Polygons.cpg
5 B Posted
- Attached to
- BD27-115 Porcupine Knoll Lop & Scatter
- Solicitation number
- BD27-115
- Issued by
- Summit County, Utah
About this file
This file is a code page specification document (Polygons.cpg) related to an Invitation for Bid (IFB) issued by the State of Utah Division of Purchasing on behalf of the Division of Wildlife Resources. The solicitation (BD27-115) seeks hand cut and pile services for encroaching conifers across 390 acres located in the Twelve Mile drainage within the South Manti Big Game Habitat Restoration project on the Sanpete Ranger District of the Manti La Sal National Forest. The project must be completed by November 31st, 2026. No mandatory site visit will be held prior to bidding; however, potential bidders are strongly encouraged to inspect the project site to assess general and local conditions that may affect contract performance costs. Failure to inspect the site does not constitute grounds for claims following contract award. The procurement is anticipated to result in a single contract award to the lowest cost responsive and responsible vendor, with the contract term running from the time of award through November 31st, 2026.
This solicitation is restricted to prequalified contractors only, and interested parties must be listed on the current Pre-approved/Pre-qualified Vendor list to submit a bid. The vendor must guarantee pricing through project completion. No specific pricing terms, set-asides, or funding sources are detailed in the available documentation. The file itself is a UTF-8 encoded code page specification, which appears to be a technical component of the project's geographic data system rather than a substantive contract document.
Text of this file
UTF-8
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .