This Invitation for Bids (IFB1 2027-048) document is issued by the Colorado Division of Parks and Wildlife for construction of day use area improvements at John Martin Reservoir State Park in Hasty, Colorado. The project encompasses construction of vault restrooms, parking areas, trails, day use sites, and related site work. The base bid includes 15 line items ranging from mobilization and geotechnical engineering services to concrete paving, parking bumpers, and complete day use sites with shade shelters, picnic tables, and grills. Five optional add items are available for the Catch & Fry Day Use Area (Options A and B), West Boat Ramp Day Use Area, East Boat Ramp Day Use Area, and East Day Use Area, totaling 22 additional bid line items. The mandatory pre-bid conference is scheduled for November 10, 2026 at 11:00 AM at the project site. Written questions must be submitted by November 12, 2026 at 12:00 PM to Chase Keltgen, the single point of contact. Sealed bids are due by November 19, 2026 at 1:00 PM at the Southeast Region Office in Colorado Springs. Notice of Award is anticipated for November 20, 2026, with Notice to Proceed on December 14, 2026. The contractor must complete all work within 120 calendar days from the Notice to Proceed, with substantial completion targeted for April 13, 2027. Bids must include a five-percent bid bond if the bid price exceeds $50,000.

Pricing is on a unit cost and lump sum basis as detailed in the bid schedule, with mobilization paid in two installments (60% on first month's estimate, 40% upon final cleanup approval). The state will award to the lowest responsible bidder taking into account Colorado resident bidder preferences. Service Disabled Veteran Owned Small Businesses certified through the U.S. Small Business Administration Center for Veteran Enterprise are eligible for a 5% bid preference. Colorado labor must constitute at least 80% of the workforce on this project, which exceeds $500,000, with written justification required if this threshold cannot be met. Prevailing wage rates apply to all trades. Performance and labor & materials bonds equal to 100% of the contract price are required upon award. The successful bidder must maintain comprehensive insurance coverage including workers' compensation, commercial general liability ($1,000,000 combined single limit), automobile liability ($1,000,000), and pollution liability ($1,000,000). Liquidated damages are assessed at $500 per calendar day for work not completed by the contract deadline. The project is funded through Colorado Parks and Wildlife capital development resources.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

John Martin Reservoir State Park - Day Use Improvements Bidding and Contract Information

Project No. C23JM1

IFB1 2027*048

Mandatory Pre-Bid Conference: November 10th, 2026 at 11:00 AM

Bid Opening: November 19th, 2026 at 1:00 PM

Accommodation Statement: The State of Colorado is committed to providing equitable access to our services to all Coloradans. Please contact our AccessDNR team by email

(accessdnr@state.co.us) or Lauren Beecher by phone(720-682-8330) for personalized accessibility assistance using this document. We will contact you directly within three business days. Visit ouraccessibility web pageformore information and services, including AIRA, our free service for blind and low-vision users.

Version August 2026 mailto:accessdnr@state.co.us tel:+1-720-682-8330 https://dnr.colorado.gov/accessibility

Table of Contents

C23JM1

BiddingandContractInformation

TableofContents

InvitationForBids

BidSchedule

VendorResponseSignaturePage

MeasurementandPayment

InstructionstoBidders

ApprenticeshipUtilizationSurvey

Specifications

Appendices...........................................................................SeparateFiles

AppendixA.....................................................................BidPlans/Drawings

AppendixB.......................................GeneralConditionsforCapitalConstruction

AppendixC.....................................................SampleConstructionAgreement

AppendixD........................................................................SampleBidBond

AppendixE............................................................SamplePerformanceBond

AppendixF......................................................SampleLabor&MaterialsBond

AppendixG.......................................................PrevailingWageRequirements

End of Table of Contents

Version August 2026

Invitation For Bids

John Martin Reservoir State Park - Day Use Improvements

The Colorado Division of Parks and Wildlife is accepting sealed bids for construction of day use area improvements including vault restrooms, parking areas, trails, day use sites and other related site work.

Sealed bids will be received by Colorado Parks and Wildlife at theSoutheast Region

Office, 4255 Sinton Road, Colorado Springs, CO 80907to the attention ofChase

KeltgenuntilNovember 19th, 2026 at 1:00 PM,after which the bids will then be made public. Bids shall be submitted using the form provided in the project specifications. On-line bid submittals are not accepted.

A five-percent (5%) Bid Bond, certified check, or cashier’s check is required with bid proposals of $50,000.00 or more.

Mandatory Pre-bid conference: November 10th, 2026 at 11:00 AMat the project site.

Project Address: John Martin Reservoir State Park

30703 County Road 24

Hasty, Colorado 81044

Bent County

Project Coordinates: Latitude: 38.083941° N

Longitude: -102.952606° W

View Google Map Location –Right Click and EditHyperlink

Contractor Questions: All questions related to the project shall be submitted via e-mail to theSingle Point of Contact, Chase Keltgen,PE at chase.keltgen@state.co.us. The deadline for questionsis November 12th, 2026 at

12:00 PM. Unauthorized contact with any Agency/Institutionpersonnel other than the

Single Point of Contact regarding this solicitation is prohibited and may result in http://maps.google.com/maps?saddr=40.449259138,-106.815911444%20(%22Untitled%20Placemark%22)&daddr=40.4365368878,-106.826746779%20(%22Chuck%20Lewis%20-%20SWA%20-%20Shop%20Building%22)&ie=utf-8&v=2.2&cv=5.0.11337.1968&hl=e mailto:XXXX@state.co.us disqualification. Questions submitted after the deadline will not be addressed. All questions and answers will be posted as solicitation amendments on the Vendor Self

Service (VSS) website. Bidders may not automatically be notified of the existence of a modification or addendum. It is the responsibility of the bidder to check the VSS website periodically to see if any modifications have been issued. Failure to retrieve such modifications and include their provisions in your bid response may result in your bid being deemed non-responsive.

Plans and specifications are available for all bidders on the web at:

www.colorado.gov/vss

The following is a tentative project schedule, which will be revised and expanded by the selected Contractor and submitted to the Project Manager for review:

1. Mandatory Pre-Bid Conference

a. November 10th, 2026 at 11:00 AM

2. Written Questions Due

a. November 12th, 2026 at 12:00 PM

3. Bid Opening

a. November 19th, 2026 at 1:00 PM

4. Notice of Award

a. November 20th, 2026

5. Notice to Proceed

a. December 14th, 2026

6. Substantial Completion

a. April 13th, 2027

End of Section http://www.colorado.gov/vss

Bid Schedule

John Martin Reservoir State Park - Day Use Improvements

Department of Natural Resources

Colorado Parks and Wildlife

State of Colorado

By way of this Invitation for Bids submission, Bidder shall furnish all labor, equipment, materials, and incidentals needed to complete the John Martin Reservoir State Park -

Day Use Improvements. The work shall be completed in 120 calendar days from the date of the Notice to Proceed. Offeror has read and confirms understanding of, the

“Instructions to Bidders”, the “General Conditions for Capital Construction”, the

“Specifications”, the Construction Drawings information included in the solicitation.

Technical Specifications related to construction materials and methods for work embraced under this Contract shall consist of references to, but not limited to, the

Colorado Department of Transportation Most Current Standard Specifications for

Roads and Bridge Construction. Special attention shouldbe given to these references and revisions noted within.

Units:LF= linear foot, SF= square foot, SFF= squareface foot, LS= lump sum, SY= square yard, CY= cubic yard, TON= tons, AC= acres

Service Disabled Veteran Owned Small Business Statement (SDVOSB):The undersigned bidder shall certify bycheckingbelowthat the corporation, partnership, or sole proprietorshipIs or Is Notclaiming a 5%bid preference in accordance with

C.R.S. 24-103-211. SDVOSB certification must be included with your bid.

Is

Is Not

Colorado Labor:The undersigned bidder shall certify byindicating the percentageof

Colorado labor of the total workforce to be utilized for this project in accordance with C.R.S. 8-17-101. Colorado Labor shall be employed to perform at least 80% of the work on a public works project greater than $500,000.00. A written justification for not meeting this percentage must be included with your bid.

% of Colorado Labor: ___________

Addendum Inclusion Statement:The undersigned biddershall certify bylistingbelow that all Addendums have been considered and included as part of the Contractor’s proposal. The Addendum numbers that the Contractor has included as part of his proposal shall be listed in the space provided.

Addendums:

Base Bid:Furnish and install all materials and laborfor the completion of the Base

Bid Improvements per the Construction Drawings and Specifications.

Base Bid Items: Quantity Unit Unit Cost Total Item Cost

1. Mobilization. 1 LS $ $

2. Provide geotechnical engineer services to perform material testing as specified.

1 LS $ $

3. Stormwater Controls 1 LS $ $

4. Site Prep and Earthwork. 1 LS $ $

5. F&I Crushed Stone Base for

Sub-Base of Concrete, Roads, Parking Areas, Trails and Vault

Restrooms.

2,540 TON $ $

6. F&I ¾”-1” Clean Gravel for

Surface Course of Roads and

Parking Areas.

1,000 TON $ $

7. F&I Crusher Fines (Tan Breeze) for Surface Course of Trails.

220 TON $ $

8. F&I 5” Fiber Reinforced Concrete

Paving for Sidewalks per Detail

4/SD-2.

370 SF $ $

9. F&I 6” Fiber Reinforced Concrete

Paving for Parking Pads per Detail

3/SD-2.

1,480 SF $ $

10.F&I 6-ft Precast Concrete Parking

Blocks per Detail 1/SD-2.

6 EA $ $

11.F&I ADA Parking Pavement

Markings.

1 LS $ $

12.F&I ADA Parking Signs and Sign

Post per Detail 2/SD-2.

4 EA $ $

13.F&I Double Vault Restroom with

Chase.

2 EA $ $

14.F&I Day Use Site per Sheet SD-3. 27 EA $ $

15.F&I 8-ft Solid Plastic Parking

Bumpers for Parking Space

Delineation at East Day Use Area.

28 EA $ $

Base BidAmount$______________________

Base BidAmount:(Please Write Out Bid Amount)

$______________________________________________________________Dollars

Add Item #1 Bid:The following bid items are to becompleted by the bidder, and are additional items and are NOT to be included in the Base Bid. They may be added in any combination to arrive at the selection of the lowest responsible bidder.

Furnish and install all materials and labor for the Add Item #1 Bid per the Construction Drawings and Specifications.

Add Item #1 Catch & Fry Day Use

Area Opt-A Optional Bid Items:

Quantity Unit Unit Cost Total Item Cost

16.Additional Mobilization. 1 LS $ $

17.F&I Crushed Stone Base for

Sub-Base of Trails.

95 TON $ $

18.F&I Crusher Fines (Tan Breeze) for Surface Course of Trails.

35 TON $ $

19.F&I Day Use Site per Sheet SD-3. 7 EA $ $

Add Item #1 BidAmount_$______________________

Add Item #1 BidAmount:(Please write out bid amount)

$______________________________________________________________Dollars

Add Item #2 Bid:The following bid items are to becompleted by the bidder, and are additional items and are NOT to be included in the Base Bid. They may be added in any combination to arrive at the selection of the lowest responsible bidder.

Furnish and install all materials and labor for the Add Item #2 Bid per the Construction Drawings and Specifications.

Add Item #2 Catch & Fry Day Use

Area Opt-B Optional Bid Items:

Quantity Unit Unit Cost Total Item Cost

20.Additional Mobilization. 1 LS $ $

21.F&I Crushed Stone Base for

Sub-Base of Parking Area and

Trails.

75 TON $ $

22.F&I ¾”-1” Clean Gravel for

Surface Course of Roads and

Parking Areas.

25 TON $ $

23.F&I Crusher Fines (Tan Breeze) for Surface Course of Trails.

10 TON $ $

24.F&I Day Use Site per Sheet SD-3. 2 EA $ $

Add Item #2 BidAmount_$______________________

Add Item #2 BidAmount:(Please write out bid amount)

$______________________________________________________________Dollars

Add Item #3 Bid:The following bid items are to becompleted by the bidder, and are additional items and are NOT to be included in the Base Bid. They may be added in any combination to arrive at the selection of the lowest responsible bidder.

Furnish and install all materials and labor for the Add Item #3 Bid per the Construction Drawings and Specifications.

Add Item #3 West Boat Ramp Day

Use Area Opt-A Optional Bid

Items:

Quantity Unit Unit Cost Total Item Cost

25.Additional Mobilization. 1 LS $ $

26.F&I Crushed Stone Base for

Sub-Base of Trails.

19 TON $ $

27.F&I Crusher Fines (Tan Breeze) for Surface Course of Trails.

3 TON $ $

28.F&I Day Use Site per Sheet SD-3. 3 EA $ $

Add Item #3 BidAmount_$______________________

Add Item #3 BidAmount:(Please write out bid amount)

$______________________________________________________________Dollars

Add Item #4 Bid:The following bid items are to becompleted by the bidder, and are additional items and are NOT to be included in the Base Bid. They may be added in any combination to arrive at the selection of the lowest responsible bidder.

Furnish and install all materials and labor for the Add Item #4 Bid per the Construction Drawings and Specifications.

Add Item #4 East Boat Ramp Day

Use Area Opt-A Optional Bid

Items:

Quantity Unit Unit Cost Total Item Cost

29.Additional Mobilization. 1 LS $ $

30.F&I Crushed Stone Base for

Sub-Base of Trails.

54 TON $ $

31.F&I Crusher Fines (Tan Breeze) for Surface Course of Trails.

20 TON $ $

32.F&I Day Use Site per Sheet SD-3. 3 EA $ $

Add Item #4 BidAmount_$______________________

Add Item #4 BidAmount:(Please write out bid amount)

$______________________________________________________________Dollars

Add Item #5 Bid:The following bid items are to becompleted by the bidder, and are additional items and are NOT to be included in the Base Bid. They may be added in any combination to arrive at the selection of the lowest responsible bidder.

Furnish and install all materials and labor for the Add Item #5 Bid per the Construction Drawings and Specifications.

Add Item #5 East Day Use Area

Opt-A Optional Bid Items:

Quantity Unit Unit Cost Total Item Cost

33.Additional Mobilization. 1 LS $ $

34.F&I Crushed Stone Base for

Sub-Base of Trails.

1,275 TON $ $

35.F&I ¾”-1” Clean Gravel for

Surface Course of Roads and

Parking Areas.

190 TON $ $

36.F&I Crusher Fines (Tan Breeze) for Surface Course of Trails.

22 TON $ $

37.F&I Day Use Site per Sheet SD-3. 4 EA $ $

Add Item #5 BidAmount_$______________________

Add Item #5 BidAmount:(Please write out bid amount)

$______________________________________________________________Dollars

~Not required to be filled out (used as a double check aid)~

Supplemental Totals – For Information Only Total Item Cost

Base Bid Items: $

Add Item #1 Catch & Fry Day Use Area Opt-A

Optional Bid Items:

Add Item #2 Catch & Fry Day Use Area Opt-B

Optional Bid Items:

Add Item #3 West Boat Ramp Day Use Area Opt-A

Optional Bid Items:

Add Item #4 East Boat Ramp Day Use Area Opt-A

Optional Bid Items:

Add Item #5 East Day Use Area Opt-A Optional Bid

Items:

Total For All Bid Items $

Vendor Response Signature Page

John Martin Reservoir State Park - Day Use Improvements

IFB1 2027*048

Bidders must complete this form and return it with their Bid Schedule

Corporate Signature Block

Company Name

A __________________________ Corporation

Date: ________________________, 20_____

Colorado VSS Vendor ID# (if available) _____________________________________

By: __________________________________________

President

Attested to by: _________________________________

Secretary

A Partnership Signature Block

A limited partnership of _____________________________________, general partner;

doing business as (dba) __________________________________________________

Company Name

Colorado VSS Vendor ID# (if available) ______________________________________ by ______________________________________

General Partner

A Sole Proprietorship Signature Block

A Sole Proprietorship of ________________________________________________

(dba)________________________________________________________________

Colorado VSS Vendor ID# (if available) ____________________________________ by____________________________________________________________ Owner

End of Bid Schedule Section

Measurement and Payment

John Martin Reservoir State Park - Day Use Improvements

IFB1 2027*048

The following descriptions delineate the Work, materials, and how measurements of completed Work will be made and paid for, for each bid item in the Bid Schedule. The

Bidder is to read these definitions and price their proposal accordingly.

Bid Item 1 – Mobilization

This bid item includes the mobilization of personnel, equipment and supplies at the project site in preparation for the Work, as well as the establishment and maintenance for the duration of the Contract of the Contractor’s sanitary facilities, protective fencing and barricades not included elsewhere, necessary facilities, and all other costs incurred or labor and operations which must be performed prior to beginning the other items under the Contract. This item shall include any costs for required bonding of this project. This item shall also include marshalling, disassembly and security of all items indicated on the Construction Drawings or Specifications or installed as part of mobilization and demobilization from the site. Payment will be made in two installments: the first 60% will be paid on the first month’s pay estimate, and the remaining 40% after the final cleanup has been completed and approved.

Bid Item 2 – Geotechnical Engineering Services

This bid item includes providing Geotechnical Engineering Testing for subgrade compaction and concrete strength. Payment will be made based on the percentage of work completed and accepted.

Bid Item 3 – Stormwater Controls

This bid item includes planning, obtaining permit from CDPHE, installation, and maintenance of runoff and erosion control during construction in accordance with the

Construction Drawings, Specifications, and in compliance with the construction stormwater management program of the Water Quality Control Division of the

Colorado Department of Public Health and Environment. Runoff and erosion control will not be measured and paid for separately, but shall be paid for at the lump sum bid price for this bid item and shall be full compensation for all work necessary to maintain compliance with the permits. Payment will be made in two installments: the first 60% will be paid on the first month’s pay estimate after the runoff and erosion control plan has been submitted and preliminary controls installed, and the remaining

40% after the final cleanup has been completed and approved.

Bid Item 4 – Site Prep and Earthwork

This bid item includes all labor, materials, equipment, and incidental cost connected with earthwork including excavation, transportation of onsite material, and shaping and compacting of all material encountered within the limits of work as noted on the plans or as otherwise directed by the Project Manager. Payment will be made based on the percentage of work completed and accepted.

Bid Item 5 – Crushed Stone Base

This bid item includes all labor, materials, equipment, submittals, independent testing services, and incidental costs associated with the furnishing and placement of crushed stone base material at the locations indicated on the plans. Material shall be placed at optimum moisture content and compacted to a minimum 95% of standard proctor density. The method to bring mixture to optimum moisture and density will not be measured or paid for separately, but shall be included in the unit price for this item. Measurement for this item will be based on load tickets delivered to the site, and paid based on the unit price in Tons as reported on the Bid Schedule. The load tickets shall be submitted by the Contractor with the pay application.

Bid Item 6 – (¾” - 1”) Clean Gravel

This bid item includes all labor, materials, equipment, submittals, independent testing services, and incidental costs associated with the furnishing and placement of

¾” - 1” Clean Gravel material at the locations indicated on the plans. Material shall be placed at optimum moisture content and compacted to a minimum 95% of standard proctor density. The method to bring mixture to optimum moisture and density will not be measured or paid for separately, but shall be included in the unit price for this item. Measurement for this item will be based on load tickets delivered to the site, and paid based on the unit price in Tons as reported on the Bid Schedule. The load tickets shall be submitted by the Contractor with the pay application.

Bid Item 7 – Crusher Fines (Tan Breeze)

This bid item includes labor, materials, equipment, and incidental costs connected with shaping, placement and compaction of tan colored breeze as shown in the details and directed by the Project Manager. Weight tickets of materials delivered will be used to define the amount of materials used. Payment will be made as identified in the Bid Schedule based on work completed and accepted.

Bid Item 8 – 5” Thick Concrete Paving

This bid item includes labor, materials, equipment, and incidental costs connected with furnishing, placement and finishing of cast-in-place 5” thick concrete flatwork as shown in the plans and directed by the Project Manager. This pay item shall include fiber-mesh reinforcing. Payment will be made as identified in the Bid Schedule based on work completed and accepted.

Bid Item 9 – 6” Thick Concrete Paving

This bid item includes labor, materials, equipment, and incidental costs connected with furnishing, placement and finishing of cast-in-place 6” thick concrete flatwork as shown in the plans and directed by the Project Manager. This pay item shall include fiber-mesh reinforcing and #4 rebar at 18” OC each way. Payment will be made as identified in the Bid Schedule based on work completed and accepted.

Bid Item 10 – Precast Concrete Parking Blocks

This bid item includes all labor, materials, equipment, and incidental costs connected with furnishing and installing 6’ concrete parking blocks as shown in the plans and directed by the Project Manager. This pay item shall include the concrete block, rebar pins, drilling holes in concrete flatwork as necessary to securely anchor the parking blocks. Payment will be made as identified in the Bid Schedule based on work complete and accepted.

Bid Item 11 – ADA Pavement Markings

This bid item includes all labor, materials, equipment, and incidental costs connected with furnishing and installing accessible parking pavement markings as shown in the plans and directed by the Project Manager. Payment will be made as identified in the

Bid Schedule based on work complete and accepted.

Bid Item 12 – ADA Parking Sign & Post

This bid item includes all labor, materials, equipment, and incidental costs connected with ADA Parking Sign, mounting sign on new posts using new hardware as shown in the plans and directed by the Project Manager. This pay item shall include the sign, metal post and fastening hardware as defined in the project Drawing Details. Payment will be made as identified in the Bid Schedule based on work completed and accepted.

Bid Item 13 – Double Vault Restroom with Chase

This bid item includes all material, labor, equipment, independent testing services, and incidental costs connected with furnishing and erecting a double vault restroom with chase at the location shown on the plans. This bid item includes, but is not limited to:

● A complete pre-engineered and concrete vault toilet system, erected on the site as shown in the plans

● Earthwork, structural excavations, structural backfill, and compaction

● Building furnishings, signage, and fixtures, as specified

● Fine grading and cleanup around the structure upon completion

This bid item also includes all required shop drawings, submittals, certifications, permits, and inspections. The building will be measured and paid as a completed building unit in place. Progress payments will be made based on a percentage of the completed work, at the lump sum bid price.

Bid Item 14 – Day Use Site, Complete

This bid item includes all labor, materials, equipment, and submittals to furnish and install a complete Day Use Site as noted on the plans and specifications. This bid item includes, but is not limited to:

● Site preparation, including localized grading, excavation, subgrade compaction, aggregate base placement, and backfilling.

● Concrete for shelter footings and concrete slab for use pad, including formwork, subgrade preparation, reinforcement rebar, jointing, concrete placement, finishing, and curing.

● Fabrication, delivery, installation of complete shade shelter according to plans and specifications.

● Procurement, delivery, assembly, and installation of picnic table according to plans and manufacturer specifications.

● Procurement, delivery, assembly, and installation of outdoor pedestal grill with surface mount according to plans and manufacturer specifications.

● Final Site Cleanup.

This bid item also includes all required shop drawings and submittals. This bid item will be measured and paid as a completed functional Day Use Site in place. Progress payments will be made based on a percentage of the completed work, at the lump sum bid price.

Bid Item 15 – (8-ft) Solid Plastic Parking Bumpers

This bid item includes all labor, materials, equipment, submittals, and incidental cost associated with furnishing and installing 8’ solid plastic parking bumpers as shown in the plans and directed by the Project Manager. This bid item shall include the parking bumper and 18” galvanized spikes to anchor bumpers. Payment will be made as identified in the bid schedule based on work completed and accepted.

ADDITIONAL BID ITEM #1 (CATCH & FRY OPT-A)

Bid Item 16 – Additional Mobilization

This bid item includes the additional mobilization of personnel, equipment and supplies at the project site in preparation for the Work, as well as the establishment and maintenance for the duration of the Contract of the Contractor’s sanitary facilities, protective fencing and barricades not included elsewhere, necessary facilities, and all other costs incurred or labor and operations which must be performed prior to beginning the other items under the Contract. This item shall include any additional costs for required bonding of this project.

Bid Item 17 – Crushed Stone Base

This bid item includes all labor, materials, equipment, submittals, independent testing services, and incidental costs associated with the furnishing and placement of crushed stone base material at the locations indicated on the plans. Material shall be placed at optimum moisture content and compacted to a minimum 95% of standard proctor density. The method to bring mixture to optimum moisture and density will not be measured or paid for separately, but shall be included in the unit price for this item. Measurement for this item will be based on load tickets delivered to the site, and paid based on the unit price in Tons as reported on the Bid Schedule. The load tickets shall be submitted by the Contractor with the pay application.

Bid Item 18 – Crusher Fines (Tan Breeze)

This bid item includes labor, materials, equipment, and incidental costs connected with shaping, placement and compaction of tan colored breeze as shown in the details and directed by the Project Manager. Weight tickets of materials delivered will be used to define the amount of materials used. Payment will be made as identified in the Bid Schedule based on work completed and accepted.

Bid Item 19 - Day Use Site, Complete

This bid item includes all labor, materials, equipment, and submittals to furnish and install a complete Day Use Site as noted on the plans and specifications. This bid item includes, but is not limited to:

● Site preparation, including localized grading, excavation, subgrade compaction, aggregate base placement, and backfilling.

● Concrete for shelter footings and concrete slab for use pad, including formwork, subgrade preparation, reinforcement rebar, jointing, concrete placement, finishing, and curing.

● Fabrication, delivery, installation of complete shade shelter according to plans and specifications.

● Procurement, delivery, assembly, and installation of picnic table according to plans and manufacturer specifications.

● Procurement, delivery, assembly, and installation of outdoor pedestal grill with surface mount according to plans and manufacturer specifications.

● Final Site Cleanup.

This bid item also includes all required shop drawings and submittals. This bid item will be measured and paid as a completed functional Day Use Site in place. Progress payments will be made based on a percentage of the completed work, at the lump sum bid price.

ADDITIONAL BID ITEM #2 (CATCH & FRY OPT-B)

Bid Item 20 - Additional Mobilization

This bid item includes the additional mobilization of personnel, equipment and supplies at the project site in preparation for the Work, as well as the establishment and maintenance for the duration of the Contract of the Contractor’s sanitary facilities, protective fencing and barricades not included elsewhere, necessary facilities, and all other costs incurred or labor and operations which must be performed prior to beginning the other items under the Contract. This item shall include any additional costs for required bonding of this project.

Bid Item 21 - Crushed Stone Base

This bid item includes all labor, materials, equipment, submittals, independent testing services, and incidental costs associated with the furnishing and placement of crushed stone base material at the locations indicated on the plans. Material shall be placed at optimum moisture content and compacted to a minimum 95% of standard proctor density. The method to bring mixture to optimum moisture and density will not be measured or paid for separately, but shall be included in the unit price for this item. Measurement for this item will be based on load tickets delivered to the site, and paid based on the unit price in Tons as reported on the Bid Schedule. The load tickets shall be submitted by the Contractor with the pay application.

Bid Item 22 - (¾” - 1”) Clean Gravel

This bid item includes all labor, materials, equipment, submittals, independent testing services, and incidental costs associated with the furnishing and placement of

¾” - 1” Clean Gravel material at the locations indicated on the plans. Material shall be placed at optimum moisture content and compacted to a minimum 95% of standard proctor density. The method to bring mixture to optimum moisture and density will not be measured or paid for separately, but shall be included in the unit price for this item. Measurement for this item will be based on load tickets delivered to the site, and paid based on the unit price in Tons as reported on the Bid Schedule. The load tickets shall be submitted by the Contractor with the pay application.

Bid Item 23 – Crusher Fines (Tan Breeze)

This bid item includes labor, materials, equipment, and incidental costs connected with shaping, placement and compaction of tan colored breeze as shown in the details and directed by the Project Manager. Weight tickets of materials delivered will be used to define the amount of materials used. Payment will be made as identified in the Bid Schedule based on work completed and accepted.

Bid Item 24 – Day Use Site, Complete

This bid item includes all labor, materials, equipment, and submittals to furnish and install a complete Day Use Site as noted on the plans and specifications. This bid item includes, but is not limited to:

● Site preparation, including localized grading, excavation, subgrade compaction, aggregate base placement, and backfilling.

● Concrete for shelter footings and concrete slab for use pad, including formwork, subgrade preparation, reinforcement rebar, jointing, concrete placement, finishing, and curing.

● Fabrication, delivery, installation of complete shade shelter according to plans and specifications.

● Procurement, delivery, assembly, and installation of picnic table according to plans and manufacturer specifications.

● Procurement, delivery, assembly, and installation of outdoor pedestal grill with surface mount according to plans and manufacturer specifications.

● Final Site Cleanup.

This bid item also includes all required shop drawings and submittals. This bid item will be measured and paid as a completed functional Day Use Site in place. Progress payments will be made based on a percentage of the completed work, at the lump sum bid price.

ADDITIONAL BID ITEM #3 (WEST BOAT RAMP DAY USE AREA OPT-A)

Bid Item 25 – Additional Mobilization

This bid item includes the additional mobilization of personnel, equipment and supplies at the project site in preparation for the Work, as well as the establishment and maintenance for the duration of the Contract of the Contractor’s sanitary facilities, protective fencing and barricades not included elsewhere, necessary facilities, and all other costs incurred or labor and operations which must be performed prior to beginning the other items under the Contract. This item shall include any additional costs for required bonding of this project.

Bid Item 26 – Crushed Stone Base

This bid item includes all labor, materials, equipment, submittals, independent testing services, and incidental costs associated with the furnishing and placement of crushed stone base material at the locations indicated on the plans. Material shall be placed at optimum moisture content and compacted to a minimum 95% of standard proctor density. The method to bring mixture to optimum moisture and density will not be measured or paid for separately, but shall be included in the unit price for this item. Measurement for this item will be based on load tickets delivered to the site, and paid based on the unit price in Tons as reported on the Bid Schedule. The load tickets shall be submitted by the Contractor with the pay application.

Bid Item 27 – Crusher Fines (Tan Breeze)

This bid item includes labor, materials, equipment, and incidental costs connected with shaping, placement and compaction of tan colored breeze as shown in the details and directed by the Project Manager. Weight tickets of materials delivered will be used to define the amount of materials used. Payment will be made as identified in the Bid Schedule based on work completed and accepted.

Bid Item 28 - Day Use Site, Complete

This bid item includes all labor, materials, equipment, and submittals to furnish and install a complete Day Use Site as noted on the plans and specifications. This bid item includes, but is not limited to:

● Site preparation, including localized grading, excavation, subgrade compaction, aggregate base placement, and backfilling.

● Concrete for shelter footings and concrete slab for use pad, including formwork, subgrade preparation, reinforcement rebar, jointing, concrete placement, finishing, and curing.

● Fabrication, delivery, installation of complete shade shelter according to plans and specifications.

● Procurement, delivery, assembly, and installation of picnic table according to plans and manufacturer specifications.

● Procurement, delivery, assembly, and installation of outdoor pedestal grill with surface mount according to plans and manufacturer specifications.

● Final Site Cleanup.

This bid item also includes all required shop drawings and submittals. This bid item will be measured and paid as a completed functional Day Use Site in place. Progress payments will be made based on a percentage of the completed work, at the lump sum bid price.

ADDITIONAL BID ITEM #4 (EAST BOAT RAMP DAY USE AREA OPT-A)

Bid Item 29 – Additional Mobilization

This bid item includes the additional mobilization of personnel, equipment and supplies at the project site in preparation for the Work, as well as the establishment and maintenance for the duration of the Contract of the Contractor’s sanitary facilities, protective fencing and barricades not included elsewhere, necessary facilities, and all other costs incurred or labor and operations which must be performed prior to beginning the other items under the Contract. This item shall include any additional costs for required bonding of this project.

Bid Item 30 – Crushed Stone Base

This bid item includes all labor, materials, equipment, submittals, independent testing services, and incidental costs associated with the furnishing and placement of crushed stone base material at the locations indicated on the plans. Material shall be placed at optimum moisture content and compacted to a minimum 95% of standard proctor density. The method to bring mixture to optimum moisture and density will not be measured or paid for separately, but shall be included in the unit price for this item. Measurement for this item will be based on load tickets delivered to the site, and paid based on the unit price in Tons as reported on the Bid Schedule. The load tickets shall be submitted by the Contractor with the pay application.

Bid Item 31 – Crusher Fines (Tan Breeze)

This bid item includes labor, materials, equipment, and incidental costs connected with shaping, placement and compaction of tan colored breeze as shown in the details and directed by the Project Manager. Weight tickets of materials delivered will be used to define the amount of materials used. Payment will be made as identified in the Bid Schedule based on work completed and accepted.

Bid Item 32 - Day Use Site, Complete

This bid item includes all labor, materials, equipment, and submittals to furnish and install a complete Day Use Site as noted on the plans and specifications. This bid item includes, but is not limited to:

● Site preparation, including localized grading, excavation, subgrade compaction, aggregate base placement, and backfilling.

● Concrete for shelter footings and concrete slab for use pad, including formwork, subgrade preparation, reinforcement rebar, jointing, concrete placement, finishing, and curing.

● Fabrication, delivery, installation of complete shade shelter according to plans and specifications.

● Procurement, delivery, assembly, and installation of picnic table according to plans and manufacturer specifications.

● Procurement, delivery, assembly, and installation of outdoor pedestal grill with surface mount according to plans and manufacturer specifications.

● Final Site Cleanup.

This bid item also includes all required shop drawings and submittals. This bid item will be measured and paid as a completed functional Day Use Site in place. Progress payments will be made based on a percentage of the completed work, at the lump sum bid price.

ADDITIONAL BID ITEM #5 (EAST DAY USE AREA OPT-A)

Bid Item 33 - Additional Mobilization

This bid item includes the additional mobilization of personnel, equipment and supplies at the project site in preparation for the Work, as well as the establishment and maintenance for the duration of the Contract of the Contractor’s sanitary facilities, protective fencing and barricades not included elsewhere, necessary facilities, and all other costs incurred or labor and operations which must be performed prior to beginning the other items under the Contract. This item shall include any additional costs for required bonding of this project.

Bid Item 34 - Crushed Stone Base

This bid item includes all labor, materials, equipment, submittals, independent testing services, and incidental costs associated with the furnishing and placement of crushed stone base material at the locations indicated on the plans. Material shall be placed at optimum moisture content and compacted to a minimum 95% of standard proctor density. The method to bring mixture to optimum moisture and density will not be measured or paid for separately, but shall be included in the unit price for this item. Measurement for this item will be based on load tickets delivered to the site, and paid based on the unit price in Tons as reported on the Bid Schedule. The load tickets shall be submitted by the Contractor with the pay application.

Bid Item 35 - (¾” - 1”) Clean Gravel

This bid item includes all labor, materials, equipment, submittals, independent testing services, and incidental costs associated with the furnishing and placement of

¾” - 1” Clean Gravel material at the locations indicated on the plans. Material shall be placed at optimum moisture content and compacted to a minimum 95% of standard proctor density. The method to bring mixture to optimum moisture and density will not be measured or paid for separately, but shall be included in the unit price for this item. Measurement for this item will be based on load tickets delivered to the site, and paid based on the unit price in Tons as reported on the Bid Schedule. The load tickets shall be submitted by the Contractor with the pay application.

Bid Item 36 – Crusher Fines (Tan Breeze)

This bid item includes labor, materials, equipment, and incidental costs connected with shaping, placement and compaction of tan colored breeze as shown in the details and directed by the Project Manager. Weight tickets of materials delivered will be used to define the amount of materials used. Payment will be made as identified in the Bid Schedule based on work completed and accepted.

Bid Item 37 – Day Use Site, Complete

This bid item includes all labor, materials, equipment, and submittals to furnish and install a complete Day Use Site as noted on the plans and specifications. This bid item includes, but is not limited to:

● Site preparation, including localized grading, excavation, subgrade compaction, aggregate base placement, and backfilling.

● Concrete for shelter footings and concrete slab for use pad, including formwork, subgrade preparation, reinforcement rebar, jointing, concrete placement, finishing, and curing.

● Fabrication, delivery, installation of complete shade shelter according to plans and specifications.

● Procurement, delivery, assembly, and installation of picnic table according to plans and manufacturer specifications.

● Procurement, delivery, assembly, and installation of outdoor pedestal grill with surface mount according to plans and manufacturer specifications.

● Final Site Cleanup.

This bid item also includes all required shop drawings and submittals. This bid item will be measured and paid as a completed functional Day Use Site in place. Progress payments will be made based on a percentage of the completed work, at the lump sum bid price.

As a footnote to the bid items, the following items have NOT been included as specific pay items and ARE to be considered incidental to the construction for which they are required:

● Testing

● State electrical permits and inspections

● Water, watering, and dust control

● Dewatering

● Temporary facilities and utilities

● Traffic control

● Barricades and other required safety provisions

This concludes the bid items listed in the proposal. The only payments made under this contract are for the bid items listed herein, and no additional payments will be made to the Contractor for work specified or shown in these Contract Documents. If any discrepancies exist, the Contractor shall notify the Project Manager in writing, requesting clarification.

End of Measurement and Payment

Instructions to Bidders

Project: John Martin Reservoir State Park - DayUse Improvements

Project No: C23JM1

IFB1:2027*048

1. Review of Solicitation Documents:Bidders mustreview the plans and specifications, construction site and conditions in their entirety, and determine the problems that may be encountered in performing the work. The bidder shall include any costs associated with his/her findings in the prices quoted in the proposal.

Documents will be available on the State of Colorado VSS website www.colorado.gov/vss. No additional copies of thedrawings and specifications will be provided by the Division of Parks and Wildlife at any time before or after the bid opening.

Contractors must monitor the amendment history in ColoradoVSS for any updates or modifications. In the event that it becomes necessary to modify the DQ, the modification will be made in ColoradoVSS. It is very important that vendors check

ColoradoVSS on a regular basis, as this is the sole method for communicating any modifications. Modifications included in amendments published on ColoradoVSS take precedence over information in the DQ.

The ColoradoVSS Help Desk is available Monday through Friday 8:00 a.m. to 5:00 p.m. MT and can be reached by emailingvsshelp@state.co.us.

2. General Conditions for Capital Construction:Allwork must conform to the requirements stated in the “General Conditions for Capital Construction, October

2026” (GCs).

3. Inquiries:All questions concerning this projectshall be in writing directed to the

Single Point of Contact identified in the Invitation for Bids section of the solicitation.

The Invitation for Bids also identifies important dates and deadlines for this project.

mailto:vsshelp@state.co.us

4. Bid Schedule:

A. The bidder shall include on the signature page, their Vendor ID (if available) obtained from registration on the Colorado VSS website.

B. The bidder shall complete the Minority Business, Service Disabled Veteran

Owned Small Business and Colorado Labor statements as well as acknowledge addendum(s) on the first page of the Bid Schedule.

C. All bid items shall include a unit and extended price or the bid will be disqualified. The bidder shall write in words and numerically the total base bid and add/alternate (if applicable) amounts on the included Bid Schedule. If conflicts exist between the written words and the numerical amount, the actual line item unit cost shall take precedence.

D. The Bid Schedule shall be signed manually in ink:

1)If the bidder is a corporation, use the corporate signature block, insert the name of the state in which the company was incorporated, and include the

Employer Identification Number (E.I.N.) in the appropriate spaces. The bid must be signed by an officer (President or Vice President), and the title indicated. The signature of the officer shall be attested to by the Secretary and properly sealed. Cross out incorrect titles and insert correct ones, if necessary.

2)If the bidder is a partnership, use the partnership signature block. Cross out the word "Limited" if the partnership is a general one. Print each partner's name and note the proportion of the partnership that each partner has. The majority or general partner must sign the proposal. The same person must sign the contract, if awarded. Print the company name in the appropriate space.

3)If the bidder is a proprietorship, use the sole proprietorship signature block, print in the owner's name, Social Security number, and the business name in the blanks provided, and the owner signs the owner blank.

5. Bid Security:A bid security (bid bond) is requiredfor all competitive sealed bids when the price exceeds $50,000. A bid security in an amount not less than five percent (5%) of the total bid price must be submitted in the form of a bid bond, a bank cashier's check, or a bank certified check. Checks should be made payable to the

Treasurer of the State of Colorado. An irrevocable letter of credit is not acceptable as a bid security. Failure to provide a bid security in the proper form and amount by the time set for opening of bids, if not cured, makes the bid unacceptable.

6. Performance Bond, Labor and Material Bond:Thesuccessful bidder shall furnish a bond in the amount of 100% of the contract price for performance and for material and labor payment when bid is equal to or exceeds $150,000. The bond shall be executed on the standard State of Colorado form. The State requests that the Surety and Contractor leave the date of the Contract found on the first page of each bond form blank, and we will DNR in the date after the Controller Delegate executes the

Contract. These bonds will be submitted along with the standard State Agreement form within 10 days of the "Notice of Award."

7. Vendor Bond Assistance:Any vendors that need supportresponding to solicitations may contact the Colorado Supplier Diversity Navigator at the Statewide Equity Office of Supplier Diversitydhr.colorado.gov/statewide-equity-office/supplier-diversity.

Services provided include assistance with responding to solicitations, interpretation of solicitation documents, technical assistance referrals, availability of resources, and bond assistance under the Construction Statewide Bond Assistance Program dhr.colorado.gov/statewide-equity-office/supplier-diversity/construction-and-bond-as sistance, through which eligible contractors can applyfor assistance in securing the required bonding. The office can be reached during normal business hours by calling

303-866-5765or emailingDPA_SupplierDiversityHelp@state.co.us.

8. Service Disabled Veteran Owned Small Businesses (SDVOSB’s):SDVOSBs, who are incorporated or organized in Colorado or maintain a place of business or have an office in Colorado and who are officially registered and verified as a SDVOSB by the

Center for Veteran Enterprise within the U.S. Small Business Administration

(https://veterans.certify.sba.gov), may receive a 5% preference on their bid. This preference applies only to the price, and the SDVOSBs must still meet all other https://dhr.colorado.gov/statewide-equity-office/supplier-diversity https://dhr.colorado.gov/statewide-equity-office/supplier-diversity/construction-and-bond-assistance https://dhr.colorado.gov/statewide-equity-office/supplier-diversity/construction-and-bond-assistance mailto:DPA_SupplierDiversityHelp@state.co.us qualifications required in the bid. SDVOSBs claiming this preference shall submit documentation of SDVOSB certification Issued through the Center for Veteran

Enterprise within the U.S. Small Business Administration in their response to the solicitation. Bid submissions without this documentation will not be given a preference

9. Resident Bidder Preference:When a contract forcommodities or services is to be awarded to a bidder (projects >$500,000), a resident bidder shall be allowed a preference against a nonresident bidder equal to the preference given or required by the state in which the nonresident bidder is a resident. (§24-103-906 C.R.S.) A resident bidder is authorized to transact business in the State of Colorado, maintains a place of business in Colorado and pays unemployment compensation taxes.

10. Accessibility Requirements:All work performedas a result of this solicitation must comply with all applicable provisions of §§24-85-101, C.R.S., et seq., and the

Accessibility Standards for Individuals with a Disability,as established by the Office

Of Information Technology pursuant to §24-85-103 (2.5), C.R.S. and 3) all State of

Colorado technology standards related to technology accessibility and with Level AA of the most current version of the Web Content Accessibility Guidelines (WCAG), incorporated in the State of Colorado technology standards.

11. Colorado Labor:Colorado Labor shall be employedto perform at least eighty percent (80%) of the work on a public works project(>$500,000)per CRS 8-17-101.

CORE notice to require bidder to indicate 80% Colorado labor in bid or proposal and provide written justification if the 80% Colorado labor is not included in the bid. The justification is a requirement of the bid or proposal submittal. State Agency shall waive the 80% requirement and post justification on its web site; if there is reasonable evidence to demonstrate insufficient Colorado labor to perform the work and, if compliance with the 80% would create an undue burden that would substantially prevent a project from proceeding to completion. Posting of the agency’s written waiver should include but not be limited to contractor’s justification for insufficient available Colorado labor and the agency’s determination that there is an undue burden negatively impacting the project schedule, budget/appropriation, quality/standards of care or any other specific requirement of the project due to compliance with the 80% Colorado labor requirement.