Pre-Bid Agenda - JMR Day Use Imp IFB1 2027-048.pdf

PDF 332 KB Posted

Attached to
PMAA, SEJM, John Martin Res SP Day Use Imp, C23JM1
Solicitation number
IFB1 PMAA 2027000048 3
Issued by
El Paso County, Colorado Springs City, Colorado

About this file

This is a Pre-Bid Conference Agenda issued by Colorado Parks & Wildlife's Southeast Region for Invitation for Bid (IFB) 2027-048, concerning day use improvements at John Martin Reservoir State Park. The project encompasses construction of day use recreation areas including labor, equipment, materials, and incidentals necessary for completion. Key bid items include Bid Item #14, a lump sum bid for a complete functioning day use site with use pad, shade shelter, picnic table, and pedestal grill, and Bid Item #3 addressing stormwater management plan (SWMP) responsibilities. The pre-bid conference is scheduled for November 10, 2026 at 11:00 AM at the Southeast Region Office in Colorado Springs. The question deadline is November 12, 2026 at 12:00 PM, with sealed bids due by November 19, 2026 at 1:00 PM. The awarded contractor has 120 calendar days from the Notice to Proceed to complete the project. All bid documents, addenda, the pre-bid attendance list, agenda, and project Q&A will be posted on the Colorado Vendor Self Serve (VSS) website.

Bidders must submit a signed Bid Schedule acknowledging any addenda, a bid bond equal to 5% of the total bid price, SDVOSB certification issued through the U.S. Department of Veterans Affairs if applicable, Colorado Labor Justification if not utilizing 80% Colorado labor if applicable, and an Apprenticeship Utilization Survey if applicable. The project is anticipated to be subject to state prevailing wage requirements, with applicable prevailing wages included in Appendix G of the bid documents. The awarded contractor will be responsible for obtaining a stormwater management permit from the Colorado Department of Public Health and Environment (CDPHE) and for installation, maintenance, and reporting as required by CDPHE.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pre-Bid Conference Agenda Page 1 of 2 IFB1 2027*048

Southeast Region Office

4255 Sinton Road • Colorado Springs, CO 80907 cpw.state.co.us

PRE-BID CONFERENCE AGENDA

John Martin Reservoir State Park

Day Use Improvements

IFB1 – 2027*048

11/10/2026 @ 11:00 AM

Colorado Parks & Wildlife Southeast Region Chase Keltgen – Project Manager Phone: (719) 227-5290 E-mail: chase.keltgen@state.co.us

1. General:

a. All bid documents including any addendum(s) will be posted on the State VSS website www.colorado.gov/VSS.

b. If issued, all addenda must be acknowledged on the bid proposal. It is the bidder’s responsibility to check for addenda. Failure to acknowledge may result in rejection of bid.

c. Pre-bid attendance list, agenda and project Q&A will also be posted on the State Vendor Self Serve website (www.colorado.gov/VSS).

d. Amendments are part of the VSS posting system. Anything posted to VSS including Pre-Bid sign-in sheet, addenda, and Q&A will have an accompanying amendment. These do not need to be acknowledged.

However, additional amendments may have an addendum associated with them that will require acknowledgement.

2. Proposed Project Timing:

a. Question Deadline – 12:00 PM on Thursday, November 12, 2026. Send all questions via email to chase.keltgen@state.co.us. Questions sent after the deadline will not be addressed. A Q&A document will be posted to the State VSS website with answers to submitted questions.

b. Bid Opening – Sealed bids will be received by Colorado Parks and Wildlife, 4255 Sinton Road Colorado Springs, CO 80907 until Thursday November 19, 2026 at 1:00 PM. Bids shall be submitted using the provided Bid Schedule.

a. Inclusions – Please include with your bid the following:

Bid Schedule – signed and acknowledging addendums (if any)

Bid Bond – 5% of the total bid price

SDVOSB Certification issued through the U.S. Department of Veterans Affairs (if applicable)

Colorado Labor Justification if not using 80% Colorado Labor (if applicable)

Apprenticeship Utilization Survey (if applicable)

b. Project Schedule – the contractor shall have 120 calendar days from the Notice to Proceed date to complete the project, unless otherwise provided for in the General Requirements and Covenants for Capital Construction.

3. Project Information:

a. The project is for the construction of day use recreation areas at John Martin Reservoir State Park including all labor, equipment, materials and incidentals necessary to complete construction in accordance with the bid documents.

b. Carefully review all project specifications, bid items, descriptions, drawings and appendices prior to submitting your bids.

Pre-Bid Conference Agenda Page 2 of 2 IFB1 2027*048

c. Bid Item #14 Day Use Site, Lump Sum bid item. Bid is for a complete functioning day use site including use pad, shade shelter, picnic table, pedestal grill, etc.

d. Bid Item #3 SWMP. Awarded contractor will be responsible for obtaining permit from CDPHE for stormwater management as well as installation, maintenance and reporting as required by CDPHE.

e. Prevailing Wages – It is anticipated that this project will be subject to state prevailing wage requirements. Applicable prevailing wages are included in the bid documents as Appendix G.

f. Please be sure to acknowledge all addenda on bid proposal.

4. Questions?

File details come from the government source that posted it. Updated .