Prelim Letter_Gardner River High Bridge.pdf
PDF 145 KB Posted
- Attached to
- WY NPS YELL 10(26), Gardner River High Bridge
- Solicitation number
- 69056726R000002
About this file
This document is a Notice to Prospective Bidders for a federal highway project located in Yellowstone National Park, Wyoming. The solicitation (No. 69056726R000002) involves rehabilitation work on the Gardner River High Bridge along the Grand Loop Road, with specific tasks including installing containment systems around steel truss sections, removing lead-based paint, painting the structure, replacing concrete approach spans, installing deep patches, constructing concrete guardwalls, replacing bridge joints, applying an epoxy overlay on the bridge deck, and paving bridge approaches.
The project is scheduled for the winter of 2025/2026, with solicitation documents to be available on SAM.gov. Prospective bidders are advised to view the project during fall due to potential snow access limitations after November 1, 2025. A special notice indicates that all construction vehicles and equipment must undergo a weed inspection by Park personnel, and all material sources must be certified as free from noxious and invasive plants. Technical questions should be emailed to wfl.plansspec@dot.gov, and general questions can be directed to wfl.contracts@dot.gov or 360-619-7520.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PROJECT DESCRIPTION_Gardner River High Bridge.pdf | ||
| Prelim Plans_Gardner River.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Western Federal Lands Highway Division 610 E. Fifth Street
Vancouver, WA 98661 Phone 360-619-7700
Fax 360-619-7846
NOTICE TO PROSPECTIVE BIDDERS
RE: WY NPS YELL 10(26), Gardner River High Bridge
Solicitation No. 69056726R000002
The attached preliminary plans are being furnished to aid prospective Bidders in identifying the location and type of work for this project. The project will be advertised during a period when viewing of the project may not be possible due to snow. Therefore, prospective Bidders are encouraged to view the project during fall as conditions permit. After November 1, 2025 access will be weather dependent; contact Yellowstone National Park for current road conditions at https://www.nps.gov/yell/planyourvisit/conditions.htm. No Federal Highway Administration personnel will be available for show-me tours.
Project Location and Type of Work - All project work is located in Yellowstone National
Park, Park County, Wyoming.
• Grand Loop Road – Gardner River High Bridge o Work consists of installing containment systems surrounding steel truss sections and towers, removing existing lead-based paint from all surfaces, painting the structure, replacing concrete approach spans, installing deep patches at bridge approaches, constructing concrete guardwalls, replace bridge joints, placing a thin epoxy overlay across the bridge deck, minor bridge repairs, and paving bridge approaches.
Technical Questions – All technical questions must be submitted by email wfl.plans-spec@dot.gov .
General Questions - Contact our office at wfl.contracts@dot.gov or at 360-619-7520.
Special Notice - Fall Weed Inspection May be Necessary
The upcoming contract will require all construction vehicles and equipment to be inspected by Park personnel before their entry into the Park for mud, weeds, and other unwanted substances. All material sources and materials incorporated into the work must be certified to be free from noxious weeds, invasive plants, and other deleterious materials by a federal, state or local public agency. Commercial certifications may be acceptable if materials have been certified through the North American Weed Free
Forage Program standard or a similarly recognized certification process approved by the CO.
Solicitation documents - Documents will be available during the winter of 2025/2026. Please monitor the SAM site (www.sam.gov) for actual date of solicitation release. To receive
September 05, 2025 https://www.nps.gov/yell/planyourvisit/conditions.htm mailto:plans-spec@dot.gov mailto:plans-spec@dot.gov mailto:wfl.contracts@dot.gov http://www.sam.gov/
Preliminary Plans letter automatic notification through SAM, you must be logged in and select the “Follow” feature. For more information go to How do I follow items on SAM.gov?.
Thank you for your interest in this project.
https://www.fsd.gov/gsafsd_sp?id=gsafsd_kb_articles&sys_id=ad9c8da01bfbe1502fe5ed7ae54bcbc8
File details come from the government source that posted it. Updated .