Attachment A - Special Provisions~6.docx
DOCX document 15 MB Posted
- Solicitation number
- S-73000-00014091
- Issued by
- Multnomah County, Oregon
About this file
This document is a Special Provisions attachment for an Oregon Department of Transportation (ODOT) highway maintenance project involving I-84 pavement rehabilitation between Troutdale and Hood River. The project scope includes grinding and inlaying specific segments of I-84 eastbound and westbound lanes at multiple locations between mileposts 19.5 and 64.4, with work to be completed no later than September 30, 2025. The contract requires 2-inch depth cold plane pavement removal, 2-inch depth inlay using Level 3 ACP, traffic control, temporary and permanent pavement markings, and maintenance of existing rumble strips. Lane closures are restricted during peak travel times, with specific limitations on weekday and weekend work hours.
The project is a state-funded contract with no explicit pricing details disclosed in the document. The contractor will be responsible for traffic control, environmental protection, erosion control, and quality assurance, with no separate payments for many incidental activities. The contractor must provide a traffic control plan, pre-construction meeting, material mix design, and comply with ODOT specifications, safety regulations, and equipment standards. Notification requirements include advance communication with the Project Manager and ODOT Traffic Management Operations Center. The contractor must submit invoices, certified payrolls, and project submittals electronically to the designated ODOT representative.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Preliminary Bid Results~63.xlsx | XLSX spreadsheet | |
| Attachment B - Bid Pricing Form~36.xlsx | XLSX spreadsheet | |
| Addendum-3-WAC_Roofing-WA-25-07-02.pdf | ||
| 00014091_Invitation To Bid.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
I-84 Maintenance Pave
SPECIAL PROVISIONS FOR
I-84: Troutdale - Hood River Maintenance Pave (Multiple Locations) MP 19.5 to MP 64.4
DESCRIPTION OF WORK
COMPLETION OF WORK
Complete all work to be done in the contract no later than September 30, 2025.
SCOPE OF WORK
The work to be done in this contract consists of the following:
1. Grind and inlay the following locations I-84 eastbound and westbound between Troutdale and Hood River:
a) I-84 eastbound MP 46.4 – MP 46.5 Left and Right lanes and one-foot of shoulders. Approximately 475ft. Sawcut bridge joint 1½” depth and fill with hot applied joint sealant.
b) I-84 westbound MP 64.3 – MP 64.4 Left and Right lanes and two feet of left shoulders and one foot on right shoulder. Approximately 400ft. Sawcut bridge joint 1½” depth and fill with hot applied joint sealant.
c) I-84 westbound MP 63.04 – MP 63. 36 Right Lane, approximately 1,700ft. Grind and inlay shall leave existing skips and recessed markers and extend six inches beyond white fog line into the shoulder.
d) I-84 westbound MP 39.18 – MP 39.47 Right Lane, approximately 1,500ft. Grind and inlay shall remove existing skips and recessed markers and six inches beyond white fog line into the shoulder.
e) I-84 westbound MP 19.60 – MP 19.71 Right Lane, approximately 600ft. Grind and inlay shall remove existing skips and recessed markers and six inches beyond white fog line into the shoulder.
2. Existing rumble strips are to remain in place
3. Cold Plane ACP removal 2” depth as specified.
4. Pave 2” depth inlay. Level 3 – ½ inch ACP.
5. Contractor will provide necessary traffic control to complete the project.
6. Contractor will provide temporary pavement markings.
7. Contractor will provide permanent pavement markings.
8. For locations a) and b) and c), no lane closures between 8:00 a.m. to 8:00 p.m. Monday through Friday and from Friday 8:00 p.m. to Sunday 8:00 p.m. For locations d) and e), no lane closures from Friday at noon to Sunday 8:00 p.m. No work on holidays unless approved by the Project Manager.
9. Comply with the 2024 Oregon Standard Specification for Construction
LOCATION OF WORK
The project is located as specified in the maps below.
Figure 1: Vicinity of 2" Grind and Inlay on I-84, multiple locations between Troutdale and Hood River
Figure 2: Site Map of Approximate Grind and Inlay location a) eastbound MP 46.4 – MP 46.5
Figure 3: Site Map of Approximate Grind and Inlay location a) eastbound MP 46.4 – MP 46.5
Figure 4: Site Map of Approximate Grind and Inlay Area b) westbound MP 64.3 - MP 64.4
Figure 5: Site Map of Approximate Grind and Inlay Area c) westbound MP 63.04 - MP 63.36
Figure 6: Site Map of Approximate Grind and Inlay Area d) westbound MP 39.18 - MP 39.47
Figure 7: Site Map of Approximate Grind and Inlay Area e) westbound MP 19.60 – MP 19.71
STOCKPILE AND STAGING LOCATIONS
Contractor will be responsible for locating suitable locations for storing equipment throughout the project area.
APPLICABLE SPECIFICATIONS
The 2024 Oregon Standard Specifications for Construction (“Standard Specifications”) include detailed technical specifications in Sections 00200 and beyond that apply to this Contract. Some sections of the technical specifications may be identified and modified in the Plans and these Special Provisions. Sections of the technical specifications not identified in the Plans and Special Provisions remain applicable to the Contract according to their original terms.
Sections in Part 00100 of the Standard Specifications (General Conditions) are not applicable to the Contract unless they are specifically identified in the Plans and Special Provisions as being applicable. However, if a Part 00100 section that has been identified as being applicable references another section in Part 00100, or a technical specification (Parts 00200 and beyond) references a section from Part 00100, that section from Part 00100 applies to the Contract for purposes of supporting and giving full effect to the specification that referenced it. Bidders can access the Standard Specifications online at:
http://www.oregon.gov/ODOT/Business/Pages/Standard_Specifications.aspx Standard Drawings referenced in the Standard Specifications are available at:
http://www.oregon.gov/odot/engineering/pages/standards.aspx
All number references in these Special Provisions shall be understood to refer to the Sections and subsections of the Standard Specifications bearing like numbers and to Sections and subsections contained in these Special Provisions in their entirety.
CLASS OF PROJECT
This is a State Project.
SECTION 00210 - MOBILIZATION
Comply with Section 00210 of the 2024 Standard Specifications.
SECTION 00220 – ACCOMMODATIONS FOR PUBLIC TRAFFIC
Comply with Section 00220 of the Standard Specifications modified as follows:
00220.40(e)(1) Closed Lanes - Replace this subsection, except for the subsection number and title, with the following:
Traffic Lanes may be closed on the Columbia River Highway (I-84) when allowed, shown, or directed during the following periods of time except as specified in 00220.40(e)(2):
· Locations a) MP 46.4 – MP 46.5, b) MP 64.4 – MP 64.3 and c) MP 63.38 – MP 63.05
· Nightly, Sunday night through Friday morning 8:00 p.m. through 8:00 a.m.
· Location d) MP 39.45 – MP 39.25 and e) MP 19.69 – MP 19.63
· Weekly, between Sunday at 8:00 p.m. and Friday at noon.
00220.40(e)(2)(b) Special Events - Add the following to the end of this subsection:
The following special events will occur during this Project:
· None anticipated
SECTION 00221 – COMMON PROVISIONS FOR WORK ZONE TRAFFIC CONTROL
Comply with Section 00221 of the Standard Specifications.
SECTION 00225 – TEMPORARY PAVEMENT MARKINGS
Install temporary pavement markings in accordance with Section 00225 of the Standard Specifications. No separate measurement or payment will be made for Temporary pavement Markings and should be considered incidental to the Level 3, ½ inch dense ACP.
SECTION 00280 – EROSION AND SEDIMENT CONTROL
Perform any necessary environmental protection in accordance with the 2024 Standard Specifications. Any work or materials needed for erosion and sediment control will be considered incidental to the project. No separate or additional payments will be made for erosion and sediment control.
SECTION 00290 – ENVIRONMENTAL PROTECTION
Perform any necessary environmental protection in accordance with the 2024 Standard Specifications. Any work or materials needed for environmental protection will be considered incidental to the project. No separate or additional payments will be made for environmental protection.
SECTION 00620 – COLD PLANE PAVEMENT REMOVAL
Comply with Section 00620 of the Standard Specifications modified as follows:
00620.43 Maintenance Under Traffic - Replace this subsection, except for the subsection number and title, with the following:
Traffic is not allowed on the cold planed surface. Before opening the area to traffic, pave the surface according to 00744.51.
SECTION 00730 – EMULSIFIED ASPHALT TACK COAT
Comply with Section 00730 of the Standard Specifications, modified as follows:
00730.90 Payment – Replace this subsection, except for the name and number, with the following:
No separate measurement or payment will be made for tack coat and should be considered incidental to the Level 3, ½ inch ACP.
SECTION 00744 – ASPHALT CONCRETE PAVEMENT
Comply with Section 00744 of the Standard Specifications, modified as follows:
00744.16 Sampling and Testing – Replace this subsection, except for the subsection number and title, with the following:
When required under 00744.17, have a CAT-I perform a minimum of one of each of the following test methods as modified in the MFTP per day
· Asphalt Content – AASHTO T 308 with ODOT TM 323 determined Calibration Factor
· Gradation – AASHTO T 30
· Mix Moisture – AASHTO T 329
· Maximum Specific Gravity – AASHTO T 209 Provide test results to the Project Manager by the middle of the following work shift. The Project Manager may waive the requirement for any of AASHTO T 308, AASHTO T 30, AASHTO T 329, AASHTO T 209, and ODOT TM 326 on a daily basis.
Provide samples or split samples to the Project Manager when requested.
00744.17 Acceptance – Replace this subsection, except for the subsection number and title, with the following:
The mixture will be accepted by visual inspection by the Project Manager. If the mixture is considered suspect, the Project Manager may request verification that the mixture is within tolerances and limits of 00744.14. When requested by the Project Manager, provide sampling and testing according to 00744.16. If the test result for each mix gradation constituent, asphalt content, and density measurement is within the specification limits, the material will be accepted. If the asphalt content, one or more gradation constituents, or the density measurement are not within the specification limits, the material that is not within the specification limits will be accepted according to 00150.25.
00744.49 Compaction - Replace this subsection, except for the subsection number and title, with the following:
Contractor shall meet the compaction requirements listed in this section of a minimum of 91% of MAMD. Contractor shall be responsible to provide quality control and quality assurance for the project. The Project Manager reserves the right to take and test material samples, and based upon such test results, to reject any material not meeting the referenced Specifications. It is agreed and understood that the contractor shall replace all rejected material with material meeting the Specifications at no additional cost to the State.
Add the following subsections:
00744.51 Opening Section to Traffic - Schedule Work so that, during the same shift, the surfaces being paved are paved full width and length through the wearing Course before opening to traffic.
SECTION 00850 – COMMON PROVISIONS FOR PAVEMENT MARKINGS
Comply with Section 00850 of the Standard Specifications modified as follows:
00850.30 Manufacturer’s Representative - Replace this subsection, except for the subsection number and title, with the following:
For Sections referencing 00850.30, the services of a manufacturer’s representative are not required. Place pavement markings only when the pavement is ready for the pavement marking material according to the manufacturer’s installation instructions.
SECTION 00855 – PAVEMENT MARKERS
Comply with Section 00855 of the Standard Specifications.
SECTION 00865 – LONGITUDINAL PAVEMENT MARKINGS – DURABLE
Comply with Section 00865 of the Standard Specifications.
SUPPLEMENTAL SPECIAL PROVISIONS
1. The quantities in the bid items list intended to serve only as a guide to bidders and are not to be construed as a guarantee. All quantities are estimated and are for bid purposes only. The quantities for each bid item include all labor, equipment and materials for all activities associated with this project. The Oregon Department of Transportation (ODOT) reserves the right to adjust quantities and add or delete, as needed.
2. Contractor will be responsible for traffic control measures for all closures, based on approved traffic control plan (TCP). Submit TCP at least seven (7) days prior to pre-construction meeting to allow for review and approval.
3. The total number of PCMS required for the project will be determined by the Contractor’s TCP. Contractor must include the message to be displayed on their TCP. Abrupt edge PCMS signs will be required if a longitudinal abrupt edge is left.
4. Contractor shall provide a schedule to the Project Manager at least seven (7) days prior to the preconstruction meeting to allow for review.
5. Contractor shall schedule a pre-construction meeting with the Project Manager at least seven (7) days prior to the proposed start of construction.
6. Contractor shall provide a recently approved ODOT asphalt mix design for Level 3, ½ inch dense, ACP at least seven (7) days prior to the pre-construction meeting for review.
7. Contractor shall provide weigh slips for each load of ACP material placed in performance of Work under contract. Contractor shall collect weigh slips during shift and give the group of them to the inspector at the end of shift.
8. Replace removed 4” White mono-direction recessed pavement markers between skip lines within project limits as per detail WB/R-40 on standard drawing TM502, TM517 and the project special provisions.
9. Contractor is responsible for placing all new lines in the same location and configuration as all existing lines. Cost to control work to meet this responsibility is incidental to the bid item “Methyl Methacrylate, Wet Weather, Grooved, Non-Profiled”.
10. Contractor shall apply durable longitudinal pavement markings by Standard Specifications Section 00865 Method D: Wet Weather Markings. Methyl Methacrylate, Wet Weather, Grooved, Non-Profiled.
11. Contractor will follow all oversize traffic restrictions as specified by the Commerce and Compliance Division, Over-Dimension Operations guidelines. ODOT will submit the mobility restriction request for the project. Any schedule changes will be subject to the approval of the mobility restriction notice. Contractor schedules will be subject to the approval of the mobility restriction notice. Over Dimensional Restriction notices need to be submitted at least 35 days before work begins.
12. Contractor shall furnish a 12 foot straight edge. Test with a 12 foot straight edge parallel to and perpendicular to the centerline and at joints as directed. The pavement surface shall not vary by more than ¼ inch. District 2C manager will determine when corrective action from section 00744.75 of the Oregon Standard Specifications for Construction for pavement roughness is acceptable for the project.
13. Contractor shall be responsible to provide quality control and quality assurance for the project. The contractor shall meet the compaction requirement listed in section 0744.49 of a minimum of 91% of MAMD. The Project Manager reserves the right to take and re-test material samples, and based on such test results, to reject any material not meeting the referenced Specifications. It is agreed and understood that the Contractor shall replace all rejected material with material meeting the Specifications at no additional cost to the State.
14. Defective pavement will be repaired, at no additional cost to the state, according to the Region 1 Maintenance: Guideline for Pavement Restoration or Defective Work.
15. All new transverse joints pavement edges shall be sand sealed. This work will be considered incidental to the bid item “Level 3, ½ inch ACP”.
16. No separate measurement or payment will be made for tack coat and should be considered incidental to the bid item “Level 3, ½ inch ACP”.
17. No separate measurement or payment for temporary pavement markers will be made and should be considered incidental to the bid item “Level 3, ½ inch ACP.
18. No separate measurement or payment will be made for saw cutting and sealing bridge joints and should be considered incidental to the bid item “Level 3, ½ inch ACP. Contractors responsible to re-install in the same location.
19. Contractor shall submit invoices and certified payroll documents to the Project Manager via email, reference the ODOT project name in the subject line.
20. Contractor’s employees and their subcontractors shall not wear clothing, hats, vests, ect. that have the ODOT name or “flying T” symbol.
21. There is public interest in the work. Contractor is advised to use courtesy and respect in any work site interaction with the public and to refer all public relation matters to the ODOT Project Manager.
22. Contractor shall implement safety policies, procedures and practices in conformance with all applicable local, state, and federal laws, rules and regulations including but not limited to:
a. Applicable OSHA safety regulations
b. ANZI Z 133.1 Safety standards agreed upon by ODOT and local jurisdiction
c. The Manual of Uniform Traffic Control Devices (MUTCD)
d. Any other applicable safety laws, regulations and codes
23. All equipment utilized during this contract shall be in good and serviceable condition.
24. In addition to notifications required under the Standard Specifications and Special Provisions, Contractor will also:
a. At least 72 hours prior to executing lane and/or complete closures notify:
The Project Manager, Jason McNeil: (503) 702-9080
b. At the time of lane and/or complete roadway closure and again when the lane and/or complete roadway is open notify:
ODOT Traffic Management Operations Center (TMOC): (503) 283-5859
25. Correspondence for the project is required to have the project name in the subject line.
26. The invoices, certified payrolls (if applicable) and project submittals are to be via email to the Agency Authorized Representative:
Jason.P.MCNEIL@odot.oregon.gov
27. Invoices must have the following certified statement on the along with a signature by the Contractor’s Authorized Representative.
“I the undersigned, herby certify that the above bill is true and correct and that payment has not been received. Signature:_____________________________”
28. Invoices are to have the contract number and service period listed on them and the following billing address:
ODOT District 2C 2225 NW Campus Dr.
Estacada OR 97023
Special Provisions 1 image3.png image4.png image5.png image6.png image7.png image1.png image2.png