SOW UItenhage 651 - Interior painting and repairs- make ready. V2_SM.pdf

PDF 425 KB Posted

Attached to
Int/Ext Painting and M&R - 651 Uitenhage str, Faerie Glen, Pretoria
Solicitation number
PR16401406
Issued by

About this file

This is a Statement of Work (SOW) issued by the U.S. Embassy Pretoria, Facility Management division, for interior painting and repairs at a residential property (Uitenhage 651) to prepare it for occupation. The residence is generally in good condition, and work covers all buildings on the property.

The scope includes ten defined tasks: (1) preparing and repainting all interior surfaces previously painted or treated with one coat of Luxurious Silk paint in Salisbury Stone 645YY 83/062 color; (2) painting ceilings and wet areas in kitchen, laundry, and bathrooms with bathroom-specific paint; (3) touch-up painting of steelwork; (4) preparing and painting all interior and exterior doors, door frames, and wooden skirtings in white; (5) miscellaneous maintenance including door handles, shelving, windows, sliding doors, and curtain rails; (6) plumbing and bathroom fixture maintenance including resealing, replacing pull-out and pop-up seals, cleaning fixtures, replacing three toilet seats with solid wooden white seats, and repairing shower doors and bathroom accessories; (7) property-specific items including four kitchen drawer handles, kitchen cabinet edging, tile repair and documentation, master bathroom mirrors, and kitchen door lock set; (8) stove/cooker hood replacement (separately funded and itemized independently); (9) replacing kitchen and front doors with 30-minute fire-resistant rated doors matching existing dimensions with reinstalled hardware and white paint finish; and (10) final make-ready including site clearance with one large skip, touch-up painting, paint removal and cleaning, and detail work. Contractors must provide detailed responses to all tasks, itemized cost breakdown separating labor and materials, project timeline and work plan, lump sum fee, company profile with evidence of similar projects (if new to U.S. Government contracting), and a safety plan required before work starts. The project duration is two weeks for the interior scope within a combined four-week maximum for interior and exterior work. All Contractor personnel must complete security vetting before site access, including submitting identification documents, obtaining temporary clearance approval, and presenting original identification at each site visit. Proposals must use the provided pricing template with ten task categories in South African Rand currency, with VAT listed separately if applicable. A 12-month workmanship guarantee covers all surfaces, repairs, fire doors, and bathroom fixtures for defects in materials and workmanship. The Point of Contact is Etienne Smit, Project Manager and Contracting Officer's Representative. Safety compliance is mandatory under U.S. Army Corps of Engineers EM 385-1-1, OSHA requirements, and DOSAR 652.236-70, with contractors required to attend a pre-construction safety meeting, implement hazard controls, provide PPE, establish fall protection systems for work above six feet, maintain daily safety briefings, and report all incidents to the P.O.C.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTOR SIGNATURE___________________________________________________________

US Embassy Statement of Work – GOP Residential, Preparing residence for Occupation.

Interior painting and repairs.

Uitenhage 651

P a g e 1 | 8

Embassy of the United States of America

Pretoria, South Africa.

STATEMENT of WORK

Maintenance and repair.

Project: Interior painting and repairs.

Interior painting and repairs.

Uitenhage 651

P a g e 2 | 8

Project title: Uitenhage 651 - Interior painting and repairs.

1. GENERAL

1.1 Scope of Work The Contractor shall furnish all professional services, labor, materials, equipment, required insurance, permits, and any other items, accessories, and services needed to complete the maintenance work specified here. The Contractor shall perform all work in accordance with this Statement of Work, available information, and local regulations.

1.2 Project Description The U.S. Embassy Pretoria requires general interior painting and minor maintenance repairs to prepare the residence for occupation. The residence is generally in good condition. The scope covers all buildings on the property and includes:

• Preparing and repainting all interior surfaces previously painted or treated (one coat)

• Plumbing and bathroom fixture maintenance

• Property-specific kitchen, tiling and mirror repairs

• Replacing the kitchen door and front door with fire doors

• Replacing the stove/cooker hood (separately funded; itemize independently)

• General maintenance, repairs and upkeep

1.3 Proposal Requirements Proposals shall include:

• A detailed response to every task in Section 6: Project Requirements

• An itemized cost breakdown separating labor and materials for each task category

• A project timeline and work plan showing the time needed to perform the services

• A detailed lump sum fee for the services

• A company profile (if new to U.S. Government projects), with evidence of similar completed projects

• A safety plan (required before work starts)

1.4 Site Access and Security Requirements All Contractor personnel must complete security vetting before accessing the site.

Vetting requires:

• Submitting copies of identification documents to the P.O.C.

• P.O.C. submission to the security office for temporary clearance approval

• Access clearances valid only for the dates and times coordinated with the P.O.C.

• Recording all service dates on access control sheets

• Presenting original identification documents (not certified copies) at each site visit for verification

2. DEFINITIONS

• Owner: The U.S. Embassy Pretoria

• P.O.C. (Point of Contact): The designated Project Manager and Contracting Officer's Representative, Etienne Smit

• COR: Contracting Officer's Representative

• Contractor: The awarded vendor

3. SITE FAMILIARIZATION

The Embassy will conduct a site visit. The Contractor shall show thorough familiarity with the nature of the work, site conditions, and all factors that may affect the project. The Contractor shall notify the P.O.C. in writing of any additional information it needs.

4. SUGGESTED MODIFICATIONS

The Contractor may propose changes to the scope of work that would improve project outcomes. The Owner will review all suggestions for acceptance.

Interior painting and repairs.

Uitenhage 651

P a g e 3 | 8

5. PROPOSAL SUBMISSION REQUIREMENTS

5.1 Critical Notice The Contractor must verify all measurements before submitting a quotation. The Owner will not approve cost adjustments due to measurement errors.

5.2 Pricing Requirements

CONTRACTOR/COMPANY: ________________________________________

TASK CATEGORY COST –

LABOR (R)

COST –

MATERIAL (R)

1. Interior Walls (1 coat)

2. Ceilings and Wet Areas (1 coat)

3. Steelwork

4. Doors, Wood and Skirtings (1 coat)

5. Maintenance and Miscellaneous

6. Plumbing and Bathroom Fixtures

7. Property-Specific Items (drawer handles, cabinet edging, tile repair, mirrors, kitchen door lock set)

8. Stove/Cooker Hood Replacement

9. Fire Door Replacement (Kitchen and Front Door)

10. Final Make Ready/Finishing

SUBTOTAL

VAT (if applicable)

TOTAL AMOUNT QUOTED

Contractor Concerns and Notes:

Interior painting and repairs.

P a g e 4 | 8

6. PROJECT REQUIREMENTS – ALL BUILDINGS

TASK 1: Painting – Interior Walls (1 Coat)

6.1.1 Scope

• All interior walls, including inside cupboards (back walls and floor surfaces)

• All windowsills and entry steps

• Remove all nails, screws and similar fixings, then prepare and paint the walls

6.1.2 Surface Preparation

• Open, strengthen, seal and close all visible cracks before painting, and treat any areas with moisture concerns

• Make sure surfaces are clean, dry and free of loose material

• Fill all holes and imperfections; sand smooth and prime as needed

6.1.3 Paint Specifications Use only reputable paint manufacturers (Dulux, or a product of similar quality, warranty and specifications):

• Product: Luxurious Silk, Salisbury Stone 645YY 83/062, one coat

• Mid to low sheen; low VOC; lead and odor free; non-flammable

• Stain resistant, washable, with exceptional scrubbability

TASK 2: Painting – Ceilings and Wet Areas (Kitchen, Laundry, Bathrooms) (1 Coat)

6.2.1 Scope

• All interior ceilings

• All walls in wet areas that are not tiled

6.2.2 Paint Specifications

• Product: Luxurious Silk, bathroom-specific or exterior-rated paint, one coat

• Mid to low sheen; low VOC; lead and odor free; non-flammable; stain resistant and washable

TASK 3: Painting – Steelwork (Touch-Up)

• Clean all steel frames and grills, and touch up the paint where required

• Repaint painted steelwork only where needed

• Where applicable, re-glue loose wires to frames and touch up

TASK 4: Painting – Doors, Wood and Skirtings (1 Coat)

• Prepare and paint all interior and exterior doors and door frames that were previously painted. All doors and frames shall be white.

• Prepare and paint all interior wooden skirtings

• Remove or mask all door hardware before painting, then reinstall it once the work is complete

TASK 5: Maintenance – Miscellaneous

6.5.1 Doors, Handles and Hardware

• Make sure all door, drawer and cabinet handles are present, secured and, where applicable, lockable

• Replace all bedroom and passage cupboard door handles, latches and hooks

• Inspect doors, handles, striker plates, keyhole covers, gates and locks, and adjust them so they are aligned and work properly

6.5.2 Shelving

• Make sure all shelves are positioned, secured and clean

6.5.3 Windows and Sliding Doors

• Test all windows, window handles and stays, and adjust as required

• Inspect sliding doors, then reposition and secure rails and castors

Interior painting and repairs.

Uitenhage 651

P a g e 5 | 8

6.5.4 Curtain Rails and Blinds

• Remove curtain rails and blind brackets before painting, then reinstall them

• Inspect all curtain rails. Fix them securely to the walls at the specified height with appropriately sized anchors.

TASK 6: Maintenance – Plumbing and Bathroom Fixtures

6.6.1 General Plumbing

• Reseal (caulk) around all water sources, sinks, basins, showers and bathtubs. Remove failed, discolored or moldy sealant first, then reseal with a mildew-resistant silicone.

• Replace pull-out and pop-up seals on all basins and sinks

• Clean all shower roses and tap aerators

• Check all toilets, taps and waste outlets for leaks and correct operation

6.6.2 Toilet Seats

• Replace three (3) toilet seats with solid wooden white toilet seats. Fit them securely with new fixings.

6.6.3 Shower Doors

• Replace all shower door seals

• Make sure all shower doors open, close and seal properly; adjust hinges, rollers and guides as needed

6.6.4 Bathroom Fixtures and Accessories

• Inspect all bathroom fixtures and accessories, including taps, mixers, shower roses, towel rails, toilet roll holders and hooks

• Re-secure loose items. Repair or replace damaged or faulty items after the P.O.C. approves.

TASK 7: Property-Specific Interior Items

• Replace four (4) kitchen drawer handles

• Replace the kitchen cabinet edging on all affected cabinets. The Contractor shall confirm the linear meterage at the site visit.

• Fill all visibly chipped and cracked tiles. Before repairing, the Contractor shall photograph and log each location; the

P.O.C. will confirm locations at the site visit.

• Replace the mirrors in the master bathroom

• Replace the kitchen door handle and lock set

TASK 8: Stove/Cooker Hood Replacement

• Replace the stove/cooker hood

• Itemize this cost separately in the quotation, distinct from all other tasks

TASK 9: Fire Door Replacement (Kitchen and Front Door)

• Replace the existing kitchen door and front door with 30-minute fire-resistant rated doors that match the existing door dimensions and openings

• Reinstall all the existing hardware (handles, hinges, locks, strike plates, closers, etc.) on the new door leaves, in the same configuration as before

• Replace the peephole viewer on both doors

• Make sure both doors are properly certified for a 30-minute fire rating, correctly hung, and latch, close and seal properly

• Paint both doors and their frames white, to Task 4 specifications

• Touch up or repair any frame, wall or surrounding surface disturbed during the replacement, to match the existing finish

TASK 10: Final Make Ready and Finishing

6.10.1 Site Clearance

• Allow for one large skip and rubble removal. Clean the whole site once the work is complete.

6.10.2 Touch-Up and Snag Correction

• The Contractor shall return for touch-up painting or minor snag work needed after the residence is furnished and during the final occupancy phases

Interior painting and repairs.

Uitenhage 651

P a g e 6 | 8

6.10.3 Paint Removal and Cleaning

• Remove all paint marks (new or old) from windows, floors, fixtures, fittings, doors, furniture, appliances and worktops

• Do not use abrasive or harmful materials or chemicals; use scraper blades where appropriate

• Make sure no fittings or fixtures are damaged or scratched during cleaning

6.10.4 Detail Work

• Attention to detail is essential. The Contractor shall complete small detail and miscellaneous finishing work that may not have been seen during the site meeting.

7. GENERAL REQUIREMENTS

7.1 Site Management

• Remove all redundant and unused equipment, nails, hooks, wiring, antennas, dishes and mounting fixtures (confirm with the P.O.C. before removal)

• Keep the site clean and organized at all times; clean up daily

• Remove and dispose of all removed and scrap material off site (confirm with the P.O.C. before removal)

7.2 Quality Standards

• Neaten and finish all affected and surrounding damaged areas, top to bottom

• Pay meticulous attention to detail in every phase

• The Contractor is liable for repairing or replacing any fixtures and fittings it damages

7.3 Warranty

• 12-month workmanship guarantee on all surfaces and repairs, including the fire doors and bathroom fixtures

• The warranty covers defects in materials and workmanship

8. POINTS OF CONTACT

Project Manager / COR / P.O.C.: Etienne Smit U.S. Embassy Pretoria

Procurement: Until the Purchase Order is issued, route all communication through the Pretoria Procurement agent assigned to the project.

9. PROJECT LOCATION

Uitenhage 651, Pretoria

10. PROJECT DURATION

• Duration: Two (2) weeks for the interior scope, within the combined four (4) week maximum for the interior and exterior project

11. SAFETY REQUIREMENTS

11.1 Applicable Safety Standards The Contractor shall comply with all U.S. and local government safety regulations, including:

• U.S. Army Corps of Engineers EM 385-1-1 Safety and Health Requirements Manual, available at:

http://www.publications.usace.army.mil/USACEPublications/EngineerManuals.aspx

• United States Occupational Safety and Health Administration (OSHA) requirements

• DOSAR 652.236-70, Additional Safety Measures. This clause is required due to demolition (door removal). Available at: https://www.acquisition.gov/dosar/652.236-70-additional-safety-measures

11.2 Safety Plan and Implementation The Contractor shall:

1. Develop and submit: a project-specific safety plan; hazard control methods appropriate to the work in accordance with EM 385-1-1; emergency response procedures

2. Provide PPE: safety gloves, safety footwear, eye protection, hearing protection, and fall protection equipment (where applicable)

3. Implement safety measures:

o Appropriate barricades and warning signage (including wet floor signs) http://www.publications.usace.army.mil/USACEPublications/EngineerManuals.aspx https://www.acquisition.gov/dosar/652.236-70-additional-safety-measures

Interior painting and repairs.

Uitenhage 651

P a g e 7 | 8 o Fall protection systems for elevated work. For any work more than six feet (1.8m) above the ground, the

Contractor shall submit a fall arrest/safety plan before starting that work.

o Ladder safety protocols for working at heights o Keep the residence secure while the kitchen and front doors are being replaced. Do not leave door openings unsecured overnight.

o Proper inspection and maintenance of all equipment and tools o Proper use of PPE, and proper material handling and storage

4. Maintain compliance: conduct daily safety briefings; perform regular safety inspections; document safety activities;

correct unsafe conditions immediately; report all incidents to the P.O.C.

11.3 Pre-Construction Safety Meeting The Contractor shall attend a mandatory safety meeting before work starts. The meeting will review project-specific hazards, safety plan implementation, emergency procedures, site-specific requirements and communication protocols.

11.4 EM 385-1-1 Compliance Guide For successful compliance with EM 385-1-1, Contractors should focus on:

• The Introductory Letter (overview and intent)

• Section 1 (general requirements and submission procedures)

• Appendix A (required documentation and forms)

These sections detail what you need to know and submit to begin work. Additional technical sections apply only to specific hazards relevant to your project scope.

12. PICTURE INDICATIONS

Partial indications only; these do not replace the full SOW.

Interior painting and repairs.

P a g e 8 | 8

End of SOW