This is a Pre-Bid Questions and Responses document for Fort Valley State University's HPE Parking Lot project (GovTribe ID: 8ac2a3d947ae72643c00b0e08d5d7b9c). The project encompasses parking lot construction with associated infrastructure improvements, including drive adjustments, stormwater management via an 18-inch HDPE pipe system, light pole installations with solar power, asphalt paving, and site striping. The substantial completion timeline is 60 days, with specifications originally noting 120 days for other elements. A pre-bid meeting was held at Fort Valley State University, with the bid opening scheduled at the same location in the same conference room. The project scope specifically eliminates gate work and control box components that conflict with the new drive design, and site lighting will be bid as a separate add alternate. Compaction testing and material testing will be performed by the owner, while the contractor is responsible for quality control coordination. The work must conform to the Light Duty Pavement Detail specifications and grading plans, with asphalt striping to be paint rather than thermoplastic.
Key clarifications from the pre-bid response include confirmation that the site disturbance will remain under one acre, eliminating the need for a Notice of Intent filing. Proof roll observation by a geotechnical engineer is acceptable for subbase and base approval, and the slope of the stormwater pipe may be flattened from four percent to a minimum of two percent to reduce shoring and trench box costs. All asphalt testing will be performed by the owner, while the contractor assumes responsibility for coordinating testing efforts and quality control. The light poles are solar-powered rather than hardwired, eliminating on-site power supply requirements. Alternates referenced on the original bid form have been deleted per Addendum 1, and solar lighting is to be submitted as a separate add alternate bid item.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DBB_Full_Document_03_17_26.docx | DOCX document | |
| NOIA HPE Parking Lot.pdf | ||
| SPD_SPR013RFXAddendum 1.doc | DOC document | |
| 2026_04_10_ POLE BASE DETAIL_UPDATED.pdf | ||
| Pre_Bid Sign_In 4_7_2026.pdf | ||
| Drawings HPE_02_20_26.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| PRE-BID QUESTIONS & RESPONSES | ||
| QUESTIONS | RESPONSES | |
| 1 | Can you verify that the alternates listed on the bid form are to be deleted? | Yes, see addendum 1. |
| 2 | Can you verify the project time? 60 days mentioned at pre-bid and specs say 120. | Substantial completion will be 60 days. See addendum 1. |
| 3 | Can you verify that contractor is to pay for material and compaction testing and Owner covers the inspections? | The owner will cover the material and compaction testing and the contractor is responsible for quality control and coordination of testing. |
| 4 | Can you let us know if the gate work will be eliminated with adjustment to the drive or is the gate work to be included in the bid price? | The gate work and control box will be eliminated with the adjustment to the new drive . |
| 5 | Can you verify bid opening will be at FVSU and not Atlanta? | Bid opening will be at FVSU in the same conference room as the pre-bid meeting . See addendum 1. |
| 6 | Can you provide rebar detail for light pole bases? | See Sheet 8 of 8 Pole Base Detail and Pole and Brackets Detail. See rebar detail in addendum 1. |
| 7 | Can the outflow invert of the 18 in HDPE be raised in the existing Catch Basin #1-1B? As shown on the plans a 12.08 ft deep trench adjacent to the road will be required. Additional cost of trench boxes and shoring could be avoided if the slope of the pipe is flatten from its current 4% | Yes, the slope can be flattened to a minimum of 2% . Plans to be modified to show 2% line slope. |
| 8 | Please clarify the contractor's responsibility for testing. | See response in question 3. |
| 9 | Since there is no fill except backfill the pipe, will compaction test be required? | Yes, compaction testing will be required. |
| 10 | Will proof roll observed by a Geotech be sufficient for the sub base and base? | Yes, proof roll observed by a Geotech will be sufficient . |
| 11 | Will FVSU arrange and pay for any asphalt testing? | See response in question 3. |
| 12 | Who is responsible for obtaining the NOI? | NOI, will not be required. Disturbed area to be under 1 ac. |
| 13 | Please confirm that striping is paint and not thermo. | Yes, striping will not be thermoplastic. |
| 14 | Can the entrance control box that conflicts with the drive be removed? | The gate work and control box will be eliminated with the adjustment to the new drive . |
| 15 | Will the site lighting be listed as an alternate? | Yes, solar lighting is to be bidded separately as an add alternate . See addendum 1. |
| 16 | Please provide a design for the reinforcing steel in the light foundations. | See Sheet 8 of 8 Pole Base Detail and Pole and Brackets Detail. See rebar detail in addendum 1. |
| 17 | Can you clarify if the work is to match the paving detail per the Light Duty Pavement Detail on sheet 8 with grades per grading plan? This was a little confusion after the pre-bid meeting. | Work is to match the paving detial per the Light Duty Pavement Detail on sheet 8 with grades and per grading detail. We will not direct the contractors methods or means of accomplishing the work. |
| 18 | Please confirm that the Contractor is responsible for geotechnical testing only. | See response in question 3. |
| 19 | Will the Owner perform asphalt compaction testing, or is this to be included in the Contractor’s scope? | See response in question 3. |
| 20 | Will the Owner perform all required soil testing, or should this be carried by the Contractor? | See response in question 3. |
| 21 | Please clarify if the parking lot lighting is included in the current scope of work, or if it will be issued under a separate addendum. | Solar lighting is to be bidded separately as an add alternate . |
| 22 | Where will power be provided for the light poles, and are they to be solar or hardwired? | Solar powered. |
| 23 | Will the project require demolition of the existing entry gate, or will the gate be relocated to the HPE parking lot? | The gate work and control box will be eliminated with the adjustment to the new drive . |