Pop-up Targets SoW.pdf
PDF 154 KB Posted
- Attached to
- Pop-up Target System
- Solicitation number
- FA483026Q0043
About this file
This is a Statement of Work (SOW) for the Grand Bay Range Pop-Up Targets and Control System Acquisition project at Moody Air Force Base, Georgia.
The contractor must deliver nineteen (19) new pop-up targets designed to mirror the existing ATA "PIT" target form factor and size for seamless integration into current protected target berms. All target components must be exclusively battery-powered. The contractor shall also provide two (2) battery-powered control tablets/pads for range tower operator use and three (3) battery-powered hand-held controllers for maintenance personnel. The control software must enable accurate scoring and reporting of target hits, control of background lighting effects, selection and triggering of simulated return gunfire indication modes, and real-time reporting and monitoring of target battery power levels. Additionally, the contractor must establish a dependable wireless long-range communications network with a minimum two-mile range between the range tower and target placement areas, with all targets fully functional and controllable at target locations. Communications network components may be solar-powered or battery-powered.
The contractor must provide system upgrade options and required hardware/software to ensure compatibility between newly provided targets and existing on-hand ATA pop-up targets and chassis. The SOW requires comprehensive maintenance and operations training covering routine operations, system troubleshooting, battery/solar maintenance, and software utilization for designated Grand Bay Range personnel. All hardware delivery, installation, and training shall take place at Grand Bay Range, Moody AFB, Georgia. The deliverables include nineteen new targets, two range tower controllers, three maintenance controllers, one lot of wireless communications network components, one lot of legacy upgrade packages, and one training session.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Contractor Questions and Answers.pdf | ||
| Contractor Questions.docx | DOCX document | |
| Location Map.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
Project Title: Grand Bay Range Pop-Up Targets and Control System Acquisition Location: Grand Bay Range, Moody Air Force Base (AFB), GA
1.0 Background
Grand Bay Range, located at Moody AFB, GA, currently utilizes a target system originally provided by the now-defunct ATA Defense Industries to support helicopter aerial gunnery training. To maintain and enhance training capabilities, Grand Bay Range requires a modernized, augmented target system consisting of new pop-up targets, ancillary equipment, control hardware, and management software.
2.0 Scope
The Contractor shall provide all hardware, software, ancillary equipment, frames, and training necessary to deliver nineteen (19) new pop-up targets, a dependable long-range wireless communications network, and a comprehensive remote-control system.
Furthermore, the Contractor shall provide upgrade options to integrate and ensure compatibility with existing, on-hand ATA pop-up targets and chassis.
3.0 Specific Requirements
3.1 Target Hardware Specifications
Quantity: The Contractor shall deliver nineteen (19) new pop-up targets with all associated hardware.
Form Factor: The new pop-up targets must closely mirror the existing ATA "PIT" target design, form factor, and size to ensure seamless fitment into current protected target berms.
Power Supply: All target components must be exclusively battery-powered.
3.2 Control Systems and Software
The Contractor shall provide control devices and software capable of operating the entire target system.
Hardware Devices:
Two (2) control tablets/pads designated for operator use at the range tower.
Three (3) hand-held controllers designated for maintenance personnel.
All handheld and tablet control devices must be battery-powered.
Software Capabilities: The control software installed on the tablets and hand-held devices must provide the following functionalities from the range tower:
Accurate scoring and reporting of target hits.
Control of background lighting eƯects.
Selection and triggering of simulated return gunfire indication modes.
Real-time reporting and monitoring of target battery power levels.
3.3 Communications Network
Range and Reliability: The system shall utilize a dependable wireless long-range communications network (e.g., WIFI) establishing a minimum two (2) mile range between the range tower and the pop-up target placement areas. All targets must be fully functional and controllable at the target location areas.
Power Supply: Communications relays and associated network components may be solar-powered or battery-powered.
3.4 Legacy System Integration / Upgrade Options
The Contractor shall provide system upgrade options and required hardware/software to make existing, on-hand ATA pop-up targets and chassis fully compatible with the newly provided targets, communications network, and remote control software.
4.0 Training
Operations & Maintenance: The selected Contractor shall provide comprehensive maintenance and operations training to designated Grand Bay Range personnel.
Training will cover routine operations, system troubleshooting, battery/solar maintenance, and software utilization.
5.0 Place of Performance
All hardware delivery, installation (if applicable), and training shall take place at:
Grand Bay Range Moody AFB, GA [Insert specific Zip/Location code if needed]
6.0 Deliverables Schedule
Deliverable Description Quantity
New Pop-Up Targets ATA "PIT" style battery-powered targets 19
Range Tower Controllers Battery-powered control tablets/pads with software 2
Maintenance Controllers Battery-powered hand-held controllers with software 3
Communications Network
Wireless network components (WIFI, min 2-mile range, solar/battery)
1 Lot
Legacy Upgrade Package Hardware/software options to integrate existing ATA targets 1 Lot
Training Maintenance and Operations instruction for range personnel 1 Session