About this file

This amendment modifies a solicitation for dredging services. The U.S. Coast Guard is seeking to dredge a boat basin and access channel at its Aids to Navigation Team facility in Dulac, Louisiana. Cable-driven hydraulic dredges are permitted for this project. The proposal due date remains September 11, 2023 at 2:00 PM Eastern Time. Bidders must return a signed copy of this amendment with their proposal.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

PAGE OF PAGES

1 2

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

09/07/2023

4. REQUISITION/PURCHASE REQ. NO.

5. PROJECT NO. (If applicable)

20262753

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

CONTRACTING OFFICER

USCG, CIVIL ENGINEERING UNIT MIAMI

15608 SW 117TH AVENUE

MIAMI, FL 33177-1630

CONTRACTING OFFICER

USCG, CIVIL ENGINEERING UNIT MIAMI

15608 SW 117TH AVENUE

MIAMI, FL 33177-1630

8. NAME AND ADDRESS OF CONTRACTOR (NO., STREET, COUNTY, STATE AND ZIP CODE)

PROSPECTIVE BIDDERS

9A. AMENDMENT OF SOLICITATION NO.

PROJECT NO. 20262753

9B. DATED (SEE ITEM 11)

08/11/2023

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE REFERENCED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET

FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (SPECIFY TYPE OF MODIFICATION AND AUTHORITY)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (ORGANIZED BY UCF SECTION HEADINGS, INCLUDING SOLICITATION/CONTRACT SUBJECT MATTER WHERE FEASIBLE.)

IFB PROJECT NO. 20262753 – DREDGE AND DISPOSE OF DREDGE SEDIMENT FROM THE BOAT BASIN AND ACCESS CHANNEL AT U.S. COAST GUARD

(USCG) AIDS TO NAVIGATION TEAM (ANT) DULAC, LOUISIANA, IS AMENDED AS FOLLOWS:

A. THIS AMENDMENT IS ISSUED TO PROVIDE RESPONSE TO CONTRACTOR’S REQUEST FOR INFORMATION (RFI) . SEE PAGE 2.

B. PROPOSAL DUE DATE OF SEPTEMBER 11, 2023, AT 2:00 PM EST. REMAINS UNCHANGED.

C. PLEASE RETURN A SIGNED COPY OF THIS AMENDMENT ALONG WITH YOUR PROPOSAL.

15A. NAME AND TITLE OF SIGNER (Type or Print)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

ADA HOGGARD, CONTRACTING OFFICER, USCG

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED

16B UNITED STATES OF AMERICA

BY

(Signature of Contracting Officer)

16C. DATE SIGNED

NSN 7540-01-152-8070 STANDARD FORM 30 (Rev. 10-83) PREVIOUS EDITION UNUSABLE Prescribed by GSA

FAR (48 CFR) 53.243

AMENDMENT NO. 003

PROJECT NO. 20262753, TO DREDGE AND DISPOSE OF DREDGE SEDIMENT FROM THE BOAT

BASIN AND ACCESS CHANNEL AT U.S. COAST GUARD (USCG) AIDS TO NAVIGATION

TEAM (ANT) DULAC IN DULAC, LOUISIANA,

Request for Information

1. Question: Are cable-driven hydraulic dredges allowed for this project? In other words, can a cable be stretched from an anchor point on land to an anchor point on a spud barge?

Response: Yes, cable-driven hydraulic dredges are allowed.

2023-09-07T13:11:16-0400
HOGGARD.ADA.M.1053358159

File details come from the government source that posted it. Updated .