26WB1001_Task_Order_Worksheet_-_Attachment_1a_Rev_1.docx
DOCX document 17 KB Posted
- Solicitation number
- PortOpsFY190001
About this file
Attachment to Port Ops FY19-0001.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment__3_to_FY19-0001.docx | DOCX document | |
| FY19-0001_Proposal_Worksheet,_Attachment_1A_Rev_2.xlsx | XLSX spreadsheet | |
| Amendment__2_to_FY19-0001.docx | DOCX document | |
| 26WB1001_Drawing__2_5110730_Attachment_1a(ii)_Diagram_2.pdf | ||
| 26WB1001_Drawing__1_5110729_Attachment_1a(i)_Diagram_1.pdf | ||
| Attachment_3_Vessel_Library_Rev_1_22Feb19.docx | DOCX document | |
| Attachment_2_(PWS)_REV1_22AUG18.pdf | ||
| 28HS0801_Attachments_1c_-_1c(vi).zip | ZIP file | |
| Attachment_4_Badging_and_Access_Requirements.pdf | ||
| 28HS0312_Attachments_1b_-_1b(iv).zip | ZIP file | |
| 26WB1001_Attachments_1a_-_1a(ii).zip | ZIP file | |
| FY19-0001_Proposal_Worksheet,_Attachment_1A.xlsx | XLSX spreadsheet | |
| 33HS1102_Attachments_1d_-_1d(ix).zip | ZIP file | |
| RFP_FY19-0001_-_Attachment_1.docx | DOCX document | |
| Attachment_5_Wage_Determination_Combined.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N4523A18DXXXX
Requisition Date: 22 March 2019
CUSTOMER ORDER #: PORT OPS FY19-0001
| CLIN |
| VESSEL |
(Hull #)
| Location |
| Hull Type |
| Availability |
| Ship Check Date/Time/location |
| POC: |
| 0043 |
| 26ft Work Boat (26WB1001) |
| Naval Base Kitsap Bangor |
| Steel |
| 22 Apr 19 – 12 July 19 |
| 3 Apr. 2019 |
0830-1130 Naval Base Kitsap Bangor Name: Bill Stell Email: william.stell@navy.mil Phone: 360-476-3240
| Work Package |
| Conditions Noted & Specific Instructions |
| Delivery Instructions |
| Trailer Instructions |
| OFFERED PRICE |
PWS 3.1
PWS 3.2
PWS 3.4
PWS 3.5
PWS 3.6
PWS 3.7
Use sketch for current layout
Apply nonskid to the entire engine hatch exterior
Ensure correct zincs are used
Checkpoints:
1) When hull is bare metal
2) When final paint cure is over/ready
Fully Non-Skid exterior of engine room hatch
Supply/fabricate spanner wrench for small hatch inspection cover
Complete Winch Alteration in accordance with drawings 53711-583-5110729 and 53711-300-5107858
| Port Operations will deliver and pick up work boat by water. |
| N/A |