department of Transportation (ODOT) Bridge Engineering Section dated November 5, 2025, addressed to Richard Garrison, ODOT Region 1 Maintenance & Operations Project Manager, regarding the NB Boone Bridge (I-5 over Willamette River at MP 283.11) Joint Rehabilitation Project (Structure No. 02254A). The memo, prepared by Paul Strauser, Region 4 Bridge Lead Engineer, serves as an engineer of record document providing contractors with necessary information to prepare accurate bids for the removal of existing temporary work access and containment (TWAC) structures at pier 1. The document includes a plan sheet from existing bridge plans and photographs of the existing TWAC platform to enable contractors to understand the scope of removal work and submit appropriate bids.
The memo communicates that the existing TWAC platform at pier 1 is in poor condition and has been identified for removal as part of the broader NB Boone Bridge rehabilitation project. The location and limits of the TWAC are identified on the referenced plan sheet, with photographic documentation provided to convey the structural composition and condition. The primary purpose of this bid reference document is to furnish contractors with sufficient information regarding the existing conditions and removal requirements so that they can reasonably estimate costs and develop competitive bids for performing the removal work as part of the larger joint rehabilitation and reconstruction project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date: November 5, 2025
To: Richard Garrison ODOT Region 1 Maintenance & Operations Project Manager
Cc: Stephen Burgess, Region 1 Bridge Lead Engineer Project File
From: Paul Strauser, Region 4 Bridge Lead Engineer Engineer of Record
Subject: Bid Reference Document for Bridge Removal - Existing Pier 1 Temp Work Access & Containment
NB Boone Bridge (I-5 over Willamette River at MP 283.11) Joint Rehabilitation Structure No. 02254A - Willamette River, Hwy 1 (Boone Bridge)
To Whom It May Concern:
This memo includes a plan sheet from the existing bridge plans and photos of the existing temporary work access (TWAC) structures at existing pier 1. This platform is in poor condition and is proposed to be removed as a part of the project.
The approximate location and limits of the TWAC is identified on the plan sheet. Photos are provided to communicate the makeup of the structure so that the contractor can reasonably understand the required work and provide a bid to perform the removal appropriately.
Sincerely, Paul Strauser
Department of Transportation Bridge Engineering Section
355 Capitol Street NE, MS 11 Salem, Oregon 97301-3871
| Blank Page |
| Blank Page |
| Blank Page |
| Blank Page |
File details come from the government source that posted it. Updated .