This document is a Section M-Evaluation Factors for Award for a roof replacement project involving three buildings (682, 1408, and 1409). The solicitation will be evaluated using either Lowest Priced Technically Acceptable or Trade-off methodology, as determined by the Contracting Officer. The evaluation process will focus on two primary factors: Technical Acceptability and Price Evaluation. Technical Acceptability involves reviewing the contractor's proposed technical and managerial approach to ensure successful contract performance, while Price Evaluation will determine the lowest price based on the total evaluated price (TEP), calculated by summing the offeror's proposed prices for each construction work item in accordance with provided specifications and drawings.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section M-Evaluation Factors for Award

1. Technical and managerial approach for meeting the requirements of the specifications and drawings.

2. Description of requirement is listed in the attached specifications and drawings.

CLIN Description Unit of

Issue Unit Price Total Amount

0001 Roof Replacement on Building 682

EA

0002 Roof Replacement on Building 1408

EA

0003 Roof Replacement on Building 1409

EA

3. Proposals will be evaluated using Lowest Priced Technically Acceptable or Trade –off as determined by the ordering Contracting Officer (CO). The following evaluation factors will be used in awarding a task order:

a. Technical Acceptability: The Government will review the contractor’s proposed technical and managerial approach to verify it will result in successful contract performance.

b. Price Evaluation: Lowest price will be determined based on the total evaluated price (TEP). The TEP will be calculated as the sum of the offeror’s proposed price. The price proposal shall include quantities and prices for each construction work item IAW the specifications and drawings provided. The evaluation process will begin with the evaluation of all technical proposals.