Prelim Plans_Gardner River.pdf
PDF 27 MB Posted
- Attached to
- WY NPS YELL 10(26), Gardner River High Bridge
- Solicitation number
- 69056726R000002
About this file
The file is a preliminary project plan for the Gardner River High Bridge project located 1.5 miles east of Mammoth, Wyoming, within Yellowstone National Park. The project involves comprehensive bridge rehabilitation, including containment, lead-based paint removal, painting, approach span replacement, deep patching, guardwall construction, thin epoxy overlay, joint replacement, and minor bridge repairs across a 0.32-mile section.
The project is anticipated to be solicited in Fall/Winter 2025, with a tentative completion date of Fall/Winter 2026. It will be a negotiated, firm-fixed-price contract with an estimated price range between $20 million and $30 million. The solicitation will be limited to Idaho, Montana, and surrounding areas MATOC (Multiple Award Task Order Contract) contractors, with the Federal Highway Administration (FHWA) as the managing agency. Interested vendors must be registered in SAM.gov and may access additional project details through the FHWA website.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PROJECT DESCRIPTION_Gardner River High Bridge.pdf | ||
| Prelim Letter_Gardner River High Bridge.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Location
KEY MAP
NATIONAL PARK
YELLOWSTONE
W Y
O M
IN
G
ID
A
H O
WYOMING
MONTANA
Lake
Hebgen
Lake
Shoshone Lake
Yellowstone
Y e llo w s to n e
R iv e r
R iv e r
S n a k e
Lake
Jackson
NATIONAL
PARK
YELLOWSTONE
MEMORIAL PARKWAY
JOHN D. ROCKEFELLER, Jr.
PARK
NAT'L
TETON
GRAND
Faithful
Old
Thumb
West
Lake
Hot Springs
Mammoth
Canyon
Jackson
APPROVED:
DATE
DATE
Yellowstone National Park
Superintendent, Western Federal Lands Highway Division
Chief of Engineering, FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PROJECT MANAGER
N. JONES
PLANS FOR PROPOSED PROJECT
VANCOUVER, WASHINGTON
WESTERN FEDERAL LANDS HIGHWAY DIVISION
PLANS PREPARED BY
YELLOWSTONE NATIONAL PARK
NATIONAL PARK SERVICE
U. S. DEPARTMENT OF THE INTERIOR
N e (max)
V
ADT (2045)
ADT (2025)
0.060
45 MPH
<8000
Bridge rehabilitation
TYPE OF CONSTRUCTION:
DESIGN DESIGNATION:
SPECIFICATION:
WYOMING
PARK COUNTY
LENGTH 0.32 MILES
on Federal Highway Projects, FP-14
Construction of Roads and Bridges
Standard Specifications for
GARDNER RIVER HIGH BRIDGE
NPS PMIS. NO. 305864
WY NPS YELL 10(26)
SCALE IN MILES
2 4 62
Airport
Gardiner
Campground
GARDINER
O x b o w
Creek
C o tt o n w o o d
C r k
C re u ic e
C r k
Pine Crk
B e a r
C r k
G ra nd
Loop Rd
L a v a
Crk
R escu e Crk
Headquarters
Park
Visitor Center
Be att ie
Gulch
East Fork S p e c im e n
C rk
Fa n C re ek
G a rd in e r
R iv e r
Grayling
Creek
G a lla tin
R iv e r Panther
Cr ee k
Cr ee k
Indian
M u lh e ri n
C rk
PROJECT LOCATION
Lake
Swan the Woods
Lake ofLake
Grizzly
NATIONAL
PARK
SERVICE
T 13 S
T 12 S
T 12 S
T 11 S
T 11 S
T 10 S
T 10 S
T 9 S
R
E
R
E
R
E
R
E
R
E
R
E
R
E
R
E
R
E
R
E
R
W
R
W
R
E
R
E
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
M O N T A N A
W Y O M I N G
B O
U N
D A
R Y
N A
T
IO
N A
L
F
O R
E S
T
B O
U N
D A
R Y
N A
T
IO
N A
L
P
R K
N A T I O N A L P A R K
Y E L L O W S T O N E
P L A T E A U
B L A C K T A I L D E E R
Junction
Norris Village
Canyon
See Vicinity Map Sheet A.4
MAMMOTH
Canyon
Golden Gate
Ice Lake
Lake
Wolf
Lake
Grebe
Lake
Cascade
:2
M
F e b r u a r y
T it le
S h e e t c p w w o r k \d
\y e ll p ln g e n .d g n
PROJECT
NUMBER
SHEET
WY NPS YELL 10(26) A.1
NPS Drwg No. 101/188422 NPS PMIS No. 305864
WY NPS YELL 10(26)
PRELIMINARY - N
OT FOR CONSTRUCTION
:3
F e b r u a r y
S
H E
E T
I N
D E
X p w w o r k \d
\y e ll p ln g e n .d g n
SHEET INDEX
PROJECT
NUMBER
SHEET
WY NPS YELL 10(26) A.2
NPS Drwg No. 101/188422 NPS PMIS No. 305864
WY NPS YELL 10(26)
WY NPS YELL 10(26) A.3
NPS PMIS No. 305864 NPS Drwg. 101/188422
N
SCALE IN MILES
1 1
BEGIN PROJECT
END PROJECT
stockpile area
Staging and
Peak
Bunsen
Everts
Mount
Entrance Road
Temporary North
Closed to through traffic stockpile area
Staging and
W e s t Y e llo w s to n e , M
T
M ile s
Cooke City, MT
±35 Miles
G a rd in e r, M T
M il e s
"MAIN 01" 871+80
"MAIN 01" 857+00
MAMMOTH
MONTANA
WYOMING
Lava
Creek
G a rd n e r
R iv e r
Gl en
Creek
G a rd n e r
R iv e r
Rescue
Creek
B la c k ta il
Deer
C re e k
UNDINE FALLS
WRAITH FALLS
P L A T E A U
B L A C K T A I L D E E R
N A T I O N A L P A R K
Y E L L O W S T O N E
R
W
R
W
R
W
R
W
:4 e b ru a ry
V ic in it y M a p p w
-w o rk
\d \y e ll p ln g e n -4
.d g n
VICINITY MAP
PROJECT
NUMBER
SHEET
A.4
NPS Drwg No. 101/188422 NPS PMIS No. 305864
WY NPS YELL 10(26)
depth, placed in two equal lifts type 1; 4-inch compacted
Asphalt Concrete Pavement, 8-inch compacted depth
Roadway Aggregate, Method 2;
LC
bridge abutment)
(match existing at
Profile grade typ. (See Section S for details)
Structural Concrete, Class A(AE) (Guardwall);
Subgrade
Section S for details)
Pedestrian railing (see
Section S for details)
Pedestrian railing (see typ. (See Section S for details)
Structural Concrete, Class A(AE) (Guardwall);
for details)
(Guardwall); typ. (See Section S
Structural Concrete, Class A(AE) ground
Existing
4-inch compacted depth.
Roadway Aggregate, Method 2; compacted depth.
Method 2; 4-inch
Roadway Aggregate, ground
Existing ground
Existing ground
Existing ground
Existing ground
Existing with tack coat between lifts
4-inch compacted depth, placed in two equal lifts
Asphalt concrete pavement, type 1, with tack coat between lifts
4-inch compacted depth, placed in two equal lifts
Asphalt concrete pavement, type 1, typ. (See Section S for details)
Structural Concrete, Class A(AE) (Guardwall);
8-inch compacted depth
Aggregate Base Grading D;
8-inch compacted depth
Aggregate Base Grading D;
8-inch compacted depth
Aggregate Base Grading D;8-inch compacted depth
Aggregate Base Grading D;
NO SCALE
FOOTNOTES:
4. Uppermost partial sections are road transitions.
3. See wall details, Section S, for wall height transitions.
2. Match Existing road cross slopes at 857+36.64 and 869+42.69.
1. Mirror cut/fill slopes as needed to match field conditions.
[1] Left lane cross slope transitions from existing (approximately -1.45%) at 857+36.64 to -1.00% at 858+55.85
Left lane cross slope transitions from -1.00% at 868+16.92 to existing (approximately -3.05%) at 869+41.36
[2]Right lane cross slope transitions from existing ( approximately -4.74%) at 857+36.64 to -1.00% at 858+55.85
Right lane cross slope transitions from -1.00% at 868+16.92 to existing (approximately -2.22%) at 869+41.36
NOTES:
868+06.92 to 869+41.36
857+00 to 858+65.85
2.0' Shoulder
2.0' Shoulder
-1%-1%
1.92'
2-inch depth, conserved topsoil, Placing li m it s s ta k e
S lo p e
Traveled lane
10.5'
Traveled lane
10.5'
1:2 1:
li m it s s ta k e
S lo p e topsoil, 2-inch depth Placing conserved
1.92'
"MAIN 01"
1.92'
1:
li m it s s ta k e
S lo p e topsoil, 2-inch depth Placing conserved varies
C o n s tr u c ti o n l im it s
5' typ.
C o n s tr u c ti o n l im it s
5' typ.
C o n s tr u c ti o n l im it s
5' typ.
2-inch depth topsoil, conserved Placing li m it s s ta k e
S lo p e1:2
C o n s tr u c ti o n l im it s
5' typ.
869+21.91 to 869+41.36
857+00 to 858+01.44 width varies Widening, 5.92' to 2.00'
1:
li m it s s ta k e
S lo p e
868+71+92 to 869+41.36
857+00 to 857+50.62 width varies Widening, 5.92' to 2.00'
1:2 li m it s s ta k e
S lo p e
C o n s tr u c ti o n l im it s
5' typ.
C o n s tr u c ti o n l im it s
5' typ. topsoil, 2-inch depth Placing conserved
2-inch depth, conserved topsoil, Placing
868+46.92 to 868+71.92
857+50.62 to 857+75.76
868+96.91 to 869+21.91
858+01.44 to 858+26.31
[1] [2]
[1] varies [1] varies[2]
1.92' varies[2] width varies Widening, 0.00' to 4.00' width varies Widening, 0.00' to 4.00'
12"
12"
12"
:3
F e b r u a r y
T y p ic a l
O p p w w o r k
\d
\y e ll ty p
.d g n
ROADWAY TYPICAL SECTIONS
PROJECT
C.1
WY NPS YELL 10(26)
Geogrid, Stabilization
Type A (Woven)
Geotextile Class 1, Separation-Stabilization depth, placed in two equal lifts
Type 1; 4-inch compacted
Asphalt Concrete Pavement, 8-inch compacted depth
Roadway Aggregate, Method 2;
Subexcavation limit
Select borrow backfill depth, placed in two equal lifts
Type 1; 4-inch compacted
Asphalt Concrete Pavement, Type A (Woven)
Geotextile Class 1, Separation-Stabilization
Subexcavation limit Geogrid, Stabilization
CL
8-inch compacted depth
Roadway Aggregate Method;
11" 11"
11.5" Select borrow backfill
NOTE:
2. Line entire subexcavation with Separation-Stabilization Geotextile Class 1, Type A (Woven).
1. Mirror details as appropriate.
FOOTNOTE:
3' Lap (minimum) [1]
ROAD PROFILE VIEW
APPROACH DEEP PATCH
1:2
NO SCALE
ROAD SECTION VIEW
APPROACH DEEP PATCH
8.2' 4'
[1]
10.5'
Shoulder 2'
10.5' Shoulder 2'
:11
:1
6.5'
2" Spacing [2]
:0
F e b r u a r y
D
E E
P P
A T
C H
R E
P
IR
p w w o r k \d
\y e ll ty p D e e p P a tc h D
G N
DEEP PATCH REPAIR
PROJECT
C.2
WY NPS YELL 10(26)
tack coat face.
Vertical saw cut, structure pavement
Proposed
Existing roadway
ROUNDING DETAIL
CUT SLOPE
5'
D
S lo p e s ta k e l im it
.2
DD
ROUNDING DETAIL
FILL SLOPE
S lo p e s ta k e l im it
.2
D
C o n s tr u c ti o n l im it
Existing ground
Existing ground
C o n s tr u c ti o n l im it
CONNECTION DETAIL
PAVEMENT
NO SCALE
:5
F e b r u a r y
T y p ic a l
O p p w w o r k \d
\y e ll ty p .d g n
TYPICAL DETAILS
PROJECT
C.3
WY NPS YELL 10(26)
NPS PMIS No. 305864 NPS Drwg No. 101/188422
STATE PLANE COORDINATES GEO COORDINATES
POINT
NUMBER
NORTH EAST
ORTHOMETRIC
ELEVATION
LATITUDE LONGITUDE
ELLIPSOID
HEIGHT
COMBINED
FACTOR
DESCRIPTION NOTE:
GRHB1 1954054.520 2469675.437 6045.256 44°57'36.102766"N 110°40'55.591989"W 6016.9405 0.999677483 5/8" ir w/fhwa alum cap 1.
GRHB2 1953889.653 2470115.659 6053.454 44°57'34.506947"N 110°40'49.452904"W 6025.1421 0.999676935 5/8" ir w/fhwa alum cap
GRHB3 1952962.773 2470748.647 6072.330 44°57'25.400993"N 110°40'40.555433"W 6044.0345 0.99967581 5/8" ir w/fhwa alum cap
COORDINATE SYSTEM : Wyoming West SPCS NAD83 2011 VERTICAL DATUM : Orthometric elevations based on the NAVD88 GEOID18Orthometric elevations based on the NAVD88 GEOID18
EPOCH DATE : 2010.000
CADD SYSTEM COORDINATE SYSTEM : WY83/2011-WF NSRS11(NAD83/2011) Wyoming, West Zone, US Foot
PROJECT : Gardner High Bridge DATE OF FIELD WORK : May 2021 DATE OF FINAL ADJUSTMENT : May 2021
PROJECT UNITS : US Survey foot
-O ct -2
:1 A
M
C
M yF ile s\
P ro je ct s_ \Y el lo w st o n e\ g a rd n er h ig h b ri d g e\ p w
G a rd n er
H ig h B ri d g e_ co n tr o ls h ee t2 .x ls x]
S h ee t
To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.
PROJECT
D.2WY NPS YELL 10(26)
SHEET
NUMBER
SURVEY CONTROLPRELIMINARY - N
JH
JH
N
EXISTING
BRIDGE
abutment approach
Existing limits
Construction toe of slope
Existing
See Sheet S.2 for details guardwall to be removed
(Guardwall); existing
Removal of Concrete
See Sheet S.2 for details guardwall to be removed
(Guardwall); existing
Removal of Concrete abutment joint asphalt-concrete
Existing
Class A(AE) (Guardwall)
Structural Concrete
Class A(AE) (Guardwall)
Structural Concrete constructed
Line to be pavement
Edge of pavement
Edge of and elevations lines, grades, Match existing
857+00
Existing power transformer
Grade break limits
Slope stake
Grade break
Slope stake limits limits
Construction limits
Construction flowline
Exiting ditch of asphalt
Existing edge gravel edge of
Existing gravel edge of
Existing
See Sheet C.2 patch repair;
Limits of deep
Existing grade
Profile grade
PI 856+79.03
Δ = 10°06'56" (RT)
R = 2,350.00' T = 207.99' L = 414.89' e = 06
P T
.9
N44°24'05"W
857+00 857+50 858+00 858+50 859+00 859+50
6,064 6,064
6,066 6,066
6,068 6,068
6,070 6,070
6,072 6,072
6,074 6,074
6,076
6,076
6,078 6,078
-3.89%
-4.11%
-2.12%
.4
.8
.8
.5
SSD = 4982'
K = 275
60' VC
HLSD = 1303'
K = 60
120' VC
"MAIN 01"
:4
F e b ru a ry
S o u th A p p ro a c h
P la n p w
-w o rk
\d \y e ll p ln
-p ro
.d g n
PROJECT
D.3
WY NPS YELL 10(26)
EXISTING
BRIDGE
abutment approach
Existing abutment joint asphalt-concrete
Existing guardwall to be removed
(Guardwall);existing
Removal of Concrete guardwall to be removed
(Guardwall);existing
Removal of Concrete limits
Slope stake
Slope stake limits
Class A(AE) (Guardwall)
Structural Concrete
Class A(AE) (Guardwall)
Structural Concrete
Construction limits limits
Construction Existing toe of slope
Existing toe of slope asphalt edge of
Existing of asphalt
Existing edge of gravel
Existing edge of gravel
Existing edge
Existing striping
Edge of pavement pavement
Edge of grades, and elevations
Match existing lines, 869+41.36 constructed
Line to be
See Sheet C.2 Limits of deep patch repair;
Existing grade
Profile grade
PI 870+58.17
Δ = 00°18'00" (RT)
R = 95,970.00' T = 251.25' L = 502.51' e = 06
N90°00'00"E
P C
.9
867+50 868+00 868+50 869+00 869+50 870+00
6,042 6,042
6,044 6,044
6,046 6,046
6,048 6,048
6,050 6,050
6,052 6,052
6,054 6,054
6,056 6,056
-2.12%
-1.34%
-1.99%
.6
.1
.1
.4
SSD = 1719'
K = 155
100' VC
HLSD = INF'
K = 103
80' VC
"MAIN 01"
:5
F e b ru a ry
N o rt h A p p ro a c h
P p w
-w o rk
\d \y e ll p ln
-p ro
.d g n
PROJECT
D.4
WY NPS YELL 10(26)
25 50012.525
Scale in feet
BEGIN PROJECT
Construction limit
Proposed guardwall abutment
Existing bridge
"MAIN 01" 857+00.48
LEGEND:
NOTES:
temporary road obliteration.
7. Apply permanent erosion control measures, including turf establishment, as soon as possible following
6. Obliterate temporary roads according to Subsection 211.01(a) as soon as feasible following completion of use.
5. Apply temporary erosion control measures concurrent with temporary road construction.
4. Submit a temporary road Sediment and Erosion Control Plan to the CO for approval prior to construction.
3. Submit a temporary road alignment and cross section template to the CO for approval prior to construction.
2. Contractor may disturb 8,500 SF inside temporary construction road limits at abutment 1.
1. Bridge rehabilitation work from 859+00 to 868+00 not shown.
Temporary Construction Access Road Limits
:2
F e b r u a r y
A
L I-
M A
IN
-0
A C
S h e t] p w w o r k
\d
\y e ll p ln
A
R .d g n
ROAD DISTURBANCE LIMITS
SOUTH APPROACH TEMPORARY
PROJECT
E.1
WY NPS YELL 10(26)
25 50012.525
Scale in feet
END PROJECT
Proposed guardwall
Wetland (no work zone)
Construction Limit abutment
Existing bridge
LEGEND:
"MAIN 01" 871+80.00
Temporary Road Disturbance Limits
NOTES:
temporary road obliteration.
7. Apply permanent erosion control measures, including turf establishment, as soon as possible following
6. Obliterate temporary roads according to Subsection 211.01(a) as soon as feasible following completion of use.
5. Apply temporary erosion control measures concurrent with temporary road construction.
4. Submit a temporary road Sediment and Erosion Control Plan to the CO for approval prior to construction.
3. Submit a temporary road alignment and cross section template to the CO for approval prior to construction.
2. Contractor may disturb 11,500 SF inside temporary construction access road limits at abutment 2.
1. Bridge rehabilitation work from 859+00 to 868+00 not shown.
:2
F e b r u a r y
A
L I-
M A
IN
-0
A C
-1
S h e t] p w w o r k
\d
\y e ll p ln
A
R .d g n
ROAD DISTURBANCE LIMITS
NORTH APPROACH TEMPORARY
PROJECT
E.2
WY NPS YELL 10(26)
N
25 50012.525
Scale in feet
BEGIN PROJECT
Slope stake limits
Slope stake limits
Construction limits
Fiber rolls
"MAIN 01" 857+00
LEGEND:
Temporary road limits
FOOTNOTES:
based on Best Management Practices, contract Storm Water Pollution Prevention Plan, and the contract specifications.
See section E for temporary road information. Contractor to design and implement erosion control measures for the temporary road
Obliterate temporary roads as soon as feasible upon completion of use.
[2]Soil Erosion Control, Fiber Roll
5. Ensure obliterated temporary roads are seeded and apply mulch immediatly after seeding.
erosion control.
temporary erosion control; favor the use of natural erosion control features over synthetic measures for permanent
4. For temporary roads: favor the use of biodegradable erosion control products over non-biodegradable options for
3. Apply mulch immediately after application of seed.
2. Obtain government provided seed from the CO.
1. All disturbed areas are to be seeded and mulched according to Section 625.
NOTES:
:4
F e b r u a r y
S o u th
A b u tm e n t
E r o s io n C o n tr o l
P p w w o r k \d
\y e ll p ln
E
S C
.d g n
CONTROL PLAN
SOUTH ABUTMENT EROSION
PROJECT
F.1
WY NPS YELL 10(26)
N
25 50012.525
Scale in feet
Slope stake limits
Construction limits
END PROJECT
to be protected
Existing Wetland
Fiber rolls
"MAIN 01" 871+80.00
LEGEND:
Construction limits
Soil Erosion Control, Fiber Roll
FOOTNOTES:
Contractor has option of temporary road during construction work.
:3 e b r u a r y
N o r th
A b u tm e n t
E r o s io n C o n tr o l
P p w w o r k \d
\y e ll p ln
E
S C
.d g n
CONTROL PLAN
NORTH ABUTMENT EROSION
PROJECT
F.2
WY NPS YELL 10(26)
WY NPS YELL 10(26) F.3
NPS PMIS No. 305864 NPS Drwg No. 101/188422
R Y B
N
Existing transformer Existing buried power lines line(s).
intercept existing power
(Ground Box, Concrete);
Utility Box; Pull Box
(Ground Box, Concrete)
Utility Box; Pull Box line.
intercept existing power
(Bridge Box, Stainless);
Utility Box; Pull Box place empty conduit.
Conduit (4-inch Dia.);
temporary power line relocation
Conduit, 4-inch, Rigid Galvanized Steel;
(Ground Box, Concrete)
Utility Box; Pull Box
(approx. 4-foot depth).
abutment back wall
Pass conduit below existing
10 2000510
Scale in feet guardwall
Pass conduit below
N44°24'05"W
N existing power line.
Box, Stainless); intercept
Utility Box; Pull Box (Bridge relocation temporary power line
Galvanized Steel;
Conduit, 4-inch, Rigid
(Ground Box, Concrete)
Utility Box; Pull Box
(approx. 4-foot depth).
Pass conuit below abutment back wall guardwall
Pass conduit below intercept existing power line(s).
Utility Box; Pull Box (Ground Box, Concrete);
(Ground Box, Concrete)
Utility Box; Pull Box
10 2000510
Scale in feet place empty conduit.
Conduit (4-inch Dia.);
Legend:
Existing Power Line
17"x30"x26" PD style
Utility Box, Pull Box (Ground Box, Concrete);
Proposed Power Line
UL rated 24"x16"x8" NEMA 4x Stainless Steel
Utility Box, Pull Box (Bridge Box, Stainless);
Miscellaneous Future Utility
Proposed Empty Conduit for
N44°24'05"W
:2 e b r u a r y
U ti li ty P p w w o r k \d
\y e ll p ln u ti l.
d g n
UTILITY PLAN
PROJECT
L.2
WY NPS YELL 10(26)
L.3
STATE PROJECT
NUMBER
SHEET
D e f a u lt p w w o r k \d
\y e ll
L d e t.
d g n
WY NP YELL 10(26)
:2 o v e m b e r
V in c e
J I M
E N
Z
/2
/2
C h e c k e d b y
D e s ig n e d b y
NPS PMIS No. 305864 NPS Drwg. No. 101/188422
PULL BOX DETAILS
6" min.
Size box accoriding to plan.
box with traffic rated bolt-down lid.
polymer reinforced concrete pull
PD style, tier 22 loading, precast
Utility conduit geotextile
Seperation
SECTION VIEW
INSTALLATION DETAIL
(GROUND BOX)
UTILITY PULL BOX
Finish grade steel conduit
4" rigid galvanized
(meet UL requirements and NEMA 4x standard) an elastic corrosion resistant gasket or sealer
All conduit entries to be sealed liquid-tight with
BRIDGE SECTION VIEW
INSTALLATION DETAIL
(BRIDGE BOX)
UTILITY PULL BOX
access from the underside.
with lid facing downward to with bolt-down lid. Mount
4x stainless steel pull box
UL rated 24"x16"x8" NEMA stringer bridge
Existing
4" conduit
Existing
4" conduit
Existing thread for nuts both ends.
rod. Cut rod to length and
3/8-inch min. dia. hanger conduit hanger
Adjustable stirrup-type beam clamp
Steel center-load stringer
Existing bridge beam bridge floor
Existing access from the underside.
with lid facing downward to with bolt-down lid. Mount
4x stainless steel pull box
UL rated 24"x16"x8" NEMA and NEMA 4x standard) sealer (meet UL requirements corrosion resistant gasket or liquid-tight with an elastic
All conduit entries to be sealed
BRIDGE SIDE VIEW
stringer bridge
Existing parts, right)
(see assembly assebmly
Conduit hanger parts, below)
(see assembly assebmly, typ.
Conduit hanger
NO SCALE
m a te r ia l b e d d in g d e p th n o m
16" nom.
24" nom.
n o m
4" min.
sides both 12" max.
conduit
Existing 4" steel conduit galvanized
4" rigid
L.4
NUMBER
SHEET
D e f a u lt p w w o r k \d
\y e ll
L d e t.
d g n
WY NP YELL 10(26)
:3
N o v e m b e r
V in c e
J I M
E N
Z
/2
/2
C h e c k e d b y
D e s ig n e d b y
NPS PMIS No. 305864 NPS Drwg. No. 101/188422
HANGING DETAILS
CONDUIT
NO SCALE
FIXED CLAMP
CLAMP
EXPANSION
Conduit spacer galvanized steel " thick 8 for conduit
Clamp sized for expansion conduit to allow larger than
Clamp one size spacer galvanized steel " thick 8
Conduit typ.
stringer, bridge
Existing surface
Bridge finish floor beam
Existing bridge assembly
Conuit hanger assembly
Conduit hanger
(Bridge Box)
Utility Pull Box
(Ground Box)
Utility Pull Box existing conduit on bridge.
slope at elevation of
Conduit exits ground on elevation of existing conduit on bridge.
Conduit exits ground on slope at
(Bridge Box)
Utility Pull Box
(Ground Box)
Utility Pull Box
Steel Conduit
4" Rigid Galvanized max. spacing. Clamp conduit within 3' of fittings.
(see detail this sheet). Space clamps at 5' OC typ.; 10'
Hang conduit on the side of abutment with conduit clamps
This section of conduit buried.
ABUTMENT SECTION VIEW *
ABUTMENT PLAN VIEW *
opposite end of bridge
* - Mirror details for
FOOTNOTE:
max. spacing. Clamp conduit within 3' of fittings.
(see detail this sheet). Space clamps at 5' OC typ.; 10'
Hang conduit on the side of abutment with conduit clamps abutment
Face of concrete
Edge of bridge
ROAD EXISTING ABUTMENT EXISTING
BRIDGEAPPROACH
min.
3'-3"conduit
Existing 4"
Travel surface
Concrete Barrier
Temporary Traffic Control, barrier
Concrete barrier
Concrete
Travel lane
Travel laneWork Zone
Work Zone
12.5'
10'
10'
PLACEMENT DETAIL
CONCRETE BARRIER
SECTION VIEW
2.5 maximum
12.5'
12.5'
25'
25'
12.5'
12.5' WORK ZONE
10' WORK ZONE
Do not pin concrete barrier to the bridge deck.
Concrete barrier cannot exceed 2.5' in width.
1.
2.
NOTE: FOOTNOTE:
12.5' work zone in effect June 1 through October 15.
[1]
10' work zone in effect October 16 through May 31 of following year.
[2]
:4
J a n u a r y
T
T C
S a fe ty C u s h io p w w o r k
\d
\y e ll tt c ty p a tt
.d g n
TRAFFIC CONTROL
TYPICAL SECTION TEMPORARY
PROJECT
N.2
WY NPS YELL 10(26)
Concrete Barrier
Temporary Traffic Control, Crash Cushion
Temporary Traffic Control, Concrete Barrier
Temporary Traffic Control, N
20-foot spacing tubular marker, type 42-inch, Temporary Traffic Control, BEGIN PROJECT
50 10002550
Scale in feet
50 10002550
Scale in feet
WORK
ROAD
AHEAD
ONE LANE
ROAD
AHEAD
SPEED
LIMIT
ROAD WORK
END
STOP
HERE ON
RED
Traffic Signal System
Temporary Traffic Control, 121.4'
50'
40'
20'
"MAIN 01" 857+00
NOTES:
closure similar. See standard drawings for sign spacing and installation details.
Plans show location of temporary traffic control for south lane closure, north lane 1.
to signa l
Stop line 40' @ 1:4
Channel izer tape r Barrier taper
@1:8
G20-2
R10-6 W3-3
W20-1
FOOTNOTE:
Barrier opening may be relocated as needed during construction.
and maximum 200 feet.
required at each exposed end of concrete barriers. Limit opening width to a minimum 80 feet
Barrier opening for construction vehicle ingress/egress. Attenuators or crash cushions are [1]
Attenuators/crash cushions must meet TL-2 standard. 2.
3.
4.
Limit attenuators/crash cushions to a maximum width of 2.5 feet.
Do not anchor barriers or attenuators/crash cushions to bridge deck.
R2-1
W20-4
Barrier opening
:2
F e b r u a r y
T
T C
A
S c le p w w o r k
\d
\y e ll p ln tt c .d g n
CONTROL PLAN (1 of 2)
TEMPORARY TRAFFIC
PROJECT
N.3
WY NPS YELL 10(26)
Concrete Barrier
Temporary Traffic Control, Traffic Signal System
Temporary Traffic Control, N
40'50' 127.5'
20'
N
Concrete Barrier
Temporary Traffic Control, ROAD WORK
END
STOP
HERE ON
RED
SPEED
LIMIT
WORK
ROAD
AHEAD
ONE LANE
ROAD
AHEAD
END PROJECT
30 6001530
Scale in feet
30 6001530
Scale in feet
NOTES:
See standard drawings for sign spacing and installation details.
Plans show location of temporary traffic control for south lane closure, north lane closure similar. 1.
Barrier Taper @ 1:8 taper @ 1:4
Channelizer to signal
Stop line
2.
3.
4.
Attenuators/crash cushions must meet TL-2 standard.
Limit attenuators/crash cushions to a maximum width of 2.5 feet.
Do not anchor barriers or attenuators/crash cushions to bridge deck.
G20-2
W20-1
W20-4
R2-1
W3-3 R10-6
"MAIN 01" 871+80
:5
F e b r u a r y
T
T C
A
S c le p w w o r k
\d
\y e ll p ln tt c .d g n
PLAN (2 of 2)
TEMPORARY TRAFFIC CONTROL
PROJECT
N.4
WY NPS YELL 10(26)
WORK
ZONE
SPEED
LIMIT
LIMIT
SPEED
SPEED
LIMIT
WORK
ZONE
SPEED
LIMIT
LIMIT
SPEED
Project limits
SPEED
LIMIT
Undine Falls
(open)
Temporary North Entrance Road
Closed to through traffic
Notes:
R2-1
R2-1
G20-5aP
W3-5
R2-1
G20-5aP
W3-5
R2-1
Mammoth
2. Place R2-1 500 feet from beginning of work zone.
1. Place W3-5 100 feet in advance of 25 MPH R2-1.
G ra d o o p
R o a d
G rand Loop Road
G a rd n e r R iv e r
Gl en C re ek
G a rd n e r R iv e r
Lava Creek
:2
M a y
T
E M
P O
R A
R Y
T R
A F
F
IC
C O
N T
R O
L S
P E
E D
R E
D U
C T
IO
p w w o r k \d
\y e ll p ln tt c s p e e d r e d u c ti o n .d g n
SPEED REDUCTION
TEMPORARY TRAFFIC CONTROL
PROJECT
N.5
WY NPS YELL 10(26)
Project Limits
AHEAD
DETOUR
AHEAD
DETOUR
NORRIS CANYON RD
GRAND LOOP RD
DETOUR
DETOUR
GRAND LOOP RD
DETOUR
DETOUR
DETOUR
nightime closures only
Barricade Type 3;
DETOUR
nightime closures only
Barricade Type 3;
ROAD CLOSED
16 MILES AHEAD
DETOUR
DETOUR
DETOUR
DETOUR
DETOUR
DETOUR
DETOUR
ROAD CLOSED
1 MILE AHEAD
ROAD CLOSED TO
OVERSIZED
TRAFFIC
ROAD CLOSED
OVERSIZED
TRAFFIC
M4-9L
M4-9L
M4-9L
M4-9R
M4-9R
M4-9
:4
F e b r u a r y
D
E T
O U
R M p w w o r k
\d
\y e ll tt c d e to u r .d g n
DETOUR ROUTE
TEMPORARY TRAFFIC CONTROL
PROJECT
N.6
WY NPS YELL 10(26)
WY NPS YELL 10(26) N.7
NPS Drwg No. 101/188422
WY NPS YELL 10(26) N.8
NPS Drwg No. 101/188422
WY NPS YELL 10(26) N.9
NPS Drwg No. 101/188422
WY NPS YELL 10(26) N.10
NPS Drwg No. 101/188422
WY NPS YELL 10(26) N.11
NPS Drwg No. 101/188422
WY NPS YELL 10(26) N.12
NPS Drwg No. 101/188422
WY NPS YELL 10(26) N.13
NPS Drwg No. 101/188422
N
Snow Pole Holder
Solid (Double Yellow Centerline)
Pavement Markings, Type B, Fog Line)
B, Solid (White
Markings, Type
Pavement
Removal of Delineator
Removal of Delineator of Sign
Removal
"GARDNER RIVER"
Furnished Sign;
Government
Sign System, Snow Pole Holder
Snow pole holder
50 10002550
Scale in feet
Solid (Double Yellow Centerline)
Pavement Markings, Type B, Fog Line)
B, Solid (White
Markings, Type
Pavement
N
50 10002550
Scale in feet
BEGIN PROJECT
G a r d n e r R iv e r
"MAIN 01" 855+00.00
:5
F e b r u a r y
P
T C
S H
E p w w o r k
\d
\y e ll p tc p la n
.d g n
PLAN (1 OF 2)
PERMANENT TRAFFIC CONTROL
PROJECT
O.2
WY NPS YELL 10(26)
Solid (Double Yellow Centerline)
Pavement Markings, Type B, Snow Pole Holder
Snow Pole Holder
Holder
Snow Pole
Holder
Snow Pole
N
50 10002550
Scale in feet
"GARDNER RIVER"
Furnished Sign;
Government
Sign System, B, Solid (White Fog Line)
Markings, Type
Pavement
END PROJECT
"MAIN 01" 871+80.00
:5
F e b r u a r y
P
T C
S
H E
E
-1 p w w o r k
\d
\y e ll p tc p la n
.d g n
PLAN (2 OF 2)
PERMANENT TRAFFIC CONTROL
PROJECT
O.3
WY NPS YELL 10(26)
RIVER
GARDNER
gray PVC pipe
2" I.D. x 12" grade
Asphalt finish timber post
Round treated
Guardwall
NO SCALE
FURNISHED SIGN
SIGN SYSTEM, GOVERMENT
GUARDWALL
INSTALLATION AT TOE OF
SNOW POLE HOLDER
' 2"
9"2
V a r ie s
:4
J a n u a r y
P
T C
D e ta il s p w w o r k
\d
\y e ll p tc
.d g n
DETAILS
SIGN AND SNOW POLE HOLDER
PROJECT
O.4
WY NPS YELL 10(26)
45°45° d g e o f p a v e m e n t
Single
Double
SIGN POST INSTALLATION SIGN INSTALLATION ANGLE
PLAN
PROFILE
Ø=90°
Ø=93°
200' ±
On tangent alignment Ø=93°
SELECTION TABLE
BREAKAWAY HOLE
(mm) hole diameter
Breakaway
DIAMETER
POST
NO SCALE
ty p posttimber
Round treated for hole size holes See table
Drilled breakaway
NOTE:
1.
6' m in
12"
10"
9"
8"
6"
4"
3"
"2
"4
"4 lag bolts with washers
" diameter galvanized8 bolts per post.
" diameter8 3Attach sign panels with a minimum of 2-
Local tangent
:1
J a n u a r y
S ig n
P o p w w o r k \d
\y e ll p tc d e tA
.d g n
SIGN POST INSTALLATION DETAIL
PROJECT
O.5
WY NPS YELL 10(26)
type B, solid yellow
Pavement markings, dotted white, 4-inch width
Pavement markings, type B, solid white, 4-inch width
Pavement markings, type B, pavement
Edge of
LC
LC
type B, broken yellow
Pavement markings, Typical gap spacing Typical gap spacingTyp. Typ. Typ.
w id th ty p la n e w id th ty p la n e
.5
.5
.5
.5
10'30'10'30'10'
2'
2' pavement
Edge of
N.24
STATE PROJECT
WY NPS YELL 10(24)
FOOTNOTE:
The shoulder width is 2.0' on the bridge.
:0
J a n u a r y
P e r m a n e n t
P a v e m e n t
M a r k in g p w w o r k \d
\y e ll p tc d e tB
.d g n
MARKINGS
PERMANENT PAVEMENT
STATE PROJECT
NUMBER
SHEET
WY NPS YELL 10(26) O.6
NPS Drwg No. 101/188422NPS PMIS No. 305864
NO. DATE BY REVISIONS NO. DATE BY REVISIONS
2NO SCALE RG3267-B
S.2
GENERAL NOTES
1570-023PStructure Number
Furnish high-strength bolts, nuts, and washers conforming to AASHTO M 164 or AASHTO M 253.
Furnish bolts, nuts, and threaded rods conforming to ASTM A307.
Furnish structural steel, and railing components conforming to ASTM A36
Miscellaneous Structural Steel:
plans. Provide epoxy coated superstructure reinforcing steel, as noted on the bar list.
face of any bar of 2 inches, unless noted otherwise on the plans. Minimum splice lengths for all bar sizes are shown on the
Furnish reinforcing steel conforming to AASHTO M 31, or M 322, Grade 60 deformed. Use minimum concrete cover to the
Reinforcing Steel:
Furnish pre-compressed foam-supported silicon expansion joint seals, and flexible fabric-reinforced expansion joint gutter.
Joint Fillers:
inch, unless noted otherwise on the plans. 4 Chamfer exposed edges of all concrete
Provide Type II Hydraulic Cement conforming to AASHTO M 85, or Type IL Blended Hydraulic Cement conforming to AASHTO M 240.
Furnish Elastomeric concrete for truss expansion joint headers.
Furnish Class D (AE) structural concrete for approach span decks, floor beam repair, and bridge approach guardwalls.
Cast-in-place Concrete:
Reinforcing Steel: fy = 60,000 psi
Elastomeric Concrete: f'c= 2,800 psi
Class D(AE) Concrete: f'c = 5,000 psi at 28 days
Design stresses:
MATERIALS:
Deck slab designed using approximate elastic method (The "strip" method).
DESIGN CRITERIA:
HL-93. Maximum Dynamic Load Allowance (Impact), IM=33%, applied to design truck only.
Live Loads:
Structural Steel: 490 lbs. per cubic foot.
Concrete: 150 lbs. per cubic foot.
Dead Load:
DESIGN LOADS:
Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14.
Construction:
AASHTO LRFD Bridge Design Specifications, 9th Edition, 2020.
Design:
SPECIFICATIONS:
INDEX OF BRIDGE PLAN SHEETS
SHEET NO. SHEET TITLE
Approach Deep Patch Repair
Catwalk Repair Details
Miscellaneous Steel Repair
Traffic Railing Transition Bracket Details
Traffic Railing Transition Bracket Elevation
Bridge Railing Details
Pedestal Repair
Guardwall Details
Guardwall Elevation
Guardwall Plan
Expansion Joint Details
Drainage Elevation
Drainage Plan and Details
Approach Span Reinforcement
Approach Span 2
Approach Span 1
Approach Span Sections
Existing Details
General Notes
Plan and Elevation
(6)
(5)
(4)
(3)
(2)
(1)
Includes cost of structural excavation, structural backfill, geogrid, and geotextile.
23,550 SQFT (Information Only Quantity)
155,000 SQFT (Information Only Quantity)
Includes cost of removal, reinforcing steel, end guard angles, drainage system, and temporary shoring.
Includes cost of removal, excavation, foundation fill, reinforcing steel, backfill, and snow pole holders.
Contract quantity.
NOTES:
PROJECT TEAM LEADER BRIDGE DRAWING
of
DATESCALECHECKED BYDRAWN BYDESIGNED BYREVISIONSNO. DATE BY REVISIONS NO. DATE BY
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DRAWING NO.
B. OLTMANN 20
WY
GARDNER RIVER HIGH BRIDGE
YELLOWSTONE NATIONAL PARK
NPS YELL 10(26)
KNC/MSKNC/MS DECEMBER 2023
NOT
FOR
CO
NST
RUCTI
ON
PRE
LIM
INARY
GENERAL NOTES:
AT SUPPORTS AT MIDSPANS
Steel stringer (Typ.)
Steel railing (Typ.)
Concrete deck
Grand Loop Road
3NO SCALE
CL
RG3267-C
S.3
T y p
TRUSS SPANS TYPICAL SECTION
EXISTING DETAILS
(Typ.)
Steel truss catwalk
Inspection beam
Steel floor
APPROACH SPANS TYPICAL SECTION
(Approach 1, Bent 4 Only) barrier
Temp. concrete concrete deck
Remove and replace concrete floor beam
Remove and replace
5 7
Concrete deck
Open lane
APPROACH SPAN FLOOR BEAM SECTION
EXISTING APPROACH DECK DETAILS
UHPC overlay
" 2
Existing approx. 4
APPROACH 2 (WEST)APPROACH 1 (EAST)
conduit
Power line conduit
Empty concrete (Full depth)
Existing Reinforced
Along C Rdwy.LAlong C Rdwy.L with new hangers
Reinstall existing conduit with new hangers
Reinstall existing conduit
TRUSS PAINTING PHASES
Tower No. 1 Tower No. 2
Tower No. 3
PHASE 1:
PHASE 2:
WORK ITEMS:
Remove lead based paint to bare metal and repaint with three coat system
Remove and replace expansion joints at abutments
Remove and replace neoprene glands at tower expansion joints
Structural concrete crack repair injection and seal concrete surface of tower pedestals
Steel bridge railing system repairs (5 locations) and improvements
7 Apply thin bonded epoxy overlay to concrete deck surface
8 Replace concrete deck approach spans and single floor beam missing or improperly installed rivets with high strength bolts)
Misc. structural steel repair (drill out ends of minor cracks, replace
9 Repair timber catwalk (misc. timber and hardware replacement/repairs)
10 Construct concrete approach guardwalls
11 Approach deep patch repair, geotextile/geogrid repair
PROJECT TEAM LEADER BRIDGE DRAWING
of
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DRAWING NO.
B. OLTMANN 20
WY
GARDNER RIVER HIGH BRIDGE
YELLOWSTONE NATIONAL PARK
NPS YELL 10(26)
KNC/MSKNC/MS DECEMBER 2023
NOT
FOR
CO
NST
RUCTI
ON
PRE
LIM
INARY
m in
12'-6"1'-3" 12'-6" 1'-3"
18'-0" m a x
4'-0"
25'-0"
12'-6" Stage 2 12'-6" Stage 1
25'-0"
12'-6" Stage 112'-6" Stage 2
10'-0"
Limits for epoxy overlay
27'-6"
REVISIONS
4NO SCALE RG3267-D
S.4
APPROACH SPAN SECTIONS
APPROACH SPAN TYPICAL SECTION
(Approach 1, Bent 4 Only)
APPROACH SPAN FLOOR BEAM SECTION
8 spa. @ 5" = 3'-4" 8 spa. @ 5" = 3'-4"
#8S3/#8S4 Top #9S1/#9S2 Bot.
(Typ.)
curb reinf.
Keep existing
B o t.
#4B5 Stirrup reinf. (Typ.)
Keep existing floor beam
2#9B1
T o p
2#4B2
2#4B3
2#4B4 about C
Symmetrical
L
2 #4B6
#9B1
4" Fillet (Typ.)
removal concrete
Limits of removal concrete
Limits of nonshrink grout concrete with
Embed into existing or water jetting as required.
Clean existing steel and concrete by wire brush, abrasive blasting, the designated repair area as approved by the CO.
" deep along removal limit, around 2 1Saw cut
2.
1.
NOTES:
DETAIL
FLOOR BEAM
@ C Rdwy.L removal concrete
Limits of removal concrete
Limits of and bracing floor beam shoring
Provide temporary splice mechanical
Transverse
Keep existing transverse reinf.
ABUT 2 = 1'-2"
ABUT 1 = 1'-3"
APPROACH SPAN TYPICAL CROWN
about C
Symmetrical
L
#9S1/#9S2
#9S5 a-d
#9S1/#9S2
(Approach 1 shown, Approach 2 similar)
(Approach 1, Bent 4 Only)
Stage 2 Limits of removal Stage 1 Limits of removal
(Stage 1 shown, others similar)
Stage 2 Limits of removal Stage 1 Limits of removal joint
Install expansion
PROJECT TEAM LEADER BRIDGE DRAWING
of
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DRAWING NO.
B. OLTMANN 20
WY
GARDNER RIVER HIGH BRIDGE
YELLOWSTONE NATIONAL PARK
NPS YELL 10(26)
KNC/MSKNC/MS DECEMBER 2023
NOT
FOR
CO
NST
RUCTI
ON
PRE
LIM
INARY
1'-2"
1'-1"
16'-0"32 spa. @ 6" =
5 spa. @10" = 4'-2" c lr
2'-0"
Limits for removal = 26'-2"
5'-3" c lr
1'-6"
5'-3"
10"
4"
10"
6 Spa. @ 2'-1" = 12'-6" Slab Crown
1'-11"
13'-1"
7" 1'-3"
12'-6" 12'-6"
12'-6" 12'-6"
2' Min. lap
5NO SCALE RG3267-E
S.5
APPROACH SLAB 1
ELEVATION
B e n t
B e n t
B e n t
B e n t
GRADE = -2.106%
floor beam
Replace Bent #4
#8S3
#8S4
#9S1
#9S2
L
Do not remove concrete
#9B1 on adjacent lines lap splice location
Alternate top/bot.
Min. Lap
Min. Lap
Do not remove concrete
Do not remove concrete expansion joint
Install new s p a s p a
Min. Lap LC Deck
#8S6(b) #8S6(c) #8S6(d)
Min. Lap
#8S3 #8S4#8S3#8S4
Parapet wall along C
Begin Bridge guard angle
Install new
L
#8S6(a)
#8S6(c)#8S6(b)
#9S2
#9S1
#9S5(b)
#9S5(c)
#9S1 wall
Parapet
(Top of deck)
Removal limit
Parapet wall/ ScupperScupper
(Typ.)
#8S14 @ 2'-8" Str.
(Typ.)
#9S13 @ 2'-8" Str.
Removal limit (Bot. of deck)
HALF PLAN
BOTTOM MAT @ SCUPPERTOP MAT @ SCUPPER
(Bent 2 scupper shown, others similar)(Bent 2 scupper shown, others similar)
#8S3
#8S3
#8S4#8S4
#8S4 #8S3
12" Max.
#8S15 @ floor beam reinf. (Typ.)
Leave existing vertical
(Typ.)
transverse reinf.
Keep existing
Scupper (Typ.
PROJECT TEAM LEADER BRIDGE DRAWING
of
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DRAWING NO.
B. OLTMANN 20
WY
GARDNER RIVER HIGH BRIDGE
YELLOWSTONE NATIONAL PARK
NPS YELL 10(26)
KNC/MSKNC/MS DECEMBER 2023
NOT
FOR
CO
NST
RUCTI
ON
PRE
LIM
INARY
21'-0" 26'-6" 21'-0" 9"1'-3"
1'-6"
1'-6"
1'-6"
1'-6"
3'-0" 3'-0"
C R d w y
4'-0" 4'-0"
3'-0" 3'-0"12'-6"
S
S n t
B e n t
B e n t
B e n t
GRADE = -2.106%
Do not remove concrete
#8S9
#9S8
#9S7
L Install new guard angle
4" Fillet (Typ.)
Min. Lap
Min. Lap
#8S10 concrete remove
Do not Do not remove concrete
Do not remove concrete
APPROACH SLAB 2
Min. Lap Min. Lap
#8S10 #8S9
#8S12(d) #8S12(c) #8S12(b)
#8S12(a) s p a s p a
#8S10#8S9
LC Deck
Parapet wall
#8S9 on adjacent lines lap splice location
Alternate top/bot.
(Typ.)
transverse reinf.
Keep existing
HALF PLAN
ELEVATION
#9S7
#9S11(b)
#9S7
(Typ.)
#9S13 @ 2'-8" Str.
Scupper
Removal limit (Bot. of deck)
#9S8
#9S11(c) wall
Parapet
#8S12(b)
(Typ.)
#8S14 @ 2'-8" Str.
#8S12(c)
Scupper
TOP MAT @ SCUPPER BOTTOM MAT @ SCUPPER
expansion joint
Install new
Bridge
End
(Top of deck)
Removal limit
Parapet wall/
(Bent 13 scupper shown, others similar) (Bent 13 scupper shown, others similar)
S.6
#8S9 #8S10#8S10
#8S10#8S9
12" Max.
#8S15 @
4" Fillets (Typ.)
floor beam reinf. (Typ.)
Leave existing vertical
RG3267-F
Scupper (Typ.
along C
End Bridge
L
PROJECT TEAM LEADER BRIDGE DRAWING
of
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DRAWING NO.
B. OLTMANN 20
WY
GARDNER RIVER HIGH BRIDGE
YELLOWSTONE NATIONAL PARK
NPS YELL 10(26)
KNC/MSKNC/MS DECEMBER 2023
NOT
FOR
CO
NST
RUCTI
ON
PRE
LIM
INARY
18'-9" 24'-0" 18'-9"
1'-6"
1'-6"
1'-6"
1'-6"
3'-0" 3'-0"
C R d w y
9" 1'-3"
3'-6"3'-6"
3'-0" 11'-0" 3'-0" edge
Parapet
LC Floor beam ground
Existing
Trench and nest pipe with maximum 8ft spacing.
Provide support of vertical 6" PVC as required, Submit alternative scupper design to CO for approval.
Provide cast iron scupper material meeting requirements of ASTM A48.
Modify in field as necessary.
Construct drainage system to meet existing conditions.
NOTES:
3.
2.
1.
Scupper
6" PVC
DRAINAGE SECTION SCUPPER DETAILS
(Top of deck shown)
SCUPPER LOCATION
DRAINAGE PLAN
NO SCALE
in portal
Existing void
6" PVC 6" PVC 6" PVC
C Rdwy.
about
Symmetrical
L
(Approach 1 shown, Approach 2 similar)
Cleanout
S.8
8 RG3267-H
DRAINAGE PLAN AND DETAILS
Cleanout
(Non-perforated) drainage tubing
8" Corrugated
(Non-perforated) drainage tubing
8" Corrugated
(Non-perforated) drainage tubing
6" Corrugated
PROJECT TEAM LEADER BRIDGE DRAWING
of
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DRAWING NO.
B. OLTMANN 20
WY
GARDNER RIVER HIGH BRIDGE
YELLOWSTONE NATIONAL PARK
NPS YELL 10(26)
KNC/MSKNC/MS DECEMBER 2023
NOT
FOR
CO
NST
RUCTI
ON
PRE
LIM
INARY
1'-1"
"2
6"
4" 6" 6"
2"
"8
V a r ie s
"2
Approach 2 = 18'-9" Approach 1 = 21'-0"
Approach 2 = 24'-0" Approach 1 = 26'-6"
Approach 2 = 18'-9" Approach 1 = 21'-0"
9NO SCALE RG3267-I
S.9
DRAINAGE ELEVATION
(Approach 1 shown, Approach 2 similar) ground
Existing
Clear existing gutter
Cleanout
Cleanout
Cleanout
Cleanout
DRAINAGE ELEVATION
Reducer
(Non-perforated) drainage tubing
6" Corrugated
(Non-perforated) drainage tubing
8" Corrugated
PROJECT TEAM LEADER BRIDGE DRAWING
of
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DRAWING NO.
B. OLTMANN 20
WY
GARDNER RIVER HIGH BRIDGE
YELLOWSTONE NATIONAL PARK
NPS YELL 10(26)
KNC/MSKNC/MS DECEMBER 2023
NOT
FOR
CO
NST
RUCTI
ON
PRE
LIM
INARY
E s t.
E t.
Approach 2 = 18'-9" Approach 1 = 21'-0"
Approach 2 = 24'-0" Approach 1 = 26'-6"
Approach 2 = 18'-9" Approach 1 = 21'-0"
E s t.
S.10
EXPANSION JOINT DETAILSNOT
FOR
CO
NST
RUCTI
ON
PRE
LIM
INARY
(Note 1)
Limits for concrete removal
Leave in-place proposed section and replace according to device and anchor bolts
Remove expansion joint
(Note 2)
1L4x4x
(Note 2)
1L6x4x welded to angle
" Support bar 4
PROPOSED EXPANSION JOINT SECTION AT ABUTMENTS EXISTING EXPANSION JOINT SECTION AT ABUTMENTS
NOTES:
manufacturers recommendations.
foam-supported silicon expansion joint seal according to
Existing site conditions may vary. Install and size pre-compressed
Replace truss joint header concrete with elastomeric concrete.
or water jetting as required.
Clean existing steel and concrete by wire brush, abrasive blasting, to ASTM A123. Install angle between curbs matching bridge deck crown.
Provide steel angle conforming to ASTM A36. Galvanize angle according the designated repair area as approved by the CO.
" deep along removal limit, around 2 1Saw cut
5.
4.
3.
2.
1.
debris from joint
Remove and clean
EXISTING EXPANSION JOINT SECTION AT C TOWERSL
replacement concrete armor integral with deck
Cast abutment joint header
ABUTMENT EXPANSION JOINT DETAIL
ABUTMENT GUARD ANGLE DETAIL
expansion joint seal supported silicon
Pre-compressed foam bolts and nuts loose and missing
Reset or replace
Limits for concrete removal
(Bent 1 shown, Bent 14 similar)
(Note 2) stud anchor @ 1'-0"
" welded 2
" with 6x2
L4x4x C Floor beam L
(Bent 4 shown, Bent 11 similar)
(Bent 4 shown, Bent 11 similar)(Bent 4 shown, Bent 11 similar) flexible fiber-reinforced gutter
" 8 1Replace 2'-4"x stirrups (Typ.)
Keep existing floor beam
(Tower 1, Tower 2, Tower 3)
(See Note 2) stud anchor @ 1'-0"
" welded 2 16"x
Approach Span Deck
10 RG3267-J
with elastomeric concrete
Cast truss joint header armor
Approach Span Deck
PROJECT TEAM LEADER BRIDGE DRAWING
of
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DRAWING NO.
B. OLTMANN 20
WY
GARDNER RIVER HIGH BRIDGE
YELLOWSTONE NATIONAL PARK
NPS YELL 10(26)
KNC/MSKNC/MS DECEMBER 2023
NOT
FOR
CO
NST
RUCTI
ON
PRE
LIM
INARY
6" 3"10" 1'-1"
V a r ie s
1'-3"
F il le ts
T y p
6"
GUARDWALL PLAN
(Approach No. 1 Shown, Approach No. 2 similar)
PLAN
NO SCALE
Footing
LC Rdwy
NOTES:
Existing conditions may vary, field fit may be required.
12 Total).Provide and install 2" I.D. x 12" gray PVC snow-pole holder ( final conditions to match final roadway alignment.
Guardwall sheets shown on flat profile grade, curvature. Final wall alignment to be approved by C.O..
Guardwall details do not represent minor roadway alignment
FP-14 552.16(d) Class 4 - Sandblasted Finish.
Provide surface finish on exposed guardwall according to
5.
4.
3.
2.
1.
N
S.11 holder
Snow-pole
Start/End Bridge holder
Snow-pole holder
Snow-pole holder
Snow-pole holder
Snow-pole holder
Snow-pole
11 RG3267-K
rail posts
Install approach rail posts
Install approach railing transition bracket
Install new pedestrian railing transition bracket
Install new pedestrian
Footing
PROJECT TEAM LEADER BRIDGE DRAWING
of
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DRAWING NO.
B. OLTMANN 20
WY
GARDNER RIVER HIGH BRIDGE
YELLOWSTONE NATIONAL PARK
NPS YELL 10(26)
KNC/MSKNC/MS DECEMBER 2023
NOT
FOR
CO
NST
RUCTI
ON
PRE
LIM
INARY
25'-0"
3'-0"
3'-0"
25'-0"
115'-0" (Approaching lane)
65'-0" (Departing lane)
R
Approach No. 2 = 23'-7" Approach No. 1 = 25'-9"
R
Bottom of footing
Bottom of footing
Top of pavement
Top of pavement
ELEVATION
NO SCALE
Start/End bridge
GUARDWALL END SECTION
GUARDWALL HEIGHT TRANSITION
S.12
GUARDWALL ELEVATION
Weep hole (Typ.)
RG3267-L
railing transition bracket
Install new pedestrian
Start/End Bridge
Post
Existing and railing
Existing post railing extension
" approach 4
Install TS 3"x2"x
(Approach No. 2 location varies)
Install expansion jt.
rail post
Install approach rail post
Install approach
Start/End bridge wingwall
Existing
Parabolic transition
PROJECT TEAM LEADER BRIDGE DRAWING
of
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DRAWING NO.
B. OLTMANN 20
WY
GARDNER RIVER HIGH BRIDGE
YELLOWSTONE NATIONAL PARK
NPS YELL 10(26)
KNC/MSKNC/MS DECEMBER 2023
NOT
FOR
CO
NST
RUCTI
ON
PRE
LIM
INARY
115'-0" (Approaching lane)
65'-0" (Departing lane)
Length of parabola = 25'-0"
" 2
Approach No. 2 = 11'-9
Approach No. 1 = 8'-9"
3'-0"
10'-0" (Typ.) Weep hole spa.
10'-0" (Typ.) Weep hole spa.
Approach No. 2 = 23'-7" Approach No. 1 = 25'-9"
" 2
" = 35'-42
Approach No. 2 - 3 Spa. @ 11'-9
Approach No. 1 - 3 Spa. @ 11'-6" = 34'-6"
3'-0"
3'-0"
5'-0"
Start/End Bridge
Wall footing
C
C
D
D
E
E F
F
SECTION C-C
SECTION E-E
SECTION D-D
SECTION F-F
removal
Additional joint wingwall
Existing
6" min. foundation fill
2" clear (typ.)
6 #5 @ equal spa. t/b
GUARDWALL-BRIDGE PARAPET INTERFACE
#5 @ 10" O.C
NOTES:
Class 2 - Rubbed finish.
Apply smooth mortar surface according to Section 552.16(b)
Remove existing reinf. 1" below exposed surface of removed concrete.
Provide 2ft minimum required on lap splices.
Construct modified reinforcement layout in transition sections.
or water jetting as required.
Clean existing steel and concrete by wire brush, abrasive blasting, existing reinforcement as necessary to maintain clearance.
Existing reinforcement within new wall to remain. Modify/cut/bend area as approved by the CO.
" deep along removal limit, around the designated repair 2 1Saw cut
5.
4.
3.
2.
1.
TYPICAL SECTION
S.13
GUARDWALL WEEP HOLE
3" Dia. PVC as necessary for fit
Adjust reinf. or weephole location
Top of pavement pavement
Top of
#5 @ 10" O.C removal
Additional removal
Additional
GUARDWALL DETAILS
(Note 5) removal surface
Finish exposed
(Note 5) removal surface
Finish exposed
RG3267-M
A
A B
B grade
Top of for additional removal
See guardwall sections joint wingwall
Existing
Bridge
Start/End
SECTION A-A SECTION B-B
deck
Top of
EXISTING WINGWALL REMOVAL
parapet terminal
Remove existing joint wingwall
Existing railing post
Existing approach
(Note 5) removal surface
Finish exposed
PROJECT TEAM LEADER BRIDGE DRAWING
of
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DRAWING NO.
B. OLTMANN 20
WY
GARDNER RIVER HIGH BRIDGE
YELLOWSTONE NATIONAL PARK
NPS YELL 10(26)
KNC/MSKNC/MS DECEMBER 2023
NOT
FOR
CO
NST
RUCTI
ON
PRE
LIM
INARY
2%
1'-11"
3'-7"
1'-11"
"2 e q u a l s p a
3'-7"
5'-6"
1'-11" 1'-11"
1'-11"
3'-0"
1'-11"
1'-11"
M a x
"8
2'-7
" 2
Approach No. 2 = 11'-9
Approach No. 1 = 8'-9"
3'-7"
S.14
RG3267-N
PEDESTAL REPAIR
NO SCALE
GENERAL ABUTMENT PEDESTALS
(Abutment No. 1 Pedestals Shown, Abut. No. 2 similar)
GENERAL TOWER PEDESTAL ELEVATION
prepare concrete
Remove debris and surface
Seal concrete level existing ground
Limit work at
GENERAL TOWER PEDESTAL
Perform concrete seal according to Section 552.
Provide Type IV epoxy resin according to Section 725.18
" width or greater.16 to Section 561 on cracks with
Perform structural concrete injection and crack repair according exact extent of the work required (16 Pedestals total).
the photos are not intended to, nor do they represent the
,The photos shown are meant to represent existing conditions
4.
3.
2.
1.
NOTES:
surface
Existing concrete
Epoxy resin
(Typ.)
Injection port crack
Existing
CONCRETE CRACK REPAIR
GENERAL TOWER PEDESTAL
(Tower No. 2 Downstream Pedestal Shown, others similar) injection and crack repair
Structural concrete injection
PROJECT TEAM LEADER BRIDGE DRAWING
of
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DRAWING NO.
B. OLTMANN 20
WY
GARDNER RIVER HIGH BRIDGE
YELLOWSTONE NATIONAL PARK
NPS YELL 10(26)
KNC/MSKNC/MS DECEMBER 2023
NOT
FOR
CO
NST
RUCTI
ON
PRE
LIM
INARY
15NO SCALE RG3267-O
S.15
BRIDGE RAILING DETAILS
WORK ITEMS:
Remove lead based paint to bare metal and repaint with three coat system components (5 locations)
Remove and replace damaged steel bridge railing system
Guardwall / Approach Railing Interface Typical Approach Railing Section Approach Parapet/Truss Interface Typical Truss Section
Transition Bracket
Install Traffic Railing new wall section transition bracket in
Install pedestrian railing
"4
TS 3"x2"x
"8
TS 6"x2"x
Install new traffic railing transition brackets into existing parapet (4 corners) in new wall (4 corners)
Remove and install new pedestrian railing transition brackets
EXISTING RAIL POST DETAILS
(TRUSS SPANS)
EXISTING RAIL POST DETAILS
(APPROACH SPANS)
RAIL POST BASE PLATE
(TRUSS SPANS)
RAIL POST BASE PLATE
(APPROACH SPANS)
"x8"4
Bar 2"x
"x8"2
Bar 2"x
EXISTING BRIDGE RAILING SYSTEM
"8
2 Ps @ L
L holes
" Slotted4
C 1"x1
EXPANSION SPLICE
Splice bar
"x2'-0" 8
"x18
Splice bar
"x2'-0" 8
"x18
Splice bar
"x2'-0" 8
"x18
Splice bar
"x2'-0" 8
"x18
"x8"2
Bar 2"x
L "2
"x8"x1'-22
P
BRACKET ELEVATION
PEDESTRIAN RAILING TRANSITION
(ABUTMENT SPANS)
BRACKET
PEDESTRIAN RAILING TRANSITION
END VIEW
(ABUTMENT SPANS)
"x1'-0"8
"x18
Bar 2
Top of new guardwall to wall may vary
Location relative
"x1'-0"8
"x18
Welded Bar 2
"x4"x11"2
PL
" Slotted holes2
"x14
"2
"x1'-1"x1'-24
P 1
1" ø Holes
1" ø Holes transition bracket
Install pedestrian railing
Install new pedestrian approach railing and approach posts (4 corners)5 and posts railing extension
Install pedestrian
PROJECT TEAM LEADER BRIDGE DRAWING
of
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DRAWING NO.
B. OLTMANN 20
WY
GARDNER RIVER HIGH BRIDGE
YELLOWSTONE NATIONAL PARK
NPS YELL 10(26)
KNC/MSKNC/MS DECEMBER 2023
NOT
FOR
CO
NST
RUCTI
ON
PRE
LIM
INARY
"4
2 "2
3 "4
"2
"2
5" "2
5"
1'-6"1'-6"4" "2
"2
3"4
2 "4
"2
1'-2 8"
5"2"
"2
1'-0"
"2
Proj. 1
2" 2"
"4
3 "4
38"
"2
1'-2
"2
5 "2
5 "4
1"4
"4
3 8" "4
"2
5 "2
5 "4
1"4
"2
1'-2
16NO SCALE RG3267-P
S.16
BRACKET ELEVATION
TRAFFIC RAILING TRANSITION
Existing Railing
Existing Concrete Wall
Existing Deck
" embedment x44 with 13
" 2
B7 Threaded Rod, 1" X 15
Threaded Rod
Nut, 1" Heavy Hex
Washer, 1" Lock
Washer, 1" F844
New Bracket
APPROACH WALL TRAFFIC RAILING TRANSITION BRACKET
PROJECT TEAM LEADER BRIDGE DRAWING
of
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DRAWING NO.
B. OLTMANN 20
WY
GARDNER RIVER HIGH BRIDGE
YELLOWSTONE NATIONAL PARK
NPS YELL 10(26)
KNC/MSKNC/MS DECEMBER 2023
NOT
FOR
CO
NST
RUCTI
ON
PRE
LIM
INARY
"4
1'-1
17NO SCALE RG3267-Q
S.17
BRACKET DETAILS
TRAFFIC RAILING TRANSITION
"4
R
30°
ELEVATION VIEW
DETAILS
ATTACHMENT PLATE
PLAN VIEW SECTION A-A
AA
1" X 2" x2
" X 2" x24
1 -
" ASTM A364
Deflection Plate, 12" X
" ASTM A364
Deflection Plate, 10" X
" ASTM A36 x44
X 10-4 " X4
-4
Deflection Support Plate, " X 13" ASTM A36 x24 " X8
-Splice Plate, 5
" X 28" ASTM A364
Attachment Plate, 6" X
Attachment Plate
Splice Plate
PROJECT TEAM LEADER BRIDGE DRAWING
of
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DRAWING NO.
B. OLTMANN 20
WY
GARDNER RIVER HIGH BRIDGE
YELLOWSTONE NATIONAL PARK
NPS YELL 10(26)
KNC/MSKNC/MS DECEMBER 2023
NOT
FOR
CO
NST
RUCTI
ON
PRE
LIM
INARY
"8
"16
"4
2"
S.18
STEEL REPAIR
MISCELLANEOUS STRUCTURAL
surface
Prepare
Steel member edge Existing crack to uncover extent of crack
Apply dye penetrant to intercept tip of crack
Drilled hole diameter
(Tower 1 not shown, representative of known crack location)
GENERAL VIEW OF TRUSS BEARING ASSEMBLY BEARING ASSEMBLY CRACKS CLOSE-UP
(Span 1 South Truss @ Tower 1 Bearing Assembly Shown)
Opposite face similar face of bearing assembly.
Crack locations on single bearing assemblies cracks. Span 1 Tower 1
Typical location of known
RIVETS CLOSE-UP
(L04 Span 3 North Truss Shown)
Missing rivets at isolated locations.
Install high strength bolts in-place of missing rivets.
found during project to be included in work.
Tower 1 bearing assemblies (8 similar cracks). Cracks
All known and recorded cracks are located at truss Span 1 to Section 555.
Perform misc. repair of structural steel according extent of the work required.
the photos are not intended to, nor do they represent the
,The photos shown are meant to represent existing conditions
4.
3.
2.
1.
NOTES:
with high strength bolts.
Replace improperly set rivets paint surface smooth, and
Deburr, grind
DRILLED CRACK PROCEDURE
18 RG3267-R
PROJECT TEAM LEADER BRIDGE DRAWING
of
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DRAWING NO.
B. OLTMANN 20
WY
GARDNER RIVER HIGH BRIDGE
YELLOWSTONE NATIONAL PARK
NPS YELL 10(26)
KNC/MSKNC/MS DECEMBER 2023
NOT
FOR
CO
NST
RUCTI
ON
PRE
LIM
INARY
"2
19NO SCALE RG3267-S
S.19
CATWALK REPAIR DETAILS
C Tower No. 1 L
" Φ Wire rope)4 1(
8 Panels of horiz. bracing
" Φ Wire rope)4 1(
7 Panels of horiz. bracing
(Typ. of horiz. bracing) 1/4" Φ Wire Rope
Expansion Joint Reset expansion joints
C Tower No. 2 Symmetrical about
L
C RoadwayL
L"x4"x4" P Washer (Typ.)8
L L per hanger rod assembly.
"x4"x4" P washer req'd. 8
31-
"x5"x5" P washer, and 4 11-bottom end. 3 Hex nuts, on top end, 1'0 on
" Φ Rod; thread 2" 4
" Φ Carriage bolts8
6"
3"
6" support beam 6"x10" Walkway connections only.
Jam nut at bracing
(Horiz. bracing) " Φ Rod8
3"x12" Plank, SIS
SIS (Typ.)
timber planks, 3"x12" Treated
Φ
L o g b o lt s
(3" Leg, vert down) "x3" Long, Typ. 4
1L 3"x2"x
L "x1'-0"x3'-0"4 1P
& Joint C Hanger L bolts (Typ.)
" Carriage 8
WORK ITEMS:
(50 Planks, 30 Floor beams) planks and floor beam as directed by CO…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .