Polymer Rejuvenated Fog Seal Specification
This is a technical specification document for polymer-modified rejuvenating fog seal materials used by state and local highway authorities, specifically the Berkshire Regional Group Purchasing Program (BRGPP) in Massachusetts, which procures materials for participating municipalities throughout Berkshire County. The specification details the requirements for a topically applied, petroleum-based penetrating asphalt sealer with rejuvenating agents designed to slow oxidation, raveling, and other damage to existing or newly constructed asphalt pavements. The primary material specified is a CMS-1PF rejuvenating asphalt emulsion containing polymer that must meet precise technical standards. The specification establishes detailed testing procedures and performance parameters for emulsion properties, residue properties, polymer properties, and rejuvenating agent properties, with required testing methodologies referencing AASHTO and ASTM standards. The contract term runs from July 1, 2026 through June 30, 2027, with bids due April 2, 2026 at 1:00 p.m. through the OpenGov online procurement portal, and contract award anticipated by April 20, 2026. Pavement preservation products, which include fog seal materials, are estimated at $1,748,500.00 for the contract period.
The specification requires that the CMS-1PF emulsion meet stringent quality standards including viscosity ranges (10-100 SFS at 77°F), oil distillate content (0.5% maximum), storage stability (1% maximum), residue content of 30% minimum by weight, and polymer properties including penetration at 4°C, glass transition temperature, and swelling resistance in rejuvenating agent. The rejuvenating agent must have a flash point of 380°F minimum, viscosity between 50-175 CST at 140°F, and specified saturate and asphaltene content. The material shall not be diluted prior to application and must be certified by the manufacturer as meeting all specifications. Awarded contractors must be pre-qualified by MassDOT for pavement surfacing work, maintain comprehensive insurance coverage including $1,000,000 general liability per occurrence, comply with Massachusetts prevailing wage requirements, and pay a quarterly administrative fee of 1.75% of reported purchases to BRGPP.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Version 2022.1
POLYMER MODIFIED REJUVENATING FOG SEAL
DESCRIPTION
This work shall consist of furnishing all materials, equipment, labor and preparation necessary for the application of a topically applied, petroleum-based penetrating asphalt sealer with a rejuvenating agent to existing or newly constructed asphalt pavements for the primary purpose of slowing the oxidation, raveling and other damage caused to unprotected asphalt pavements.
MATERIALS
a) Emulsion: Rejuvenating asphalt emulsion, CMS-1PF, shall contain a polymer and conform to the following specifications. The emulsion shall be certified as meeting this specification from the manufacturer and shall not be diluted prior to application.
| Property |
| Test Procedure |
| Specification |
| (AASHTO) |
| (min) |
| (max) |
Emulsion Properties
| Viscosity, Saybolt-Furol, @ 77°F, SFS |
| T59 |
| 10 |
| 100 |
| Storage, 24 hour, % |
| T59 |
| Oil Distillate, % |
| T59 |
0.5
| Sieve Test, % |
| T59 |
0.1
Residue by Distillation(1) @350°F, % Residue by Distillation, % by weight
| T59 |
| 30 |
| Residue Properties From Distillation |
| T59 |
Penetration @ 4C, 200g weight, 60 sec Residue by Distillation, % by weight
| T49 |
| 30 |
| Residue Properties From Low Temp Evaporation |
| PP72-11, Procedure B |
| Dynamic Shear, G*/sin @ 64oC, kPa |
| T315 |
| Report Only |
Polymer Properties
| Swelling in rejuvenating agent, % max weight increase: 48 hrs |
| ASTM D471 (2) |
40%
| Tensile Strength (psi) |
| ASTM D412a (3) |
| 800 |
| Glass Transition Temperature (Tg) – Midpoint by DSC (°C) |
| ASTM D7426 (4) |
| 0 |
| Latex Density at 23°C (g/cm3) |
| ASTM D6937 (5) |
| 1.00 |
| 1.05 |
| Latex pH |
| ASTM E70 (6) |
| 6.0 |
| 8.0 |
Test on Rejuvenating Agent
| Flash Point, COC, °F |
| T48 |
| 380 |
| Viscosity, 140°F, CST |
| 201 |
| 50 |
| 175 |
| Saturate, % by wt |
| ASTM D2007 |
| Asphaltenes |
| ASTM D2007 |
1.0
Test on Residue
Weight Change, %
6.5
Viscosity Ratio
(1) Exception to AASHTO T59: Bring the temperature on the lower thermometer slowly to 350°F plus or minus 10°F. Maintain this temperature for 20 minutes. Complete the total distillation in 60 plus or minus 5 minutes.
(2) Polymer Testing, Resistance to Swelling: Using a syringe, place 0.8 gm of latex into a 18 mm diameter DSR mold. Allow the sample to dry at ambient lab conditions (air conditioned) on the bench for 72 hours. Sample should be easily removable from the mold. Take the “button” out of the mold and place the sample into a forced air oven at 40°C (104°F) for 48 hours (on release paper). If at the end of the ambient dry, the sample sticks to the mold, place it into the oven and check it after 1-2 hours. After 48 hours, cool and weigh the sample to the nearest 0.0001 gram and record the weight. Put ½ inch of Rejuvenating Agent into a 3 oz penetration tin. Place the “button” on the Rejuvenating Agent, and add another ½ inch of Rejuvenating Agent, so that the “button” is covered. Put the cap on the penetration tin and place it into the 40°C oven for 48 hours. Remove the “button” from the Rejuvenating Agent, blot surface of the “button” to remove excess Rejuvenating Agent, cool the “button” to room temperature and weigh it. Calculate weight gain of the “button”, express as a %.
(3) To prepare the polymer film, dilute the waterborne polymer to 40% Total Solids Content and pour 57 g into a Teflon or silicone release mold of dimensions 7” X 7” X ¼”. Allow to dry at 23°C (73 °F) and 50% RH (controlled conditions) for 7 – 10 days total time, during which time the film should be flipped around once, preferable after 3 or 4 days. The film should be transparent in the end. To drive out any residual water, place the film in an oven at 50°C for 30 min. Dried film thickness should be 25 mil +/- 5 mils. Discard films <20mil. Cut out dumbbell-shaped test specimens of dimension 75 mm total length, 25 mm mid-section (L) and 4 mm width of mid-section. Grip in Instron machine with gap size 1 inch, use 8 inch/min cross-head speed.
(4) Use between 3 – 30 mg dry polymer. Instrument used is TA Q2000 Differential Scanning Calorimeter (DSC). Heating rate is 20°C/min.
(5) Replace “Emulsified Asphalt” with “Latex” in text of test method. The testing temperature used should be 25 +/- 3°C. The calculation in Section 7 should be as follows:
D = (Wf –Wt) *0.1 S.G. = D/8.337 Where: Wf = Weight of filled cup (g), Wt = Weight of empty cup (g)
(6) A pH meter with automatic temperature measurement should be used in the evaluation with a calomel cell assembly or combination electrode. Calibration should be made using the procedure with the pH meter, according to ASTM method, prior to testing the pH of the latex. In Section 9, the procedure for measuring pH of the latex should be as follows:
1) Place the electrode and probe into the dispersion that is to be measured and swirl the sample cup or beaker gently. (You may also use the probe in a stirring motion.)
2) Wait for the reading to stabilize (usually less than a minute) and read/record this value. Note the temperature if not utilizing an ATC probe.
3) Take the Electrode and ATC probes from the sample and rinse thoroughly with deionized water. Pat dry and place back into appropriate solution recommended by electrode manufacturer for storage.
b) Material Certifications and Testing
1) The emulsion manufacturer, through the Contractor, shall submit to the Owner certified test results that the emulsion meets the specification. The polymer manufacturer and the rejuvenating agent manufacturer, through emulsion supplier and the Contractor, shall submit to the Owner certified test results on the polymer and the rejuvenating agent that meets the required specifications. The Owner will not accept test results dated more than 90 days from the date of bid opening.
2) Certifications and test results on the emulsion must be submitted to the Owner and approved by the Owner 5 days prior to supplying material.
3) Prior to and during the project the Owner may require samples of the finished emulsion, rejuvenating agent and the polymer used in the emulsion to be submitted to the Owner designated laboratory for testing. All testing shall be at the Owner’s expense.
c) Aggregate: The aggregate material shall be a dry, clean, dust and dirt-free, sound, durable, angular shaped manufactured specialty sand, such as that used as an abrasive (i.e., trade name “Black Beauty”), with a Mohs hardness of 6 to 8. The Contractor shall submit manufacturer’s technical data and a manufacturer’s certification indicating that the specialty sand meets the requirements of the specification to the Engineer prior to start of construction. The sand must be approved for use by the Engineer and shall meet the following gradation limits.
| Aggregate Material Gradation | Percentage Retained Sieves | |
| No. 8 (2.38 mm) | ||
| 0 |
| No. 16 (1.19 mm) |
| 0-10 |
| No. 20 (0.84 mm) |
| 0-25 |
| No. 30 (0.60 mm) |
| 15-50 |
| No. 40 (0.42 mm) |
| 20-45 |
| No. 50 (0.30 mm) |
| 5-35 |
| No. 70 (0.21 mm) |
| 0-5 |
| No. 200 (0.07 mm) |
| 0-2 |
1. EQUIPMENT
a) Pressure distributor: The emulsion shall be applied with a computer rate-controlled asphalt distributor. The equipment shall be in good working order and contain no contaminants or diluents in the tank. Spreader bar tips must be clean, free of burrs, and of a size to maintain an even distribution of the emulsion. Any type of tip or pressure source is suitable that will maintain predetermined flow rates and constant pressure during the application process with application speeds under eight (8) miles per hour or seven hundred (700’) feet per minute. Before use the equipment must be tested under pressure for leaks to ensure it is in good working order.
The distributor truck shall be equipped with a 12-foot minimum, spreader bar with individual nozzle control. The distributor truck shall be capable of specific application rates in the range of 0.05 to 0.25 gallons per square yard. These rates shall be computer-controlled rather than mechanical. The distributor truck shall have an easily accessible thermometer that constantly monitors the temperature of the emulsion and have an operable mechanical tank gauge that can be used to cross-check the computer accuracy.
A distributor truck shall be provided, if necessary, equipped to effectively heat and mix the material to the required temperature prior to application. Heating and mixing shall be done in accordance with the manufacturer’s recommendations. Care shall be taken not to overheat or over-mix the material.
The distributor shall be equipped to hand-spray the emulsion in areas identified either on the plans or by the Engineer, or not accessible to the distributor truck itself.
b) Calibration: Furnish all equipment, materials, and labor as necessary to calibrate the computer- controlled distributer. Perform the calibration with the specified material prior to applying the rejuvenating fog seal on the prepared surface, in accordance with applicable standards and the project specifications.
c) Aggregate spreader: The asphalt distributor truck shall be equipped with an aggregate spreader mounted to the distributer truck that can apply sand to the emulsion in a single pass operation without driving through the wet emulsion. The aggregate spreader shall be equipped with a variable control system capable of uniformly distributing the sand at the specified rate at varying application widths and speeds. The sander shall have a minimum hopper capacity of at least 3,000 pounds of sand. Push-type hand sanders will be allowed for use around lights, signs and other obstructions.
WEATHER LIMITATIONS
Place the fog seal when both the pavement and atmospheric temperature is 50F and rising.
Do not place fog seal if any of the following conditions exist:
a) Impending weather conditions do not allow for proper curing, or if temperatures are forecasted below 32F within 24 hours from the time of work.
b) The existing pavement temperature is 140F or above.
c) The pavement surface is wet, or rain is forecasted within 24 hours of placement.
SURFACE PREPARATION
The Contractor shall clean the pavement surface prior to placement with a power broom or road sweeper. Clean any muddy or dirty areas by flushing with water. Allow surface to dry completely prior to applying asphalt emulsion.
Remove oil or grease that has not penetrated the asphalt pavement by scraping or by scrubbing with a detergent, then wash thoroughly with clean water.
APPLICATION OF ASPHALT EMULSION & AGGREGATE
The Contractor shall follow the construction methods as described. Target application rates for the emulsion shall be in the range of 0.06 to 0.15 gallons per square yard as established by the Engineer after spraying a test strip or strips with varying application rates in order to determine the optimum rate to achieve coating without runoff or delayed curing times. Target application rate for the aggregate shall be 0.5 pounds per square yard, also as established by the Engineer after spraying the test strip(s). Apply the asphalt emulsion at the target rate(s) established during the test strip. Maintain the asphalt emulsion temperature from 120 to 160F during construction, including the start of each day. Reheat the asphalt emulsion at a rate of no more than 25 F per hour whenever the asphalt emulsion is allowed to cool below 110F. If the target application rates are not the optimum application rates to achieve proper coating of the existing or newly constructed pavement surface, or if the break time is too long or too short, immediately notify the Engineer. Adjust and document the new application rate by stationing. Do not allow the asphalt emulsion to streak on the road surface. If the Engineer determines that streaking is occurring, cease operations until the Engineer is satisfied that streaking has been eliminated. Apply the asphalt emulsion to all exposed areas of asphalt surface as directed by the Engineer.
During the application of the fog seal, ensure there are no deficiencies in the fog seal, resulting from poor workmanship, flushing, tracking from equipment, surface patterns, and sweeping. Inspect workmanship for untreated areas, minimum overlap on longitudinal joints, and minimum overlap on construction joints.
Verify the following for daily acceptance:
a) Fog seal edges are neat and uniform along the roadway lane, shoulder and curb lines.
b) Fog seal has no surface patterns such as lean or heavy lines.
c) Fog seal has no bleeding/flushing areas.
d) Fog seal uniformly covers all portions of the asphalt surface
e) Blotter sand is broadcast uniformly and at the proper rate.
TRAFFIC CONTROL
Unless otherwise specified in the contract documents, maintain one-way traffic on two lane highways in accordance with Standard Drawing and as directed by the Engineer. Maintain traffic on multi-lane highways as specified by the contract documents. Lower volume roadways may be closed at the discretion of the Engineer. Traffic control shall be considered incidental to the performance of this item except for police details and flagger costs. The cost of flaggers and any police details, if required, will be paid or reimbursed by the Owner. The Owner will coordinate detail assignments which will be billed to the Contractor directly based on the hourly cost. The Contractor will not be reimbursed for police detail expenses incurred due to failure to cancel or cancelling without the required notice.
METHOD OF AWARD
To ensure contractor accountability, the Owner intends to award all items to a single contractor. Accordingly, contractors must bid on all items of work, and the low bidder will be the contractor whose total bid price is the lowest. The bid quantities are not guaranteed, and their primary purpose is for the determination of the low bidder.
MEASUREMENT AND PAYMENT
d) The quantity to be measured for payment will be the number of square yards of Fog Seal completed.
e) No additional compensation shall be made for additional work required to apply Fog Seal to areas outside the normal operating width of the distributor.
10. ASPHALT PRICING AND PRICE ADJUSTMENTS
a) Asphalt Price Adjustments: Contractor’s bid prices below shall be based upon the current State DOT asphalt cement price index posted exactly two (2) weeks prior to the due date for receipt of bids (“Bid Index”). If the posted State DOT asphalt cement price index in place when the work is performed differs from the Bid Index, up or down, then Contractor’s invoices shall include price adjustments for the asphaltic materials, and these adjustments shall be calculated based on the actual tons of liquid asphalt cement incorporated into the work.
a) Future Year Price Adjustments: The Owner reserves itself the option to extend the use, terms, conditions, and prices of this bid for an additional five (5) years after the first year in which the contract is awarded. Such extension will be subject to the Owner reviewing and approving the Contractor’s annual request for a price adjustment based on and limited to the prior year’s actual rate of inflation. If such price adjustment cannot be mutually agreed upon between the Owner and Contractor, Owner may choose to re-bid the work in lieu of extending this contract.