Sol_Q_A_09-04-2025_0001.pdf

PDF 37 KB Posted

Attached to
POCATELLO ROAD GRADING 2025 Federal contract opportunity
Solicitation number
140L2625Q0074
Issued by
Department of the Interior Bureau of Land Management Idaho Region

About this file

This document is a Questions and Answers (Q&A) file for the Pocatello Road Grading 2025 project. The Q&A addresses multiple technical specifications related to clearing and grubbing work, including material disposal, specification references, and project scope. Key points include clarifications that the clearing and grubbing work is minimal, contractors should reference the Federal Lands Highway FP-14 specifications, and a pre-bid site tour was conducted on 09/03/2025. The document provides guidance on how contractors should handle clearing work, material disposal, and references to specification sections, with the agency indicating that contractors have flexibility in determining how to allocate costs for incidental clearing and grubbing tasks.

View the file

Other files for this federal contract opportunity

Other files attached to POCATELLO ROAD GRADING 2025, newest first.
File Type Posted
1510-56_PRE-BID_Pocatello_Road_Grading_2025_0001.pdf PDF
Pocatello_Road_Grading_2025_FP-14_0001.pdf PDF
Sol_140L2625Q0074_Amd_0001.pdf PDF
Sol_140L2625Q0074.pdf PDF
Pocatello_Road_Grading_2025_Maps.pdf PDF
Pocatello_Road_Grading_2025_FP-14.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

POCATELLO ROAD GRADING 2025 Q&As

RECEIVED BY EMAIL:

Q1. This project includes Clearing and Grubbing, it states the following, "Dispose of merchantable timber according to Subsection 201.06." Later it states to "Dispose of unsuitable or excess material at designated sites or according to Subsection 203.05(a)".

A1. Section 202.06 Special Clearing and Grubbing has been removed from the specifications. Section

203.05 (a) has been updated.

Q2. Neither 201.06 nor 203.05(a) is found in the specs.

A2. The specifications provided are a reference document to the separately published book by the

Federal Lands Highway. Only sections that are amended to this specific project are provided in the specification. The original FP-14 contains all of the unaltered sections. To download FP-14 or to obtain a hard copy, visit: https://highways.dot.gov/federal-lands/specs

Q3. Do we include the clearing and grubbing 15' above roadbed in the pay item for road reconditioning?

A3. Section 202.04 Selective Clearing has been updated to remove above roadbed clearing. It shall be up to the contractor to decide which pay item any possible clearing and grubbing work costs should be included.

Q4. How do you want the contractor to dispose of the material? under the 203.05 it gives options from E-K but does not "a" as mentioned above.

A4. Section 203.05 has been updated to address disposal of any possible material.

Q5. Can a chipper attached to an excavator be acceptable to complete this task?

A5. Clearing and Grubbing is very minimal for this project. Sections that address clearing and grubbing are instructional for the very small portions of roadway that contain this incidental work.

Q6. Is there any way to upload a few pictures of the worst parts that need to be cleared? what percent of the road has tress/branches that need cleared?

A6. There are no pictures of the project roadways. A pre-bid site tour was conducted on 09/03/2025.

Road locations have also been included in the specifications for possible contractor site visits outside of the scheduled pre-bid site tour.