This is a Scope of Work document prepared by the State of Nevada, Office of the Military, for a carpet replacement project at the Plumb Lane facility in Reno, Nevada. The project encompasses the complete removal of existing carpet tiles and cove base, surface preparation of the subfloor, and installation of new Tarkett Carpet Tile (Style Savant G0041 in Natural Blush) along with a 4-inch rubber cove base and transition strips in doorways. Qualified contractors must provide all labor, supervision, materials, equipment, tools, transportation, and incidentals necessary for project completion. The contractor is responsible for proper removal and disposition of all existing carpet and related debris without damage to the substrate floor. The Office of the Military will handle furniture relocation through a moving company, equipment disconnections, and relocation of equipment and personal items. Bid proposals must be submitted through Nevada EPRO, and site visits may be scheduled upon request by contacting the Reno/Stead Area Point of Contact listed in the Invitation to Bid document.
The document does not specify pricing terms, set-aside provisions, contract award dates, contract term duration, renewal options, funding amounts, or other financial details. Contractors are required to disclose all work deemed necessary to complete the project in their bid proposals and must specify the geographical location of service. The scope emphasizes that all surface preparation activities, including subfloor leveling and removal of old adhesives, are the contractor's responsibility to ensure proper installation of the new carpet tiles.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Quote Instructions.pdf | ||
| Plumb Lane Carpet Replacement Invitation to Bid.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment AA
State of Nevada, Office of the military Facilities Maintenance Scope of Work Summary
Date: July 24, 2026 Project: Plumb Lane – Carpet Replacement
General Intention: This scope of work is intended to include all the work required to complete the project described below. Contractors who submit bids are required to include and disclose in their bid all work deemed necessary to complete the project.
Task(s):
The State of Nevada, The Office of the Military, is seeking bids/proposals from qualified contractors to provide services for the following carpet replacement: Please see scope of work below for detail breakdown. The contractor shall install provided carpet tiles along with labor, supervision, materials, equipment, tools, transportation, and incidentals necessary to effectively fulfill all the requirements of this contract. The Geographical location of service must be specified in the bid proposal. Please see scope of work below for detail breakdown. Bid proposals will be submitted in Nevada EPRO.
Scope of Work:
The contractor shall install specified carpet, cover base, all related required materials and accessories to perform project completion of the carpet replacement project of specified office areas. The contractor is also responsible for all materials, tools, hardware, and labor to complete this project. Contractor is also responsible for properly disposing of all materials that have been removed from this project.
1. Old carpet flooring removal and disposition of all existing carpet tiles regardless of fiber type without any damage to the substrate floor.
1. All old carpet/carpet tiles, flooring and related debris must be removed from plot boundaries.
1. Old cove base removal and disposition from plot boundaries.
1. Install a new 4 ½” rubber cove base to proper specifications.
1. Install new transition strips in doorways.
1. Relocation of furniture to install new carpet tiles will be done by a moving company.
5. All equipment disconnections will be done by the Office of the Military.
5. All equipment/printer/plotters/IT items will be relocated by the Office of the Military.
5. All personal items will be removed by the Office of the Military.
1. Surface preparation is required to receive the new carpet tiles. (e.g. Leveling of subfloor, removal of old adhesives.)
1. Installation of new carpet tiles Tarkett Carpet Tile, Style Savant G0041 – Natural Blush 76206 and rubber cove base packaged condition.
1. Replacement of door stops or related hardware (if removed during flooring removal).
Site visits may be scheduled upon request. Please contact the Reno/Stead Area Point of Contact listed on page 7 on the Invitation to Bid document.
Location:
Plumb Lane 685 E Plumb Lane Reno, NV 89502