Pocatello_Road_Grading_2025_FP-14.docx
DOCX document 238 KB Posted
- Attached to
- POCATELLO ROAD GRADING 2025 Federal contract opportunity
- Solicitation number
- 140L2625Q0074
About this file
This document is a detailed project specification for road grading services issued by the Bureau of Land Management (BLM) for the Idaho Falls District. The project involves maintenance and improvements of BLM roads, specifically including approximately 11.6 miles of reshaping and grading of naturally surfaced existing roads and spot roadway repairs in soft or unstable areas. The work will be performed using government-furnished subbase aggregate stockpiled at the Juniper pit, with road sections located approximately 10.1 and 17.5 miles east of Highway 84 exit 263 on Juniper Road.
Key project parameters include a 60-calendar day performance period, contractor responsibilities for traffic signing, site preparation, and finish work, and specific requirements for road reconditioning. The contractor must grade and compact roads to a typical cross-section template, recondition road prisms and ditches, and construct two new ditches where none currently exist. The project involves roads on Road 665 (Lat. 42.160971, Long. -112.826449) and Road 642 (Lat. 42.050749, Long. -112.769589), with the contractor responsible for all mobilization costs and any repairs to project site access roads caused by their travel.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1510-56_PRE-BID_Pocatello_Road_Grading_2025_0001.pdf | ||
| Pocatello_Road_Grading_2025_FP-14_0001.pdf | ||
| Sol_Q_A_09-04-2025_0001.pdf | ||
| Sol_140L2625Q0074_Amd_0001.pdf | ||
| Sol_140L2625Q0074.pdf | ||
| Pocatello_Road_Grading_2025_Maps.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TABLE OF CONTENTS
| PREFACE | 4 |
| 101. – TERMS, FORMAT, AND DEFINITIONS | 5 |
| 101.01 Meaning of Terms. | 5 |
| 101.03 Abbreviations. | 5 |
| 101.04 Definitions. | 5 |
| 102. – BID, AWARD, AND EXECUTION OF CONTRACT | 8 |
| Delete Section 102. | 8 |
| 103. – SCOPE OF WORK | 9 |
| Delete Subsections 103.02, 103.03, 103.04, 103.05. | 9 |
| 103.01 Intent of Contract. | 9 |
| 104. – CONTROL OF WORK | 10 |
| Delete Subsections 104.01, 104.02, 104.04. | 10 |
| 104.06 Use of Roads by Contractor. | 10 |
| 105. – CONTROL OF MATERIAL | 11 |
| Delete Subsections 105.02 (a) Government-provided sources. | 11 |
| 105.02(b) Government-provided material stockpile. | 11 |
| Delete Subsections 105.02 (c) Contractor-located sources. | 11 |
| 105.05 Use of Material Found in the Work. | 11 |
| 106. – ACCEPTANCE OF WORK | 12 |
| 106.01 Conformity with Contract Requirements. | 12 |
| 106.02 Visual Inspection. | 14 |
| 107. – LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC | 15 |
| Delete Subsection 107.05. | 15 |
| 108. – PROSECUTION AND PROGRESS | 16 |
| Delete Section 108. | 16 |
| 109. – MEASUREMENT AND PAYMENT | 17 |
| Delete Subsections 109.06, 109.07, 109.08, 109.09. | 17 |
| 109.01 Measurement of Work. | 17 |
| 109.02 Measurement Terms and Definitions. | 18 |
| 109.03 Measurement Terms and Definitions. | 18 |
| 153. – CONTRACTOR QUALITY CONTROL | 19 |
| 153.04 (a) (2) (a) Submittal Log. | 19 |
| 155. – SCHEDULES FOR CONSTRUCTION CONTRACTS | 20 |
| Delete Section 155. | 20 |
| 156. – PUBLIC TRAFFIC | 21 |
| 156.01 Description. | 21 |
| 156.02 Material. | 21 |
| 156.03 General. | 21 |
| 156.04 Temporary Traffic Control. | 21 |
| 156.05 Acceptance. | 22 |
| 156.06 Measurement and Payment. | 22 |
| 170. – DEVELOP WATER SUPPLY AND WATERING | 23 |
| 170.01 Water Supply. | 23 |
| 170.02 Material. | 23 |
| 170.03 Application. | 23 |
| 170.04 Acceptance. | 23 |
| 170.05 Measurement and Payment. | 23 |
| 202. – ADDITIONAL CLEARING AND GRUBBING | 24 |
| 202.01 Description. | 24 |
| 202.04 Selective Clearing. | 24 |
| 202.06 Special Clearing and Grubbing. | 24 |
| 203. – REMOVAL OF STRUCTURES AND OBSTRUCTIONS | 25 |
| 203.05 Disposing of Material. | 25 |
| 204. – EXCAVATION AND EMBANKMENT | 26 |
| 204.01 Description. | 26 |
| 204.02 Definitions. | 26 |
| 204.03 Material. | 26 |
| 204.04 Preparation for Roadway Excavation and Embankment Construction. | 27 |
| 204.05 Conserved Topsoil. | 27 |
| 204.06 Roadway Excavation. | 27 |
| 204.07 Subexcavation. | 28 |
| 204.08 Borrow Excavation. | 28 |
| 204.09 Preparing Foundation for Embankment Construction. | 28 |
| 204.10 Embankment Construction. | 28 |
| 204.11 Compaction. | 29 |
| 204.12 Drainage Features. | 31 |
| 204.13 Sloping, Shaping, and Finishing. | 31 |
| 204.14 Disposal of Unsuitable or Excess Material. | 32 |
| 204.15 Acceptance. | 32 |
| 204.16 Measurment. | 32 |
| 204.17 Payment. | 34 |
| 212. – LINEAR GRADING | 39 |
| 212.03 Roadway Excavation and Embankment. | 39 |
| 301. – UNTREATED AGGREGATE COURSES | 40 |
| 301.03 General. | 40 |
| 301.04 Mixing and Spreading. | 40 |
| 301.05 Compacting. | 40 |
| 301.06 Surface Tolerance. | 40 |
| 303. – ROAD RECONDITIONING | 41 |
| 303.03 Ditch Reconditioning. | 41 |
| 303.04 Shoulder Reconditioning. | 41 |
| 303.05 Roadbed Reconditioning. | 41 |
| 303.06 Aggregate Surface Reconditioning. | 41 |
| 703. – AGGREGATE | 43 |
| 703.05 Subbase, Base, Surface Course, and Aggregate. | 43 |
PREFACE
Preface_wo_09_23_2020 Delete all but the first paragraph and add the following:
The Bureau of Land Management, US Department of the Interior has adopted FP-14 for construction of Bureau of Land Management System Roads.
101. – TERMS, FORMAT, AND DEFINITIONS
101.01_National_9_15_2016 Add the following paragraph to Subsection 101.01:
101.01 Meaning of Terms.
Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.
101.03_National_4_7_2015 Add the following to Subsection 101.03:
101.03 Abbreviations.
(a) Acronyms.
AGAR — Agriculture Acquisition Regulations AFPA — American Forest and Paper Association FAR — Federal Acquisition Regulations MSHA — Mine Safety and Health Administration NESC — National Electrical Safety Code WCLIB — West Coast Lumber Inspection Bureau
(f) Miscellaneous unit abbreviations.
| MP | — | milepost | location | ||
| ppm | — | parts per million | volume | ||
| STA | station | location |
101.04_National_9_5_2018 Make the following changes to Subsection 101.04:
101.04 Definitions.
Delete these definitions and replace the following:
Bid Schedule — The Schedule of Items.
Bridge — A structure, including supports, erected over a depression or an obstruction such as water along a road, a trail, or a railway and having a deck for carrying traffic or other loads.
Contractor — The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “Purchaser”.
Culvert — Any structure with a bottom, regardless of fill depth, depth of invert burial, or presence of horizontal driving surface, or any bottomless (natural channel) structure with footings that will not have wheel loads in direct contact with the top of the structure.
Drawings — (Public Works Contracts) Design sheets or fabrication, erection, or construction details submitted to the CO by the Contractor according to FAR Clause 52.236-21 Specifications and Drawings for Construction. Also refers to submissions and submittals.
Notice to Proceed — (Public Works Contracts) Written notice to the Contractor to begin the contract work.
Right-of-Way — A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.
Solicitation — (Public Works Contracts) The complete assembly of documents (whether attached or incorporated by reference) furnished to prospective bidders.
Add the following definitions:
Adjustment in Contract Price — “Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.
Bureau of Land Management — The United States of America, acting through the Bureau of Land Management, U.S. Department of the Interior.
Change — “Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.
Neat Line — A line defining the proposed or specified limits of an excavation or structure.
Pioneer Road — Temporary construction access built along the route of the project.
Purchaser — The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.
Shop Drawings — (Timber and Stewardship Contracts) Referred to as “Drawings” in FP-14, include drawings, diagrams, layouts, schematics, descriptive literature, illustrations, lists or tables, performance and test data, and similar materials furnished by Purchaser to explain in detail specific portions of the work required by the contract.
Utilization Standards — The minimum size and percent soundness of trees described in Public Works contract specifications or Timber Sale and IRTC contract provisions to determine merchantable timber.
Add Figure 101-1—Illustration of road structure terms:
Figure 101-1—Illustration of road structure terms.
102. – BID, AWARD, AND EXECUTION OF CONTRACT
102.00_National_9_15_2016 Delete Section 102 in its entirety.
Delete Section 102.
103. – SCOPE OF WORK
103.00_National_9_15_2016 Delete all of Section 103 except Subsection 103.01 Intent of Contract.
Delete Subsections 103.02, 103.03, 103.04, 103.05.
103.01_Idaho_Falls_2_11_2025 Add the following to Subsection 103.01 Intent of Contract:
103.01 Intent of Contract.
The work to be done under this contract includes performing maintenance/improvements of Bureau of Land Management (BLM) roads to specified dimensions. Work includes loading, hauling, placing, shaping, watering, and compaction of Government furnished subbase aggregate material stockpiled at the Juniper pit. Traffic signing, site preparation, and finish work shall be the responsibility of the Contractor.
The road shall be graded and compacted to the typical section template provided (Section 303 Figure 1. Typical Cross-Section). Work includes approximately 11.6 miles of reshaping and grading of naturally surfaced existing roads and spot roadway repairs of soft or unstable areas with Government furnished subbase aggregate. Completed road travel width shall vary and shall be kept at existing width. The road prism and ditches shall be reconditioned, and the ditches shall be cleaned. Construct (2) new ditches in cases where roads have no existing ditches. Reconditioning shall take place at the locations shown on the Project Maps.
There has been one mobilization allotted for this project. The Contractor shall be responsible for all costs associated with additional mobilizations. Any Contractor damage to project site access roads caused by travel back and forth to the project site shall be repaired at the Contractor’s expense.
Project Location See attached maps. The project road sections are located approximately 10.1 and 17.5 miles East of Highway 84 exit 263, Juniper Road.
Road 665: Lat. 42.160971º Long. -112.826449º Road 642: Lat. 42.050749º Long. -112.769589º Period of Performance 60 Calendar Days.
| Special Contract Requirements | Idaho Falls District, ID | |
| POCATELLO ROAD GRADING 2025 | Bureau of Land Management |
Local conditions (weather conditions, road conditions, etc.) that may affect work are included in the performance period. Contractor shall coordinate work hours with the Contracting Officer a minimum of 48 hours in advance of beginning work.
Page | 1
05/27/2025 1
104. – CONTROL OF WORK
104.00_National_9_15_2016 Delete Subsections 104.01, 104.02, and 104.04.
Delete Subsections 104.01, 104.02, 104.04.
104.00_Idaho_Falls_8_05_2025 Delete Subsections 104.03(c).
Delete Subsections 104.03(c) As-built drawings.
104.06_National_9_16_2016 Add the following to Subsection 104.06:
104.06 Use of Roads by Contractor.
The Contractor is authorized to use roads under the jurisdiction of the Bureau of Land Management for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the contract, when such use will not damage the roads or national resources, and when traffic can be accommodated safely.
105. – CONTROL OF MATERIAL
105.02a_Idaho_Falls_5_28_2025 Delete Subsections 105.02 (a).
Delete Subsections 105.02 (a) Government-provided sources.
105.02b_Idaho_Falls_5_28_2025 Delete all but the 1st sentence of Subsection 105.02 (b):
105.02(b) Government-provided material stockpile.
105.02c_Idaho Falls_5_28_2025 Delete Subsections 105.02 (c).
Delete Subsections 105.02 (c) Contractor-located sources.
Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:
105.05 Use of Material Found in the Work.
Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. Place excess material safely at government-approved location, at no additional cost to government.
106. – ACCEPTANCE OF WORK
106.01_National_7_18_2017 Delete Subsection 106.01 and replace with the following:
106.01 Conformity with Contract Requirements.
Follow the requirements of FAR Clause 52.246-12 Inspection of Construction.
References to standard test methods of AASHTO, ASTM, GSA, and other recognized standard authorities refer to the methods in effect on the date of solicitation for bids.
Perform all work to the lines, grades, cross-sections, dimensions, and processes or material requirements shown on the plans or specified in the contract.
Plan dimensions and contract specification values are the values to be strived for and complied with as the design values from which any deviations are allowed. Perform work and provide material that is uniform in character and reasonably close to the prescribed value or within the specified tolerance range. The purpose of a tolerance range is to accommodate occasional minor variations from the median zone that are unavoidable for practical reasons.
When standard manufactured items are specified (such as fence, wire, plates, rolled shapes, pipe conduits, etc., that are identified by gauge, unit mass, section dimensions, etc.), the identification will be considered to be nominal masses or dimensions. Unless specific contract tolerances are noted, established manufacturing tolerances will be accepted.
The Government may inspect, sample, or test all work at any time before final acceptance of the project. When the Government tests work, copies of test reports are furnished to the Contractor upon request. Government tests may or may not be performed at the work site. If Contractor testing and inspection is verified by the Government, the Contractor’s results may be used by the Government to evaluate work for acceptance. Do not rely on the availability of Government test results for process control.
Acceptable work conforming to the contract will be paid for at the contract unit bid price. Four methods of determining conformity and accepting work are described in Subsections 106.02 to 106.05 inclusive. The primary method of acceptance is specified in each Section of work. However, work may be rejected at any time it is found by any of the methods not to comply with the contract.
Remove, repair, or replace work that does not conform to the contract, or to prevailing industry standards where no specific contract requirements are noted. Removing, repairing, or replacing work; providing temporary traffic control; and any other related work to accomplish conformity will be at no cost to the Government.
(a) Disputing Government test results. If the accuracy of Government test results is disputed, promptly inform the CO. If the dispute is unresolved after reasonable steps are taken to resolve the dispute, further evaluation may be obtained by written request. Include a narrative describing the dispute and a proposed resolution protocol that addresses the following:
(1) Sampling Method;
(2) Number of samples;
(3) Sample transport;
(4) Test procedures;
(5) Testing laboratories;
(6) Reporting;
(7) Estimated time and costs; and
(8) Validation process.
If the evaluation requires additional sampling or testing be performed, mutually agree with the Government on witnessing procedures and on sampling and testing by a third-party laboratory. Use a third-party laboratory accredited by the AASHTO accreditation program. Provide proof of the laboratory’s accreditation for the test procedures to be used. Do not use the same laboratory that produced the disputed Government test results or that produced the test results used as a basis for the dispute.
The CO will review the proposed resolution protocol and may modify it before final approval and execution.
The Government will use the approved resolution protocol test results to determine the validity of the disputed testing. If the Government test results are validated, the Contractor will be responsible for all costs associated with developing and performing the resolution protocol. If the Government test results are not validated, the Government will be responsible for all costs associated with developing and performing the resolution protocol. If the validity of the Government test results cannot be determined, the Contractor and Government will equally share all costs associated with developing and carrying out the resolution protocol.
(b) Alternatives to removing and replacing non-conforming work. As an alternative to removal and replacement, the Contractor may submit a written request to:
(1) Have the work accepted at a reduced price; or
(2) Be given permission to perform corrective measures to bring the work into conformity.
The request must contain supporting rationale and documentation. Include references or data justifying the proposal based on an evaluation of test results, effect on service life, value of material or work, quality, aesthetics, and other tangible engineering basis. The CO will determine disposition of the nonconforming work.
106.02_National_10_23_2016 Delete Subsection 106.02 and replace with the following:
106.02 Visual Inspection.
Acceptance is based on visual inspection of the work for compliance with the specific contract requirements. Use prevailing industry standards in the absence of specific contract requirements or tolerances.
107. – LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC
107.05_National_7_18_2017 Delete Subsection 107.05.
Delete Subsection 107.05.
108. – PROSECUTION AND PROGRESS
108.00_National_9_16_2016 Delete Section 108 in its entirety.
Delete Section 108.
109. – MEASUREMENT AND PAYMENT
109.00_National_9_16_2016 Delete Subsections 109.06, 109.07, 109.08, and 109.09:
Delete Subsections 109.06, 109.07, 109.08, 109.09.
109.01_National_2_22_2019 Delete the third paragraph and Table 109-1 of Subsection 109.01 and replace with the following:
109.01 Measurement of Work.
Take measurements as described in Subsection 109.02 unless otherwise modified by the Measurement Subsection of the section controlling the work being performed. Table 109-1 indicates the accuracy required for quantities of the various pay units used in the Schedule of Items. Use this guide to determine the decimal placement in the final payment.
Table 109-1 Decimal Accuracy of Quantities for Final Payment
| Pay Item |
| Level of Precision |
| Linear Foot |
| 1 |
| Exception--Timber, Steel, and concrete Piles |
| 0.1 |
| Station |
| 0.1 |
| Mile |
| 0.01 |
| Square Foot |
| 0.1 |
| Square Yard |
| 0.1 |
| Each |
| 1 |
| Acre |
| 0.01 |
| Gallon |
| 1 |
| M-Gals. |
| 0.1 |
| Cubic Yard | |
| 1 |
Exception--Structure Excavation; Sheathing Materials; Bedding, Bed Course, and Backfill Materials; Gabions;
0.1
| Exception--Concrete; Masonry |
| 0.01 |
| Pound |
| 1 |
| Ton |
| 0.1 |
Exception--Calcium Chloride;
Sodium Chloride; Hydrated Lime;
Bituminous Materials; Pavements;
Bed Course Materials 0.01
| Hour |
| 0.1 |
| MFBM |
| 0.01 |
| Station Yard |
| 1 |
| Cubic Yard Mile |
| 1 |
| Ton Mile |
| 1 |
109.02_National_9_16_2016 Add the following sentence to Subsection 109.02(b):
109.02 Measurement Terms and Definitions.
(b) Contract quantity.
Contract quantities will be adjusted only when there are errors in the original design of 15% or more.
109.02_National_11_1_2016 Add the following sentence to Subsection 109.03(c):
109.03 Measurement Terms and Definitions.
(c) Project weighing system For aggregates weighed for payment, adjust scale weights of material to deduct the daily average moisture content in excess of 2 percentage points over optimum moisture as determined by AASHTO T 99 or the designated compaction method. If moisture determination is necessary, determine the average moisture content in accordance with AASHTO T 255, from not less than three representative samples of aggregate taken at random intervals each day that aggregate is being weighed.
Manual scales may be used if approved in writing by the CO and if the method of weighing meets all other contract requirements.
153. – CONTRACTOR QUALITY CONTROL
153.04_Idaho_Falls_2_11_2025 Add the following Subsection:
153.04 (a) (2) (a) Submittal Log.
At a minimum the contractor shall provide project submittals as shown on the Submittal Log below. Submittal requirements are listed in the Standard Specifications, Supplemental Specifications and Plans.
Submittal Log
| Log No. |
| Indirect payment to Pay Item(s) |
| Description of Submittal |
| Type of Submittal |
| Requirement found in Specification No. |
| Additional Specification References |
| 1 |
| 15101-1 |
| FAR Clause 52.236-15 Schedules for Construction Contracts |
| Schedule |
| 3 |
| 15101-1 |
| Material Delivery – Volume Measurement |
| Delivery Records |
| 109.04 |
| 109 |
| 6 |
| 15101-1 |
| Traffic Control Plan |
| Plan |
| 156.03 |
| 107 |
155. – SCHEDULES FOR CONSTRUCTION CONTRACTS
155.00_National_9_14_2016 Delete Section 155 in its entirety.
Delete Section 155.
156. – PUBLIC TRAFFIC
156.00_Idaho_Falls_2_11_2025 Delete Section 156 in its entirety and replace with the following:
Description
156.01 Description.
This work consists of controlling and protecting public traffic adjacent to and within the project.
Material
156.02 Material.
Conform to the MUTCO and the following Sections and Subsections:
| Permanent Traffic Control | 633 | |
| Traffic Signing and Marking Material | 718 |
Construction Requirements
156.03 General.
Accommodate traffic according to the MUTCD, the approved traffic control plan and this section. Perform work in a manner that ensures safety and convenience of the public. Keep existing roads open to all traffic during road improvement work and maintain them in a condition that will adequately accommodate traffic. Delays may not exceed 30 minutes at any one time followed by an open period to accommodate all waiting and approaching traffic. Accommodate public traffic on roads adjacent to and within the project until the project is accepted according to Subsection 106.07(b).
Submit the traffic control plan at least 30 days prior to intended use. Perform no work that interferes or conflicts with traffic or existing access to the roadway surface until a traffic control plan has been approved.
Post construction signs and traffic control devices in conformance with MUTCD and Bureau of Land Management 9130-Sign Manual and 9130-National Sign Handbook. All required signs will be in place and approved prior to beginning work on project.
156.04 Temporary Traffic Control.
Install and maintain temporary traffic control devices adjacent to and within the project as required by the approved traffic control plan and the MUTCD. Install and maintain traffic control devices as follows:
(a) Furnish and install traffic control devices before the start of construction operations.
(b) All detours outside of clearing limits will be approved in writing by the Contracting Officer as part of the traffic control plan.
(c) Install only those traffic control devices needed for each stage or phase.
(d) Relocate temporary traffic control devices as necessary.
(e) Remove devices that no longer apply to the existing conditions.
(f) Immediately replace any device that is lost, stolen, destroyed, or inoperative.
(g) Keep temporary traffic control devices clean.
(h) Remove all temporary traffic control devices upon contract completion or when approved.
(i) When required, use flaggers certified by the American Traffic Safety Services Association, the National Safety Council, the International Municipal Signal Association, a state agency, or other acceptable organization. Perform the work described under MUTCD Part 6. Use type III, VII, VIII, or IX retroreflective sheeting on flagger paddles. Do not use flags. Flaggers must wear high visibility safety apparel as required by MUTCD 6E.02.
156.05 Acceptance.
Public traffic work will be evaluated under Subsection 106.02.
Measurement and Payment
156.06 Measurement and Payment.
Do not measure Public Traffic for Payment. Payment for contract work is provided indirectly in accordance with Subsection 109.05.
170. – DEVELOP WATER SUPPLY AND WATERING
170.00_Idaho_Falls_2_11_2025 Add section 170 – Water Supply and Watering:
Description
170.01 Water Supply.
This work consists of supplying water, furnishing, hauling and applying water. Water supply for this contract is not provided by the Government but shall be the responsibility of the Contractor.
Material
170.02 Material.
Conform to the following Subsection:
Water 725.01
Construction Requirements
170.03 Application.
Apply water uniformly without ponding or washing.
170.04 Acceptance.
Developing water supplies and watering will be evaluated under Subsections 106.02 and 106.04
Measurement and Payment
170.05 Measurement and Payment.
Do not measure develop water supply and watering for payment. Payment for contract work is provided indirectly in accordance with Subsection 109.05.
202. – ADDITIONAL CLEARING AND GRUBBING
202.04_Regional_2_3_2025 Delete the Subsection 202.01 and replace the following:
202.01 Description.
This work consists of clearing and grubbing within clearing limits as designated in the plans. This work also includes scalloping clearing lines, clearing vistas, thinning vegetation, special clearing and grubbing and the removal of individual trees and stumps designated in the plans that may be outside the clearing limits.
Add the following to Subsection 202.04:
202.04 Selective Clearing.
(a) Roadside Clearing. Cut all brush and small trees, 6 inches in diameter or less at the point of cut, inside the roadside clearing limits and outside the roadbed no higher than 6 inches above ground level. If rocks or other obstructions are encountered, cut no higher than 6 inches above the obstruction. Limb live trees with a diameter larger than 6 inches to a height of 15 feet above the road surface.
Add the following to Subsection 202.06:
202.06 Special Clearing and Grubbing.
(a) Roadway and Roadside Clearing and Grubbing. Clear within the roadside clearing limits. Grub the roadway and horizontally to the top of the fill slope and 5 feet beyond the bottom of ditch or bottom of cut slope if no ditch is present or required. Clearing also includes removal of all down timber that protrudes into the road prism past the top of the cut slope or the top of the fill slope. Dispose of merchantable timber according to Subsection 201.06.
203. – REMOVAL OF STRUCTURES AND OBSTRUCTIONS
203.05_Idaho_Falls_2_11_2025 Add the following to Subsection 203.05:
203.05 Disposing of Material.
(e) Windrowing Construction Slash. Place construction slash outside the roadway in neat, compacted windrows approximately parallel to and along the toe line of embankment slopes. Do not permit the top of the windrows to extend above subgrade. Use construction equipment to matt down all material in a windrow to form a compact and uniform pile. Construct breaks of at least 15 feet at least every 150 feet in a windrow. Do not place windrows against trees.
(f) Scattering. Scatter construction slash in designated areas without damaging trees. Limb all logs. Place logs and stumps away from trees, positioned so they will not roll, and are not on top of one another. Limb and scatter other construction slash to reduce slash concentrations. When scattering for erosion control, place construction slash as flat as practicable on the completed slope.
(g) Chipping. Use an approved chipping machine to chip slash longer than 3 feet. Deposit chips on embankment slopes or outside the roadway to a loose depth less than 6 inches. Minor amounts of chips or ground woody material may be permitted within the roadway if they are thoroughly mixed with soil and do not form a layer.
(h) Debris Mat. Use tree limbs, tops, cull logs, split stumps, wood chunks, and other debris to form a mat upon which construction equipment is operated. Place stumps upside down and blend stumps into the mat.
(i) Decking. Remove brush from designated log deck areas. Limb and top logs.
Logs not meeting the Utilization Standards described in Subsection 201.04(c) shall be cut to lengths less than 30 feet and decked in designated log deck location.
Merchantable timber not associated with an existing timber sale shall be cut to length meeting the Utilization Standards described in Subsection 201.04(c).
Deck logs so that logs are piled parallel to one another; can be removed by standard log loading equipment; will not damage standing trees; will not interfere with drainage and will not roll. Keep logs in log decks free of brush and soil.
(j) Removal to dedicated locations. Remove construction slash to designated locations.
(k) Piling. Pile construction slash in designated areas. Maximize size of piles to minimize number of piles. Minimum size of pile shall be 6’ diameter by 6’ high. Place and construct piles a minimum of 15’ clear distance from leave trees so that when the piles are burned, the burning will not damage remaining trees. Keep piles free of dirt and large stumps or root balls. Piles shall not be placed against cut or fill slopes. Burning of piles shall be performed by the Government.
204. – EXCAVATION AND EMBANKMENT
204.00_National_3_9_2020 Delete Section 204 in its entirety and replace with the following.
Description
204.01 Description.
This work consists of excavating material and constructing embankments. This work also includes furnishing, hauling, stockpiling, placing, disposing, sloping, shaping, compacting, and finishing earthen and rocky material.
204.02 Definitions.
(a) Excavation. Excavation consists of the following:
(1) Roadway excavation. Material excavated from within the right-of-way or easement areas, except sub-excavation covered in Subsection 204.02(a)(2) and structure excavation covered in Sections 208 and 209. Roadway excavation includes all material encountered regardless of its nature or characteristics.
(2) Sub-excavation. Material excavated from below subgrade elevation in cut sections or from below the original ground-line in embankment sections. Sub-excavation excludes the work required by Subsection 204.05 or 204.06.
(3) Borrow excavation. Material used for embankment construction that is obtained from outside the roadway prism. Borrow excavation includes unclassified borrow, and topping.
(b) Embankment construction. Embankment construction consists of placing and compacting roadway or borrow excavation. This work includes:
(1) Preparing foundation for embankment;
(2) Constructing roadway embankments,
(3) Benching for side-hill embankments:
(4) Constructing dikes, ramps, mounds, and berms; and
(5) Backfilling sub-excavated areas, holes, pits, and other depressions.
(c) Conserved topsoil. Excavated material conserved from the roadway excavation and embankment foundation areas that is suitable for growth of grass, cover crops, or native vegetation.
(d) Waste. Excess and unsuitable roadway excavation and sub-excavation that cannot be used.
Material
204.03 Material.
Conform to the following Subsection:
| Topping | 704.05 | |
| Unclassified | 704.06 | |
| Water | 725.01(c) |
Construction Requirements
204.04 Preparation for Roadway Excavation and Embankment Construction.
Clear the area of vegetation and obstructions according to Sections 201 and 203.
Road pioneering, slash disposal, and grubbing of stumps may proceed concurrently with excavation and embankment. Maintain drainage during pioneering operations.
204.05 Conserved Topsoil.
When designated, conserve topsoil from roadway excavation and embankment foundation areas. Stockpile conserved topsoil in low windrows immediately beyond the rounding limits of cut and embankment slopes or in other approved locations. Separate conserved topsoil from other excavated material. When designated, place conserved topsoil on completed slopes according to Section 624.
204.06 Roadway Excavation.
Excavate as follows:
(a) Rock Cuts. Blast rock according to Section 205. Excavate rock cuts to 6 inches (150 millimeters) below subgrade within the roadbed limits. Backfill to subgrade with topping or other suitable material. Compact the material according to Subsection 204.11.
(b) Earth Cuts. Scarify earth cuts to 6 inches (150 millimeters) below subgrade within the roadbed limits. Compact the scarified material according to Subsection 204.11.
(c) Pioneer Roads. Conduct excavation and placement operations so material to be treated under Section 201 will not be incorporated into the roadway unless specified in the slash treatment method. Maintain drainage during pioneering operations.
Remove snow and ice in advance of the work and deposit beyond the roadway limits in a manner that will not waste material or generate sediment. Do not incorporate snow and ice into embankments. Place snow or ice in a manner to prevent resource damage.
(d) Drainage feature includes construction of all ditches, minor channel changes, drainage dips, catch basins, surface water deflectors, and other minor drainage structures. Compact the material according to Subsection 204.11. Excavate on a uniform grade between control points.
Do not disturb material and vegetation outside the construction limits. Retrieve material deposited outside the construction limits. Dispose of unsuitable or excess excavation material according to Subsection 204.14. Replace shortage of suitable material caused by premature disposal of roadway excavation.
Shape to drain and compact the work area to a uniform cross-section at the end of each day's operations.
204.07 Subexcavation.
Excavate material to the required limits. Dispose of unsuitable material according to Subsection 204.14. Take cross-sections according to Section 152. Backfill sub-excavated area with suitable material in horizontal layers not exceeding 12 inches (300 millimeters) in compacted thickness and compact according to Subsection 204.11. Prevent unsuitable material from mixing with suitable backfill.
204.08 Borrow Excavation.
Use suitable roadway excavation in embankment construction. Do not use borrow excavation when it results in excess roadway excavation. Deduct excess borrow excavation from the total borrow excavation quantity.
Obtain borrow source approval according to Subsection 105.02. Develop and restore borrow sources according to Subsections 105.03 and 105.06. Do not excavate beyond the established limits. When applicable, shape the borrow source to permit accurate measurements when excavation is complete.
204.09 Preparing Foundation for Embankment Construction.
Prepare foundation for embankment construction as follows:
(a) Embankment over natural ground. Remove topsoil and break up the ground surface to a minimum depth of 6 inches (150 millimeters) by plowing or scarifying. Compact the ground surface according to Subsection 204.11.
(b) Embankments over an existing asphalt, concrete, or gravel road surface. Scarify gravel roads to a minimum depth of 6 inches (150 millimeters). Scarify or pulverize asphalt and concrete roads to 6 inches (150 millimeters) below the pavement. Reduce particles to a maximum size of 6 inches (150 millimeters) and produce a uniform material. Compact the surface according to Subsection 204.11.
(c) Embankment across ground not capable of supporting equipment. Dump successive loads of embankment material in a uniformly distributed layer to construct the lower portion of the embankment. Limit the layer thickness to the minimum depth necessary to support the equipment.
(d) Embankment on an existing slope steeper than 1V:3H. Cut horizontal steps in the existing slope to a sufficient width to accommodate placement and compaction operations and equipment. Step the slope as the embankment is placed and compacted in layers. Begin each step at the intersection of the original ground and the vertical cut of the previous step.
204.10 Embankment Construction.
Incorporate only suitable roadway excavation material into the embankment. When the supply of suitable roadway excavation is exhausted, furnish unclassified borrow to complete the embankment. Obtain written approval before beginning construction of embankments over 6 feet (2 meters) high at subgrade centerline. Construct embankments as follows:
(a) General. At the end of each day's operations, shape to drain and compact the embankment surface to a uniform cross-section. Eliminate ruts and low spots that could hold water.
During all stages of construction, route and distribute hauling and leveling equipment over the width and length of each layer of material.
Compact embankment side slopes with a tamping foot roller, by walking with a dozer, or by over‑building the fill and then removing excess material to the final slope line. For slopes 1V:1¾H or steeper, compact the slopes as embankment construction progresses.
(b) Embankment within the roadway prism. Place embankment material in horizontal layers not exceeding 12 inches (300 millimeters) in compacted thickness. Incorporate oversize boulders or rock fragments into the 12-inch (300-millimeter) layers by reducing them in size or placing them individually as required below. Compact each layer according to Subsection 204.11 before placing the next layer.
Material composed predominately of boulders or rock fragments too large for 12-inch (300‑millimeter) layers may be placed in layers up to 24 inches (600 millimeters) thick. Incorporate oversize boulders or rock fragments into the 24-inch (600-millimeter) layer by reducing them in size or placing individual rock fragments and boulders greater than 24 inches (600 millimeters) in diameter as follows.
(1) Reduce rock to less than 48 inches (1200 millimeters) in the largest dimension;
(2) Distribute rock within the embankment to prevent nesting;
(3) Place layers of embankment material around each rock to a depth not greater than that permitted above. Fill voids between rocks; and
(4) Compact each layer according to Subsection 204.11(a) before placing the next layer.
(c) Embankment outside of roadway prism. When placing embankment outside the staked roadway prism, place material in horizontal layers not exceeding 24 inches (600 millimeters) in compacted thickness. Compact each layer according to Subsection 204.11.
204.11 Compaction.
Compact the embankment using one of the following methods as specified.
(a) Placement Method 1. Use AASHTO T 27 to determine the quantity of material retained on a No. 4 (4.75-millimeter) sieve. Compact as follows:
(1) More than 80 percent retained on a No. 4 (4.75-millimeter) sieve. Adjust the moisture content to a level suitable for compaction. Fill the interstices around rock with earth or other fine material as practical. Use compression-type rollers at speeds less than 6 feet (1.8 meters) per second and vibratory rollers at speeds less than 3 feet (1 meter) per second. Compact each layer of material full width with one of the following and until there is no visible evidence of further consolidation:
(a) Four roller passes of a vibratory roller having a minimum dynamic force of 40,000 pounds (180 kilonewtons) impact per vibration and a minimum frequency of 1000 vibrations per minute;
(b) Eight roller passes of a 20-ton (20-metric ton) compression-type roller; or
(c) Eight roller passes of a vibratory roller having a minimum dynamic force of 30,000 pounds (130 kilonewtons) impact per vibration and a minimum frequency of 1000 vibrations per minute.
Increase the compactive effort for layers deeper than 12 inches (300 millimeters) as follows:
· For each additional 6 inches (150 millimeters) or fraction thereof, increase the number of roller passes in Subsection 204.11(a)(1)(a), by four passes; or
· For each additional 6 inches (150 millimeters) or fraction thereof, increase the number of roller passes in Subsection 204.11(a)(1)(b) and (c), by eight passes.
(2) 50 to 80 percent retained on a No. 4 (4.75-millimeter) sieve. Classify the material according to AASHTO M 145. Adjust the moisture content of material classified A-1 through A-5 to a moisture content suitable for compaction. Adjust the moisture content of material classified A-6 and A-7 to within 2 percent of the optimum moisture content. Use AASHTO T 99 to determine the optimum moisture content of the portion of the material passing a No. 4 (4.75-millimeter) sieve. Multiply this number by the percentage of material passing a No. 4 (4.75-millimeter) sieve and add 2 percent to determine the optimum moisture content of the material.
Use nonvibratory rollers at speeds less than 6 feet (1.8 meters) per second and vibratory rollers at speeds less than 3 feet (1 meter) per second. Compact each layer of material full width according to Subsection 204.11(a)(1).
(3) Less than 50 percent retained on a No. 4 (4.75-millimeter) sieve. Classify the material according to AASHTO M 145. For material classified A-1 or A-2-4, determine the maximum density according to AASHTO T 99, Method C.
Adjust the moisture content of material classified A-1 through A-5 to a moisture content suitable for compaction. Adjust the moisture content of material classified A‑6 and A-7 to within 2 percent of the optimum moisture content.
Use compression-type or vibratory rollers. Compact each layer of material full width to at least 95 percent of the maximum density. Determine the in-place density and moisture content according to AASHTO T 310 or other approved test procedures. When required, use AASHTO T 224 to correct for coarse particles.
(b) Placement Method 2. Adjust the moisture content of the material to a moisture content suitable for compaction. Fill the interstices around rock with earth or other fine material as practical. Operate roller compaction equipment over the full width of each layer until there is no visible evidence of further consolidation or, if when a sheepsfoot roller is used, the roller “walks out” of the layer. Make at least three complete passes. Use compression-type rollers at speeds less than 6 feet (1.8 meters) per second and vibratory rollers at speeds less than 3 feet (1 meter) per second. Ensure rollers meet the following requirements:
(1) Steel wheeled rollers, other than vibratory, capable of exerting a force of not less than 250 pounds per inch (4.5 kilogram/millimeter) of width of the compression roll or rolls.
(2) Vibratory steel wheeled rollers equipped with amplitude and frequency controls with a minimum dynamic force of 30,000 pounds (130 kilonewtons) impact per vibration, specifically designed to compact the material on which it is used.
(3) Pneumatic-tired rollers with smooth tread tires of equal size that will provide a uniform compacting pressure for the full width of the roller and capable of exerting a ground pressure of at least 80 psi (550 Kilopascals).
(4) Sheepsfoot, tamping, or grid rollers capable of exerting a force of 250 pounds per inch (4.5 kilogram/millimeter) of width of roller drum.
(c) Placement Method 3. Adjust the moisture content of the material to a moisture content suitable for compaction. Fill the interstices around rock with earth or other fine material as practical. Operate hauling and spreading equipment uniformly over the full width of each layer until there is no visible evidence of further consolidation. Make at least three complete passes.
(d) Placement Method 4. Adjust the moisture content of the material to a moisture content suitable for compaction. Fill the interstices around rock with earth or other fine material as practical. Operate hauling and spreading equipment uniformly over the full width of each layer.
(e) Placement Method 5. Adjust the moisture content of the material to a moisture content suitable for compaction. Compact the complete surface with a bucket of an excavator larger than 39,000 pounds (18 metric ton) Gross Vehicle Weight using a minimum of three blows. Overlap compaction by ½ width of bucket.
(f) Placement Method 6. Adjust the moisture content of the material to a moisture content suitable for compaction. Compact using an approved mechanical tamper for a minimum of three complete passes.
When compacting with rollers or hauling and spreading equipment is not practical, use approved mechanical tampers for a minimum of three complete passes.
204.12 Drainage Features.
Slope, grade, and shape all drainage features. Remove projecting roots, stumps, rock, or similar matter. Maintain all drainage features in an open condition and without sticks, and other debris.
From furrow ditches by plowing or using other acceptable methods to produce a continuous furrow. Place excavated material on the downhill side so the bottom of the ditch is approximately 18 inches (450 millimeters) below the crest of the loose material. Clean the ditch using a hand shovel or other suitable method. Shape to provide drainage without overflow.
204.13 Sloping, Shaping, and Finishing.
Complete subgrade, slopes, drainage features, culverts, riprap, and other underground minor structures before placing aggregate courses. Slope, shape, and finish to the designated tolerance class as defined in Table 204-2 as follows:
(a) Sloping. Leave earth slopes with uniform roughened surfaces, except as described in Subsection 204.13(b), with no noticeable break as viewed from the road. Except in solid rock, round tops and bottoms of slopes including the slopes of drainage ditches. Round material overlaying solid rock to the extent practical. Scale rock slopes. Slope rounding is not required on tolerance class D through M roads.
If a slide or slipout occurs on a cut or embankment slope, remove or replace the material and repair or restore damage to the work. Bench or key the slope to stabilize the slide. Reshape the cut or embankment slope to an acceptable condition.
(b) Stepped slopes. Where required, construct steps on slopes of 1⅓V:1H to 1V:2H. Construct the steps approximately 18 inches (450 millimeters) high. Blend the steps into natural ground at the end of the cut. If the slope contains non-rippable rock outcrops, blend steps into the rock. Remove loose material found in transitional area. Except for removing large rocks that may fall, scaling stepped slopes is not required.
(c) Shaping. Shape the subgrade to a smooth surface and to the cross-section required. Shape slopes to gradually transition into slope adjustments without noticeable breaks. At the ends of cuts and at intersections of cuts and embankments, adjust slopes in the horizontal and vertical planes to blend into each other or into the natural ground.
(d) Finishing. Ensure that the subgrade is visibly moist during shaping and dressing; smooth and uniform and shaped to conform to the typical sections. Remove material larger than 6 inches (150 millimeters) from the top 6 inches (150 millimeters) of the roadbed. Remove unsuitable material from the roadbed and replace it with suitable material. Scarify to 6 inches (150 millimeters) below the bottom of low sections, holes, cracks, or depressions and bring back to grade with suitable material.
Maintain proper ditch drainage.
204.14 Disposal of Unsuitable or Excess Material.
Dispose of unsuitable or excess material at designated sites or according to Subsection 203.05(a) When there is a pay item for waste, shape and compact the waste material in its final location. Do not mix clearing or other material not subject to payment with the waste material.
204.15 Acceptance.
See Table 204-1 for sampling, testing, and acceptance requirements.
Material for embankment and conserved topsoil will be evaluated under Subsections 106.02 and 106.04.
Excavation and embankment construction will be evaluated under Subsections 106.02 and 106.04.
Sub-excavation will be evaluated under Subsections 106.02 and 106.04.
Measurement
204.16 Measurment.
Measure the Section 204 pay items listed in the bid schedule according to Subsection 109.02 and the following as applicable:
(a) Roadway excavation. Measure roadway excavation in its original position as follows:
(1) Include the following volumes in roadway excavation:
(a) Roadway prism excavation;
(b) Rock material excavated and removed from below subgrade in cut sections;
(c) Unsuitable material below subgrade and unsuitable material beneath embankment areas when a pay item for sub-excavation is not listed in the bid schedule;
(d) Ditches, except furrow ditches measured under a separate pay item;
(e) Conserved topsoil;
(f) Borrow material used in the work when a pay item for borrow is not listed in the bid schedule;
(g) Loose scattered rocks removed and placed as required within the roadway;
(h) Conserved material taken from pre-existing stockpiles and used in Section 204 work, except topsoil measured under 624; and
(i) Slide and slipout material not attributable to the Contractor's method of operation.
(2) Do not include the following in roadway excavation:
(a) Overburden and other spoil material from borrow sources;
(b) Overbreakage from the backslope in rock excavation;
(c) Water or other liquid material;
(d) Material used for purposes other than required;
(e) Roadbed material scarified in place and not removed;
(f) Material excavated when stepping cut slopes;
(g) Material excavated when rounding cut slopes;
(h) Preparing foundations for embankment construction;
(i) Material excavated when benching for embankments;
(j) Slide or slipout material attributable to the Contractor's method of operation;
(k) Conserved material taken from stockpiles constructed at the option of the Contractor;
(l) Material excavated outside the established slope limits; and
(m) Road pioneering for the convenience of the Contractor.
(3) When both roadway excavation and embankment construction pay items are listed in the bid schedule, measure roadway excavation only for the following:
(a) Unsuitable material below subgrade in cuts and unsuitable material beneath embankment areas when a pay item for sub-excavation is not listed in the bid schedule;
(b) Slide and slipout material not attributable to the Contractor’s method of operations; and
(c) Drainage ditches, channel changes, and diversion ditches.
(b) Unclassified borrow, and topping. When measuring by the cubic yard (cubic meter) measure in its original position. If borrow excavation is measured by the cubic yard (cubic meter) in-place, take initial cross-sections of the ground surface after stripping overburden. Upon completion of excavation and after the borrow source waste material is returned to the source, retake cross-sections before replacing the overburden. Do not measure borrow excavation until suitable roadway excavation is depleted.
(c) Embankment construction. Measure embankment construction in its final position. Do not make deductions from the embankment construction quantity for the volume of minor structures.
(1) Include the following volumes in embankment excavation:
(a) Roadway embankments;
(b) Material used to backfill sub-excavated areas, holes, pits, and other depressions;
(c) Material used to restore obliterated roadbeds to original contours; and
(d) Material used for dikes, ramps, mounds, and berms.
(2) Do not include the following in embankment construction:
(a) Preparing foundations for embankment construction;
(b) Adjustments for subsidence or settlement of the embankment or of the foundation on which the embankment is placed; and
(c) Material used to round fill slopes.
(d) Rounding cut slopes. If a pay item for slope rounding is included in the bid schedule measure rounding cut slopes horizontally along the centerline of the roadway. If a pay item is not included for slope rounding is not included in the bid schedule payment will be considered indirect to roadway excavation.
(e) Waste. Measure waste by the cubic yard (cubic meter) in its final position. Take initial cross‑sections of the ground surface after stripping over-burden. Upon completion of the waste placement, retake cross‑sections before replacing overburden.
(f) Slope scaling. Measure slope scaling by the cubic yard…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .