Preliminary Bid Results~16.xlsx

XLSX spreadsheet 20 KB Posted

Attached to
iQMS QA Contractor
Solicitation number
S-73000-00011290
Issued by
Marion County, Oregon

About this file

This is a preliminary bid tabulation document from the Oregon Department of Transportation (ODOT) for Invitation to Bid (ITB) No. S-73000-00011291, issued on September 17, 2024, for the K23521 OR99E at SE Maple St Project. The project encompasses traffic control, erosion management, pavement removal and replacement, concrete work, signage, and signal installation at the specified location. The bid tabulation includes 61 line items with estimated quantities ranging from single units to thousands of linear feet or square yards, covering temporary traffic control measures, environmental protection, excavation, asphalt and concrete paving, curbing, walkways, pavement markings, and specialized equipment such as flashing beacons and speed feedback assemblies. Three contractors submitted bids by the September 17, 2024 closing date: Brown Contracting Inc, Colton Homes Inc, and Corpac Construction Co.

The bid totals submitted were $456,732.26 from Brown Contracting Inc (lowest bid), $486,967.60 from Colton Homes Inc, and $525,642.00 from Corpac Construction Co. Pricing varies significantly across bidders, particularly on items such as traffic control supervision (ranging from $120 to $750 per unit), temporary impact attenuators ($4,500 to $19,500), truncated domes on existing surfaces ($30 to $350 per square foot), and the flashing beacon installation ($52,500 to $85,000). The document explicitly states that this bid tabulation is not an indicator of award and serves only as a compilation of submitted bids for consideration. No information regarding set-asides, contract term, renewal options, or funding sources is provided in this preliminary bid results document.

View the file

Other files

File Type Posted
00011290_EvaluationScoreMatrix.xlsx XLSX spreadsheet
00011290_ITA.docx DOCX document
00011290_CDSR_Attach A_Sample Contract_Final.docx DOCX document
00011290_Figure 1. CDSR-Timeline.pdf PDF
00011290_CDSR_RFQ_Final.docx DOCX document
00011290_Questions and Answers_Vol1.docx DOCX document
00011290_RFP_Addendum1.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Date Issued:9/17/24
ITB No.S-73000-00011291BIDDER
NAME:Brown Contracting IncColton Homes, IncCorpac Construction Co.
Bid Closing:September 17, 2024CITY/STATE:
Description:K23521 OR99E at SE Maple St ProjectCCB#:
This bid tabulation is not an indicator of award. It is only a tabulation of the bids submitted for consideration.
Bid Item #DescriptionEst
QTYUNITUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL

PRICE

1MOBILIZATION1LS$ 45,000.00$ 45,000.00$ 25,000.00$ 25,000.00$55,000.00$ 55,000.00
2TEMPORARY PROTECTION AND DIRECTION OF TRAFFIC1LS$ 63,000.00$ 63,000.00$ 18,000.00$ 18,000.00$25,000.00$ 25,000.00
3TEMPORARY SIGNS540SQFT$ 10.00$ 5,400.00$ 40.00$ 21,600.00$25.00$ 13,500.00
4SEQUENTIAL ARROW SIGNS2EACH$ 888.00$ 1,776.00$ 1,200.00$ 2,400.00$1,400.00$ 2,800.00
5PORTABLE CHANGEABLE MESSAGE SIGNS3EACH$ 2,000.00$ 6,000.00$ 3,000.00$ 9,000.00$3,500.00$ 10,500.00
6FLAGGERS160HOUR$ 45.00$ 7,200.00$ 78.00$ 12,480.00$72.50$ 11,600.00
7FLAGGER STATION LIGHTING4EACH$ 655.00$ 2,620.00$ 2,000.00$ 8,000.00$1,500.00$ 6,000.00
8TRAFFIC CONTROL SUPERVISOR71EACH$ 200.00$ 14,200.00$ 120.00$ 8,520.00$750.00$ 53,250.00
9AUTOMATED FLAGGER ASSISTANCE DEVICE2EACH$ 1,000.00$ 2,000.00$ 3,000.00$ 6,000.00$4,500.00$ 9,000.00
10TEMPORARY BARRICADES, TYPE III9EACH$ 255.00$ 2,295.00$ 400.00$ 3,600.00$160.00$ 1,440.00
11TEMPORARY PLASTIC DRUMS43EACH$ 78.00$ 3,354.00$ 70.00$ 3,010.00$75.00$ 3,225.00
12TEMPORARY STRIPING5,400FOOT$ 1.00$ 5,400.00$ 2.00$ 10,800.00$1.00$ 5,400.00
13TEMPORARY PAVEMENT LEGENDS3EACH$ 344.00$ 1,032.00$ 3,000.00$ 9,000.00$250.00$ 750.00
14TEMPORARY PAVEMENT BARS410SQFT$ 6.00$ 2,460.00$ 10.00$ 4,100.00$5.50$ 2,255.00
15STRIPE REMOVAL540FOOT$ 5.00$ 2,700.00$ 5.00$ 2,700.00$4.00$ 2,160.00
16TEMPORARY IMPACT ATTENUATOR, TRUCK MOUNTED1EACH$ 4,500.00$ 4,500.00$ 8,000.00$ 8,000.00$19,500.00$ 19,500.00
17REPAIR TEMPORARY IMPACT ATTENUATOR, TRUCK MOUNTED2EACH$ 1.00$ 2.00$ 1,000.00$ 2,000.00$4,500.00$ 9,000.00
18PEDESTRIAN CHANNELIZING DEVICES160FOOT$ 11.00$ 1,760.00$ 12.00$ 1,920.00$38.00$ 6,080.00
19TEMPORARY CURB RAMP, PARALLEL4EACH$ 888.00$ 3,552.00$ 1,000.00$ 4,000.00$1,800.00$ 7,200.00
20EROSION CONTROL1LS$ 3,333.00$ 3,333.00$ 1,000.00$ 1,000.00$5,500.00$ 5,500.00
21INLET PROTECTION, TYPE 310EACH$ 125.00$ 1,250.00$ 150.00$ 1,500.00$75.00$ 750.00
22INLET PROTECTION, TYPE 44EACH$ 165.00$ 660.00$ 150.00$ 600.00$105.00$ 420.00
23POLLUTION CONTROL PLAN1LS$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$2,000.00$ 2,000.00
24CONTAMINATED SOIL DISPOSAL8TON$ 300.00$ 2,400.00$ 250.00$ 2,000.00$150.00$ 1,200.00
25LEAD COMPLIANCE PLAN1LS$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$2,000.00$ 2,000.00
26CONSTRUCTION SURVEY WORK1LS$ 15,555.00$ 15,555.00$ 5,000.00$ 5,000.00$7,500.00$ 7,500.00
27REMOVAL OF PIPES10FOOT$ 200.00$ 2,000.00$ 130.00$ 1,300.00$65.00$ 650.00
28REMOVAL OF CURBS30FOOT$ 30.00$ 900.00$ 100.00$ 3,000.00$65.00$ 1,950.00
29REMOVAL OF WALKS AND DRIVEWAYS19SQYD$ 45.00$ 832.50$ 220.00$ 4,070.00$150.00$ 2,775.00
30REMOVAL OF SURFACINGS4SQYD$ 80.00$ 304.00$ 220.00$ 836.00$250.00$ 950.00
31REMOVAL OF INLETS1EACH$ 2,000.00$ 2,000.00$ 1,500.00$ 1,500.00$750.00$ 750.00
32REMOVAL OF STRUCTURES AND OBSTRUCTIONS1LS$ 15,555.00$ 15,555.00$ 6,000.00$ 6,000.00$8,500.00$ 8,500.00
33GENERAL EXCAVATION40CUYD$ 200.00$ 7,960.00$ 140.00$ 5,572.00$75.00$ 2,985.00
34SUBGRADE GEOTEXTILE42SQYD$ 5.00$ 210.00$ 21.00$ 882.00$3.50$ 147.00
35CONCRETE INLETS, TYPE G-21EACH$ 5,000.00$ 5,000.00$ 7,000.00$ 7,000.00$4,250.00$ 4,250.00
36COLD PLANE PAVEMENT REMOVAL, 2 INCHES DEEP340SQYD$ 55.00$ 18,700.00$ 20.00$ 6,800.00$25.00$ 8,500.00
37AGGREGATE BASE42TON$ 120.00$ 5,061.60$ 80.00$ 3,374.40$65.00$ 2,741.70
38LEVEL 3, 1/2 INCH ACP48TON$ 398.00$ 19,211.46$ 260.00$ 12,550.20$450.00$ 21,721.50
39PG 64-22 ASPHALT IN LEVEL 3, 1/2 INCH ACP3TON$ 150.00$ 435.00$ 260.00$ 754.00$2.00$ 5.80
40CONCRETE CURBS, CURB AND GUTTER66FOOT$ 98.00$ 6,419.00$ 210.00$ 13,755.00$85.00$ 5,567.50
41CONCRETE CURBS, STANDARD CURB64FOOT$ 98.00$ 6,262.20$ 190.00$ 12,141.00$65.00$ 4,153.50
42CONCRETE ISLANDS430SQFT$ 26.00$ 11,180.00$ 40.00$ 17,200.00$45.00$ 19,350.00
43CONCRETE WALKS580SQFT$ 15.00$ 8,700.00$ 35.00$ 20,300.00$18.00$ 10,440.00
44EXTRA FOR NEW CURB RAMPS4EACH$ 1,111.00$ 4,444.00$ 1,500.00$ 6,000.00$1,200.00$ 4,800.00
45TRUNCATED DOMES ON NEW SURFACES22SQFT$ 56.00$ 1,232.00$ 30.00$ 660.00$150.00$ 3,300.00
46TRUNCATED DOMES ON EXISTING SURFACES33SQFT$ 125.00$ 4,062.50$ 30.00$ 975.00$350.00$ 11,375.00
47MONO-DIRECTIONAL WHITE TYPE IAR MARKERS3EACH$ 80.00$ 240.00$ 50.00$ 150.00$15.00$ 45.00
48BI-DIRECTIONAL YELLOW TYPE IAR MARKERS25EACH$ 30.00$ 750.00$ 50.00$ 1,250.00$15.00$ 375.00
49THERMOPLASTIC, EXTRUDED, SURFACE, PROFILED1,800FOOT$ 4.00$ 7,200.00$ 5.00$ 9,000.00$4.00$ 7,200.00
50PAVEMENT LEGEND, TYPE B-HS: BICYCLE LANE STENCIL3EACH$ 444.00$ 1,332.00$ 500.00$ 1,500.00$450.00$ 1,350.00
51PAVEMENT BAR, TYPE B-HS410SQFT$ 22.00$ 9,020.00$ 30.00$ 12,300.00$26.00$ 10,660.00
52CURB MARKING, PAINT100FOOT$ 7.00$ 700.00$ 10.00$ 1,000.00$7.50$ 750.00
53CROSSWALK CLOSURE SUPPORTS2EACH$ 111.00$ 222.00$ 1,100.00$ 2,200.00$750.00$ 1,500.00
54REMOVE EXISTING SIGNS1LS$ 1,000.00$ 1,000.00$ 1,200.00$ 1,200.00$500.00$ 500.00
55SIGN SUPPORT FOOTINGS1CUYD$ 5,500.00$ 2,750.00$ 4,000.00$ 2,000.00$1,500.00$ 750.00
56PERFORATED STEEL SQUARE TUBE ANCHOR SIGN SUPPORTS320LB$ 7.00$ 2,240.00$ 14.00$ 4,480.00$50.00$ 16,000.00
57SIGNS, STANDARD SHEETING, SHEET ALUMINUM52SQFT$ 80.00$ 4,160.00$ 54.00$ 2,808.00$35.00$ 1,820.00
5842 INCH DIAMETER SIGNAL SUPPORT DRILLED SHAFT25FOOT$ 600.00$ 15,000.00$ 600.00$ 15,000.00$550.00$ 13,750.00
59FLASHING BEACON INSTALLATION, OR99E AT MAPLE ST1EACH$ 59,000.00$ 59,000.00$ 85,000.00$ 85,000.00$52,500.00$ 52,500.00
60UNINTEGRATED SPEED FEEDBACK ASSEMBLY2EACH$ 16,000.00$ 32,000.00$ 26,000.00$ 52,000.00$20,000.00$ 40,000.00
61CINDER MULCH2CUYD$ 600.00$ 1,200.00$ 90.00$ 180.00$250.00$ 500.00
TOTAL$ 456,732.26$ 486,967.60$ 525,642.00