This is a preliminary bid tabulation document from the Oregon Department of Transportation (ODOT) for Invitation to Bid (ITB) No. S-73000-00011291, issued on September 17, 2024, for the K23521 OR99E at SE Maple St Project. The project encompasses traffic control, erosion management, pavement removal and replacement, concrete work, signage, and signal installation at the specified location. The bid tabulation includes 61 line items with estimated quantities ranging from single units to thousands of linear feet or square yards, covering temporary traffic control measures, environmental protection, excavation, asphalt and concrete paving, curbing, walkways, pavement markings, and specialized equipment such as flashing beacons and speed feedback assemblies. Three contractors submitted bids by the September 17, 2024 closing date: Brown Contracting Inc, Colton Homes Inc, and Corpac Construction Co.
The bid totals submitted were $456,732.26 from Brown Contracting Inc (lowest bid), $486,967.60 from Colton Homes Inc, and $525,642.00 from Corpac Construction Co. Pricing varies significantly across bidders, particularly on items such as traffic control supervision (ranging from $120 to $750 per unit), temporary impact attenuators ($4,500 to $19,500), truncated domes on existing surfaces ($30 to $350 per square foot), and the flashing beacon installation ($52,500 to $85,000). The document explicitly states that this bid tabulation is not an indicator of award and serves only as a compilation of submitted bids for consideration. No information regarding set-asides, contract term, renewal options, or funding sources is provided in this preliminary bid results document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 00011290_EvaluationScoreMatrix.xlsx | XLSX spreadsheet | |
| 00011290_ITA.docx | DOCX document | |
| 00011290_CDSR_Attach A_Sample Contract_Final.docx | DOCX document | |
| 00011290_Figure 1. CDSR-Timeline.pdf | ||
| 00011290_CDSR_RFQ_Final.docx | DOCX document | |
| 00011290_Questions and Answers_Vol1.docx | DOCX document | |
| 00011290_RFP_Addendum1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Date Issued: | 9/17/24 | ||||
| ITB No. | S-73000-00011291 | BIDDER | |||
| NAME: | Brown Contracting Inc | Colton Homes, Inc | Corpac Construction Co. | ||
| Bid Closing: | September 17, 2024 | CITY/STATE: | |||
| Description: | K23521 OR99E at SE Maple St Project | CCB#: | |||
| This bid tabulation is not an indicator of award. It is only a tabulation of the bids submitted for consideration. |
| Bid Item # | Description | Est | |
| QTY | UNIT | UNIT | |
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL |
PRICE
| 1 | MOBILIZATION | 1 | LS | $ 45,000.00 | $ 45,000.00 | $ 25,000.00 | $ 25,000.00 | $55,000.00 | $ 55,000.00 |
| 2 | TEMPORARY PROTECTION AND DIRECTION OF TRAFFIC | 1 | LS | $ 63,000.00 | $ 63,000.00 | $ 18,000.00 | $ 18,000.00 | $25,000.00 | $ 25,000.00 |
| 3 | TEMPORARY SIGNS | 540 | SQFT | $ 10.00 | $ 5,400.00 | $ 40.00 | $ 21,600.00 | $25.00 | $ 13,500.00 |
| 4 | SEQUENTIAL ARROW SIGNS | 2 | EACH | $ 888.00 | $ 1,776.00 | $ 1,200.00 | $ 2,400.00 | $1,400.00 | $ 2,800.00 |
| 5 | PORTABLE CHANGEABLE MESSAGE SIGNS | 3 | EACH | $ 2,000.00 | $ 6,000.00 | $ 3,000.00 | $ 9,000.00 | $3,500.00 | $ 10,500.00 |
| 6 | FLAGGERS | 160 | HOUR | $ 45.00 | $ 7,200.00 | $ 78.00 | $ 12,480.00 | $72.50 | $ 11,600.00 |
| 7 | FLAGGER STATION LIGHTING | 4 | EACH | $ 655.00 | $ 2,620.00 | $ 2,000.00 | $ 8,000.00 | $1,500.00 | $ 6,000.00 |
| 8 | TRAFFIC CONTROL SUPERVISOR | 71 | EACH | $ 200.00 | $ 14,200.00 | $ 120.00 | $ 8,520.00 | $750.00 | $ 53,250.00 |
| 9 | AUTOMATED FLAGGER ASSISTANCE DEVICE | 2 | EACH | $ 1,000.00 | $ 2,000.00 | $ 3,000.00 | $ 6,000.00 | $4,500.00 | $ 9,000.00 |
| 10 | TEMPORARY BARRICADES, TYPE III | 9 | EACH | $ 255.00 | $ 2,295.00 | $ 400.00 | $ 3,600.00 | $160.00 | $ 1,440.00 |
| 11 | TEMPORARY PLASTIC DRUMS | 43 | EACH | $ 78.00 | $ 3,354.00 | $ 70.00 | $ 3,010.00 | $75.00 | $ 3,225.00 |
| 12 | TEMPORARY STRIPING | 5,400 | FOOT | $ 1.00 | $ 5,400.00 | $ 2.00 | $ 10,800.00 | $1.00 | $ 5,400.00 |
| 13 | TEMPORARY PAVEMENT LEGENDS | 3 | EACH | $ 344.00 | $ 1,032.00 | $ 3,000.00 | $ 9,000.00 | $250.00 | $ 750.00 |
| 14 | TEMPORARY PAVEMENT BARS | 410 | SQFT | $ 6.00 | $ 2,460.00 | $ 10.00 | $ 4,100.00 | $5.50 | $ 2,255.00 |
| 15 | STRIPE REMOVAL | 540 | FOOT | $ 5.00 | $ 2,700.00 | $ 5.00 | $ 2,700.00 | $4.00 | $ 2,160.00 |
| 16 | TEMPORARY IMPACT ATTENUATOR, TRUCK MOUNTED | 1 | EACH | $ 4,500.00 | $ 4,500.00 | $ 8,000.00 | $ 8,000.00 | $19,500.00 | $ 19,500.00 |
| 17 | REPAIR TEMPORARY IMPACT ATTENUATOR, TRUCK MOUNTED | 2 | EACH | $ 1.00 | $ 2.00 | $ 1,000.00 | $ 2,000.00 | $4,500.00 | $ 9,000.00 |
| 18 | PEDESTRIAN CHANNELIZING DEVICES | 160 | FOOT | $ 11.00 | $ 1,760.00 | $ 12.00 | $ 1,920.00 | $38.00 | $ 6,080.00 |
| 19 | TEMPORARY CURB RAMP, PARALLEL | 4 | EACH | $ 888.00 | $ 3,552.00 | $ 1,000.00 | $ 4,000.00 | $1,800.00 | $ 7,200.00 |
| 20 | EROSION CONTROL | 1 | LS | $ 3,333.00 | $ 3,333.00 | $ 1,000.00 | $ 1,000.00 | $5,500.00 | $ 5,500.00 |
| 21 | INLET PROTECTION, TYPE 3 | 10 | EACH | $ 125.00 | $ 1,250.00 | $ 150.00 | $ 1,500.00 | $75.00 | $ 750.00 |
| 22 | INLET PROTECTION, TYPE 4 | 4 | EACH | $ 165.00 | $ 660.00 | $ 150.00 | $ 600.00 | $105.00 | $ 420.00 |
| 23 | POLLUTION CONTROL PLAN | 1 | LS | $ 1,000.00 | $ 1,000.00 | $ 1,000.00 | $ 1,000.00 | $2,000.00 | $ 2,000.00 |
| 24 | CONTAMINATED SOIL DISPOSAL | 8 | TON | $ 300.00 | $ 2,400.00 | $ 250.00 | $ 2,000.00 | $150.00 | $ 1,200.00 |
| 25 | LEAD COMPLIANCE PLAN | 1 | LS | $ 1,000.00 | $ 1,000.00 | $ 1,000.00 | $ 1,000.00 | $2,000.00 | $ 2,000.00 |
| 26 | CONSTRUCTION SURVEY WORK | 1 | LS | $ 15,555.00 | $ 15,555.00 | $ 5,000.00 | $ 5,000.00 | $7,500.00 | $ 7,500.00 |
| 27 | REMOVAL OF PIPES | 10 | FOOT | $ 200.00 | $ 2,000.00 | $ 130.00 | $ 1,300.00 | $65.00 | $ 650.00 |
| 28 | REMOVAL OF CURBS | 30 | FOOT | $ 30.00 | $ 900.00 | $ 100.00 | $ 3,000.00 | $65.00 | $ 1,950.00 |
| 29 | REMOVAL OF WALKS AND DRIVEWAYS | 19 | SQYD | $ 45.00 | $ 832.50 | $ 220.00 | $ 4,070.00 | $150.00 | $ 2,775.00 |
| 30 | REMOVAL OF SURFACINGS | 4 | SQYD | $ 80.00 | $ 304.00 | $ 220.00 | $ 836.00 | $250.00 | $ 950.00 |
| 31 | REMOVAL OF INLETS | 1 | EACH | $ 2,000.00 | $ 2,000.00 | $ 1,500.00 | $ 1,500.00 | $750.00 | $ 750.00 |
| 32 | REMOVAL OF STRUCTURES AND OBSTRUCTIONS | 1 | LS | $ 15,555.00 | $ 15,555.00 | $ 6,000.00 | $ 6,000.00 | $8,500.00 | $ 8,500.00 |
| 33 | GENERAL EXCAVATION | 40 | CUYD | $ 200.00 | $ 7,960.00 | $ 140.00 | $ 5,572.00 | $75.00 | $ 2,985.00 |
| 34 | SUBGRADE GEOTEXTILE | 42 | SQYD | $ 5.00 | $ 210.00 | $ 21.00 | $ 882.00 | $3.50 | $ 147.00 |
| 35 | CONCRETE INLETS, TYPE G-2 | 1 | EACH | $ 5,000.00 | $ 5,000.00 | $ 7,000.00 | $ 7,000.00 | $4,250.00 | $ 4,250.00 |
| 36 | COLD PLANE PAVEMENT REMOVAL, 2 INCHES DEEP | 340 | SQYD | $ 55.00 | $ 18,700.00 | $ 20.00 | $ 6,800.00 | $25.00 | $ 8,500.00 |
| 37 | AGGREGATE BASE | 42 | TON | $ 120.00 | $ 5,061.60 | $ 80.00 | $ 3,374.40 | $65.00 | $ 2,741.70 |
| 38 | LEVEL 3, 1/2 INCH ACP | 48 | TON | $ 398.00 | $ 19,211.46 | $ 260.00 | $ 12,550.20 | $450.00 | $ 21,721.50 |
| 39 | PG 64-22 ASPHALT IN LEVEL 3, 1/2 INCH ACP | 3 | TON | $ 150.00 | $ 435.00 | $ 260.00 | $ 754.00 | $2.00 | $ 5.80 |
| 40 | CONCRETE CURBS, CURB AND GUTTER | 66 | FOOT | $ 98.00 | $ 6,419.00 | $ 210.00 | $ 13,755.00 | $85.00 | $ 5,567.50 |
| 41 | CONCRETE CURBS, STANDARD CURB | 64 | FOOT | $ 98.00 | $ 6,262.20 | $ 190.00 | $ 12,141.00 | $65.00 | $ 4,153.50 |
| 42 | CONCRETE ISLANDS | 430 | SQFT | $ 26.00 | $ 11,180.00 | $ 40.00 | $ 17,200.00 | $45.00 | $ 19,350.00 |
| 43 | CONCRETE WALKS | 580 | SQFT | $ 15.00 | $ 8,700.00 | $ 35.00 | $ 20,300.00 | $18.00 | $ 10,440.00 |
| 44 | EXTRA FOR NEW CURB RAMPS | 4 | EACH | $ 1,111.00 | $ 4,444.00 | $ 1,500.00 | $ 6,000.00 | $1,200.00 | $ 4,800.00 |
| 45 | TRUNCATED DOMES ON NEW SURFACES | 22 | SQFT | $ 56.00 | $ 1,232.00 | $ 30.00 | $ 660.00 | $150.00 | $ 3,300.00 |
| 46 | TRUNCATED DOMES ON EXISTING SURFACES | 33 | SQFT | $ 125.00 | $ 4,062.50 | $ 30.00 | $ 975.00 | $350.00 | $ 11,375.00 |
| 47 | MONO-DIRECTIONAL WHITE TYPE IAR MARKERS | 3 | EACH | $ 80.00 | $ 240.00 | $ 50.00 | $ 150.00 | $15.00 | $ 45.00 |
| 48 | BI-DIRECTIONAL YELLOW TYPE IAR MARKERS | 25 | EACH | $ 30.00 | $ 750.00 | $ 50.00 | $ 1,250.00 | $15.00 | $ 375.00 |
| 49 | THERMOPLASTIC, EXTRUDED, SURFACE, PROFILED | 1,800 | FOOT | $ 4.00 | $ 7,200.00 | $ 5.00 | $ 9,000.00 | $4.00 | $ 7,200.00 |
| 50 | PAVEMENT LEGEND, TYPE B-HS: BICYCLE LANE STENCIL | 3 | EACH | $ 444.00 | $ 1,332.00 | $ 500.00 | $ 1,500.00 | $450.00 | $ 1,350.00 |
| 51 | PAVEMENT BAR, TYPE B-HS | 410 | SQFT | $ 22.00 | $ 9,020.00 | $ 30.00 | $ 12,300.00 | $26.00 | $ 10,660.00 |
| 52 | CURB MARKING, PAINT | 100 | FOOT | $ 7.00 | $ 700.00 | $ 10.00 | $ 1,000.00 | $7.50 | $ 750.00 |
| 53 | CROSSWALK CLOSURE SUPPORTS | 2 | EACH | $ 111.00 | $ 222.00 | $ 1,100.00 | $ 2,200.00 | $750.00 | $ 1,500.00 |
| 54 | REMOVE EXISTING SIGNS | 1 | LS | $ 1,000.00 | $ 1,000.00 | $ 1,200.00 | $ 1,200.00 | $500.00 | $ 500.00 |
| 55 | SIGN SUPPORT FOOTINGS | 1 | CUYD | $ 5,500.00 | $ 2,750.00 | $ 4,000.00 | $ 2,000.00 | $1,500.00 | $ 750.00 |
| 56 | PERFORATED STEEL SQUARE TUBE ANCHOR SIGN SUPPORTS | 320 | LB | $ 7.00 | $ 2,240.00 | $ 14.00 | $ 4,480.00 | $50.00 | $ 16,000.00 |
| 57 | SIGNS, STANDARD SHEETING, SHEET ALUMINUM | 52 | SQFT | $ 80.00 | $ 4,160.00 | $ 54.00 | $ 2,808.00 | $35.00 | $ 1,820.00 |
| 58 | 42 INCH DIAMETER SIGNAL SUPPORT DRILLED SHAFT | 25 | FOOT | $ 600.00 | $ 15,000.00 | $ 600.00 | $ 15,000.00 | $550.00 | $ 13,750.00 |
| 59 | FLASHING BEACON INSTALLATION, OR99E AT MAPLE ST | 1 | EACH | $ 59,000.00 | $ 59,000.00 | $ 85,000.00 | $ 85,000.00 | $52,500.00 | $ 52,500.00 |
| 60 | UNINTEGRATED SPEED FEEDBACK ASSEMBLY | 2 | EACH | $ 16,000.00 | $ 32,000.00 | $ 26,000.00 | $ 52,000.00 | $20,000.00 | $ 40,000.00 |
| 61 | CINDER MULCH | 2 | CUYD | $ 600.00 | $ 1,200.00 | $ 90.00 | $ 180.00 | $250.00 | $ 500.00 |
| TOTAL | $ 456,732.26 | $ 486,967.60 | $ 525,642.00 |
File details come from the government source that posted it. Updated .