PREBID MINS- SPSP Marina Life Safety.pdf

PDF 69 KB Posted

Attached to
Marina Life Safety Upgrades
Solicitation number
BPM042061
Issued by
Anne Arundel County, Annapolis City, Maryland

About this file

This document is the minutes of a pre-bid conference for the Marina Life Safety Upgrades project at Sandy Point State Park in Anne Arundel County, Maryland. The project requires the contractor to provide labor, equipment, materials, supplies, insurance, permits, etc. to install life safety devices onto the marina docks. The scope of work includes installing 4' and 8' sections of new bumpers on approximately 600 pilings, as well as installing E-Z Lok Threaded inserts to make ladder maintenance easier. The pre-bid conference was held on 2/6/2024 and the bid is due on 2/26/2017 at 1:00 PM via the EMMA electronic bid submission process. The project manager, facility representative, and attendees were noted, and questions regarding the scope of work were discussed and answered.

The project is being procured by the Maryland Department of Natural Resources and is located in Anne Arundel County and the City of Annapolis. No additional details were provided regarding pricing terms, set asides, incumbents, funding requirements or sources, or contract term and renewal options.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Marina Life Safety

Sandy Point State Park

EC24-09015-25

Minutes or Notes: Pre-Bid Conference

Date: 2/6/2024

Time: 10:00 AM

Location: Sandy Point State Park

Weather: Cloudy

Attendees:

Please see attached copy of “Pre-Bid Conference Sign-In Sheet”:

Name, Organization, MBE, Phone #, Fax # and E-mail Address

New Business:

Note: All questions (after the Pre-Bid Meeting) should be referred to the Procurement Officer.

PBC – 1 Introduced the DNR Project Manager (Benjamin Degenhard) and Facility

Representative (Chris Driscoll).

PBC-2 Reviewed the Scope of Work

Answer questions regarding Plans and Specifications.

PBC-3 Discuss: project schedule, working hours, access to the site, storage of materials and use of utilities / facilities.

PBC-4 Review Information to Bidders and Bid Form

Bid Due Date and Time: 2/26/2017 at 1:00 PM

Type of Bid: EMMA - electronic

PBC-5 Discussion regarding facility concerns, Facility Regulations, etc.

PBC-6 Tour of job site

QUESTIONS

Q1: The specifications call for 4’ sections of new bumpers to be installed on 600 pilings.

Some pilings are longer than others and may want a longer section than 4’. Explain?

A1: Some pilings require an 8’ section of bumper instead of 4’. This shall be accomplished by using two 4’ sections or an uncut 8’ section of bumper. Any excess bumpers will be given to the park to be stored for future use.

Q2: What is the intent with the E-Z Lok Threaded insert?

A2: The intent was to make installation/maintenance of the ladder easier from above, without having to work from the water.

File details come from the government source that posted it. Updated .