About this file

The file is a Preliminary Bid Results document from the Oregon Department of Transportation (ODOT) for ITB No. S-73000-00014091, soliciting bids for highway maintenance and paving on Interstate 84 between Troutdale and Hood River. The project involves grind and inlay paving across multiple locations from mile posts 19.5 to 64.4, with work including 2-inch depth cold plane pavement removal, 950 tons of Level 3 Asphalt Concrete Pavement placement, traffic control, and pavement marking installation. Three bidders submitted proposals - Kerr Contractors, Oregon Knife River Corporation, and Granite Construction Company - with bid responses ranging from $360,624.50 to $433,433.00. The bid closing date is July 9, 2025, with project substantial completion targeted for September 20, 2025, and full completion required by September 30, 2025.

The bid tabulation reveals unit pricing for key project components, including mobilization, flagging, traffic control, pavement removal, asphalt placement, and roadway markings. Bidders must submit electronic proposals through the OregonBuys eProcurement system and will be evaluated as the lowest responsive and responsible bidder. The contract requires 100% performance and payment bonds, compliance with prevailing wage rates, and adherence to domestic preference requirements for steel and manufactured products. While no specific set-aside designations for disadvantaged enterprises are mentioned, the procurement appears open to qualified contractors, with potential non-resident bidder preferences and requirements for subcontractors performing over 5% of total bid work or $350,000 to undergo detailed reporting.

View the file

Other files

File Type Posted
Attachment B - Bid Pricing Form~36.xlsx XLSX spreadsheet
Attachment A - Special Provisions~6.docx DOCX document
Addendum-3-WAC_Roofing-WA-25-07-02.pdf PDF
00014091_Invitation To Bid.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Date Issued:7/9/25
ITB No.S-73000-00014091BIDDER
NAME:Kerr Contractors OregonKnife River Corporation - NorthwestGranite Construction Company
Bid Closing:July 9, 2025CITY/STATE:
Description:I-84: Troutdale -Hood River Maintenance Pave (Multiple Locations)CCB#:
This bid tabulation is not an indicator of award. It is only a tabulation of the bids submitted for consideration.
Bid Item #DescriptionEst
QTYUNITUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL

PRICE

1Mobilization1LS$34,600.00$ 34,600.00$ 68,000.00$ 68,000.00$14,812.50$ 14,812.50
2Flagging / Traffic Control1LS$15,385.00$ 15,385.00$ 67,530.00$ 67,530.00$45,000.00$ 45,000.00
3Cold Plane Pavement Removal, 2" Depth8,175SY$8.50$ 69,487.50$ 11.00$ 89,925.00$10.00$ 81,750.00
4Level 3, 1/2 Inch ACP950TON$190.00$ 180,500.00$ 135.00$ 128,250.00$260.00$ 247,000.00
5Mono-Directional White Type IAR Markers, Recessed78EA$25.00$ 1,950.00$ 23.00$ 1,794.00$18.50$ 1,443.00
6Methyl Methacrylate, Wet Weather, Grooved, Non-Profiled5,990FT$9.80$ 58,702.00$ 9.00$ 53,910.00$7.25$ 43,427.50
TOTAL$ 360,624.50$ 409,409.00$ 433,433.00