Plumbing_maintenance_and_repair_services_(Addendum_#1_Revision).pdf

PDF 590 KB Posted

Attached to
Plumbing maintenance and repair services
Solicitation number
24-0200-ITB
Issued by
Pinellas County, Clewiston City, Florida

About this file

This is an Invitation to Bid (ITB-C) issued by Pinellas County, Florida for plumbing maintenance and repair services. The county is soliciting a new contract to obtain routine and emergency plumbing services for various county-owned and leased facilities, including the County Justice Center and Detention Center. The bid was released on February 5, 2024, with questions due by February 16, 2024, and bid submissions due by March 5, 2024, at 3:00 PM. The contract will have a duration of 36 months, with unit prices firm for the first 12 months and adjustable thereafter based on the Consumer Price Index, not to exceed 4% annually.

The pricing proposal includes hourly rates for standard business hours, overtime, and emergency response services, as well as rates for owned equipment usage and equipment rental. The estimated total contract value includes $175,000 for parts and materials, with contractors required to provide a discount from manufacturer's suggested retail price. The contract covers a wide range of plumbing services including main and sewer line maintenance, pipe repairs, fixture replacements, leak detection, and video camera inspections. All contractor personnel must be licensed plumbers with at least three years of commercial plumbing experience, and the contract includes strict security requirements for background checks and facility access, particularly for sensitive locations like detention facilities.

View the file

Other files

File Type Posted
SAMPLE_SIMPLIFIED_CONSTRUCTION_AGREEMENT.docx DOCX document
OpenGov_Fillable-_Final.pdf PDF
Airport_Security_Program.pdf PDF
Bid_Submittal_Form-JOC.pdf PDF
Florida_Trench_Safety_Form.pdf PDF
SBE_Compliance_Form.pdf PDF
E-Verify_Affidavit.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INVITATION TO BID - CONSTRUCTION (ITB-C)

24-0200-ITB

PLUMBING MAINTENANCE AND REPAIR SERVICES

Pinellas County

Pinellas County Courthouse Annex Bldg., Sixth Floor

Clearwater, FL 33765

THE MISSION OF PINELLAS COUNTY

"Pinellas County Government is committed to progressive public policy, superior public service, courteous public contact, judicious exercise of authority and sound management of public resources to meet the needs and concerns of our citizens today and tomorrow."

ISSUE/RELEASE DATE: February 5, 2024

QUESTION SUBMISSION DEADLINE: February 16, 2024

PROPOSAL SUBMISSION DEADLINE: March 5, 2024, 3:00 pm

RESPONSES MUST BE SUBMITTED ELECTRONICALLY VIA OPENGOV TO:

https://procurement.opengov.com/portal/pinellasfl https://procurement.opengov.com/portal/%7bproject.government.code%7d

Pinellas County

INVITATION TO BID - CONSTRUCTION (ITB-C)

Plumbing maintenance and repair services

Table of Contents No table of contents entries found.

Attachments:

A - OpenGov Fillable- Final

B - E-Verify_Affidavit

C - SAMPLE SIMPLIFIED CONSTRUCTION AGREEMENT

Invitation to Bid - Construction (ITB-C) #24-0200-ITB Title: Plumbing maintenance and repair services

1. Notice

INVITATION TO BID

SUBMITTALS ARE OPENED PUBLICLY AND ARE ACCEPTED VIA OPENGOV

ITB - Simplified Construction

24-0200-ITB

Plumbing maintenance and repair services

ALL QUESTIONS MUST BE SUBMITTED IN OPENGOV WITHIN THE QUESTION & ANSWER SECTION.

SOLICITATION MEETINGS: Site Visit: None; Pre-Conference: None

SUBMITTALS MAY NOT BE WITHDRAWN FOR120 DAYS AFTER OPENING DATE.

PUBLIC MICROSOFT TEAMS MEETING - https://teams.microsoft.com/l/meetup-join/19%3ameeting_YTk2ZDM5NzgtZmFiOS00ZWM1LTk1NjgtYWIxOWZiYzliMGQ4%40thread.v2/0?co ntext=%7b%22Tid%22%3a%22c32ee18f-a4c7-46ff-af40-

8ed605642745%22%2c%22Oid%22%3a%227427c034-238b-4d40-aa5d-19b05166cbf8%22%7d @ 3:30 on the Bid 2 Submittal Date.

Meeting ID: 292 583 511 912

Passcode: avjUPp

Or call in (audio only)

+1 813-644-3116

Phone Conference ID: 487 254 075#

The Purchasing and Risk Management Division for the Pinellas County Board of County Commissioners has transitioned to OpenGov Procurement for contractor/vendor registration, and for posting, submitting and receiving bids, quotes and proposals for active solicitations. Contractors/Vendors must register with OpenGov Procurement (https://procurement.opengov.com/signup) to participate in active County solicitations.

Should you need technical assistance with OpenGov, the following options are available:

Phone: (855) 680-4747, 8 a.m. to 8 p.m., Monday - Friday

Email:procurement-support@opengov.com

Chat is available in the OpenGov application

Web:https://help.procurement.opengov.com https://teams.microsoft.com/l/meetup-join/19%3ameeting_YTk2ZDM5NzgtZmFiOS00ZWM1LTk1NjgtYWIxOWZiYzliMGQ4%40thread.v2/0?context=%7b%22Tid%22%3a%22c32ee18f-a4c7-46ff-af40-8ed605642745%22%2c%22Oid%22%3a%227427c034-238b-4d40-aa5d-19b05166cbf8%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_YTk2ZDM5NzgtZmFiOS00ZWM1LTk1NjgtYWIxOWZiYzliMGQ4%40thread.v2/0?context=%7b%22Tid%22%3a%22c32ee18f-a4c7-46ff-af40-8ed605642745%22%2c%22Oid%22%3a%227427c034-238b-4d40-aa5d-19b05166cbf8%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_YTk2ZDM5NzgtZmFiOS00ZWM1LTk1NjgtYWIxOWZiYzliMGQ4%40thread.v2/0?context=%7b%22Tid%22%3a%22c32ee18f-a4c7-46ff-af40-8ed605642745%22%2c%22Oid%22%3a%227427c034-238b-4d40-aa5d-19b05166cbf8%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_YTk2ZDM5NzgtZmFiOS00ZWM1LTk1NjgtYWIxOWZiYzliMGQ4%40thread.v2/0?context=%7b%22Tid%22%3a%22c32ee18f-a4c7-46ff-af40-8ed605642745%22%2c%22Oid%22%3a%227427c034-238b-4d40-aa5d-19b05166cbf8%22%7d https://procurement.opengov.com/signup mailto:procurement-support@opengov.com https://help.procurement.opengov.com/

Please Note:

From time to time, addenda may be issued to this solicitation. Any such addenda will be posted to https://procurement.opengov.com/portal/pinellasfl. Receipt of addenda confirmation is required in

OpenGov.

AUTHORIZED BY:

Merry Celeste, CPPB

Division Director of Purchasing and Risk Management

2. Introduction

2.1. Summary

The County is soliciting a new contract for the purpose of obtaining plumbing maintenance and repair services.

2.2. Contact Information

Project Contact:

Jason O'Toole, NIGP-CPP, CPPB

Procurement Analyst Coordinator

400 S. Fort Harrison Ave.

6th Floor

Clearwater, FL 33765

Email: jo'toole@pinellas.gov

Phone: (727) 464-4104

Procurement Contact:

Jason O'Toole, NIGP-CPP, CPPB

Procurement Analyst Coordinator

400 S. Fort Harrison Ave.

6th Floor

Clearwater, FL 33765

Email: jo'toole@pinellas.gov

Phone: (727) 464-4104

Department:

ADMINISTRATIVE SERVICES

2.3. Timeline

Issue Date February 5, 2024

Question Submission Deadline February 16, 2024, 3:00pm

Bid Submission Deadline March 5, 2024, 3:00pm mailto:jo'toole@pinellas.gov tel:(727)464-4104 mailto:jo'toole@pinellas.gov tel:(727)464-4104

3. Definitions

Whenever the following terms, or pronouns used in place of them, are used in these Contract

Documents they shall have the meanings given below:

Addendum: A modification, revision or clarification of the Plans or other Contract Documents, issued by the Purchasing Department and distributed to prospective Bidders before the bid opening.

Adjustment Factors: The Bidder’s competitively bid price adjustments to be applied to the unit prices listed in the Construction Task Catalog®.

Agreement:The final written agreement between the County and the successful Contractor under this solicitation, regardless of the title of that final document, and may be used interchangably with

"Contract".

Approved Equal: An approved equivalent item that is approved in writing, (via an Addendum to the

Agreement), prior to the Bid Opening. Bidder must submit their proposed equivalent item no later than question deadline date on page 1. Any information received after this deadline will not be considered.

Award Criteria Figure: The amount determined in the Award Criteria Figure Calculation section of the

Bid Form, which is used for the purposes of determining the lowest Bid.

Bid Publication: The date on which public notice is made to request a bid/request for proposal for this

Project.

Bid/Request for Proposal: The offer to perform the Work described in the Contract Documents at a specified cost.

Architect/Design Professional/Engineer of Record: The Professional Architect/Design

Professional/Engineer or Architectural/Design Professional/Engineering Firm contracted by the County and registered in the State of Florida who develops criteria and concept for a Project, performs the analysis and is responsible for the preparation of a Project’s Plans and Specifications. If applicable to a

Project, the Architect/Design Professional/Engineer of Record will be a Consultant retained by the

County or a county in-house staff member.

Board of County Commissioners: Governing body of Pinellas County hereinafter referred to as the

Board.

Calendar Day: Every day shown on the calendar, ending and beginning at Midnight.

Change Order: A written order authorized by the Board or County Administrator, issued by the Design

Professional/Engineer/Project Manager, and accepted by the Contractor directing certain changes, additions or reductions in the Work, in the materials used, or in the Job Order Contract.

Commencement Date: Date established in the Notice to Proceed or Agreement. Contractor shall commence the Work within fifteen (15) consecutive calendar days, or Contractor shall commence the

Job Order Contract on the date of the Notice to Proceed, or as mutually agreed by the Parties, from the date of the Notice to Proceed.

Construction Task Catalog® (CTC): A comprehensive listing of construction related tasks together with a specific unit of measure and a published Unit Price.

Consultant: The Professional Engineer/Design Professional or Engineering Firm registered in the State of

Florida who performs Professional Engineering Services for the County, other than County personnel.

The Consultant may be the Design Professional/Engineer of Record or may provide services through and be subcontracted to the Design Professional/Engineer of Record or maybe providing construction engineering and inspection (CEI) services, as applicable.

Contract Administrator: The County’s designee for overseeing the Job Order Contracting program.

Contractor: The General Contractor, the Individual, Partnership or Corporation agreeing to do the Work for the County as Prime Contractor. The Contractor may be referred to interchangeably as "Bidder"

"Respondent", "Vendor", "Submitter", and/or "Proposer" in this document depending on the contracting phase governed herein.

Contract Documents: All documents referred to herein in addition to all duly executed and issued addenda, legal advertisements and change orders.

County:Pinellas County, a subdivision of the State of Florida and may be used interchangeably with

"Pinellas County".

Design Professional: A collective term intended to apply to “Architect/Engineer of Record”, licensed and registered in the State of Florida, the prime party responsible for the design, engineering, and construction documentation of the project and contracted directly with the County/Owner.

Detailed Scope of Work: A document setting forth the Work the Contractor is obligated to complete for a particular Job Order.

Engineer: The Engineer, a staff member of the County or his duly authorized representative, acting on behalf of the County.

FDOT: The Florida Department of Transportation.

FDOT Specifications: Florida Department of Transportation, “STANDARD SPECIFICATIONS FOR ROAD

AND BRIDGE CONSTRUCTION”, (latest edition at time of advertisement), and all supplemental specifications thereto.

Final Acceptance: Whenever the Work provided for under the Agreement/Job Order has been completely performed by the Contractor, and the final inspection has been made by the Design

Professional/Engineer/Project Manager.

Final Completion: The point in which all Work is complete and all other Agreement/Job Order requirements have been satisfied.

Inspector: An authorized representative of the Design Professional/Engineer/Project Manager, assigned to make any or all necessary inspections of the Work performed, and materials furnished by the

Contractor.

Job Order: A written order issued by the Owner, as the notice to proceed, requiring the Contractor to complete the Detailed Scope of Work within the Job Order Completion Time for the Job Order Price. A project may consist of (1) or more Job Orders, generated from JOC software showing scope, price and duration.

Job Order Amount: The lump sum, fixed price amount the Contractor will be paid for completing the

Detailed Scope of Work of a particular Job Order.

Job Order Completion Time:The period of time allotted for the Contractor to complete the Detailed

Scope of Work of a particular Job Order.

Job Order Price Proposal: The price proposal prepared by the Contractor that includes the Pre-priced

Tasks, Non-Priced Tasks, quantities and the appropriate Adjustment Factors required to complete the

Detailed Scope of Work.

Job Order Proposal: A set of documents including at least: (a) Job Order Price Proposal; (b) required drawings or sketches; (c) list of anticipated Subcontractors and Materialmen; (d) construction schedule;

and (e) other requested documents.

Joint Scope Meeting: A site meeting to discuss the Project before the Detailed Scope of Work is finalized.

Man Day: A unit of measure for work by one person in a calendar day.

Maximum Contract Term Value: The maximum dollar value of Job Orders that can be ordered during the term of the Contract.

Maximum Contract Total Value: The maximum dollar value of Job Orders that can be ordered under this Contract during the entire duration of the Contract.

Non Pre-priced Task: An item of work required by the Detailed Scope of Work but not included in the

Construction Task Catalog®.

Non-Secure Area: An area wherein the Work is to be performed by the Contractor, not designated as a

Secure Area.

Normal Working Hours: 7:00 AM to 7:00 PM Monday through Friday except Holidays.

Notice of Award: The formal document informing the Contractor of its successful selection to construct the Project.

Notice to Proceed: Formal written document informing the Contractor to begin the Work, and notifying the Contractor of the architect, project engineer and other agency or person to which the Contractor may submit its payment request or invoice.

Other Than Normal Working Hours: The hours of 7:01 PM to 6:59 AM Monday through Friday and any time Saturday, Sunday, and Holidays. County holidays are as follows: New Year Day, January 1st, Martin

Luther King Day, 3rd Monday in January, Memorial Day, Last Monday in May, Juneteenth, June 19th, Independence Day, July 4th, Labor Day, 1st Monday in September, Veterans Day, November 11th, Thanksgiving Day, 4th Thursday in November, Friday following Thanksgiving, and Christmas, December

25th. If Christmas or New Year’s Day shall fall on Tuesday or Thursday, the proceeding Monday or following Friday is also recognized as a holiday. When a holiday falls on a Saturday, the proceeding

Friday is observed as the official holiday. If the holiday falls on a Sunday, the proceeding Monday is observed as the official holiday.

Owner: Is Pinellas County, a political subdivision of the State of Florida, herein after referred to as the

County.

PCU - Standard Specifications: Pinellas County Utilities (PCU) “Material Specification Manual”, “Technical Specifications”, “Pump Station Standard Details” and “Standard Details” as described and defined on the Utility Department’s website at www.pinellascounty.org/utilities under the Engineering header. Contractor’s bid must be based on those standards that are in place as of the Bid Publication date.

PC Special Provisions: Pinellas County Roadway Special Provisions that provide specific additions and/or revisions to the requirements of the Pinellas County Standard Technical Specifications for Roadway and

General Construction (latest edition)

PC Std. Tech. Spec.: Pinellas County Standard Technical Specifications for Roadway and General

Construction (latest edition at time of advertisement) shown on the Pinellas County website.

PC Supplemental Specifications: Specifications adopted by Pinellas County that add or revise the

Pinellas County Standard Technical Specifications for Roadway and General Construction (latest edition) and/or the Pinellas County Special Provisions, setting forth conditions varying from or additional to the

Pinellas County Standard Technical Specifications (latest edition) and/or the Pinellas County Special

Provisions applicable to a specific Project or a specific set of conditions.

Plans: Approved drawings or reproductions thereof, showing the location, character, dimension and details of the work to be done as issued by the Design Professional/Engineer.

Project: All Work, materials or equipment (whether or not specifically called for) required to produce the intended result as described within the Contract Documents, Job Order, or a series of related Job

Orders.

Project Manager: The individual designated by the Owner to represent the owner on all administrative matters related to the Project.

Proposal and Bid Submittal Sheets: Form, as required within a solicitation.

Punch List: The written compilation of those items identified by the Design

Professional/Engineer/Project Manager after Substantial Completion is achieved, which are required to be rendered complete, satisfactory and acceptable for the Project (or Job Order).

Purchase Order (PO): A formal written document used to encumber funds by the Purchasing

Department. The document contains a Purchase Order number, generated from County accounting software showing a PO number for invoicing purposes.

Record Drawings: Record Drawings are a set of signed/sealed CONTRACT PLANS that are maintained by the Contractor for the express use of recording AS-BUILT INFORMATION.

Regular Work Day or Business Day: Any calendar day from 7:00 AM to 7:00 PM except a Saturday, Sunday or recognized holiday.

Request for Proposal (RFP): A written request to the Contractor issued by the County that formally requests the Contractor to prepare a Proposal for a Detailed Scope of Work referenced therein.

Schedule of Values: The individual values as set forth by the Contractor as payment for the bid quantity units identified on the bid submittal sheets, or the Work completed on a Job Order. The total of the extended units in the Schedule of Values determines the Agreement Amount. The Agreement Amount may only be modified by Change Order approved by the Board, or County Administrator.

Scope of Work: The general intent of the Work to be accomplished as defined by the Project Plans and

Specifications.

Secure Area: An area wherein work is to be performed by the Contractor designated by the Project

Manager as a secure program area wherein facility security personnel must monitor and/or supervise the Contractor and the Contractor must comply with various County security precautions and regulations.

Special Notices: Specific clauses adding to or revising the Standard Specifications, setting forth conditions varying from or additional to the Standard Specifications, for a specific Project.

Specifications: The directions, provisions and requirements contained herein, together with all stipulations contained in the plans or Contract Documents, setting out or relating to the method and manner of performing the Work, or to the quantities and qualities of materials and labor to be furnished under the Agreement.

Submittal:A Respondent's submissions in response to this solicitation, and may be used interchangeably with the terms "submission", "bid", "quote", or "proposal", as applicable to the specific solicitation. For example, these terms should be interpreted to mean "bid" if this is an ITB, or "quote" if this is an ITQ, and "proposal" if this is an RFP.

Substantial Completion: The date of “Substantial Completion” of the Work (or designated portions thereof) is the date certified by the Consultant and approved by the Design

Professional/Engineer/Project Manager when construction is sufficiently complete, in accordance with the Contract Documents/Job Order, so the county can occupy or utilize the Work (or designated portions thereof) for the use for which it was intended.

Supplemental Job Order: A Job Order that adds work to, deletes work from, or adjusts the Job Order

Completion Time for a prior related Job Order.

Technical Special Provisions: Specifications prepared, signed and sealed by the Consultant. These would be listed in the document hierarchy ahead of any other “Standard Specifications”, if applicable.

Survey Crew Day: A unit of measurement for Work by a survey crew in a calendar day.

Unforeseen Work: Conditions encountered during the performance of the Work, sub-surface or otherwise concealed, or of an unusual nature, which differ materially from those indicated in the

Contract Documents/Detailed Scope of Work.

Unit Price: The price published in the Construction Task Catalog® for a specific construction or construction related work task. Unit Prices for new Pre-priced Tasks can be established during the course of the Contract and added to the Construction Task Catalogs®. Each Unit Price is comprised of labor, equipment, and material costs to accomplish that specific Pre-priced Task.

Unspecified: A pay item included for usage as directed by the County, and for usage under conditions or circumstances unforeseen at the time of Agreement.

Work:All labor, materials & incidentals required for the construction of the improvement for which the

Agreement is made or Job Order is issued, including superintendence, use of equipment & tools, and all services & responsibilities prescribed or implied, which are necessary for the complete performance by the Contractor of his obligations under the contact. Unless otherwise specified herein or in the

Agreement, all costs of liability and of performing the Work shall be at the Contractor's expense.

4. Special Conditions

4.1. TWO-STEP QUALIFICATION PROCESS

NOT APPLICABLE

4.2. PRICING/PERIOD OF CONTRACT

Duration of the contract shall be for a period of thirty-six (36) months with unit prices firm for the first twelve (12) months and adjustable (increase/decrease) at twelve (12) months after the date of contract award anniversary and thereafter annually for the life of the contract, in an amount not to exceed the average of the Consumer Price Index (CPI) for all Urban Consumers, Series Id: CUUR000SA0, Not

Seasonally Adjusted, Area: U.S. city average, Item: All Items, Base Period: 1982-84=100 or 4%, whichever is less. The increase or decrease in the CPI shall be the index published and available three (3) months prior to the end of the contract year. The index month utilized will be the most recent available on the bureau of labor website compared to 12 months prior.

It is the vendor’s responsibility to request any pricing adjustment under this provision. For any adjustment to commence annually, the vendor’s request for adjustment shall be submitted ninety (90) days prior to contract anniversary date. The vendor adjustment request should not be in excess of the relevant pricing index change. If no adjustment request is received from the vendor, the County will assume the vendor has agreed to continue without a pricing change.

4.3. PRE-BID CONFERENCE:

NOT APPLICABLE

4.4. SITE VISIT:

NOT APPLICABLE

4.5. PRE-COMMENCEMENT MEETING

Upon award of bid, the County will coordinate a pre-commencement meeting with the successful

Contractor. The meeting will require Contractor and the County Representative to review specific contract details and deliverable documents at this meeting to ensure the scope of work and work areas are understood.

4.6. BID BOND GUARANTEE

NOT APPLICABLE

4.7. CONTRACT SECURITY

NOT APPLICABLE

4.8. LICENSES, PERMITS, FEES AND TAXES

A. Pursuant to section 218.80, Florida Statutes, Pinellas County discloses to the contractor the following permits and fees generally which will have to be obtained by and will be payable by the contractor who is the successful bidder or proposer. Contractor will be reimbursed for the actual amount paid for the permits as evidenced by official receipts from the office(s) collecting the permit fees. No reimbursement will be provided for license fees. Permits/fees may include the following:

1. Impact Fees.

2. Inspection Fees.

3. Other permits or fees required by Pinellas County for the completion of the work, if applicable.

4. License fees: The Pinellas County Construction Licensing Board (PCCLB), an independent government agency, may require licensure or registration of a State of Florida construction license. These are not Pinellas County Government fees, but the contractor is hereby put on notice that fees may be required by the PCCLB. License fees are not reimbursable.

5. The foregoing list of fees apply only to those fees imposed by Pinellas County or imposed by another governmental agency which has assigned or delegated the responsibility for issuance of permits, licenses and conduction of inspections and attendant collection of fees to Pinellas County. The contractor is responsible for determining if other fees and permits are required by any other Federal, State, or local governmental entity, agency, or board.

B. All sales, consumer, use, and other similar taxes associated with the Work or portions thereof, which are applicable during the performance of the work, shall be paid by the contractor.

C. Compliance with permit and licenses requirements: The contractor shall comply with all applicable Local, State and Federal permit conditions and license requirements, applicable building and construction code requirements and such other rules and regulations as may apply to the prosecution of Work. Failure of the contractor to comply with the above-specified requirements shall result in contractor being prohibited from performing work pursuant to this agreement. Any additional costs incurred by the contractor as a result of non-compliance shall be the responsibility of the contractor and shall not be paid by the County. Additionally, contractor shall be required to pay any fines due as a result of non-compliance with the applicable requirements.

4.9. COMPLIANCE WITH LAWS

The contractor agrees to comply, at its own expense, with all Federal, State and Local laws, codes, statutes, ordinances, rules, regulations and requirements applicable to the Project or Job Order

Contract, including but not limited to, those dealing with taxation, workers' compensation, equal employment, safety (including, but not limited to, the Trench Safety Act, Chapter 553.60-553.64, Florida

Statutes), labor, work hours, labor conditions, environment, and related matters. If the contractor observes that the contract documents are at variance therewith, it shall promptly notify the Design

Professional/Engineer/Project Manager in writing.

4.10. QUANTITIES

A. Quantities shown on the Bid Submittal Form are estimated for bidding purposes only and shall be verified by the contractor before placing orders for material. No payment shall be allowed for excess materials.

B. Payment for work performed under this agreement shall be based on the pay items and bid quantities shown on the Bid Submittal Form, subject to such extension of pay quantities as may be required.

C. Regardless of uncertainties of material supply and production at the time of bidding, bidders shall base their bids in strict accordance with items, materials and methods as set forth in the contract documents.

D. Pay items that are required to complete the scope of the Work, as defined by the project plans and specifications may be added to the list of pay items by the design professional/engineer/project manager at a later date through a change order process.

4.11. QUANTITIES REFLECTED IN PERMITTING DOCUMENTS

Any construction items or quantities reflected in the permitting documents, if any, required for this project are provided only for the purpose of enabling permitting authorities to assess the probable impact of the project on environmental concerns, and are in no way intended to reflect or represent actual construction items or quantities for pay purposes.

4.12. AWARD OF CONTRACT

The contract will be awarded for the entire Work (with or without optional/alternates items) to the lowest responsible and responsive bidder, provided that the bid is reasonable, and that it is in the best interest of the County to accept.

4.13. AFTER NOTICE OF AWARD TO CONTRACTOR

Subsequent communications between the County and the contractor shall be delivered to the County's representative. A Preconstruction Conference will be held following execution of the contract documents and prior to the Notice to Proceed.

4.14. INTENT OF THE CONTRACT DOCUMENTS

A. It is the intent of the Contract Documents to describe a functionally complete Project (or portion thereof) to be constructed in accordance with the Contract Documents which combine to define the Scope of Work. Any Work, materials or equipment that may reasonably be inferred from the

Contract Documents as being required to produce the intended result shall be supplied whether or not specifically called for. When words which have a well-known technical or trade meaning are used to describe Work, materials or equipment, such words shall be interpreted in accordance with that meaning. Reference to standard Specifications, manuals or codes of any technical society, organization or association or to the laws or regulations of any governmental authority having jurisdiction over the Project, whether such reference be specific or by implication, shall mean the latest standard Specification, manual, code, law or regulation in effect at the time the Work is performed, except as may be otherwise specifically stated herein.

B. The Contract Documents and all referenced standards cited therein are essential parts of the

Agreement requirements. A requirement occurring in one is as binding as though occurring in all. They are intended to be complementary and to describe and provide for a complete Project.

C. Plans are intended to show general arrangements, design and extent of Work. Specifications are separated into divisions for convenience of reference only and shall not be interpreted as establishing divisions for the Work, trades, subcontracts, or extent of any part of the Work. In the event of a discrepancy between or among the Plans, Specifications or other Contract

Document provisions, the Contractor shall be required to comply with the provision which is the more restrictive or stringent requirement upon the Contractor, as determined by the Design

Professional/Engineer/Project Manager. Unless otherwise specifically mentioned, all anchors, bolts, screws, fittings, fillers, hardware, accessories, trim and other parts required in connection with any portion of the Work to make a complete, serviceable, finished and first quality installation shall be furnished and installed as part of the Work, whether or not called for by the

Contract Documents.

4.15. SANITATION

The Contractor shall provide and maintain adequate sanitary conveniences for the use of persons employed on the Work. These conveniences shall be maintained at all times without nuisance, and their use shall be strictly enforced. The location of these conveniences shall be subject to the Design

Professional/Engineer/Project Manager’s approval.

4.16. ERRORS AND OMISSIONS

The Contractor shall not take advantage of any apparent error or omission in the Contract Documents. If any errors and/or omissions appear in the Contract Documents, or construction stakeout, the

Contractor shall immediately notify the Purchasing Department, in writing, of such errors and/or omissions. In the event the Contractor knows or should have known of any errors and/or omissions and fails to provide such notification, it shall be deemed to have waived any claim for increased time or compensation it may have had and he shall be held responsible for the results and the costs of rectifying any such errors and/or omissions.

4.17. CONTRACTORS AND SUBCONTRACTORS

A. Qualification

1. The Contractor shall assure that all personnel are competent, careful and reliable. All personnel must have sufficient skill and experience to properly perform the Work assigned them. All personnel shall have had sufficient experience to perform their assigned task properly and satisfactorily and to operate any equipment involved, and shall make due and proper effort to execute the Work in the manner prescribed in the Contract Documents, or the Design Professional/Engineer/Project Manager may take action as prescribed below.

2. Whenever the Design Professional/Engineer/Project Manager shall determine that any person is incompetent, unfaithful, intemperate, disorderly or insubordinate, such person shall upon notice, be discharged from the Work and shall not again be employed on it except with the written consent of the Design Professional/Engineer/Project Manager.

Should the Contractor fail to remove such person or persons the Design

Professional/Engineer/Project Manager may withhold all estimates which are or may become due, or may suspend the Work until such orders are complied with.

B. Identification

1. Within 10 days after the award of any subcontract, either by himself or a subcontractor, the

Contractor shall deliver to the Design Professional/Engineer/Project Manager a statement setting forth the name and address of the subcontractor and a summary description of the

Work subcontracted.

2. The Contractor shall be as fully responsible to the County for acts and omissions the subcontractor and of persons either directly or indirectly employed by the subcontractor, as the Contractor is for the acts and omissions of persons directly employed by the Contractor.

4.18. AUTHORITY OF THE PROJECT MANAGER

A. All Work shall be done in accordance with the Contract Documents.

B. It is agreed by the parties hereto that the Design Professional/Engineer/Project Manager shall decide all questions, difficulties and disputes, of whatever nature, which may arise relative to the interpretation of the Plans, construction, prosecution and fulfillment of the Agreement, and as to the character, quality, amount and value of any Work done, and materials furnished, under or by reason of the Agreement.

C. The County retains the right to inspect all Work to verify compliance with the Contract

Documents. The Design Professional/Engineer/Project Manager may appoint such designees and/or representatives as desired. They shall be authorized to inspect all Work done and all materials furnished. This right of inspection in no way means or implies County control or other supervision over the Work done or the work site. This right is solely for the County's benefit and imposes no duties or responsibilities on the County and confers no rights on any other parties.

Such inspection may extend to all or any part of the Work and to the manufacture, preparation or fabrication of the materials to be used. Such designees and/or representatives shall not be authorized to revoke, alter or waive any requirement of the Contract Documents.

D. The designees and/or representatives shall be authorized to call to the attention of the

Contractor any failure of the Work or materials to conform to the Contract Documents, and shall have the authority to reject materials or suspend the Work until any questions at issue can be referred to and decided by the Design Professional/Engineer/Project Manager. The Contractor shall be immediately notified in writing of any such suspension of the Work and such notice shall state in detail the reasons for the suspension. The presence of the inspector or other designee shall in no way lessen the responsibility of the Contractor.

E. Contractor's Supervision Prosecution of Work:

1. The Contractor shall give the Work the constant attention necessary to assure the scheduled progress and it shall cooperate fully with the Design Professional/Engineer/Project Manager and with other Contractors at Work in the vicinity.

F. Contractor's Superintendent:

1. The Contractor shall at all times have on the Work as his agent, a competent superintendent capable of thoroughly interpreting the Plans and Specifications and thoroughly experienced in the type of Work being performed, who shall receive the instructions from the Design

Professional/Engineer/Project Manager or his/her authorized representatives. The superintendent shall have full authority to execute the orders or directions of the Design

Professional/Engineer/Project Manager and to supply promptly any materials, tools, equipment, labor and incidentals which may be required. Such superintendence shall be furnished regardless of the amount of Work sublet.

2. The Contractor's superintendent shall speak and understand English, and at least one responsible person who speaks and understands English shall be on the Project during all working hours.

G. Supervision for Emergencies:

1. The Contractor shall have a responsible person available at or reasonably near the work site on a 24-hour basis, 7 days a week, in order that he/she may be contacted in emergencies and in cases where immediate action must be taken to maintain traffic or to handle any other problem that might arise. The Contractor's responsible person for supervision for emergencies shall speak and understand English. The Contractor shall submit, by certified mail, phone numbers and names of personnel designated to be contacted in cases of emergencies along with a description of the Project location to the Florida Highway Patrol and all other local law enforcement agencies.

H. Worksite Traffic Supervisor: (When the work involves road construction/reconstruction or changes affect normal traffic patterns)

1. The Contractor shall have a Worksite Traffic Supervisor who will be responsible for initiating, installing and maintaining all traffic control devices as described in Section 102 of the Florida

Department of Transportation Standard Specifications for Road and Bridge Construction, and in the Plans. The Worksite Traffic Supervisor shall have at least one year of experience directly related to worksite traffic control in a supervisory or responsible capacity and shall be certified by the American Traffic Safety Services Association Worksite Traffic Supervisor

Certification Program or an equal approved by the Florida Department of Transportation.

Approved alternate Worksite Traffic Supervisors may be used when necessary.

2. The Worksite Traffic Supervisor shall be available on a 24 hour per day basis and shall review the Project on a day to day basis as well as being involved in all changes to traffic control.

The Worksite Traffic Supervisor shall have access to all equipment and materials needed to maintain traffic control and handle traffic related situations. The Worksite Traffic Supervisor shall ensure that routine deficiencies are corrected within a 24-hour period.

3. The Worksite Traffic Supervisor shall be available on the site within 45 minutes after notification of an emergency situation, prepared to positively respond to repair the Work zone traffic control or to provide alternate traffic arrangements.

4. Failure of the Worksite Traffic Supervisor to comply with the provisions of the Sub-article may be grounds for decertification or removal from the Project or both. Failure to maintain a designated Worksite Traffic Supervisor or failure to comply with these provisions will result in temporary suspension of all activities except traffic and erosion control and such other activities deemed to be necessary for Project maintenance.

I. General Inspection Requirements

1. Cooperation by the Contractor: No Work shall be done nor materials used, without suitable supervision or inspection by the Design Professional/Engineer/Project Manager or his/her representative, and the Contractor shall furnish the Design Professional/Engineer/Project

Manager with every reasonable facility for ascertaining whether the Work performed and materials used are in accordance with the requirements and intent of the Plans and

Specifications. If the Design Professional/Engineer/Project Manager so requests, the

Contractor shall, at any time before final acceptance of the Work, remove or uncover such portions of the finished Work as may be directed. After examination, the Contractor shall restore the uncovered portions of the Work to the standard required by the Specifications.

Should the Work so exposed or examined prove unacceptable, the uncover or removal, and the replacing of the covering or making good of the parts removed, shall be at the

Contractor's expense. However, should the Work thus exposed or examined prove acceptable, the uncovering or removing, and the replacing of the covering or making good of the parts removed, shall be paid for as Unforeseeable Work.

J. Failure of the Design Professional/Engineer/Project Manager to Reject Work During

Construction:

1. If, during or prior to construction operations, the Design Professional/Engineer/Project

Manager should fail to reject defective Work or materials, whether from lack of discovery of such defect or for any other reason, such initial failure to reject shall in no way prevent his/her later rejection when such defect is discovered, or obligate the County to final acceptance, and the Contractor shall make no claim for losses suffered due to any necessary removals or repairs of such defects.

K. Failure to Remove and Renew Defective Materials and Work:

1. Should the Contractor fail or refuse to remove and renew any defective materials used or

Work performed, or to make any necessary corrections in an acceptable manner and in accordance with the requirements of the Specifications, within the time indicated in writing, the Design Professional/Engineer/Project Manager shall have the authority to cause the unacceptable or defective materials or Work to be repaired, removed and renewed, as may be necessary; all at the Contractor's expense.

2. Any expense incurred by the County in making these repairs, removals, or renewals, which the Contractor has failed or refused to make, shall be paid for out of any moneys due or which may become due the Contractor, or may be charged against the Performance Bond.

Continued failure or refusal on the part of the Contractor to make any or all necessary repairs promptly, fully and in an acceptable manner shall be sufficient cause for the County, at its option, to perform the Work with its own organization, or to contract with any other individual, firm or corporation to perform the Work. All costs and expenses incurred thereby shall be charged against the defaulting Contractor and the amount thereof deducted from any moneys due or which may become due him, or shall be charged against the applicable bond. Any Work performed subsequent to forfeiture of the Agreement, as described in this

Paragraph, shall not relieve the Contractor in any way of its responsibility for the Work performed by it.

L. Inspection by the Federal Government:

1. When the Work involves the Federal Government it is to pay a portion of the cost of construction the construction Work will be subject to inspection by its representatives as they may deem necessary, but such inspection will in no case make the Federal Government a party to Agreement.

4.19. EXECUTION OF WORK ON SATURDAYS, SUNDAYS AND RECOGNIZED

HOLIDAYS

A. All Work must be done during Regular Workday hours (7:00 AM to 7:00 PM) Monday through

Friday. The County may require alternative Work hours due to specific individual Project conditions when necessary. Work will not be done beyond hours specified herein or on

Saturdays, Sundays or holidays unless authorized in advance by the Design

Professional/Engineer/Project Manager to meet special requirements. Contractor must comply with the County noise ordinance.

B. Work will not be permitted on Saturdays, Sundays and recognized Holidays unless permission to

Work has been requested in writing by the Contractor and approval, in writing, has been granted by the Design Professional/Engineer/Project Manager. Request for permission to Work must be received by the Design Professional/Engineer/Project Manager no less than 24 hours prior to the regular Workday.

C. No Work will be permitted on:

1. New Year’s Day

2. Independence Day

3. Thanksgiving Day

4. Christmas Day

D. When approval is granted in accordance with the provisions stated above, Work will be allowed on:

1. Martin Luther King, Jr. Day

2. Memorial Day

3. Juneteenth

4. Labor Day

5. Veterans Day

6. Friday after Thanksgiving Day

7. If Christmas or New Year's Day shall fall on Tuesday or Thursday, the preceding Monday or the following Friday shall be recognized as a holiday also. If any recognized holiday shall fall on a Saturday, the preceding Friday shall be observed as a holiday. If any recognized holiday shall fall on a Sunday, the following Monday shall be observed as a holiday.

4.20. PINELLAS COUNTY’S COMMITMENT TO SAFETY

A. All work shall be completed in a safe manner and consideration for cost of any equipment needed to perform contract in a safe manner, including personal protection equipment, shall be included in the contract bid.

B. If County discovers an unsafe act or condition in contractor’s performance under this contract, County shall inform Design Professional/Engineer/Project Manager of unsafe act or condition. If unsafe act or condition poses the threat of imminent danger, Design

Professional/Engineer/Project Manager shall be authorized to stop work until unsafe act or condition is remedied. No time extension shall be allowed. If remedy causes contractor to fail to meet the time specified, County shall be entitled to liquidated damages. If unsafe act or condition is does not pose the threat of imminent danger, Design Professional/Engineer/Project

Manager shall be authorized to require contractor remedy the unsafe act or unsafe condition as soon as possible, but in no event later than 3 days from date of notice. No time extension shall be allowed. If remedy causes contractor to fail to meet the time specified, County shall be entitled to liquidated damages.

4.21. CHANGES IN THE WORK

A. If changes to the Scope of the Work are required or if the Contract time or the total Contract

Amount is increased by the additional Work, a Change Order approved by the Board will be required.

B. Should a Change Order be required, and the County and the Contractor are unable to agree on the requested change, the Contractor shall, nevertheless, promptly perform the change as directed in writing by the Design Professional/Engineer/Project Manager. If the Contractor disagrees with the Design Professional/Engineer/Project Manager's adjustment determination, the Contractor must make a claim pursuant to the Claims and Dispute Section herein, or else be deemed to have waived any claim on this matter it might otherwise have had.

C. In an emergency endangering life or property, or as expressly set forth herein, the Design

Professional/Engineer/Project Manager has the authority to order the necessary Work in writing. The County shall not be liable to the Contractor for any increased compensation without such written order. The payment authorized by a written order shall represent full and complete compensation to the Contractor for labor, materials, incidental expenses, overhead, profit, impact costs, and time associated with the Work authorized by such written order.

D. Execution by the Contractor of a properly authorized Change Order (see Appendix Sample

Change Order) shall be considered a waiver of all claims or requests for additional time or compensation for any activities prior to the time of execution related to items included in the

Change Order.

4.22. CLAIMS AND DISPUTES

A. A Claim is a demand or assertion by one of the parties seeking an adjustment or interpretation of the terms of the Contract Documents, payment of money, extension of time or other relief with respect to the terms of the Contract Documents. The term "Claim" also includes other disputes and matters in question between the County and the Contractor arising out of or relating to the Contract Documents. The responsibility to substantiate a claim shall rest with the party making the Claim.

B. Claims by the Contractor shall be made in writing to the Design Professional/Engineer/Project

Manager within two (2) regular Workdays after the commencement of the event giving rise to such Claim or else the Contractor shall be deemed to have waived the claim. Written supporting data shall be submitted to the Design Professional/Engineer/Project Manager within 15 calendar days after the occurrence of the event, unless the County grants additional time in writing, or else the Contractor shall be deemed to have waived the Claim. All Claims shall be priced in accordance with provisions of the section in this document entitled Changes in the Work.

C. The Contractor shall proceed diligently with its performance as directed by the County, regardless of any pending Claim, action, suit, or administrative proceeding, unless otherwise agreed to by the County in writing. The County shall continue to make payments in accordance with the Contract Documents during the pendency of any Claim.

4.23. MEASUREMENT AND PAYMENT

A. All Work completed under the terms of this Agreement shall be measured according to United

States Standard Measures.

B. All measurements shall be taken horizontally or vertically, unless specifically provided otherwise.

C. In the measurement of items to be paid for on the basis of area of finished Work, when the pay quantity is designated to be determined by calculation, the lengths and/or widths to be used in the calculations shall be the station-to-station dimensions shown on the Plans, the station-to-station dimensions actually constructed within the limits designated by the Manager, or the final dimensions measured of the completed Work within the lines shown on the Plans or designated by the Project Manager. The method, or combination of methods, shall be those which reflect with reasonable accuracy the actual area of finished Work as determined and authorized by the

Project Manager.

D. The Contractor shall accept compensation provided under the terms of this Agreement as full payment for furnishing all materials and for performing all Work contemplated and embraced under this Agreement. Such compensation shall also be for any and all loss or damage arising out of the nature of the Work or from the action of the elements, or from any unforeseen difficulties or obstructions encountered during the Agreement Time until final acceptance by the

County.

E. Whenever any change, or combination of changes in the Specifications, results in an increase or decrease in the original Contract quantities, and the Work added or decreased/eliminated is of the same general character as that called for in the Specifications, the Contractor shall accept payment in full at the original schedule of values for the actual quantity of Work performed, with no allowance for any loss of anticipated profits.

F. Where the pay quantity for an item is designated to be Lump Sum, and the Plans or

Specifications indicate an estimated quantity, compensation for that item will be adjusted proportionately if a plan change results in a significant change in the quantity from such estimated plan quantity.

G. Failure to construct any item to plan or authorized dimensions within the Specification tolerances shall result in reconstruction by the Contractor to acceptable tolerances at no additional cost to the County, acceptance at no pay, or acceptance at reduced final pay as determined by the Project Manager.

H. Waiver of Claims

1. The Contractor's acceptance of final payment shall constitute a full waiver of any and all

Claims by the Contractor against the County arising out of this Agreement or otherwise related to the Project, except those previously made in writing and identified by the

Contractor as unsettled at the time the final estimate is prepared.

2. Neither the acceptance of the Work nor payment…