This file is a technical drawing package for the Material Plasma Exposure Experiment (MPEX) Reverse Target Shield components, developed by Oak Ridge National Laboratory under U.S. Department of Energy contract DE-AC05-00OR22725. The package contains fifteen detailed engineering drawings (MPEX-04-DES-05-A548 through A563) specifying the design, fabrication, and assembly requirements for various target shield subassemblies and component parts, all dated July-September 2023.

The drawings specify fabrication of precision vacuum components including a target shield weldment assembly, support structures, channels, covers, and bonded components manufactured from materials such as 316 stainless steel (ASTM A240/A276), GLIDCOP AL-15 copper alloy, and tungsten (ASTM B760). Critical requirements include magnetic permeability specifications of <1.03 at 200 oersteds, precision cleaning per MPEX Vacuum Handbook Section 4, helium leak testing at 1×10⁻⁹ STD cc/sec per ASTM E498-95, vacuum-tight weld quality per AWS D17.1/D17.1M Class A specifications, and explosion bonding for composite components. Dimensional tolerancing follows ASME Y14.5-2018 standards with linear tolerances ranging from ±0.005 to ±0.1 inches depending on feature classification. All components require dimensional reports, weld/braze inspection reports, and cleaning certifications, with deviation requests and nonconformance reports marked as required quality verification documents. Assembly weights range from 0.042 to 8.60 pounds for individual subassemblies.

View the file

Other files

File Type Posted
MPEX-00-ENG-002-A3.pdf PDF
MPEX-00-ENG-002.pdf PDF
MPEX-00-ENG-002-A1.pdf PDF
MPEX-12-PLAN-001 (1).pdf PDF
MPEX-04-SOW-604_R0_Statement of Work for a Target Service Shield_SIGNED.pdf PDF
MPEX-00-ENG-002-A2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

7 6 5 4 3 2 18

A

C

D

A

B

C

D

MATERIAL PLASMA EXPOSURE EXPERIMENT

DEPARTMENT OF ENERGY UNDER U.S. GOVE RNMENT CONTRACT DE-AC05-00OR22725

OAK RIDGE NATIONAL LABORATORY

THIS DRAWING IS THE PROPERTY OF

OAK RIDGE, TENNESSEE

(.664)

(2.039)

R.25

AFTER

WELDING

D W G

N O

M P E X D E S A

S H

NEXT USED ASSEMBLIES

MPEX-04-DES-05-A550

DIMENSIONS ARE IN INCHES

DRAFTING STANDARD: ASME Y14.1

DIMENSIONING AND TOLERANCING IN

ACCORDANCE WITH ASME Y14.5, 2018

APPROVALS

DESIGNER DATE

L.REFFI 7/2023

DETAILER DATE

L.REFFI 7/2023

CHECKER DATE

DO NOT SCALE DRAWING D.OTTINGER 7/2023

DEFAULT TOLERANCES

LINEAR ANGULAR

ENGINEER DATE

MPEX

REVERSE TARGET SHIELD

T.BOYD 7/2023

CONTROL ACCOUNT MANAGER DATE

X.X .1 .5

X.XX .01

X.XXX .005

A.AARON 7/2023

TARGET SHIELD SHORT, WELDMENT

REMOVE ALL BURRS AND

BREAK SHARP EDGES:

SURFACE ROUGHNESS:

.03

125 RMS MAX

SIZE DRAWING NUMBER REV

D MPEX-04-DES-05-A548 0

THIRD ANGLE PROJECTION SCALE CAD MODEL SHEET

1:1 MPEX-04-DES-05-A548 1 of 1

MPEX GUIDE

THIS DRAWING PREPARED ON CREOMPEX-00-ENG-005

QUALITY VERIFICATION

APPLICABLEDOCUMENTS REQUIRED

MATERIAL MILL TEST REPORT

LEAK TEST REPORT

CLEANING CERT

WELD / BRAZE INSPECTION REPORT

HEAT TREAT REPORT (W/CHART)

DIMENSIONAL REPORT

MATERIAL SELLER CERT

FUNCTIONAL TEST REPORT

X DEVIATION REQUEST

X NONCONFORMANCE REPORT

DATEQA REP

3.81 LBSPARTS LIST

TOTAL WEIGHT

MATERIAL / SPECIFICATIONDESCRIPTION OR NOMENCLATUREPART OR IDENTIFYING NUMBERQTY

FIND

NO.

TARGET SHIELD WELDMENTMPEX-04-DES-05-A56011

TARGET SHIELD EX-BONDED SHORT, COVER RELIEFMPEX-04-DES-05-A56312

MODEL REV

NO REPRESENTATION OR WARRANTY, EXPRESSED OR IMPLIED, IS MADE AS TO THE ACCURACY, COMPLETENESS OR USEFULNESS OF THE INFORMATION OR STATEMENTS CONTAINED IN THESE DRAWINGS, OR THAT THE DISCLOSURE OF ANY INFORMATION, APPARATUS, METHOD OR PROCESS DISCLOSED IN THESE DRAWINGS MAY NOT INFRINGE PRIVATE RIGHTS OF OTHERS. NO LIABILITY IS ASSUMED WITH RESPECT TO THE USE OF, OR FOR DAMAGES RESULTING FROM THE USE OF, ANY INFORMATION, APPARATUS, METHOD OR PROCESS DISCLOSED IN THESE DRAWINGS. DRAWINGS MADE AVAILABLE FOR INFORMATION TO BIDDER ARE NOT TO BE USED FOR OTHER PURPOSES AND ARE TO BE RETURNED UPON REQUEST OF THE FORWARDING CONTRACTOR.

REVISIONS

DATECAMENGCKDETDESDESCRIPTION OF CHANGETYPEREV

8/23/2023AATBDOCCCCORIGINAL ISSUE 0

DRAWING PACKAGE I.D.

NOTES:

1. ALL COMPONENTS SHALL BE PRECISION CLEANED ACCORDING TO SECTION 4 OF THE MPEX VACUUM HANDBOOK (MPEX-00-ENG-002) PRIOR TO WELDING.

2. AFTER CLEANING, ALL COMPONENTS SHALL BE HANDLED ACCORDING TO SECTION 3.10 OF THE MPEX VACUUM HANDBOOK (MPEX-00-ENG-002) TO AVOID CONTAMINATION OF WELDS.

3. ALL COMPONENTS, FILLER MATERIALS, AND WELDED JOINTS SHALL BE NON-MAGNETIC ACCORDING TO SECTION 3.4 OF THE MPEX VACUUM HANDBOOK (MPEX-00-ENG-002) AFTER WELDING.

4. SUPPLIER SHALL MANUFACTURE A WELD SAMPLE TO VERIFY THAT THE MAGNETIC PERMEABILITY REQUIREMENTS ARE MET. A WELD PROCEDURE WITH PROCESS SETTINGS SHALL BE DOCUMENTED

AND USED FOR BOTH THE SAMPLE AND PRODUCTION ASSEMBLIES.

5. ALL VT (VACUUM TIGHT) WELDS MUST PASS A HELIUM LEAK TEST OF 1 X 10^-9 STD CC/SEC HELIUM PERFORMED ACCORDING TO ASTM E498-95, STANDARD TEST METHODS FOR LEAK DETECTION.

6. SUPPLIER SHALL MAINTAIN WELD PROCEDURE AND INSPECTION RECORDS.

7. WELD PROCEDURE AND PERFORMANCE QUALIFICATIONS PER AWS B2.1/2.IM:2014.

8. WELD QUALITY REQUIREMENTS OF AWS D17.1/D17.1M (FUSION WELDING) SPECIFICATION FOR CLASS A WELDS MUST BE MET. WELDS MUST BE VISUALLY INSPECTED.

9. WELD SYMBOLS PER ANSI/AWS A2.4.

ALL SURFACES

SECTION A-A

SEE DETAIL A

⫽ .002 A

DETAIL A

SCALE 2:1

VT

A

OAK RIDGE NATIONAL LABORATORY

A

C

D

A

B

C

D

MATERIAL PLASMA EXPOSURE EXPERIMENT

DEPARTMENT OF ENERGY UNDER U.S. GOVE RNMENT CONTRACT DE-AC05-00OR22725

OAK RIDGE NATIONAL LABORATORY

THIS DRAWING IS THE PROPERTY OF

OAK RIDGE, TENNESSEE

2X 1.280

1.200

(2X 7.22) 2X 1.000

2X 1.120

(2X 1.25)

(5.25)

(6.03)

(2.50)

D W G

N O

M P E X D E S A

S H

NEXT USED ASSEMBLIES

MPEX-04-DES-05-A550

DIMENSIONS ARE IN INCHES

DRAFTING STANDARD: ASME Y14.1

DIMENSIONING AND TOLERANCING IN

ACCORDANCE WITH ASME Y14.5, 2018

APPROVALS

DESIGNER DATE

L.REFFI 7/2023

DETAILER DATE

L.REFFI 7/2023

CHECKER DATE

DO NOT SCALE DRAWING D.OTTINGER 7/2023

DEFAULT TOLERANCES

LINEAR ANGULAR

ENGINEER DATE

MPEX

REVERSE TARGET SHIELD

T.BOYD 7/2023

CONTROL ACCOUNT MANAGER DATE

X.X .1 .5

X.XX .01

X.XXX .005

A.AARON 7/2023

TARGET SHIELD SUPPORT REVERSE ASSY

REMOVE ALL BURRS AND

SIZE DRAWING NUMBER REV

D MPEX-04-DES-05-A549 0

THIRD ANGLE PROJECTION SCALE CAD MODEL SHEET

1:2 MPEX-04-DES-05-A549 1 of 1

MPEX GUIDE

THIS DRAWING PREPARED ON CREOMPEX-00-ENG-005

QUALITY VERIFICATION

APPLICABLEDOCUMENTS REQUIRED

MATERIAL MILL TEST REPORT

LEAK TEST REPORT

CLEANING CERT

WELD / BRAZE INSPECTION REPORT

HEAT TREAT REPORT (W/CHART)

DIMENSIONAL REPORT

MATERIAL SELLER CERT

FUNCTIONAL TEST REPORT

X DEVIATION REQUEST

X NONCONFORMANCE REPORT

DATEQA REP

4.69 LBSPARTS LIST

TOTAL WEIGHT

MATERIAL / SPECIFICATIONDESCRIPTION OR NOMENCLATUREPART OR IDENTIFYING NUMBERQTY

FIND

NO.

316 STAINLESS STEEL

ASTM A240

TARGET SHIELD ARM LODMPEX-04-DES-05-A55511

316 STAINLESS STEEL

ASTM A276

TARGET WELDED TUBE VERTICALMPEX-04-DES-05-A55622

316 STAINLESS STEEL

ASTM A240

SHIELD SUPPORT ADJUSTER REVERSEMPEX-04-DES-05-A55713

316 STAINLESS STEEL

ASTM A276

SHIELD 90 DEG TUBEMPEX-04-DES-05-A55824

316/316L STAINLESS STEEL90 DEG ELBOW CONN, 3/8 PIPE, HIGH PRESS, SOCKET CONNVMPEX-MMC-45515K11325

SS 316 (S31600)

FITTING, SOCKET WELD, 1/2" VCR X 1/2" TUBE, SS316VMPEX-SWG-SS-8-VCR-326

SS 316 (S31600)

NUT, 1/2", VCR, MALE, SS316VMPEX-SWG-SS-8-VCR-427

MODEL REV

NO REPRESENTATION OR WARRANTY, EXPRESSED OR IMPLIED, IS MADE AS TO THE ACCURACY, COMPLETENESS OR USEFULNESS OF THE INFORMATION OR STATEMENTS CONTAINED IN THESE DRAWINGS, OR THAT THE DISCLOSURE OF ANY INFORMATION, APPARATUS, METHOD OR PROCESS DISCLOSED IN THESE DRAWINGS MAY NOT INFRINGE PRIVATE RIGHTS OF OTHERS. NO LIABILITY IS ASSUMED WITH RESPECT TO THE USE OF, OR FOR DAMAGES RESULTING FROM THE USE OF, ANY INFORMATION, APPARATUS, METHOD OR PROCESS DISCLOSED IN THESE DRAWINGS. DRAWINGS MADE AVAILABLE FOR INFORMATION TO BIDDER ARE NOT TO BE USED FOR OTHER PURPOSES AND ARE TO BE RETURNED UPON REQUEST OF THE FORWARDING CONTRACTOR.

REVISIONS

DATECAMENGCKDETDESDESCRIPTION OF CHANGETYPEREV

8/23/2023AATBDOCCCCORIGINAL ISSUE 0

DRAWING PACKAGE I.D.

NOTES:

1. ALL COMPONENTS SHALL BE PRECISION CLEANED ACCORDING TO SECTION 4 OF THE MPEX VACUUM HANDBOOK (MPEX-00-ENG-002) PRIOR TO WELDING.

2. AFTER CLEANING, ALL COMPONENTS SHALL BE HANDLED ACCORDING TO SECTION 3.10 OF THE MPEX VACUUM HANDBOOK (MPEX-00-ENG-002) TO AVOID CONTAMINATION OF WELDS.

3. ALL COMPONENTS, FILLER MATERIALS, AND WELDED JOINTS SHALL BE NON-MAGNETIC ACCORDING TO SECTION 3.4 OF THE MPEX VACUUM HANDBOOK (MPEX-00-ENG-002) AFTER WELDING.

4. SUPPLIER SHALL MANUFACTURE A WELD SAMPLE TO VERIFY THAT THE MAGNETIC PERMEABILITY REQUIREMENTS ARE MET. A WELD PROCEDURE WITH PROCESS SETTINGS SHALL BE

DOCUMENTED AND USED FOR BOTH THE SAMPLE AND PRODUCTION ASSEMBLIES.

5. ALL VT (VACUUM TIGHT) WELDS MUST PASS A HELIUM LEAK TEST OF 1 X 10^-9 STD CC/SEC HELIUM PERFORMED ACCORDING TO ASTM E498-95, STANDARD TEST METHODS FOR LEAK DETECTION.

6. SUPPLIER SHALL MAINTAIN WELD PROCEDURE AND INSPECTION RECORDS.

7. WELD PROCEDURE AND PERFORMANCE QUALIFICATIONS PER AWS B2.1/2.IM:2014.

8. WELD QUALITY REQUIREMENTS OF AWS D17.1/D17.1M (FUSION WELDING) SPECIFICATION FOR CLASS A WELDS MUST BE MET. WELDS MUST BE VISUALLY INSPECTED.

9. WELD SYMBOLS PER ANSI/AWS A2.4.

SCALE 3:4

SCALE 3:4

SECTION A-A

⏊ .002 A

SEE DETAIL A

⫽ .002 A

DETAIL A

SCALE 3:2

2X VT

2X VT

2X VT

A

OAK RIDGE NATIONAL LABORATORY

A

C

D

A

B

C

D

MATERIAL PLASMA EXPOSURE EXPERIMENT

DEPARTMENT OF ENERGY UNDER U.S. GOVE RNMENT CONTRACT DE-AC05-00OR22725

OAK RIDGE NATIONAL LABORATORY

THIS DRAWING IS THE PROPERTY OF

OAK RIDGE, TENNESSEE

(9.36)

1.629

(5.63)

D W G

N O

M P E X D E S A

S H

NEXT USED ASSEMBLIES

DIMENSIONS ARE IN INCHES

DRAFTING STANDARD: ASME Y14.1

DIMENSIONING AND TOLERANCING IN

ACCORDANCE WITH ASME Y14.5, 2018

APPROVALS

DESIGNER DATE

L.REFFI 7/2023

DETAILER DATE

L.REFFI 7/2023

CHECKER DATE

DO NOT SCALE DRAWING D.OTTINGER 7/2023

DEFAULT TOLERANCES

LINEAR ANGULAR

ENGINEER DATE

MPEX

REVERSE TARGET SHIELD

T.BOYD 7/2023

CONTROL ACCOUNT MANAGER DATE

X.X .1 .5

X.XX .01

X.XXX .005

A.AARON 7/2023

REVERSE TARGET SHIELD FULL ASSY

REMOVE ALL BURRS AND

SIZE DRAWING NUMBER REV

D MPEX-04-DES-05-A550 0

THIRD ANGLE PROJECTION SCALE CAD MODEL SHEET

1:2 MPEX-04-DES-05-A550 1 of 1

MPEX GUIDE

THIS DRAWING PREPARED ON CREOMPEX-00-ENG-005

QUALITY VERIFICATION

APPLICABLEDOCUMENTS REQUIRED

MATERIAL MILL TEST REPORT

LEAK TEST REPORT

CLEANING CERT

WELD / BRAZE INSPECTION REPORT

HEAT TREAT REPORT (W/CHART)

DIMENSIONAL REPORT

MATERIAL SELLER CERT

FUNCTIONAL TEST REPORT

X DEVIATION REQUEST

X NONCONFORMANCE REPORT

DATEQA REP

8.60 LBSPARTS LIST

TOTAL WEIGHT

MATERIAL / SPECIFICATIONDESCRIPTION OR NOMENCLATUREPART OR IDENTIFYING NUMBERQTY

FIND

NO.

TARGET SHIELD SHORT, WELDMENTMPEX-04-DES-05-A54811

TARGET SHIELD SUPPORT REVERSE ASSYMPEX-04-DES-05-A54912

18-8 STAINLESS STEELSCREW, SET, CUP POINT, SOCKET, 10-32 x 7/8" lgVMPEX-UCC-T-1014-NC23

18-8 STAINLESS STEELSCREW, SET, CUP POINT, SOCKET, 10-32 x 1 1/2" lgVMPEX-UCC-T-1024-NC14

18-8 STAINLESS STEELWASHER, LEVELING, 1/4" SCREW, 0.173"- 0.203" THKVMPEX-MMC-91944A43025

18-8 STAINLESS STEELSCREW, SOCKET HD, VENTED, 1/4-28 x 2" LGVMPEX-UCC-C-2832-C16

18-8 STAINLESS STEELSCREW, SOCKET HD, VENTED, 1/4-28 x 1 1/2" LGVMPEX-UCC-C-2824-C17

18-8 STAINLESS STEELSCREW, SET, CUP POINT, SOCKET, 8-32 x 3/4" LGVMPEX-UCC-T-812-C28

MODEL REV

NO REPRESENTATION OR WARRANTY, EXPRESSED OR IMPLIED, IS MADE AS TO THE ACCURACY, COMPLETENESS OR USEFULNESS OF THE INFORMATION OR STATEMENTS CONTAINED IN THESE DRAWINGS, OR THAT THE DISCLOSURE OF ANY INFORMATION, APPARATUS, METHOD OR PROCESS DISCLOSED IN THESE DRAWINGS MAY NOT INFRINGE PRIVATE RIGHTS OF OTHERS. NO LIABILITY IS ASSUMED WITH RESPECT TO THE USE OF, OR FOR DAMAGES RESULTING FROM THE USE OF, ANY INFORMATION, APPARATUS, METHOD OR PROCESS DISCLOSED IN THESE DRAWINGS. DRAWINGS MADE AVAILABLE FOR INFORMATION TO BIDDER ARE NOT TO BE USED FOR OTHER PURPOSES AND ARE TO BE RETURNED UPON REQUEST OF THE FORWARDING CONTRACTOR.

REVISIONS

DATECAMENGCKDETDESDESCRIPTION OF CHANGETYPEREV

8/23/2023AATBDOCCCCORIGINAL ISSUE 0

DRAWING PACKAGE I.D.

NOTES:

WELDING

1. ALL COMPONENTS SHALL BE PRECISION CLEANED ACCORDING TO SECTION 4 OF THE MPEX VACUUM HANDBOOK (MPEX-00-ENG-002) PRIOR TO WELDING.

2. AFTER CLEANING, ALL COMPONENTS SHALL BE HANDLED ACCORDING TO SECTION 3.10 OF THE MPEX VACUUM HANDBOOK (MPEX-00-ENG-002) TO AVOID CONTAMINATION OF WELDS.

3. ALL COMPONENTS, FILLER MATERIALS, AND WELDED JOINTS SHALL BE NON-MAGNETIC ACCORDING TO SECTION 3.4 OF THE MPEX VACUUM HANDBOOK (MPEX-00-ENG-002) AFTER WELDING.

4. SUPPLIER SHALL MANUFACTURE A WELD SAMPLE TO VERIFY THAT THE MAGNETIC PERMEABILITY REQUIREMENTS ARE MET. A WELD PROCEDURE WITH PROCESS SETTINGS SHALL BE

DOCUMENTED AND USED FOR BOTH THE SAMPLE AND PRODUCTION ASSEMBLIES.

5. ALL VT (VACUUM TIGHT) WELDS MUST PASS A HELIUM LEAK TEST OF 1 X 10^-9 STD CC/SEC HELIUM PERFORMED ACCORDING TO ASTM E498-95, STANDARD TEST METHODS FOR LEAK DETECTION.

6. SUPPLIER SHALL MAINTAIN WELD PROCEDURE AND INSPECTION RECORDS.

7. WELD PROCEDURE AND PERFORMANCE QUALIFICATIONS PER AWS B2.1/2.IM:2014.

8. WELD QUALITY REQUIREMENTS OF AWS D17.1/D17.1M (FUSION WELDING) SPECIFICATION FOR CLASS A WELDS MUST BE MET. WELDS MUST BE VISUALLY INSPECTED.

9. WELD SYMBOLS PER ANSI/AWS A2.4.

VACUUM

10. CLEAN AND BAKE IN ACCORDANCE WITH GUIDELINES DEFINED IN SECTIONS 3 AND 4 OF THE MPEX VACUUM HANDBOOK (MPEX-00-ENG-002).

11. PROTECT KNIFE EDGES OF VACUUM COMPONENTS. INSTALL BLANKS ON OPEN FLANGES ACCORDING TO SECTIONS 3 AND 4 OF THE MPEX VACUUM HANDBOOK (MPEX-00-ENG-002).

12. METAL SEALS SHALL BE USED WHEN PERFORMING THE FINAL HELIUM LEAK TEST.

13. HELIUM LEAK TESTING OF ALL FABRICATED PARTS SHALL SHOW A TOTAL LEAK RATE LESS THAN 8 X 10^-10 TORR-L/SECOND USING A MASS SPEC LEAK DETECTOR ACCORDING TO

ASTM E498-95, STANDARD TEST METHODS FOR LEAK DETECTION.

14. THE VESSEL OR ASSEMBLY TOTAL OUT-GASSING RATE SHALL BE MEASURED AFTER 10 HOURS OF PUMPING FROM ATMOSPHERE. THE OUT-GASSING RATE MUST NOT EXCEED 8 X 10^-10 TORR/LITER/SEC/CM2.

ITEM IDENTIFICATION

15. VACUUM VESSEL SHALL BE INDENTIFIED IN ACCORDANCE WITH SECTION 3.8 OF MPEX VACUUM HANDBOOK (MPEX-00-ENG-002).

PACKAGING NOTES

16. ALL VACUUM VESSELS AND COMPONENTS SHALL BE HANDLED, PACKAGED, AND SHIPPED ACCORDING TO THE GUIDELINES OF SECTION 3.10 AND SECTION 3.11 OF THE MPEX VACUUM HANDBOOK (MPEX-00-ENG-002)

SCALE 1:2

⏊ .010 A

2X VT

A

A

C

D

A

B

C

D

MATERIAL PLASMA EXPOSURE EXPERIMENT

DEPARTMENT OF ENERGY UNDER U.S. GOVE RNMENT CONTRACT DE-AC05-00OR22725

OAK RIDGE NATIONAL LABORATORY

THIS DRAWING IS THE PROPERTY OF

OAK RIDGE, TENNESSEE

⌀5.500

.500

⌀2.100 THRU

D W G

N O

M P E X D E S A

S H

NEXT USED ASSEMBLIES

MPEX-04-DES-05-A562

QUALITY VERIFICATION

APPLICABLEDOCUMENTS REQUIRED

MATERIAL MILL TEST REPORT

LEAK TEST REPORT

CLEANING CERT

WELD / BRAZE INSPECTION REPORT

HEAT TREAT REPORT (W/CHART)

DIMENSIONAL REPORT

MATERIAL SELLER CERT

FUNCTIONAL TEST REPORT

X DEVIATION REQUEST

X NONCONFORMANCE REPORT

DATEQA REP

DIMENSIONS ARE IN INCHES

DRAFTING STANDARD: ASME Y14.1

DIMENSIONING AND TOLERANCING IN

ACCORDANCE WITH ASME Y14.5, 2018

APPROVALS

DESIGNER DATE

L.REFFI 7/2023

DETAILER DATE

L.REFFI 7/2023

CHECKER DATE

DO NOT SCALE DRAWING D.OTTINGER 7/2023

DEFAULT TOLERANCES

LINEAR ANGULAR

ENGINEER DATE

MPEX

REVERSE TARGET SHIELD

T.BOYD 7/2023

CONTROL ACCOUNT MANAGER DATE

X.X .1 .5

X.XX .01

X.XXX .005

A.AARON 7/2023

TARGET SHIELD CHANNELS LOD

REMOVE ALL BURRS AND

125 RMS

SIZE DRAWING NUMBER REV

D MPEX-04-DES-05-A551 0

THIRD ANGLE PROJECTION SCALE CAD MODEL SHEET

1:1 MPEX-04-DES-05-A551 1 of 1

MPEX GUIDE

THIS DRAWING PREPARED ON CREOMPEX-00-ENG-005

MODEL REV

PART INFORMATION

WEIGHTSPECIFICATIONMATERIAL

3.26 LBSAL-15GLIDCOP

NO REPRESENTATION OR WARRANTY, EXPRESSED OR IMPLIED, IS MADE AS TO THE ACCURACY, COMPLETENESS OR USEFULNESS OF THE INFORMATION OR STATEMENTS CONTAINED IN THESE DRAWINGS, OR THAT THE DISCLOSURE OF ANY INFORMATION, APPARATUS, METHOD OR PROCESS DISCLOSED IN THESE DRAWINGS MAY NOT INFRINGE PRIVATE RIGHTS OF OTHERS. NO LIABILITY IS ASSUMED WITH RESPECT TO THE USE OF, OR FOR DAMAGES RESULTING FROM THE USE OF, ANY INFORMATION, APPARATUS, METHOD OR PROCESS DISCLOSED IN THESE DRAWINGS. DRAWINGS MADE AVAILABLE FOR INFORMATION TO BIDDER ARE NOT TO BE USED FOR OTHER PURPOSES AND ARE TO BE RETURNED UPON REQUEST OF THE FORWARDING CONTRACTOR.

REVISIONS

DATECAMENGCKDETDESDESCRIPTION OF CHANGETYPEREV

8/23/2023AATBDOCCCCORIGINAL ISSUE 0

DRAWING PACKAGE I.D.

.001 A B

NOTES:

1. ALL PARTS AND COMPONENTS SHALL BE FABRICATED IN ACCORDANCE WITH GOOD VACUUM

PRACTICES AND THE GUIDELINES OUTLINED IN THE MPEX VACUUM HANDBOOK (MPEX-00-ENG-002).

2. USE ONLY WATER SOLUBLE, NON-SULFUROUS BEARING CUTTING OILS FOR MACHINING.

3. ALL COMPONENTS SHALL BE PRECISION CLEANED ACCORDING TO SECTION 4 OF THE MPEX VACUUM HANDBOOK (MPEX-00-ENG-002)

4. SUPPLIER MUST VERIFY THAT ALL MATERIALS AND FABRICATION PROCESS STEPS RESULT IN ALL COMPONENTS (INCLUDING WELD AFFECTED AREAS AND HARDWARE) HAVING A MAGNETIC PERMEABILITY OF <1.0 3 AT 200 OERSTEDS.

ALL

SURFACES

SECTION A-A

⏥ .001

⫽ .002 A

⏥ .001

A

B

OAK RIDGE NATIONAL LABORATORY

Supplied by ORNL

A

C

D

A

B

C

D

MATERIAL PLASMA EXPOSURE EXPERIMENT

DEPARTMENT OF ENERGY UNDER U.S. GOVE RNMENT CONTRACT DE-AC05-00OR22725

OAK RIDGE NATIONAL LABORATORY

THIS DRAWING IS THE PROPERTY OF

OAK RIDGE, TENNESSEE

.100

⌀5.500

⌀2.100 THRU

D W G

N O

M P E X D E S A

S H

NEXT USED ASSEMBLIES

MPEX-04-DES-05-A562

QUALITY VERIFICATION

APPLICABLEDOCUMENTS REQUIRED

MATERIAL MILL TEST REPORT

LEAK TEST REPORT

CLEANING CERT

WELD / BRAZE INSPECTION REPORT

HEAT TREAT REPORT (W/CHART)

DIMENSIONAL REPORT

MATERIAL SELLER CERT

FUNCTIONAL TEST REPORT

X DEVIATION REQUEST

X NONCONFORMANCE REPORT

DATEQA REP

DIMENSIONS ARE IN INCHES

DRAFTING STANDARD: ASME Y14.1

DIMENSIONING AND TOLERANCING IN

ACCORDANCE WITH ASME Y14.5, 2018

APPROVALS

DESIGNER DATE

L.REFFI 7/2023

DETAILER DATE

L.REFFI 7/2023

CHECKER DATE

DO NOT SCALE DRAWING D.OTTINGER 7/2023

DEFAULT TOLERANCES

LINEAR ANGULAR

ENGINEER DATE

MPEX

REVERSE TARGET SHIELD

T.BOYD 7/2023

CONTROL ACCOUNT MANAGER DATE

X.X .1 .5

X.XX .01

X.XXX .005

A.AARON 7/2023

TARGET SHIELD COVER LOD

REMOVE ALL BURRS AND

32 RMS

SIZE DRAWING NUMBER REV

D MPEX-04-DES-05-A552 0

THIRD ANGLE PROJECTION SCALE CAD MODEL SHEET

1:1 MPEX-04-DES-05-A552 1 of 1

MPEX GUIDE

THIS DRAWING PREPARED ON CREOMPEX-00-ENG-005

MODEL REV

PART INFORMATION

WEIGHTSPECIFICATIONMATERIAL

0.58 LBSASTM A276316 STAINLESS STEEL

NO REPRESENTATION OR WARRANTY, EXPRESSED OR IMPLIED, IS MADE AS TO THE ACCURACY, COMPLETENESS OR USEFULNESS OF THE INFORMATION OR STATEMENTS CONTAINED IN THESE DRAWINGS, OR THAT THE DISCLOSURE OF ANY INFORMATION, APPARATUS, METHOD OR PROCESS DISCLOSED IN THESE DRAWINGS MAY NOT INFRINGE PRIVATE RIGHTS OF OTHERS. NO LIABILITY IS ASSUMED WITH RESPECT TO THE USE OF, OR FOR DAMAGES RESULTING FROM THE USE OF, ANY INFORMATION, APPARATUS, METHOD OR PROCESS DISCLOSED IN THESE DRAWINGS. DRAWINGS MADE AVAILABLE FOR INFORMATION TO BIDDER ARE NOT TO BE USED FOR OTHER PURPOSES AND ARE TO BE RETURNED UPON REQUEST OF THE FORWARDING CONTRACTOR.

REVISIONS

DATECAMENGCKDETDESDESCRIPTION OF CHANGETYPEREV

8/23/2023AATBDOCCCCORIGINAL ISSUE 0

DRAWING PACKAGE I.D.

.001 A B

NOTES:

1. ALL PARTS AND COMPONENTS SHALL BE FABRICATED IN ACCORDANCE WITH GOOD VACUUM

PRACTICES AND THE GUIDELINES OUTLINED IN THE MPEX VACUUM HANDBOOK (MPEX-00-ENG-002).

2. USE ONLY WATER SOLUBLE, NON-SULFUROUS BEARING CUTTING OILS FOR MACHINING.

3. ALL COMPONENTS SHALL BE PRECISION CLEANED ACCORDING TO SECTION 4 OF THE MPEX VACUUM HANDBOOK (MPEX-00-ENG-002)

4. SUPPLIER MUST VERIFY THAT ALL MATERIALS AND FABRICATION PROCESS STEPS RESULT IN ALL COMPONENTS (INCLUDING WELD AFFECTED AREAS AND HARDWARE) HAVING A MAGNETIC PERMEABILITY OF <1.03 AT 200 OERSTEDS.

ALL SURFACES

SECTION A-A

⏥ .001

⫽ .002 A

⏥ .001

A

B

OAK RIDGE NATIONAL LABORATORY

A

C

D

A

B

C

D

MATERIAL PLASMA EXPOSURE EXPERIMENT

DEPARTMENT OF ENERGY UNDER U.S. GOVE RNMENT CONTRACT DE-AC05-00OR22725

OAK RIDGE NATIONAL LABORATORY

THIS DRAWING IS THE PROPERTY OF

OAK RIDGE, TENNESSEE

.04

⌀2.100 THRU

⌀5.500

D W G

N O

M P E X D E S A

S H

NEXT USED ASSEMBLIES

MPEX-04-DES-05-A562

QUALITY VERIFICATION

APPLICABLEDOCUMENTS REQUIRED

MATERIAL MILL TEST REPORT

LEAK TEST REPORT

CLEANING CERT

WELD / BRAZE INSPECTION REPORT

HEAT TREAT REPORT (W/CHART)

DIMENSIONAL REPORT

MATERIAL SELLER CERT

FUNCTIONAL TEST REPORT

X DEVIATION REQUEST

X NONCONFORMANCE REPORT

DATEQA REP

DIMENSIONS ARE IN INCHES

DRAFTING STANDARD: ASME Y14.1

DIMENSIONING AND TOLERANCING IN

ACCORDANCE WITH ASME Y14.5, 2018

APPROVALS

DESIGNER DATE

L.REFFI 7/2023

DETAILER DATE

L.REFFI 7/2023

CHECKER DATE

DO NOT SCALE DRAWING D.OTTINGER 7/2023

DEFAULT TOLERANCES

LINEAR ANGULAR

ENGINEER DATE

MPEX

REVERSE TARGET SHIELD

T.BOYD 7/2023

CONTROL ACCOUNT MANAGER DATE

X.X .1 .5

X.XX .01

X.XXX .005

A.AARON 7/2023

TARGET EX-BONDED TUNGSTEN LOD

REMOVE ALL BURRS AND

SIZE DRAWING NUMBER REV

D MPEX-04-DES-05-A553 0

THIRD ANGLE PROJECTION SCALE CAD MODEL SHEET

1:1 MPEX-04-DES-05-A553 1 of 1

MPEX GUIDE

THIS DRAWING PREPARED ON CREOMPEX-00-ENG-005

MODEL REV

PART INFORMATION

WEIGHTSPECIFICATIONMATERIAL

0.49 LBSASTM B760TUNGSTEN

NO REPRESENTATION OR WARRANTY, EXPRESSED OR IMPLIED, IS MADE AS TO THE ACCURACY, COMPLETENESS OR USEFULNESS OF THE INFORMATION OR STATEMENTS CONTAINED IN THESE DRAWINGS, OR THAT THE DISCLOSURE OF ANY INFORMATION, APPARATUS, METHOD OR PROCESS DISCLOSED IN THESE DRAWINGS MAY NOT INFRINGE PRIVATE RIGHTS OF OTHERS. NO LIABILITY IS ASSUMED WITH RESPECT TO THE USE OF, OR FOR DAMAGES RESULTING FROM THE USE OF, ANY INFORMATION, APPARATUS, METHOD OR PROCESS DISCLOSED IN THESE DRAWINGS. DRAWINGS MADE AVAILABLE FOR INFORMATION TO BIDDER ARE NOT TO BE USED FOR OTHER PURPOSES AND ARE TO BE RETURNED UPON REQUEST OF THE FORWARDING CONTRACTOR.

REVISIONS

DATECAMENGCKDETDESDESCRIPTION OF CHANGETYPEREV

8/23/2023AATBDOCCCCORIGINAL ISSUE 0

DRAWING PACKAGE I.D.

.001 A B

NOTES:

1. ALL PARTS AND COMPONENTS SHALL BE FABRICATED IN ACCORDANCE WITH GOOD VACUUM

PRACTICES AND THE GUIDELINES OUTLINED IN THE MPEX VACUUM HANDBOOK (MPEX-00-ENG-002).

2. USE ONLY WATER SOLUBLE, NON-SULFUROUS BEARING CUTTING OILS FOR MACHINING.

3. ALL COMPONENTS SHALL BE PRECISION CLEANED ACCORDING TO SECTION 4 OF THE MPEX VACUUM HANDBOOK (MPEX-00-ENG-002)

4. SUPPLIER MUST VERIFY THAT ALL MATERIALS AND FABRICATION PROCESS STEPS RESULT IN ALL COMPONENTS (INCLUDING WELD AFFECTED AREAS AND HARDWARE) HAVING A MAGNETIC PERMEABILITY OF <1.03 AT 200 OERSTEDS.

ALL SURFACES

SECTION A-A

⏥ .001

⫽ .002 A

⏥ .001

A

B

OAK RIDGE NATIONAL LABORATORY

A

C

D

A

B

C

D

MATERIAL PLASMA EXPOSURE EXPERIMENT

DEPARTMENT OF ENERGY UNDER U.S. GOVE RNMENT CONTRACT DE-AC05-00OR22725

OAK RIDGE NATIONAL LABORATORY

THIS DRAWING IS THE PROPERTY OF

OAK RIDGE, TENNESSEE

1.500

⌀.675+.001 -.000

⌀.423+.001 -.000

D W G

N O

M P E X D E S A

S H

NEXT USED ASSEMBLIES

MPEX-04-DES-05-A560

QUALITY VERIFICATION

APPLICABLEDOCUMENTS REQUIRED

MATERIAL MILL TEST REPORT

LEAK TEST REPORT

CLEANING CERT

WELD / BRAZE INSPECTION REPORT

HEAT TREAT REPORT (W/CHART)

DIMENSIONAL REPORT

MATERIAL SELLER CERT

FUNCTIONAL TEST REPORT

X DEVIATION REQUEST

X NONCONFORMANCE REPORT

DATEQA REP

DIMENSIONS ARE IN INCHES

DRAFTING STANDARD: ASME Y14.1

DIMENSIONING AND TOLERANCING IN

ACCORDANCE WITH ASME Y14.5, 2018

APPROVALS

DESIGNER DATE

L.REFFI 7/2023

DETAILER DATE

L.REFFI 7/2023

CHECKER DATE

DO NOT SCALE DRAWING D.OTTINGER 7/2023

DEFAULT TOLERANCES

LINEAR ANGULAR

ENGINEER DATE

MPEX

REVERSE TARGET SHIELD

T.BOYD 7/2023

CONTROL ACCOUNT MANAGER DATE

X.X .1 .5

X.XX .01

X.XXX .005

A.AARON 7/2023

TARGET EX-BONDED TUBE SHORT

REMOVE ALL BURRS AND

SIZE DRAWING NUMBER REV

D MPEX-04-DES-05-A554 0

THIRD ANGLE PROJECTION SCALE CAD MODEL SHEET

3:1 MPEX-04-DES-05-A554 1 of 1

MPEX GUIDE

THIS DRAWING PREPARED ON CREOMPEX-00-ENG-005

MODEL REV

PART INFORMATION

WEIGHTSPECIFICATIONMATERIAL

0.09 LBSASTM A276316 STAINLESS STEEL

NO REPRESENTATION OR WARRANTY, EXPRESSED OR IMPLIED, IS MADE AS TO THE ACCURACY, COMPLETENESS OR USEFULNESS OF THE INFORMATION OR STATEMENTS CONTAINED IN THESE DRAWINGS, OR THAT THE DISCLOSURE OF ANY INFORMATION, APPARATUS, METHOD OR PROCESS DISCLOSED IN THESE DRAWINGS MAY NOT INFRINGE PRIVATE RIGHTS OF OTHERS. NO LIABILITY IS ASSUMED WITH RESPECT TO THE USE OF, OR FOR DAMAGES RESULTING FROM THE USE OF, ANY INFORMATION, APPARATUS, METHOD OR PROCESS DISCLOSED IN THESE DRAWINGS. DRAWINGS MADE AVAILABLE FOR INFORMATION TO BIDDER ARE NOT TO BE USED FOR OTHER PURPOSES AND ARE TO BE RETURNED UPON REQUEST OF THE FORWARDING CONTRACTOR.

REVISIONS

DATECAMENGCKDETDESDESCRIPTION OF CHANGETYPEREV

8/23/2023AATBDOCCCCORIGINAL ISSUE 0

DRAWING PACKAGE I.D.

.005 A B

NOTES:

1. ALL PARTS AND COMPONENTS SHALL BE FABRICATED IN ACCORDANCE WITH GOOD VACUUM

PRACTICES AND THE GUIDELINES OUTLINED IN THE MPEX VACUUM HANDBOOK (MPEX-00-ENG-002).

2. USE ONLY WATER SOLUBLE, NON-SULFUROUS BEARING CUTTING OILS FOR MACHINING.

3. ALL COMPONENTS SHALL BE PRECISION CLEANED ACCORDING TO SECTION 4 OF THE MPEX VACUUM HANDBOOK (MPEX-00-ENG-002)

4. SUPPLIER MUST VERIFY THAT ALL MATERIALS AND FABRICATION PROCESS STEPS RESULT IN ALL COMPONENTS (INCLUDING WELD AFFECTED AREAS AND HARDWARE) HAVING A MAGNETIC PERMEABILITY OF <1.03 AT 200 OERSTEDS.

⏥ .001⫽ .002 A

⏥ .001

A

B

OAK RIDGE NATIONAL LABORATORY

A

C

D

A

B

C

D

MATERIAL PLASMA EXPOSURE EXPERIMENT

DEPARTMENT OF ENERGY UNDER U.S. GOVE RNMENT CONTRACT DE-AC05-00OR22725

OAK RIDGE NATIONAL LABORATORY

THIS DRAWING IS THE PROPERTY OF

OAK RIDGE, TENNESSEE

2X ⌀.440 ↧.500 ⌴ ⌀.502+.001

-.000 ↧.250

1.200

1.000

2.25

5.940

.452 +.001 -.000

(.50)

R.226

4X R.25

.625

1.200

2X ⌀.440 ↧5.70 ⌴⌀.680 ↧.500

2X .500

2X .375

D W G

N O

M P E X D E S A

S H

NEXT USED ASSEMBLIES

MPEX-04-DES-05-A549

QUALITY VERIFICATION

APPLICABLEDOCUMENTS REQUIRED

MATERIAL MILL TEST REPORT

LEAK TEST REPORT

CLEANING CERT

WELD / BRAZE INSPECTION REPORT

HEAT TREAT REPORT (W/CHART)

DIMENSIONAL REPORT

MATERIAL SELLER CERT

FUNCTIONAL TEST REPORT

X DEVIATION REQUEST

X NONCONFORMANCE REPORT

DATEQA REP

DIMENSIONS ARE IN INCHES

DRAFTING STANDARD: ASME Y14.1

DIMENSIONING AND TOLERANCING IN

ACCORDANCE WITH ASME Y14.5, 2018

APPROVALS

DESIGNER DATE

L.REFFI 7/2023

DETAILER DATE

L.REFFI 7/2023

CHECKER DATE

DO NOT SCALE DRAWING D.OTTINGER 7/2023

DEFAULT TOLERANCES

LINEAR ANGULAR

ENGINEER DATE

MPEX

REVERSE TARGET SHIELD

T.BOYD 7/2023

CONTROL ACCOUNT MANAGER DATE

X.X .1 .5

X.XX .01

X.XXX .005

A.AARON 7/2023

TARGET SHIELD ARM LOD

REMOVE ALL BURRS AND

SIZE DRAWING NUMBER REV

D MPEX-04-DES-05-A555 0

THIRD ANGLE PROJECTION SCALE CAD MODEL SHEET

1:1 MPEX-04-DES-05-A555 1 of 1

MPEX GUIDE

THIS DRAWING PREPARED ON CREOMPEX-00-ENG-005

MODEL REV

PART INFORMATION

WEIGHTSPECIFICATIONMATERIAL

3.015 LBSASTM A240316 STAINLESS STEEL

NO REPRESENTATION OR WARRANTY, EXPRESSED OR IMPLIED, IS MADE AS TO THE ACCURACY, COMPLETENESS OR USEFULNESS OF THE INFORMATION OR STATEMENTS CONTAINED IN THESE DRAWINGS, OR THAT THE DISCLOSURE OF ANY INFORMATION, APPARATUS, METHOD OR PROCESS DISCLOSED IN THESE DRAWINGS MAY NOT INFRINGE PRIVATE RIGHTS OF OTHERS. NO LIABILITY IS ASSUMED WITH RESPECT TO THE USE OF, OR FOR DAMAGES RESULTING FROM THE USE OF, ANY INFORMATION, APPARATUS, METHOD OR PROCESS DISCLOSED IN THESE DRAWINGS. DRAWINGS MADE AVAILABLE FOR INFORMATION TO BIDDER ARE NOT TO BE USED FOR OTHER PURPOSES AND ARE TO BE RETURNED UPON REQUEST OF THE FORWARDING CONTRACTOR.

REVISIONS

DATECAMENGCKDETDESDESCRIPTION OF CHANGETYPEREV

8/23/2023AATBDOCCCCORIGINAL ISSUE 0

DRAWING PACKAGE I.D.

.005 C

.005 A B C

.005 A B C

NOTES:

1. ALL PARTS AND COMPONENTS SHALL BE FABRICATED IN ACCORDANCE WITH GOOD VACUUM

PRACTICES AND THE GUIDELINES OUTLINED IN THE MPEX VACUUM HANDBOOK (MPEX-00-ENG-002).

2. USE ONLY WATER SOLUBLE, NON-SULFUROUS BEARING CUTTING OILS FOR MACHINING.

3. ALL COMPONENTS SHALL BE PRECISION CLEANED ACCORDING TO SECTION 4 OF THE MPEX VACUUM HANDBOOK (MPEX-00-ENG-002)

4. SUPPLIER MUST VERIFY THAT ALL MATERIALS AND FABRICATION PROCESS STEPS RESULT IN ALL COMPONENTS (INCLUDING WELD AFFECTED AREAS AND HARDWARE) HAVING A MAGNETIC PERMEABILITY OF <1.03 AT 200 OERSTEDS.

ALL SURFACES

SECTION A-A

⏥ .001

SECTION B-B

⏊ .002 A

A

B

C

OAK RIDGE NATIONAL LABORATORY

A

C

D

A

B

C

D

MATERIAL PLASMA EXPOSURE EXPERIMENT

DEPARTMENT OF ENERGY UNDER U.S. GOVE RNMENT CONTRACT DE-AC05-00OR22725

OAK RIDGE NATIONAL LABORATORY

THIS DRAWING IS THE PROPERTY OF

OAK RIDGE, TENNESSEE

1.250

⌀.675

⌀.423+.001 -.000

D W G

N O

M P E X D E S A

S H

NEXT USED ASSEMBLIES

MPEX-04-DES-05-A549

QUALITY VERIFICATION

APPLICABLEDOCUMENTS REQUIRED

MATERIAL MILL TEST REPORT

LEAK TEST REPORT

CLEANING CERT

WELD / BRAZE INSPECTION REPORT

HEAT TREAT REPORT (W/CHART)

DIMENSIONAL REPORT

MATERIAL SELLER CERT

FUNCTIONAL TEST REPORT

X DEVIATION REQUEST

X NONCONFORMANCE REPORT

DATEQA REP

DIMENSIONS ARE IN INCHES

DRAFTING STANDARD: ASME Y14.1

DIMENSIONING AND TOLERANCING IN

ACCORDANCE WITH ASME Y14.5, 2018

APPROVALS

DESIGNER DATE

L.REFFI 7/2023

DETAILER DATE

L.REFFI 7/2023

CHECKER DATE

DO NOT SCALE DRAWING D.OTTINGER 7/2023

DEFAULT TOLERANCES

LINEAR ANGULAR

ENGINEER DATE

MPEX

REVERSE TARGET SHIELD

T.BOYD 7/2023

CONTROL ACCOUNT MANAGER DATE

X.X .1 .5

X.XX .01

X.XXX .005

A.AARON 7/2023

TARGET WELDED TUBE VERTICAL

REMOVE ALL BURRS AND

SIZE DRAWING NUMBER REV

D MPEX-04-DES-05-A556 0

THIRD ANGLE PROJECTION SCALE CAD MODEL SHEET

4:1 MPEX-04-DES-05-A556 1 of 1

MPEX GUIDE

THIS DRAWING PREPARED ON CREOMPEX-00-ENG-005

MODEL REV

PART INFORMATION

WEIGHTSPECIFICATIONMATERIAL

0.08 LBSASTM A276316 STAINLESS STEEL

NO REPRESENTATION OR WARRANTY, EXPRESSED OR IMPLIED, IS MADE AS TO THE ACCURACY, COMPLETENESS OR USEFULNESS OF THE INFORMATION OR STATEMENTS CONTAINED IN THESE DRAWINGS, OR THAT THE DISCLOSURE OF ANY INFORMATION, APPARATUS, METHOD OR PROCESS DISCLOSED IN THESE DRAWINGS MAY NOT INFRINGE PRIVATE RIGHTS OF OTHERS. NO LIABILITY IS ASSUMED WITH RESPECT TO THE USE OF, OR FOR DAMAGES RESULTING FROM THE USE OF, ANY INFORMATION, APPARATUS, METHOD OR PROCESS DISCLOSED IN THESE DRAWINGS. DRAWINGS MADE AVAILABLE FOR INFORMATION TO BIDDER ARE NOT TO BE USED FOR OTHER PURPOSES AND ARE TO BE RETURNED UPON REQUEST OF THE FORWARDING CONTRACTOR.

REVISIONS

DATECAMENGCKDETDESDESCRIPTION OF CHANGETYPEREV

8/23/203AATBDOCCCCORIGINAL ISSUE 0

DRAWING PACKAGE I.D.

.005 A B

NOTES:

1. ALL PARTS AND COMPONENTS SHALL BE FABRICATED IN ACCORDANCE WITH GOOD VACUUM

PRACTICES AND THE GUIDELINES OUTLINED IN THE MPEX VACUUM HANDBOOK (MPEX-00-ENG-002).

2. USE ONLY WATER SOLUBLE, NON-SULFUROUS BEARING CUTTING OILS FOR MACHINING.

3. ALL COMPONENTS SHALL BE PRECISION CLEANED ACCORDING TO SECTION 4 OF THE MPEX VACUUM HANDBOOK (MPEX-00-ENG-002)

4. SUPPLIER MUST VERIFY THAT ALL MATERIALS AND FABRICATION PROCESS STEPS RESULT IN ALL COMPONENTS (INCLUDING WELD AFFECTED AREAS AND HARDWARE) HAVING A MAGNETIC PERMEABILITY OF <1.03 AT 200 OERSTEDS.

⏥ .001 ⫽ .002 A

⏥ .001

B

A

OAK RIDGE NATIONAL LABORATORY

A

C

D

A

B

C

D

MATERIAL PLASMA EXPOSURE EXPERIMENT

DEPARTMENT OF ENERGY UNDER U.S. GOVE RNMENT CONTRACT DE-AC05-00OR22725

OAK RIDGE NATIONAL LABORATORY

THIS DRAWING IS THE PROPERTY OF

OAK RIDGE, TENNESSEE

5.375

2.500

.875

2.250

3.750

2X .625

2.000

.375

1.375 1.750

2.550

4.625

45°

.500

.450 +.001 -.000

.625

.945

.50

2X .280

2X .655

3X 1.125

.525 .625

2X R.13

1.50

R.25

.38

.38

2X .50

90.0°

45° X .38

D W G

N O

M P E X D E S A

S H

NEXT USED ASSEMBLIES

MPEX-04-DES-05-A549

QUALITY VERIFICATION

APPLICABLEDOCUMENTS REQUIRED

MATERIAL MILL TEST REPORT

LEAK TEST REPORT

CLEANING CERT

WELD / BRAZE INSPECTION REPORT

HEAT TREAT REPORT (W/CHART)

DIMENSIONAL REPORT

MATERIAL SELLER CERT

FUNCTIONAL TEST REPORT

X DEVIATION REQUEST

X NONCONFORMANCE REPORT

DATEQA REP

DIMENSIONS ARE IN INCHES

DRAFTING STANDARD: ASME Y14.1

DIMENSIONING AND TOLERANCING IN

ACCORDANCE WITH ASME Y14.5, 2018

APPROVALS

DESIGNER DATE

L.REFFI 7/2023

DETAILER DATE

L.REFFI 7/2023

CHECKER DATE

DO NOT SCALE DRAWING D.OTTINGER 7/202

DEFAULT TOLERANCES

LINEAR ANGULAR

ENGINEER DATE

MPEX

REVERSE TARGET SHIELD

T.BOYD 7/2023

CONTROL ACCOUNT MANAGER DATE

X.X .1 .5

X.XX .01

X.XXX .005

A.AARON 7/2023

SHIELD SUPPORT ADJUSTER REVERSE

REMOVE ALL BURRS AND

SIZE DRAWING NUMBER REV

D MPEX-04-DES-05-A557 0

THIRD ANGLE PROJECTION SCALE CAD MODEL SHEET

1:1 MPEX-04-DES-05-A557 1 of 1

MPEX GUIDE

THIS DRAWING PREPARED ON CREOMPEX-00-ENG-005

MODEL REV

PART INFORMATION

WEIGHTSPECIFICATIONMATERIAL

0.70 LBSASTM A240316 STAINLESS STEEL

NO REPRESENTATION OR WARRANTY, EXPRESSED OR IMPLIED, IS MADE AS TO THE ACCURACY, COMPLETENESS OR USEFULNESS OF THE INFORMATION OR STATEMENTS CONTAINED IN THESE DRAWINGS, OR THAT THE DISCLOSURE OF ANY INFORMATION, APPARATUS, METHOD OR PROCESS DISCLOSED IN THESE DRAWINGS MAY NOT INFRINGE PRIVATE RIGHTS OF OTHERS. NO LIABILITY IS ASSUMED WITH RESPECT TO THE USE OF, OR FOR DAMAGES RESULTING FROM THE USE OF, ANY INFORMATION, APPARATUS, METHOD OR PROCESS DISCLOSED IN THESE DRAWINGS. DRAWINGS MADE AVAILABLE FOR INFORMATION TO BIDDER ARE NOT TO BE USED FOR OTHER PURPOSES AND ARE TO BE RETURNED UPON REQUEST OF THE FORWARDING CONTRACTOR.

REVISIONS

DATECAMENGCKDETDESDESCRIPTION OF CHANGETYPEREV

8/24/2023AATBDOCCCCORIGINAL ISSUE 0

DRAWING PACKAGE I.D.

.005 C

.014 A B C

.03 A B C

NOTES:

1. ALL PARTS AND COMPONENTS SHALL BE FABRICATED IN ACCORDANCE WITH GOOD VACUUM

PRACTICES AND THE GUIDELINES OUTLINED IN THE MPEX VACUUM HANDBOOK (MPEX-00-ENG-002).

2. USE ONLY WATER SOLUBLE, NON-SULFUROUS BEARING CUTTING OILS FOR MACHINING.

3. ALL COMPONENTS SHALL BE PRECISION CLEANED ACCORDING TO SECTION 4 OF THE MPEX VACUUM HANDBOOK (MPEX-00-ENG-002)

4. SUPPLIER MUST VERIFY THAT ALL MATERIALS AND FABRICATION PROCESS STEPS RESULT IN ALL COMPONENTS (INCLUDING WELD AFFECTED AREAS AND HARDWARE) HAVING A MAGNETIC PERMEABILITY OF <1.03 AT 200 OERSTEDS.

ALL SURFACES

10-32 UNF - 2B TAP ↧ 0.380

#21 DRILL ( 0.159 ) -( 1 ) HOLE THRU

FULL R ⌖ ⌀.010 A B C

SEE DETAIL A

2X 10-32 UNF - 2B TAP THRU⌖ ⌀.010 A B C

SECTION A-A

⏥ .001

⫽ .002 A

⏥ .001

8-32 UNC - 2B TAP ↧ 1.750

#29 DRILL ( 0.136 ) -( 1 ) HOLE THRU⌖ ⌀.010 A B C

DETAIL A

SCALE 2:1

4X FULL R

A

B

C

OAK RIDGE NATIONAL LABORATORY

A

C

D

A

B

C

D

MATERIAL PLASMA EXPOSURE EXPERIMENT

DEPARTMENT OF ENERGY UNDER U.S. GOVE RNMENT CONTRACT DE-AC05-00OR22725

OAK RIDGE NATIONAL LABORATORY

THIS DRAWING IS THE PROPERTY OF

OAK RIDGE, TENNESSEE

1.250 R.50

⌀.50 STK

.049W

1.250

D W G

N O

M P E X D E S A

S H

NEXT USED ASSEMBLIES

MPEX-04-DES-05-A549

QUALITY VERIFICATION

APPLICABLEDOCUMENTS REQUIRED

MATERIAL MILL TEST REPORT

LEAK TEST REPORT

CLEANING CERT

WELD / BRAZE INSPECTION REPORT

HEAT TREAT REPORT (W/CHART)

DIMENSIONAL REPORT

MATERIAL SELLER CERT

FUNCTIONAL TEST REPORT

X DEVIATION REQUEST

X NONCONFORMANCE REPORT

DATEQA REP

DIMENSIONS ARE IN INCHES

DRAFTING STANDARD: ASME Y14.1

DIMENSIONING AND TOLERANCING IN

ACCORDANCE WITH ASME Y14.5, 2018

APPROVALS

DESIGNER DATE

L.REFFI 7/2023

DETAILER DATE

L.REFFI 7/2023

CHECKER DATE

DO NOT SCALE DRAWING D.OTTINGER 7/2023

DEFAULT TOLERANCES

LINEAR ANGULAR

ENGINEER DATE

MPEX

REVERSE TARGET SHIELD

T.BOYD 7/2023

CONTROL ACCOUNT MANAGER DATE

X.X .1 .5

X.XX .01

X.XXX .005

A.AARON 7/2023

SHIELD 90 DEG TUBE

REMOVE ALL BURRS AND

SIZE DRAWING NUMBER REV

D MPEX-04-DES-05-A558 0

THIRD ANGLE PROJECTION SCALE CAD MODEL SHEET

2:1 MPEX-04-DES-05-A558 1 of 1

MPEX GUIDE

THIS DRAWING PREPARED ON CREOMPEX-00-ENG-005

MODEL REV

PART INFORMATION

WEIGHTSPECIFICATIONMATERIAL

0.042 LBSASTM A276316 STAINLESS STEEL

NO REPRESENTATION OR WARRANTY, EXPRESSED OR IMPLIED, IS MADE AS TO THE ACCURACY, COMPLETENESS OR USEFULNESS OF THE INFORMATION OR STATEMENTS CONTAINED IN THESE DRAWINGS, OR THAT THE DISCLOSURE OF ANY INFORMATION, APPARATUS, METHOD OR PROCESS DISCLOSED IN THESE DRAWINGS MAY NOT INFRINGE PRIVATE RIGHTS OF OTHERS. NO LIABILITY IS ASSUMED WITH RESPECT TO THE USE OF, OR FOR DAMAGES RESULTING FROM THE USE OF, ANY INFORMATION, APPARATUS, METHOD OR PROCESS DISCLOSED IN THESE DRAWINGS. DRAWINGS MADE AVAILABLE FOR INFORMATION TO BIDDER ARE NOT TO BE USED FOR OTHER PURPOSES AND ARE TO BE RETURNED UPON REQUEST OF THE FORWARDING CONTRACTOR.

REVISIONS

DATECAMENGCKDETDESDESCRIPTION OF CHANGETYPEREV

8/23/2023AATBDOCCCCORIGINAL ISSUE 0

DRAWING PACKAGE I.D.

NOTES:

1. ALL PARTS AND COMPONENTS SHALL BE FABRICATED IN ACCORDANCE WITH GOOD VACUUM

PRACTICES AND THE GUIDELINES OUTLINED IN THE MPEX VACUUM HANDBOOK (MPEX-00-ENG-002).

2. USE ONLY WATER SOLUBLE, NON-SULFUROUS BEARING CUTTING OILS FOR MACHINING.

3. ALL COMPONENTS SHALL BE PRECISION CLEANED ACCORDING TO SECTION 4 OF THE MPEX VACUUM HANDBOOK (MPEX-00-ENG-002)

4. SUPPLIER MUST VERIFY THAT ALL MATERIALS AND FABRICATION PROCESS STEPS RESULT IN ALL COMPONENTS (INCLUDING WELD AFFECTED AREAS AND HARDWARE) HAVING A MAGNETIC PERMEABILITY OF <1.03 AT 200 OERSTEDS.

A

C

D

A

B

C

D

MATERIAL PLASMA EXPOSURE EXPERIMENT

DEPARTMENT OF ENERGY UNDER U.S. GOVE RNMENT CONTRACT DE-AC05-00OR22725

OAK RIDGE NATIONAL LABORATORY

THIS DRAWING IS THE PROPERTY OF

OAK RIDGE, TENNESSEE

(1.200)

(2.140)

2X 1.375

(.125)

D W G

N O

M P E X D E S A

S H

NEXT USED ASSEMBLIES

MPEX-04-DES-05-A548

DIMENSIONS ARE IN INCHES

DRAFTING STANDARD: ASME Y14.1

DIMENSIONING AND TOLERANCING IN

ACCORDANCE WITH ASME Y14.5, 2018

APPROVALS

DESIGNER DATE

L.REFFI 9/2023

DETAILER DATE

L.REFFI 9/2023

CHECKER DATE

DO NOT SCALE DRAWING D.OTTINGER 9/2023

DEFAULT TOLERANCES

LINEAR ANGULAR

ENGINEER DATE

MPEX

REVERSE TARGET SHIELD

T.BOYD 9/2023

CONTROL ACCOUNT MANAGER DATE

X.X .1 .5

X.XX .01

X.XXX .005

A.AARON 9/2023

TARGET SHIELD WELDMENT

REMOVE ALL BURRS AND

32 RMS MAX

SIZE DRAWING NUMBER REV

D MPEX-04-DES-05-A560 0

THIRD ANGLE PROJECTION SCALE CAD MODEL SHEET

1:1 MPEX-04-DES-05-A560 1 of 1

MPEX GUIDE

THIS DRAWING PREPARED ON CREOMPEX-00-ENG-005

QUALITY VERIFICATION

APPLICABLEDOCUMENTS REQUIRED

MATERIAL MILL TEST REPORT

LEAK TEST REPORT

CLEANING CERT

WELD / BRAZE INSPECTION REPORT

HEAT TREAT REPORT (W/CHART)

DIMENSIONAL REPORT

MATERIAL SELLER CERT

FUNCTIONAL TEST REPORT

X DEVIATION REQUEST

X NONCONFORMANCE REPORT

DATEQA REP

0.76 LBSPARTS LIST

TOTAL WEIGHT

MATERIAL / SPECIFICATIONDESCRIPTION OR NOMENCLATUREPART OR IDENTIFYING NUMBERQTY

FIND

NO.

316 SS

ASTM A276

TARGET SHIELD COVER LODMPEX-04-DES-05-A56111

316 STAINLESS STEEL

ASTM A276

TARGET EX-BONDED TUBE SHORTMPEX-04-DES-05-A55422

MODEL REV

NO REPRESENTATION OR WARRANTY, EXPRESSED OR IMPLIED, IS MADE AS TO THE ACCURACY, COMPLETENESS OR USEFULNESS OF THE INFORMATION OR STATEMENTS CONTAINED IN THESE DRAWINGS, OR THAT THE DISCLOSURE OF ANY INFORMATION, APPARATUS, METHOD OR PROCESS DISCLOSED IN THESE DRAWINGS MAY NOT INFRINGE PRIVATE RIGHTS OF OTHERS. NO LIABILITY IS ASSUMED WITH RESPECT TO THE USE OF, OR FOR DAMAGES RESULTING FROM THE USE OF, ANY INFORMATION, APPARATUS, METHOD OR PROCESS DISCLOSED IN THESE DRAWINGS. DRAWINGS MADE AVAILABLE FOR INFORMATION TO BIDDER ARE NOT TO BE USED FOR OTHER PURPOSES AND ARE TO BE RETURNED UPON REQUEST OF THE FORWARDING CONTRACTOR.

REVISIONS

DATECAMENGCKDETDESDESCRIPTION OF CHANGETYPEREV

9/2023AATBDOCCCCORIGINAL ISSUE 0

DRAWING PACKAGE I.D.

NOTES:

1. ALL COMPONENTS SHALL BE PRECISION CLEANED ACCORDING TO SECTION 4 OF THE MPEX VACUUM HANDBOOK (MPEX-00-ENG-002) PRIOR TO WELDING.

2. AFTER CLEANING, ALL COMPONENTS SHALL BE HANDLED ACCORDING TO SECTION 3.10 OF THE MPEX VACUUM HANDBOOK (MPEX-00-ENG-002) TO AVOID CONTAMINATION OF WELDS.

3. ALL COMPONENTS, FILLER MATERIALS, AND WELDED JOINTS SHALL BE NON-MAGNETIC ACCORDING TO SECTION 3.4 OF THE MPEX VACUUM HANDBOOK (MPEX-00-ENG-002) AFTER WELDING.

4. SUPPLIER SHALL MANUFACTURE A WELD SAMPLE TO VERIFY THAT THE MAGNETIC PERMEABILITY REQUIREMENTS ARE MET. A WELD PROCEDURE WITH PROCESS SETTINGS SHALL BE DOCUMENTED

AND USED FOR BOTH THE SAMPLE AND PRODUCTION ASSEMBLIES.

5. ALL VT (VACUUM TIGHT) WELDS MUST PASS A HELIUM LEAK TEST OF 1 X 10^-9 STD CC/SEC HELIUM PERFORMED ACCORDING TO ASTM E498-95, STANDARD TEST METHODS FOR LEAK DETECTION.

6. SUPPLIER SHALL MAINTAIN WELD PROCEDURE AND INSPECTION RECORDS.

7. WELD PROCEDURE AND PERFORMANCE QUALIFICATIONS PER AWS B2.1/2.IM:2014.

8. WELD QUALITY REQUIREMENTS OF AWS D17.1/D17.1M (FUSION WELDING) SPECIFICATION FOR CLASS A WELDS MUST BE MET. WELDS MUST BE VISUALLY INSPECTED.

9. WELD SYMBOLS PER ANSI/AWS A2.4.

ALL SURFACES

⫽ .002 A

2X WT

-1/8

A

A

C

D

A

B

C

D

MATERIAL PLASMA EXPOSURE EXPERIMENT

DEPARTMENT OF ENERGY UNDER U.S. GOVE RNMENT CONTRACT DE-AC05-00OR22725

OAK RIDGE NATIONAL LABORATORY

THIS DRAWING IS THE PROPERTY OF

OAK RIDGE, TENNESSEE

.125

⌀5.297

1.200

2X 2.140

.6002X ⌀.680±.001 THRU

⌀2.553 THRU

D W G

N O

M P E X D E S A

S H

NEXT USED ASSEMBLIES

MPEX-04-DES-05-A560

QUALITY VERIFICATION

APPLICABLEDOCUMENTS REQUIRED

MATERIAL MILL TEST REPORT

LEAK TEST REPORT

CLEANING CERT

WELD / BRAZE INSPECTION REPORT

HEAT TREAT REPORT (W/CHART)

DIMENSIONAL REPORT

MATERIAL SELLER CERT

FUNCTIONAL TEST REPORT

X DEVIATION REQUEST

X NONCONFORMANCE REPORT

DATEQA REP

DIMENSIONS ARE IN INCHES

DRAFTING STANDARD: ASME Y14.1

DIMENSIONING AND TOLERANCING IN

ACCORDANCE WITH ASME Y14.5, 2018

APPROVALS

DESIGNER DATE

L.REFFI 9/2023

DETAILER DATE

L.REFFI 9/2023

CHECKER DATE

DO NOT SCALE DRAWING D.OTTINGER 9/2023

DEFAULT TOLERANCES

LINEAR ANGULAR

ENGINEER DATE

MPEX

REVERSE TARGET SHEILD

T.BOYD 9/2023

CONTROL ACCOUNT MANAGER DATE

X.X .1 .5

X.XX .01

X.XXX .005

A.AARON 9/2023

TARGET SHIELD COVER LOD

REMOVE ALL BURRS AND

SIZE DRAWING NUMBER REV

D MPEX-04-DES-05-A561 0

THIRD ANGLE PROJECTION SCALE CAD MODEL SHEET

1:1 MPEX-04-DES-05-A561 1 of 1

MPEX GUIDE

THIS DRAWING PREPARED ON CREOMPEX-00-ENG-005

MODEL REV

PART INFORMATION

WEIGHTSPECIFICATIONMATERIAL

0.58 LBSASTM A276316 SS

NO REPRESENTATION OR WARRANTY, EXPRESSED OR IMPLIED, IS MADE AS TO THE ACCURACY, COMPLETENESS OR USEFULNESS OF THE INFORMATION OR STATEMENTS CONTAINED IN THESE DRAWINGS, OR THAT THE DISCLOSURE OF ANY INFORMATION, APPARATUS, METHOD OR PROCESS DISCLOSED IN THESE DRAWINGS MAY NOT INFRINGE PRIVATE RIGHTS OF OTHERS. NO LIABILITY IS ASSUMED WITH RESPECT TO THE USE OF, OR FOR DAMAGES RESULTING FROM THE USE OF, ANY INFORMATION, APPARATUS, METHOD OR PROCESS DISCLOSED IN THESE DRAWINGS. DRAWINGS MADE AVAILABLE FOR INFORMATION TO BIDDER ARE NOT TO BE USED FOR OTHER PURPOSES AND ARE TO BE RETURNED UPON REQUEST OF THE FORWARDING CONTRACTOR.

REVISIONS

DATECAMENGCKDETDESDESCRIPTION OF CHANGETYPEREV

9/2023AATBDOCCCCORIGINAL ISSUE 0

DRAWING PACKAGE I.D.

.005 A B

.001 A B

NOTES:

1. ALL PARTS AND COMPONENTS SHALL BE FABRICATED IN ACCORDANCE WITH GOOD VACUUM

PRACTICES AND THE GUIDELINES OUTLINED IN THE MPEX VACUUM HANDBOOK (MPEX-00-ENG-002).

2. USE ONLY WATER SOLUBLE, NON-SULFUROUS BEARING CUTTING OILS FOR MACHINING.

3. ALL COMPONENTS SHALL BE PRECISION CLEANED ACCORDING TO SECTION 4 OF THE MPEX VACUUM HANDBOOK (MPEX-00-ENG-002)

4. SUPPLIER MUST VERIFY THAT ALL MATERIALS AND FABRICATION PROCESS STEPS RESULT IN ALL COMPONENTS (INCLUDING WELD AFFECTED AREAS AND HARDWARE) HAVING A MAGNETIC PERMEABILITY OF <1.03 AT 200 OERSTEDS.

ALL SURFACES

⌓ .0005Ⓤ.0005

SECTION A-A

⏥ .001

⫽ .002 A

⏥ .001

B

A

OAK RIDGE NATIONAL LABORATORY

A

C

D

A

B

C

D

MATERIAL PLASMA EXPOSURE EXPERIMENT

DEPARTMENT OF ENERGY UNDER U.S. GOVE RNMENT CONTRACT DE-AC05-00OR22725

OAK RIDGE NATIONAL LABORATORY

THIS DRAWING IS THE PROPERTY OF

OAK RIDGE, TENNESSEE

⌀2.100

AFTER BONDING

(⌀5.50)

.639

D W G

N O

M P E X D E S A

S H

NEXT USED ASSEMBLIES

MPEX-04-DES-05-A562

DIMENSIONS ARE IN INCHES

DRAFTING STANDARD: ASME Y14.1

DIMENSIONING AND TOLERANCING IN

ACCORDANCE WITH ASME Y14.5, 2018

APPROVALS

DESIGNER DATE

L.REFFI 7/2023

DETAILER DATE

L.REFFI 7/2023

CHECKER DATE

DO NOT SCALE DRAWING D.OTTINGER 7/2023

DEFAULT TOLERANCES

LINEAR ANGULAR

ENGINEER DATE

MPEX

REVERSE TARGET SHIELD

T.BOYD 7/2023

CONTROL ACCOUNT MANAGER DATE

X.X .1 .5

X.XX .01

X.XXX .005

A.AARON 7/2023

TARGET SHIELD EX-BONDED SHORT, COOLING CHANNEL

REMOVE ALL BURRS AND

SIZE DRAWING NUMBER REV

D MPEX-04-DES-05-A562 0

THIRD ANGLE PROJECTION SCALE CAD MODEL SHEET

1:1 MPEX-04-DES-05-A562 1 of 1

MPEX GUIDE

THIS DRAWING PREPARED ON CREOMPEX-00-ENG-005

QUALITY VERIFICATION

APPLICABLEDOCUMENTS REQUIRED

MATERIAL MILL TEST REPORT

LEAK TEST REPORT

CLEANING CERT

WELD / BRAZE INSPECTION REPORT

HEAT TREAT REPORT (W/CHART)

DIMENSIONAL REPORT

MATERIAL SELLER CERT

FUNCTIONAL TEST REPORT

X DEVIATION REQUEST

X NONCONFORMANCE REPORT

DATEQA REP

4.32 LBSPARTS LIST

TOTAL WEIGHT

MATERIAL / SPECIFICATIONDESCRIPTION OR NOMENCLATUREPART OR IDENTIFYING NUMBERQTY

FIND

NO.

GLIDCOP

AL-15

TARGET SHIELD CHANNELS LODMPEX-04-DES-05-A55111

316 SS

ASTM A276

TARGET SHIELD COVER LODMPEX-04-DES-05-A55212

TUNGSTEN

ASTM B760

TARGET EX-BONDED TUNGSTEN LODMPEX-04-DES-05-A55313

MODEL REV

NO REPRESENTATION OR WARRANTY, EXPRESSED OR IMPLIED, IS MADE AS TO THE ACCURACY, COMPLETENESS OR USEFULNESS OF THE INFORMATION OR STATEMENTS CONTAINED IN THESE DRAWINGS, OR THAT THE DISCLOSURE OF ANY INFORMATION, APPARATUS, METHOD OR PROCESS DISCLOSED IN THESE DRAWINGS MAY NOT INFRINGE PRIVATE RIGHTS OF OTHERS. NO LIABILITY IS ASSUMED WITH RESPECT TO THE USE OF, OR FOR DAMAGES RESULTING FROM THE USE OF, ANY INFORMATION, APPARATUS, METHOD OR PROCESS DISCLOSED IN THESE DRAWINGS. DRAWINGS MADE AVAILABLE FOR INFORMATION TO BIDDER ARE NOT TO BE USED FOR OTHER PURPOSES AND ARE TO BE RETURNED UPON REQUEST OF THE FORWARDING CONTRACTOR.

REVISIONS

DATECAMENGCKDETDESDESCRIPTION OF CHANGETYPEREV

8/23/2023AATBDOCCCCORIGINAL ISSUE 0

DRAWING PACKAGE I.D.

.001 A B

NOTES:

EXPLOSION BONDING

1. ITEMS 1, 2, AND 3 SHALL BE PERMANENTLY JOINED BY EXPLOSION BONDING.

2. ALL COMPONENTS SHALL BE PRECISION CLEANED ACCORDING TO SECTION 4 OF THE MPEX VACUUM HANDBOOK (MPEX-00-ENG-002) PRIOR TO EXPLOSION BONDING.

3. AFTER CLEANING, ALL COMPONENTS SHALL BE HANDLED ACCORDING TO SECTION 3.10 OF THE MPEX VACUUM HANDBOOK (MPEX-00-ENG-002) TO AVOID CONTAMINATION.

4. ALL COMPONENTS SHALL BE NON-MAGNETIC ACCORDING TO SECTION 3.4 OF THE MPEX VACUUM HANDBOOK (MPEX-00-ENG-002) AFTER EXPLOSION BONDING.

ALL

SURFACES

NOTES:

EXPLOSION BONDING

1. ITEMS 1, 2, AND 3 SHALL BE PERMANENTLY JOINED BY EXPLOSION BONDING.

2. ALL COMPONENTS SHALL BE PRECISION CLEANED ACCORDING TO SECTION 4 OF THE MPEX VACUUM HANDBOOK (MPEX-00-ENG-002) PRIOR TO EXPLOSION BONDING.

3. AFTER CLEANING, ALL COMPONENTS SHALL BE HANDLED ACCORDING TO SECTION 3.10 OF THE MPEX VACUUM HANDBOOK (MPEX-00-ENG-002) TO AVOID CONTAMINATION.

4. ALL COMPONENTS SHALL BE NON-MAGNETIC ACCORDING TO SECTION 3.4 OF THE MPEX VACUUM HANDBOOK (MPEX-00-ENG-002) AFTER EXPLOSION BONDING.

WELDING

5. ALL COMPONENTS SHALL BE PRECISION CLEANED ACCORDING TO SECTION 4 OF THE MPEX VACUUM HANDBOOK (MPEX-00-ENG-002) PRIOR TO WELDING.

6. AFTER CLEANING, ALL COMPONENTS SHALL BE HANDLED ACCORDING TO SECTION 3.10 OF THE MPEX VACUUM HANDBOOK (MPEX-00-ENG-002) TO AVOID CONTAMINATION OF WELDS.

7. ALL COMPONENTS, FILLER MATERIALS, AND WELDED JOINTS SHALL BE NON-MAGNETIC ACCORDING TO SECTION 3.4 OF THE MPEX VACUUM HANDBOOK (MPEX-00-ENG-002) AFTER WELDING.

8. SUPPLIER SHALL MANUFACTURE A WELD SAMPLE TO VERIFY THAT THE MAGNETIC PERMEABILITY REQUIREMENTS ARE MET. A WELD PROCEDURE WITH PROCESS SETTINGS SHALL BE DOCUMENTED

AND USED FOR BOTH THE SAMPLE AND PRODUCTION ASSEMBLIES.

9. ALL VT (VACUUM TIGHT) WELDS MUST PASS A HELIUM LEAK TEST OF 1 X 10^-9 STD CC/SEC HELIUM PERFORMED ACCORDING TO ASTM E498-95, STANDARD TEST METHODS FOR LEAK DETECTION.

10. SUPPLIER SHALL MAINTAIN WELD PROCEDURE AND INSPECTION RECORDS.

11. WELD PROCEDURE AND PERFORMANCE QUALIFICATIONS PER AWS B2.1/2.IM:2014.

12. WELD QUALITY REQUIREMENTS OF AWS D17.1/D17.1M (FUSION WELDING) SPECIFICATION FOR CLASS A WELDS MUST BE MET. WELDS MUST BE VISUALLY INSPECTED.

13. WELD SYMBOLS PER ANSI/AWS A2.4.

SCALE 3:4

SECTION A-A

SCALE 3:4

B

A

OAK RIDGE NATIONAL LABORATORY

A

C

D

A

B

C

D

MATERIAL PLASMA EXPOSURE EXPERIMENT

DEPARTMENT OF ENERGY UNDER U.S. GOVE RNMENT CONTRACT DE-AC05-00OR22725

OAK RIDGE NATIONAL LABORATORY

THIS DRAWING IS THE PROPERTY OF

OAK RIDGE, TENNESSEE

(.64) (⌀5.500)

.100

5.300

(⌀2.100)

2X 1.766 2X 1.867

2X 2.149

.626 .626

.700.700

.950 .950

⌀3.800

2X R.195

2X R.210

1.375

.475

.600

D W G

N O

M P E X D E S A

S H

NEXT USED ASSEMBLIES

MPEX-04-DES-05-A548

DIMENSIONS ARE IN INCHES

DRAFTING STANDARD: ASME Y14.1

DIMENSIONING AND TOLERANCING IN

ACCORDANCE WITH ASME Y14.5, 2018

APPROVALS

DESIGNER DATE

L.REFFI 9/2023

DETAILER DATE

L.REFFI 9/2023

CHECKER DATE

DO NOT SCALE DRAWING D.OTTINGER 9/2023

DEFAULT TOLERANCES

LINEAR ANGULAR

ENGINEER DATE

MPEX

REVERSE TARGET SHIELD

T.BOYD 9/2023

CONTROL ACCOUNT MANAGER DATE

X.X .1 .5

X.XX .01

X.XXX .005

A.AARON 9/2023

TARGET SHIELD EX-BONDED SHORT, COVER RELIEF

REMOVE ALL BURRS AND

32 RMS MAX

SIZE DRAWING NUMBER REV

D MPEX-04-DES-05-A563 0

THIRD ANGLE PROJECTION SCALE CAD MODEL SHEET

1:1 MPEX-04-DES-05-A563 1 of 1

MPEX GUIDE

THIS DRAWING PREPARED ON CREOMPEX-00-ENG-005

QUALITY VERIFICATION

APPLICABLEDOCUMENTS REQUIRED

MATERIAL MILL TEST REPORT

LEAK TEST REPORT

CLEANING CERT

WELD / BRAZE INSPECTION REPORT

HEAT TREAT REPORT (W/CHART)

DIMENSIONAL REPORT

MATERIAL SELLER CERT

FUNCTIONAL TEST REPORT

X DEVIATION REQUEST

X NONCONFORMANCE REPORT

DATEQA REP

3.07 LBSPARTS LIST

TOTAL WEIGHT

MATERIAL / SPECIFICATIONDESCRIPTION OR NOMENCLATUREPART OR IDENTIFYING NUMBERQTY

FIND

NO.

TARGET SHIELD EX-BONDED SHORT, COOLING CHANNELMPEX-04-DES-05-A56211

MODEL REV

NO REPRESENTATION OR WARRANTY, EXPRESSED OR IMPLIED, IS MADE AS TO THE ACCURACY, COMPLETENESS OR USEFULNESS OF THE INFORMATION OR STATEMENTS CONTAINED IN THESE DRAWINGS, OR THAT THE DISCLOSURE OF ANY INFORMATION, APPARATUS, METHOD OR PROCESS DISCLOSED IN THESE DRAWINGS MAY NOT INFRINGE PRIVATE RIGHTS OF OTHERS. NO LIABILITY IS ASSUMED WITH RESPECT TO THE USE OF, OR FOR DAMAGES RESULTING FROM THE USE OF, ANY INFORMATION, APPARATUS, METHOD OR PROCESS DISCLOSED IN THESE DRAWINGS. DRAWINGS MADE AVAILABLE FOR INFORMATION TO BIDDER ARE NOT TO BE USED FOR OTHER PURPOSES AND ARE TO BE RETURNED UPON REQUEST OF THE FORWARDING CONTRACTOR.

REVISIONS

DATECAMENGCKDETDESDESCRIPTION OF CHANGETYPEREV

AATBDOCCCCORIGINAL ISSUE 0

DRAWING PACKAGE I.D.

NOTES:

1. ALL PARTS AND COMPONENTS SHALL BE FABRICATED IN ACCORDANCE WITH GOOD VACUUM

PRACTICES AND THE GUIDELINES OUTLINED IN THE MPEX VACUUM HANDBOOK (MPEX-00-ENG-002).

2. USE ONLY WATER SOLUBLE, NON-SULFUROUS BEARING CUTTING OILS FOR MACHINING.

3. ALL COMPONENTS SHALL BE PRECISION CLEANED ACCORDING TO SECTION 4 OF THE MPEX VACUUM HANDBOOK (MPEX-00-ENG-002)

4. SUPPLIER MUST VERIFY THAT ALL MATERIALS AND FABRICATION PROCESS STEPS RESULT IN ALL COMPONENTS (INCLUDING WELD AFFECTED AREAS AND HARDWARE) HAVING A MAGNETIC PERMEABILITY OF <1.0 3 AT 200 OERSTEDS.

ALL SURFACES

SEE DETAIL A

SECTION A-A

⌓ .0005Ⓤ.0005

DETAIL A

SCALE 2:1

A

B

OAK RIDGE NATIONAL LABORATORY

mpex-04-des-05-a548
Sheet 1
Views
new_view_1
new_view_2
right_13
A
new_view_15
Zones
D8
D7
D6
D5
D4
D3
D2
D1
C8
C7
C6
C5
C4
C3
C2
C1
B8
B7
B6
B5
B4
B3
B2
B1
A8
A7
A6
A5
A4
A3
A2
A1
mpex-04-des-05-a549
Sheet 1
Views
new_view_1
new_view_2
right_4
right_5
top_6
A
Zones
D8
D7
D6
D5
D4
D3
D2
D1
C8
C7
C6
C5
C4
C3
C2
C1
B8
B7
B6
B5
B4
B3
B2
B1
A8
A7
A6
A5
A4
A3
A2
A1
mpex-04-des-05-a550
Sheet 1
Views
new_view_1
new_view_2
right_3
new_view_6
Zones
D8
D7
D6
D5
D4
D3
D2
D1
C8
C7
C6
C5
C4
C3
C2
C1
B8
B7
B6
B5
B4
B3
B2
B1
A8
A7
A6
A5
A4
A3
A2
A1
mpex-04-des-05-a551
Sheet 1
Views
new_view_3
top_4
new_view_5
Zones
D8
D7
D6
D5
D4
D3
D2
D1
C8
C7
C6
C5
C4
C3
C2
C1
B8
B7
B6
B5
B4
B3
B2
B1
A8
A7
A6
A5
A4
A3
A2
A1
mpex-04-des-05-a552
Sheet 1
Views
new_view_1
new_view_3
right_4
Zones
D8
D7
D6
D5
D4
D3
D2
D1
C8
C7
C6
C5
C4
C3
C2
C1
B8
B7
B6
B5
B4
B3
B2
B1
A8
A7
A6
A5
A4
A3
A2
A1
mpex-04-des-05-a553
Sheet 1
Views
new_view_1
right_2
new_view_3
Zones
D8
D7
D6
D5
D4
D3
D2
D1
C8
C7
C6
C5
C4
C3
C2
C1
B8
B7
B6
B5
B4
B3
B2
B1
A8
A7
A6
A5
A4
A3
A2
A1
mpex-04-des-05-a554
Sheet 1
Views
new_view_1
left_2
new_view_3
Zones
D8
D7
D6
D5
D4
D3
D2
D1
C8
C7
C6
C5
C4
C3
C2
C1
B8
B7
B6
B5
B4
B3
B2
B1
A8
A7
A6
A5
A4
A3
A2
A1
mpex-04-des-05-a555
Sheet 1
Views
new_view_1
bottom_2
right_3
new_view_4
top_5
left_6
Zones
D8
D7
D6
D5
D4
D3
D2
D1
C8
C7
C6
C5
C4
C3
C2
C1
B8
B7
B6
B5
B4
B3
B2
B1
A8
A7
A6
A5
A4
A3
A2
A1
mpex-04-des-05-a556
Sheet 1
Views
new_view_2
left_3
new_view_4
Zones
D8
D7
D6
D5
D4
D3
D2
D1
C8
C7
C6
C5
C4
C3
C2
C1
B8
B7
B6
B5
B4
B3
B2
B1
A8
A7
A6
A5
A4
A3
A2
A1
mpex-04-des-05-a557
Sheet 1
Views
new_view_2
new_view_3
right_4
top_7
A
new_view_11
Zones
D8
D7
D6
D5
D4
D3
D2
D1
C8
C7
C6
C5
C4
C3
C2
C1
B8
B7
B6
B5
B4
B3
B2
B1
A8
A7
A6
A5
A4
A3
A2
A1
mpex-04-des-05-a558
Sheet 1
Views
new_view_1
new_view_2
left_3
Zones
D8
D7
D6
D5
D4
D3
D2
D1
C8
C7
C6
C5
C4
C3
C2
C1
B8
B7
B6
B5
B4
B3
B2
B1
A8
A7
A6
A5
A4
A3
A2
A1
mpex-04-des-05-a560
Sheet 1
Views
new_view_1
new_view_2
right_3
Zones
D8
D7
D6
D5
D4
D3
D2
D1
C8
C7
C6
C5
C4
C3
C2
C1
B8
B7
B6
B5
B4
B3
B2
B1
A8
A7
A6
A5
A4
A3
A2
A1
mpex-04-des-05-a561
Sheet 1
Views
new_view_1
right_2
new_view_3
Zones
D8
D7
D6
D5
D4
D3
D2
D1
C8
C7
C6
C5
C4
C3
C2
C1
B8
B7
B6
B5
B4
B3
B2
B1
A8
A7
A6
A5
A4
A3
A2
A1
mpex-04-des-05-a562
Sheet 1
Views
new_view_1
new_view_2
right_4
new_view_13
Zones
D8
D7
D6
D5
D4
D3
D2
D1
C8
C7
C6
C5
C4
C3
C2
C1
B8
B7
B6
B5
B4
B3
B2
B1
A8
A7
A6
A5
A4
A3
A2
A1
mpex-04-des-05-a563
Sheet 1
Views
new_view_1
new_view_2
right_3
A
Zones
D8
D7
D6
D5
D4
D3
D2
D1
C8
C7
C6
C5
C4
C3
C2
C1
B8
B7
B6
B5
B4
B3
B2
B1
A8
A7
A6
A5
A4
A3
A2
A1

File details come from the government source that posted it. Updated .