Blank IGE Multi Roofs 682 1408 1409.xlsx
XLSX spreadsheet 19 KB Posted
- Attached to
- Replace Roofs 682, 1408, and 1409-Amendment 0001
- Solicitation number
- FA330025RFP0588
About this file
This file is a blank Independent Government Estimate (IGE) cost breakdown template for a roofing repair project at Maxwell Air Force Base in Alabama. The project, identified as PNQS 25-9165, involves repairing roofs on Buildings 682, 1408, and 1409, with the Department of the Air Force Air Education and Training Command as the contracting agency. The IGE template is structured with standard construction cost divisions, including materials, labor, taxes, overhead, and profit calculations, though all line items are currently populated with $0.00 values. The associated federal contract opportunity solicitation (FA330025RFP0588) requires the contractor to furnish all necessary labor, materials, and equipment to complete the roof repairs in accordance with provided specifications and drawings.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Total
CONSTRUCTION COST ESTIMATE BREAKDOWN
| CONTRACTOR | DATE | ADDRESS | ||||||
| 400 Cannon Street Maxwell Air Force Base Alabama | ||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||
| $0.00 | ||||||||
| LOCATION (Work to be performed) | PROJECT NUMBER/WORK ORDER | WORK LOCATION | ||||||
| REPAIR ROOFS 682 1408 1409 | PNQS 25 9165 | 682 1408 1409 MAXWELL | ||||||
| ITEM | UNIT OF MEASURE | QUANTITY | MATERIAL/EQUIP. COSTS | LABOR RATES | OTHER | |||
| UNIT | AVERAGE | DIRECT | LINE | |||||
| TOTAL | RATE | TOTAL | COSTS | TOTAL | ||||
| DIVISION 1 (General Requirements) | ||||||||
| SUPERINTENDENT | $0.00 | $0.00 | ||||||
| DIVISION 2 (Site Work) | ||||||||
| TRASH DUMPSTER | EA | $0.00 | $0.00 | $0.00 | ||||
| DIVISION 3 (CONCRETE | ||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | |||||
| DIVISION 4 (MASONRY) | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||
| DIVISION 5 (METAL) | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||
| DIVISION 6 (WOOD AND PLASTICS) | ||||||||
| REPAIR DECKING | sf | $0.00 | $0.00 | $0.00 | ||||
| DIVISION 7 (THERMAL AND MOISTURE PROTECTION) | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||
| BLDG 682 | sf | $0.00 | $0.00 | $0.00 | ||||
| BLDG 1408 | sf | $0.00 | $0.00 | $0.00 | ||||
| BLDG 1409 | sf | $0.00 | $0.00 | $0.00 | ||||
| DIVISION 8 (DOORS AND WINDOWS) | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||
| DIVISION 9 (FINISHES) | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||
| DIVISION 10 (SPECIALTIES) | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | ||||||
| DIVISION 11 (EQUIPMENT) | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | ||||||
| DIVISION 12 (FURNISHINGS) | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | ||||||
| DIVISION 13 (SPECIAL CONSTRUCTION) | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | ||||||
| DIVISION 14 (CONVEYING SYSTEMS) | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | ||||||
| DIVISION 15 (MECHANICAL) | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | ||||||
| DIVISION 16 (ELECTRICAL/FIRE SYSTEM/COMMUNICATIONS) | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| $0.00 | $0.00 | $0.00 | ||||||
| Material Costs | $0.00 | $0.00 | ||||||
| Tax on Materials | 10% | $0.00 | $0.00 | |||||
| TOTAL MATERIAL COST | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | ||||||
| Labor Cost | $0.00 | $0.00 | ||||||
| Insurance & Tax on Labor | 20% | $0.00 | $0.00 | |||||
| TOTAL LABOR COST | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | ||||||
| Total Other Direct Costs | $0.00 | $0.00 | $0.00 | |||||
| Total Material, Labor, Tax & Insurance | $0.00 | $0.00 |
| TOTAL DIRECT COSTS | $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | |||
| Overhead | 10% | $0.00 | $0.00 | $0.00 | |
| Subtotal | $0.00 | $0.00 | $0.00 | $0.00 | |
| Profit | 10% | $0.00 | $0.00 | $0.00 | |
| Sub Total | $0.00 | $0.00 | |||
| TOTAL | $0.00 | $0.00 | $0.00 | ||
| Bonds | 2.5% | $0.00 | $0.00 | ||
| TOTAL | $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | ||||
| I acknowledge the above cost estimate has been estimated to the best of my ability and means. |
Signature: _____________________