This file contains preliminary bid results for Oregon Department of Transportation project S-73000-00003949, US 97 Wildlife Fence MP 178.1 - MP 180, a culvert rehabilitation and installation project. The project encompasses 25 bid items including mobilization, traffic control, erosion control, riprap installation, culvert rehabilitation across multiple pipe sizes (18", 24", 30", and 36"), video inspection, trench resurfacing, pipe installation at varying depths, and related drainage infrastructure work. Five contractors submitted bids: JR Carlon Corp, Whitaker Construction Co. Inc., Monson, Inc., Jesse Rodriguez Construction LLC, and HP Civil Inc. The estimated quantities range from single units for mobilization and traffic control to 2,083 linear feet for mainline video inspection and 376 linear feet for 30-inch culvert rehabilitation.

Bid totals submitted by the five contractors ranged from $598,363.16 (JR Carlon Corp - lowest bid) to $915,194.44 (HP Civil Inc.). Individual bid items showed significant variation in unit pricing across contractors, with notable differences in major cost drivers such as culvert rehabilitation, where unit prices for 18-inch pipe ranged from $89 to $290 per foot. The file notes a calculation error correction for Whitaker Construction Co. Inc.'s mobilization line item and specifies that in case of discrepancies between extended prices and unit prices, unit prices will prevail. No contract award date, contract term, or renewal options are indicated in this preliminary bid results document.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

S-73000-00003949 US97 Wildlife Fence MP 178.1 - MP 180
PRELIMINARY BID RESULTSJR Carlon Corp*Whitaker Construction Co. Inc.Monson, Inc.Jesse Rodriguez Construction LLCHP Civil Inc.
Bid Item #DescriptionEst
QTYUNITUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL

PRICE

1Mobilization1LS$ 42,198.00$ 42,198.00$ 115,000.00$ 115,000.00$77,966.00$ 77,966.00$ 55,000.000$ 55,000.00$ 91,519.440$ 91,519.44
2Temporary Work Zone Traffic Control, Complete1LS$ 40,000.00$ 40,000.00$ 75,000.00$ 75,000.00$ 52,912.00$ 52,912.00$ 64,325.000$ 64,325.00$ 300,000.000$ 300,000.00
3Portable Changeable Message Signs2EACH$ 1,792.00$ 3,584.00$ 13,000.00$ 26,000.00$ 2,450.00$ 4,900.00$ 5,500.000$ 11,000.00$ 10,000.000$ 20,000.00
4Pollution Control Plan1LS$ 750.00$ 750.00$ 3,000.00$ 3,000.00$ 1750.00$ 1,750.00$ 500.000$ 500.00$ 500.000$ 500.00
5Erosion Control1LS$ 750.00$ 750.00$ 5,000.00$ 5,000.00$ 3,500.00$ 3,500.00$ 1,500.000$ 1,500.00$ 5,000.000$ 5,000.00
6Class 100 riprap10CUYD$ 192.50$ 1,925.00$ 550.00$ 5,500.00$ 40.00$ 400.00$ 150.000$ 1,500.00$ 500.000$ 5,000.00
7point repair3EACH$ 600.00$ 1,800.00$ 4,750.00$ 14,250.00$ 1500.00$ 4,500.00$ 6,975.000$ 20,925.00$ 2,000.000$ 6,000.00
8grout invert14FOOT$ 50.00$ 700.00$ 550.00$ 7,700.00$ 108.00$ 1,512.00$ 595.000$ 8,330.00$ 150.000$ 2,100.00
9Rehabilitate 18" culvert354FOOT$ 275.00$ 97,350.00$ 180.00$ 63,720.00$ 290.00$ 102,660.00$ 89.000$ 31,506.00$ 270.000$ 95,580.00
10Rehabilitate 24" culvert60FOOT$ 396.80$ 23,808.00$ 250.00$ 15,000.00$ 367.00$ 22,020.00$ 300.000$ 18,000.00$ 370.000$ 22,200.00
11Rehabilitate 30" culvert376FOOT$ 409.60$ 154,009.60$ 240.00$ 90,240.00$ 450.00$ 169,200.00$ 327.000$ 122,952.00$ 240.000$ 90,240.00
12Rehabilitate 36" culvert126FOOT$ 499.20$ 62,899.20$ 370.00$ 46,620.00$ 575.00$ 72,450.00$ 626.000$ 78,876.00$ 380.000$ 47,880.00
13Rehabilitate 36" culvert57FOOT$ 499.20$ 28,454.40$ 380.00$ 21,660.00$ 575.00$ 32,775.00$ 929.000$ 52,953.00$ 395.000$ 22,515.00
14Mainline Video Inspection2083FOOT$ 15.00$ 31,245.00$ 3.00$ 6,249.00$ 12.00$ 24,996.00$ 12.000$ 24,996.00$ 20.000$ 41,660.00
15Trench Resurfacing74SQYD$ 119.74$ 8,860.76$ 425.00$ 31,450.00$ 107.00$ 7,918.00$ 265.000$ 19,610.00$ 525.000$ 38,850.00
16Paved Culvert End Slope194SQFT$ 22.07$ 4,281.58$ 95.00$ 18,430.00$ 43.00$ 8,342.00$ 45.000$ 8,730.00$ 75.000$ 14,550.00
17Install 18" culvert pipe, 5' Depth60FOOT$ 305.00$ 18,300.00$ 190.00$ 11,400.00$ 272.00$ 16,320.00$ 495.000$ 29,700.00$ 305.000$ 18,300.00
18Install 18" culvert pipe, 10' Depth77FOOT$ 445.00$ 34,265.00$ 220.00$ 16,940.00$ 469.00$ 36,113.00$ 575.000$ 44,275.00$ 325.000$ 25,025.00
19Salvaging and Relaying 24"x 35" Pipe, 5' Depth20FOOT$ 100.00$ 2,000.00$ 180.00$ 3,600.00$ 268.00$ 5,360.00$ 1,245.000$ 24,900.00$ 375.000$ 7,500.00
2018" sloped end section4EACH$ 275.68$ 1,102.72$ 750.00$ 3,000.00$ 335.00$ 1,340.00$ 1,295.000$ 5,180.00$ 4,200.000$ 16,800.00
2124" sloped end section2EACH$ 411.45$ 822.90$ 750.00$ 1,500.00$ 357.00$ 714.00$ 1,697.000$ 3,394.00$ 3,100.000$ 6,200.00
22connect to extg. Pipe2EACH$ 0.50$ 1.00$ 1,200.00$ 2,400.00$ 670.00$ 1,340.00$ 2,345.000$ 4,690.00$ 755.000$ 1,510.00
23Culvert Drainage Markers, Type 114EACH$ 300.00$ 4,200.00$ 250.00$ 3,500.00$ 345.00$ 4,830.00$ 325.000$ 4,550.00$ 500.000$ 7,000.00
24Culvert Drainage Markers, Type 214EACH$ 125.00$ 1,750.00$ 250.00$ 3,500.00$ 345.00$ 4,830.00$ 325.000$ 4,550.00$ 500.000$ 7,000.00
25Install 24" culvert pipe, 10' depth61FOOT$ 546.00$ 33,306.00$ 225.00$ 13,725.00$ 491.00$ 29,951.00$ 575.000$ 35,075.00$ 365.000$ 22,265.00
TOTAL$ 598,363.16$ 604,384.00$ 688,599.00$ 677,017.00$ 915,194.44
*Calculation error corrected. In the event of a discrepancy between extended prices and unit prices, unit prices will prevail.