This amendment modifies a solicitation for dredging services. The U.S. Coast Guard is seeking a contractor to dredge and dispose of sediment from the boat basin and access channel at the Aids to Navigation Team facility in Dulac, Louisiana using hydraulic dredging. Mechanical dredging is not permitted. Track equipment will be allowed to access the designated disposal area and the contractor is responsible for any damages and restoration. A temporary berm can be constructed using material from the disposal site to contain dredged materials but must be removed upon completion. The proposal due date remains September 11, 2023 at 2:00 PM EST. Responders must return a signed copy of this amendment with their proposal.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
PAGE OF PAGES
1 2
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
8/22/2023
4. REQUISITION/PURCHASE REQ. NO.
5. PROJECT NO. (If applicable)
20262753
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
CONTRACTING OFFICER
USCG, CIVIL ENGINEERING UNIT MIAMI
15608 SW 117TH AVENUE
MIAMI, FL 33177-1630
CONTRACTING OFFICER
USCG, CIVIL ENGINEERING UNIT MIAMI
15608 SW 117TH AVENUE
MIAMI, FL 33177-1630
8. NAME AND ADDRESS OF CONTRACTOR (NO., STREET, COUNTY, STATE AND ZIP CODE)
PROSPECTIVE BIDDERS
9A. AMENDMENT OF SOLICITATION NO.
PROJECT NO. 20262753
9B. DATED (SEE ITEM 11)
08/11/2023
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE REFERENCED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET
FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (SPECIFY TYPE OF MODIFICATION AND AUTHORITY)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (ORGANIZED BY UCF SECTION HEADINGS, INCLUDING SOLICITATION/CONTRACT SUBJECT MATTER WHERE FEASIBLE.)
IFB PROJECT NO. 20262753 – DREDGE AND DISPOSE OF DREDGE SEDIMENT FROM THE BOAT BASIN AND ACCESS CHANNEL AT U.S. COAST GUARD
(USCG) AIDS TO NAVIGATION TEAM (ANT) DULAC IN DULAC, LOUISIANA, IS AMENDED AS FOLLOWS:
A. THIS AMENDMENT IS ISSUED TO PROVIDE RESPONSES TO REQUEST FOR INFORMATION (RFI) THAT HAVE BEEN RECIEVED. SEE PAGE 2.
REVISED DRAWING SHEET M2436C003 IS ATTCHED.
B. PROPOSAL DUE DATE OF SEPTEMBER 11, 2023, AT 2:00 PM EST. REMAINS UNCHANGED.
C. PLEASE RETURN A SIGNED COPY OF THIS AMENDMENT ALONG WITH YOUR PROPOSAL.
15A. NAME AND TITLE OF SIGNER (Type or Print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
ODALYS MCGEE, CONTRACTING OFFICER, USCG
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED
16B UNITED STATES OF AMERICA
BY
(Signature of Contracting Officer)
16C. DATE SIGNED
NSN 7540-01-152-8070 STANDARD FORM 30 (Rev. 10-83) PREVIOUS EDITION UNUSABLE Prescribed by GSA
FAR (48 CFR) 53.243
AMENDMENT NO. 0001
PROJECT NO. 20262753, TO DREDGE AND DISPOSE OF DREDGE SEDIMENT FROM THE BOAT
BASIN AND ACCESS CHANNEL AT U.S. COAST GUARD (USCG) AIDS TO NAVIGATION
TEAM (ANT) DULAC IN DULAC, LOUISIANA,
Request for Information
1. Question: The specifications mention hydraulic dredging, will mechanical dredging be allowed?
Response: Permit is for hydraulic dredging. Mechanical dredging is NOT allowed.
2. Question: Will tracked equipment be allowed in the disposal area? If yes, can the access route to the disposal area be provided?
Response: Track equipment will be allowed in the disposal area. Contractor is responsible for repairing any damages and restoring area to acceptable conditions. Only road to gain access to the site is Shrimpers Row.
3. Question: Specification 3.2.5.2 states the contractor is to provide & maintain some type of structure to confine and retain the fill in the dredge area. The drawings do not depict any type of berm or retainment, will a berm be allowed to be constructed with material from the disposal area?
Response: A temporary berm is allowed using material from the deposit sites, but contractor is responsible for restoring the area once construction is completed. (SEE
ATTACHED M2436C003-Revised)