Plans - W912DS25BA011.pdf
PDF 9 MB Posted
- Solicitation number
- W912DS25BA011
About this file
This is a solicitation document for a maintenance dredging project by the U.S. Army Corps of Engineers New York District. The project involves dredging approximately 28,775 cubic yards of sand from the Long Island Intracoastal Waterway Federal Navigation Channel in Bellport Bay and Moriches Bay, Suffolk County, New York, to a depth of -6 feet Mean Lower Low Water (MLLW) plus 2 feet overdepth. The dredged material will be hydraulically placed along the shorelines of Cupsogue Beach County Park and Smith Point County Park to provide shoreline stabilization.
The solicitation is an unrestricted procurement with an estimated cost between $1,000,000 and $5,000,000. The contract requires the contractor to commence work within 5 calendar days of the notice to proceed and maintain a minimum production rate of 2,000 cubic yards per day. The project is anticipated to be awarded in August 2025 and completed between October 2025 and January 2026, with liquidated damages of $2,722 per calendar day of delay. The dredging will be performed using a hydraulic cutterhead dredge, supported by barges, tugboats, and land-based equipment. Dredging is prohibited from January 1 through September 30 due to environmental restrictions, and special provisions are in place to protect marine habitats and endangered species.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
New York District THIS IS AN UNRESTRICTED PROCUREMENT NAISC CODE 237990
SAFETY PAYS
MAINTENANCE DREDGING
LONG ISLAND INTRACOASTAL WATERWAY
FEDERAL NAVIGATION CHANNEL
Solicitation &
Specifications
IFB No. W912DS-25-B-A011
Maintenance Dredging of Long Island Intracoastal Waterway, NY 25 LIIW25
PROJECT TABLE OF CONTENTS
DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS
00 00 01 COVER SHEET
00 00 02 CHECK LIST FOR BIDDERS
00 01 15 LIST OF DRAWINGS
00 10 00 SF 1442 AND BIDDING SCHEDULE
00 21 13 INSTRUCTIONS, CONDITIONS, AND NOTICE TO BIDDERS
00 45 00 REPRESENTATION AND CERTIFICATION
00 70 00 CONTRACT CLAUSES
00 90 00 WAGE RATES
00 90 01 LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
00 90 02 WATER QUALITY CERTIFICATES
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 11 00 SUMMARY OF WORK
01 20 00.00 20 PRICE AND PAYMENT PROCEDURES
01 22 00.00 10 MEASUREMENT AND PAYMENT
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 20 QUALITY CONTROL
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 20.00 10 ENVIRONMENTAL PROTECTION
01 58 00 PROJECT IDENTIFICATION
01 78 00 CLOSEOUT SUBMITTALS
DI VI SI ON 31 - EARTHWORK
31 24 00.00 18 BEACH FILL PLACEMENT
DI VI SI ON 35 - WATERWAY AND MARI NE CONSTRUCTI ON
35 20 23 DREDGING
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
SECTION TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 00 01
COVER SHEET
01/20
PART 1 GENERAL
PART 2 PRODUCTS
PART 3 EXECUTION
-- End of Section Table of Contents --
DOCUMENT 00 00 01 Page 1
SECTION 00 00 01
COVER SHEET
01/20
PART 1 GENERAL
NEW YORK DISTRICT
CORPS OF ENGINEERS
NEW YORK, NEW YORK 10278-0090
INVITATION FOR BIDS
FOR
MAINTENANCE DREDGING
LONG ISLAND INTRACOASTAL WATERWAY
FEDERAL NAVIGATION CHANNEL
SUFFOLK COUNTY, NEW YORK
1. Attached is INVITATION FOR BIDS (IFB) NO. W912DS-25-B-A011.
2. BIDS MUST SET FORTH full, accurate, and complete information as requested by this Invitation for Bids, including attachments. The penalty for making false statements in bids is prescribed in Title 18, United States Code, Section 1001.
3. SUBMISSION OF BIDS: Complete details concerning proper submission of bids are contained in the INSTRUCTIONS, CONDITIONS, AND NOTICES TO BIDDERS (Section 00 21 13).
4. N/A
5. NOTE THE CERTIFICATION OF NONSEGREGATED FACILITIES IN THIS
SOLICITATION. Bidders, Offerors, and applicants are cautioned to note the "Certification of Nonsegregated Facilities" in the solicitation.
Failure of bidder or offeror to agree to the certification will render his bid or offer non-responsive to the terms of solicitation involving awards of contracts exceeding $10,000, which are not exempt from the provisions of Equal Opportunity Clause. (1984 APR)
6. REPRESENTATIONS AND CERTIFICATIONS- SECTION 00 45 00
Bidders and Offerors are required to complete the REPRESENTATIONS AND CERTIFICATIONS and submit them with their bids.
7. THIS PROJECT IS NOT A SMALL BUSINESS SET-ASIDE.
DOCUMENT 00 00 01 Page 2
PART 2 PRODUCTS
PART 3 EXECUTION
-- End of Section --
DOCUMENT 00 00 01 Page 3
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 00 02
CHECK LIST FOR BIDDERS
01/20
PART 1 GENERAL
DOCUMENT 00 00 02 Page 1
SECTION 00 00 02
CHECK LIST FOR BIDDERS
01/20
PART 1 GENERAL
ATTACHED IS IFB FOR
MAI NTENANCE DREDGI NG 2025
LONG I SLAND I NTRACOASTAL WATERWAY
FEDERAL NAVI GATI ON CHANNEL
SUFFOLK COUNTY, NEW YORK
ALL INFORMATION REQUIRED BY THE TERMS OF THIS SOLICITATION MUST BE
FURNISHED. MISTAKES OR OMISSIONS MAY RENDER YOUR BID INELIGIBLE FOR
AWARD. IMPORTANT ITEMS FOR YOU TO CHECK ARE
INCLUDED IN BUT NOT LIMITED TO THOSE LISTED BELOW. THIS
INFORMATION IS FURNISHED ONLY TO ASSIST YOU IN SUBMITTING A
PROPER BID.
__ HAVE YOU ACKNOWLEDGED ALL AMENDMENTS?
__ HAVE YOU COMPLETED THE "REPRESENTATIONS AND CERTIFICATIONS" (SECTION 00
45 00) PORTION OF THE SOLICITATION?
__ IS YOUR DUNS NUMBER LISTED ON THE STANDARD FORM 1442?
__ IS YOUR BID PROPERLY SIGNED?
__ A BID BOND IS REQUIRED. HAS YOUR SURETY PROVIDED YOU WITH A BID BOND ON
STANDARD FORM 24 OR A SIMILAR FORM CONTAINING THE SAME LANGUAGE AS A
STANDARD FORM 24?
__ IS YOUR BID GUARANTEE IN THE PROPER AMOUNT?
__ IS YOUR BID GUARANTEE PROPERLY SIGNED BY BOTH THE BIDDER AND SURETY AND
ARE ALL REQUIRED SEALS AFFIXED?
__ IS THE NAME IN WHICH YOU SUBMITTED THE BID THE SAME ON YOUR BID AS ON
THE BID BOND?
__ IS YOUR BID BOND INCLUDED WITH YOUR BID? (A LATE BID GUARANTEE IS
TREATED THE SAME AS A LATE BID)
__ HAVE YOU ENSURED THAT YOU HAVE NOT RESTRICTED YOUR BID BY ALTERING THE
PROVISIONS OF THE SOLICITATION?
__ WHEN REQUIRED, HAVE YOU ENTERED A UNIT PRICE FOR EACH BID ITEM? (THE
SOLICITATION SPECIFICALLY STATES WHEN THIS IS NECESSARY.)
__ ARE DECIMALS IN YOUR PRICES IN THE PROPER PLACE? ARE YOUR FIGURES
LEGIBLE?
__ IF YOU HAVE MADE ERASURES OR CORRECTIONS ON YOUR BID, ARE THEY
INITIALED BY THE PERSON SIGNING THE BID?
DOCUMENT 00 00 02 Page 2
__ DOES THE ENVELOPE CONTAINING YOUR BID PROPERLY IDENTIFY THAT IT IS A
SEALED BID AND DOES IT CONTAIN THE CORRECT SOLICITATION NUMBER AND BID
OPENING TIME?
__ WILL YOUR BID ARRIVE ON TIME? (SEE PARAGRAPH ENTITLED "LATE
SUBMISSIONS, MODIFICATIONS, AND WITHDRAWALS OF BIDS" IN THE INSTRUCTIONS,
CONDITIONS, AND NOTICES TO BIDDERS, SECTION 00 21 13 OF THE SOLICITATION.)
BIDDER IS RESPOSIBLE TO ENSURE BID IS SUBMITTED ON TIME.
DOCUMENT 00 00 02 Page 3
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 01 15
LIST OF DRAWINGS
02/11
PART 1 GENERAL
1.1 SUMMARY
1.2 CONTRACT DRAWINGS, MAPS, & SPECIFICATIONS
PART 2 PRODUCTS
PART 3 EXECUTION
DOCUMENT 00 01 15 Page 1
SECTION 00 01 15
LIST OF DRAWINGS
02/11
PART 1 GENERAL
1.1 SUMMARY
This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."
1.2 CONTRACT DRAWINGS, MAPS, & SPECIFICATIONS
Contract drawings are as follows:
a. The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
b. The Contractor shall:
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer or Contracting Officer's Representative of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
c. In general:
(1) Large-scale drawings shall in general govern over small-scale drawings. Information and data provided in contract specifications shall govern over similar information and data specified in contract drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
d. Omissions from the drawings or specifications or the misdescription of details of work which are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
e. The work shall conform to the following contract drawings and maps, all of which form a part of these specifications and are
DOCUMENT 00 01 15 Page 2 available in the office of the District Engineer, U.S. Army Corps of Engineers, New York District, 26 Federal Plaza, New York, N.Y.
10278-0090:
Maintenance Dredging of
Long Island Intracoastal Waterway Federal Navigation Channel
Suffolk County, New York
SHEET NO. TITLE
1 Cover Sheet & Index
2 Project Site Plan, Typical Cross Section, NOAA Chart, & Notes
3 Location Map and Detail Sheet
4 Dredging Limit
5 Dredging Limit
6 Dredging Limit
7 Dredging Limit
8 Dredging Limit
9 Dredging Limit
10 Dredging Limit
11 Dredging Limit
12 Dredging Limit
13 Dredging Limit
14 Dredging Limit
15 Dredging Limit
16 Dredging Limit
17 Smith Point County Park
18 Cupsogue Beach County Park
19 Smith Point County Park Profiles
20 Cupsogue Beach County Park Profiles
f. The Contractor shall check all drawings furnished to him immediately upon their receipt and shall promptly notify the Contracting Officer or Contracting Officer's Representative of any discrepancies. Figures marked on drawings shall in general be
DOCUMENT 00 01 15 Page 3 followed in preference to scale measurements unless dimensions are specified. Large-scale drawings shall in general govern over small-scale drawings. Information and data provided in contract specifications shall govern over similar information and data specified in contract drawings. The Contractor shall compare all drawings and verify the figures before laying out the work and will be responsible for any errors which might have thereby been avoided (DOD FAR Suppl. 52.236-7002).
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
DOCUMENT 00 01 15 Page 4
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 10 00
SF 1442 AND BIDDING SCHEDULE
01/20
PART 1 GENERAL
1.1 SF 1442 SOLICITATION, OFFER, AND AWARD
1.2 BID SCHEDULE
PART 2 PRODUCTS
PART 3 EXECUTION
DOCUMENT 00 10 00 Page 1
SECTION 00 10 00
SF 1442 AND BIDDING SCHEDULE
01/20
PART 1 GENERAL
1.1 SF 1442 SOLICITATION, OFFER, AND AWARD
To be provided by Contracting Division.
1.2 BID SCHEDULE
To be provided by Contracting Division.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
DOCUMENT 00 10 00 Page 2
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 21 13
INSTRUCTIONS, CONDITIONS, AND NOTICE TO BIDDERS
01/20
PART 1 GENERAL
DOCUMENT 00 21 13 Page 1
SECTION 00 21 13
INSTRUCTIONS, CONDITIONS, AND NOTICE TO BIDDERS
01/20
PART 1 GENERAL
To be provided by Contracting
DOCUMENT 00 21 13 Page 2
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 45 00
REPRESENTATION AND CERTIFICATION
01/20
PART 1 GENERAL
PART 2 PRODUCTS
PART 3 EXECUTION
DOCUMENT 00 45 00 Page 1
SECTION 00 45 00
REPRESENTATION AND CERTIFICATION
01/20
PART 1 GENERAL
TO BE PROVIDED BY CONTRACTING DIVISION
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
DOCUMENT 00 45 00 Page 2
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 70 00
CONTRACT CLAUSES
01/20
PART 1 GENERAL
PART 2 PRODUCTS
PART 3 EXECUTION
DOCUMENT 00 70 00 Page 1
SECTION 00 70 00
CONTRACT CLAUSES
01/20
PART 1 GENERAL
To be provided by Contracting Division.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
DOCUMENT 00 70 00 Page 2
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 90 00
WAGE RATES
PART 1 GENERAL
1.1 NOTES
PART 2 PRODUCTS
PART 3 EXECUTION
3.1 [Enter Appropriate Subpart Title Here]
DOCUMENT 00 90 00 Page 1
SECTION 00 90 00
WAGE RATES
01/20
PART 1 GENERAL
1.1 NOTES
Wage rates provided by Contracting Division.
A copy of the wage rate shall be displayed at a highly visible location on the dredge at all times for the duration of the project.
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
3.1 [Enter Appropriate Subpart Title Here]
Not Used.
DOCUMENT 00 90 00 Page 2
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 90 01
LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
04/08
PART 1 GENERAL
1.1 SUBMITTALS
PART 2 PRODUCTS
PART 3 EXECUTION
3.1 ATTACHMENTS
3.1.1 Attachment A Long Island Intracoastal Waterway Dredging Area
Reference Map
3.1.2 Attachment B Sample Daily Construction Quality Control Report
3.1.3 Attachment C Project Sign and Safety Sign
3.1.4 Attachment D Title 33 Oil and Hazardous Material Operations
3.1.5 Attachment E Guideline for Preparing the Accident Prevention
Plan
3.1.6 Attachment F Daily Reports for Dredging
3.1.7 Attachment G USACE Transportation and Placement Log
3.1.8 Attachment H Daily Site Safety and Health Inspection Log
3.1.9 Attachment I Whale and Turtle Logs and Incident Report of
Sturgeon
3.1.10 Attachment J 2024 and 2025 Long Island Intracoastal Waterway
Sampling Results Grain Size Analysis - See attachments to this solicitation on SAM.GOV for complete Sampling and Testing Results Package
3.1.11 Attachement K EXAMPLE Submittal Register
3.1.12 Attachment L Survey XYZ Data of 14-17 April 2025 Plans &
Specifications Survey and 7, 8 May 2025 Plans & Specifications Survey - See attachments to this solicitation on SAM.GOV for complete set of XYZ Data
DOCUMENT 00 90 01 Page 1
SECTION 00 90 01
LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
04/08
PART 1 GENERAL
1.1 SUBMITTALS
Not Used
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
3.1 ATTACHMENTS
The following attachments have been provided for reference to the bidder for use in performing the contract requirements.
DOCUMENT 00 90 01 Page 2
3.1.1 Attachment A Long Island Intracoastal Waterway Dredging Area Reference Map
3.1.2 Attachment B Sample Daily Construction Quality Control Report
3.1.3 Attachment C Project Sign and Safety Sign
3.1.4 Attachment D Title 33 Oil and Hazardous Material Operations
3.1.5 Attachment E Guideline for Preparing the Accident Prevention Plan
3.1.6 Attachment F Daily Reports for Dredging
3.1.7 Attachment G USACE Transportation and Placement Log
3.1.8 Attachment H Daily Site Safety and Health Inspection Log
3.1.9 Attachment I Whale and Turtle Logs and Incident
Report of Sturgeon
3.1.10 Attachment J 2024 and 2025 Long Island Intracoastal Waterway Sampling Results Grain Size Analysis - See attachments to this solicitation on SAM.GOV for complete Sampling and Testing Results Package
3.1.11 Attachement K EXAMPLE Submittal Register
3.1.12 Attachment L Survey XYZ Data of 14-17 April 2025 Plans & Specifications Survey and 7, 8 May 2025 Plans & Specifications Survey - See attachments to this solicitation on SAM.GOV for complete set of XYZ Data
DOCUMENT 00 90 01 Page 3
SECTION 00 90 01
ATTACHMENT A
DREDGING AREA REFERENCE MAP
CONTRACTORS QUALITY CONTROL REPORT (QCR)
DAILY LOG OF CONSTRUCTION
REPORT NUMBER
XX
DATE
DD MM YYYY - Monday
CONTRACT NUMBER
W912DSXXCXXXX
PROJECT
Maintenance Dredging of Long Island Intracoastal Waterway, NY
CONTRACTORS ON SITE (Report first and/or last day contractors were on site)
Name First Day Last Day
Dredging Contractor Co. MM/DD/YYYY
QC NARRATIVES
XX
PREP/INITIAL DATES
XX preparatory inspections held today
XX initial inspections held today
ACTIVITY START/FINISH
XX activities were started or finished today
QC REQUIREMENTS
XX QC requirements were entered today
ISSUED QA/QC DEFICIENCES
XX QC Deficiency items were issued today
CORRECTED QA/QC DEFICENCY
XX QC Deficiency items were corrected today
CONTRACTOR WEATHER
Weather Caused No Delay Temperature Min XX F Max XX F
No Precipitation XX MPH Wind
Dredging Contractor Co.
00 90 01: Attachment B
MM/DD/YYYY
CONTRACTORS QUALITY CONTROL REPORT (QCR)
DAILY LOG OF CONSTRUCTION
REPORT NUMBER
XX
DATE
DD MM YYYY - Monday
CONTRACT NUMBER
W912DSXXCXXXX
PROJECT
Maintenance Dredging of Long Island Intracoastal Waterway, NY
LABOR HOURS
Number of
Employees Hours WorkedPosition
XX.00 XX.00N/A
Crew
No labor hours to report
Total hrs worked to date: XX.00 Hrs worked MTD: XX.00 Total: XX.00 XX.00
EQUIPMENT HOURS
Equipment Name Idle
Hours Operating
HoursDescription
No equipment hours to report XX.00 XX.00N/A
Total operating hrs to date: XX.00 Idle hrs MTD: XX.00 Opr hrs MTD: XX.00 Total: XX.00 XX.00
MISHAP REPORTING
XX mishaps reported today
QC REPRESENTATIVE SIGNATURE DATE SUPERINTENDENT'S INITIALS DATE
CONTRACTOR CERTIFICATION On behalf of the contractor, I certify that this Report is complete and correct and all equipment and material used and work performed during this Reporting period are in compliance with the contract plans and specifications, to the best of my knowledge, except as noted above.
00 90 01: Attachment B
EP310-1-6a 01 Jun 06
Below are two samples of the Construc tion Project Identification sign showing how this panel is adaptable for use to identify either military (top) or civil works projects (bottom). The graphic format for this 4'x 6' sign panel follows the legend guidelines and layout as specified below.
The large 4'x 4' section of the panel on the right is to be white with black legend.
The 2'x 4' section of the sign on the left
Legend Group 1: One- to two-line description of Corps relationship to project.
Color: White Typeface: 1.25" Helvetica Regular Maximum line length: 19"
Legend Group 2: New York District (optional). Placed below 10.5" reverse Signature (6" Castle).
Color: White Typeface: 1.25" Helvetica Regular
Legend Group 2a: One- to three-line identifica tion of Military or Civil Works sponsor (optional). Place below Corps Signature to cross-align with Group 5a-b.
Color: White Typeface: 1.25" Helvetica Regular Maximum line length: 19"
Legend Group 3: One- to three-line project title legend describes the work being done under this contract.
Color: Black Typeface: 3" Helvetica Bold Maximum line length: 42"
Legend Group 4: One- to two-line identification of project or facility (civil works) or name of sponsoring department (military).
Color: Black Typeface: 1.5" Helvetica Regular Maximum line length: 42"
Cross-align the first line of Legend Group 4 with the first line of the Corps Signature (US Army Corps) as shown.
Legend Groups 5a-b: One- to five-line identification of prime contractors including:
type (architect, general contractor, etc.), corporate or firm name, city, state. Use of Legend Group 5 is optional.
Color: Black Typeface: 1.25" Helvetica Regular Maximum line length: 21"
All typography is flush left and rag right, upper and lower case with initial capitals only as shown. Letter- and word-spacing to follow Corps standards as specified in Appendix D.
Construction Project Identification Sign with the full Corps Signature (reverse version) is to be screen-printed Commu nication Red on the white background The designation of a sponsor in the area indicated is optional with Military or Civil Works construction signs. Signs may list one sponsoring entity. If agreement on a sponsor designation cannot be achieved, the area should be left blank.
This sign is to be placed with the Safety Performance sign shown on the following page. Mounting and fabrication details are provided on page 16-4.
Special applications or situations not covered in these guidelines should be referred to the district Sign Program Manager.
4.5"
2"
6.25"
10.5"
2.5"
Sign Type
Legend Size (A)
Panel Size
3" 42"
Maintenance Dredging and Beach Nourishment
3"
Long Island Intracoastal Waterway, Federal Navigation Channel, New York
Contractor:
21" 1" 21"
Maintenance Dredging and Beach Nourishment
Long Island Intracoastal Waterway, Federal Navigation Channel, New York
Contractor:
3"
2"
Post Size
Specification Code
Mounting Height
Color Bkg/Lgd
6"
4.5"
4.5"
6"
2.25"
9.5"
1.875" 1.875" 1.875" 1.875"
7.75"
CID-01 various 4'x6' 4"x4" HDO-3 48" WH-RD/BK
16-2
US Army Corps of Engineers
NORTH ATLANTIC DIVISION
NEW YORK DISTRICT Operations Division
US Army Corps of Engineers
NORTH ATLANTIC DIVISION
NEW YORK DISTRICT Operations Division
Each contractor's safety record is to be posted on Corps managed or supervised construction projects and mounted with the Construction Project Identification sign specified on page 16-2.
The graphic format, color, size and type faces used on the sign are to be repro duced exactly as specified below. The
Legend Group 1: Standard two-line title "Safety is a Job Requirement" with 8" (outside diameter) Safety Green first aid logo.
Color: To match Pantone system 347 Typeface: 3" Helvetica Bold Color: Black
Legend Group 2: One- to two-line project title legend describes the work being done under this contract and name of host project.
Color: Black Typeface: 1.5" Helvetica Regular Maximum line length: 42"
Legend Group 3: One- to two-line identifica tion: name of prime contractor and city, state address. Color: Black Typeface: 1.5" Helvetica Regular Maximum line length: 42"
Legend Group 4: Standard safety record captions as shown.
Color: Black Typeface: 1.25" Helvetica Regular
Replaceable numbers are to be mounted on white .060 aluminum plates and screw mounted to background.
Color: Black Typeface: 3" Helvetica Regular Plate size: 2.5" x 4.5"
All typography is flush left and rag right, upper and lower case with initial capitals only as shown. Letter- and word-spacing to follow
Corps standards as specified in Appendix D.
Attachment C - Page 3 of 4
Safety Performance Sign EP 310-1-6a 01 Jun 06 title with First Aid logo in the top section of the sign, and the performance record captions are standard for all signs of this type. Legend groups 2 and 3 below identify the project and the contractor and are to be placed on the sign as shown.
Safety record numbers are mounted on individual metal plates and are screw-
3" 33.030"
I I mounted to the background to allow for daily revisions to posted safety perfor mance record.
Special applications or situations not covered in these guidelines should be referred to the district Sign Program Manager.
eq. 8" eq.
I I I I
6"
4.5"
Safety is a Job I.I.\ Requirement \Tl
10.5"
2.25" 3"
2.25"
3"
4.875"
4.875"
6.75"
3"
MAINTENANCE DREDGING
LONG ISLAND INTRACOASTAL
WATERWAY FEDERAL NAVIGATION
CHANNEL
This project started
Days since last lost time accident
Total lost time injuries
42"
8-3-99
I I I I I rn
3"
4.875"
.75"
4.875"
4.5"
3"
Sign Type
Legend Size (A)
Panel Size
Post Size
Specification Code
Mounting Height
Color Bkg/Lgd
CID-02 various 4'x4' 4"x4" HDO-3 48" WH/BK-SG
2.25" 2.25" 2.25" 2.25"
.75" 0
3"
.75" 0 0 0 0 16-3
00 90 01 ATT. D- 1
[Code of Federal Regulations] [Title 33, Volume 2] [Revised as of July 1, 2005] From the U.S. Government Printing Office via GPO Access
[CITE: 33CFR154.105]
[Page 314-316]
TITLE 33--NAVIGATION AND NAVIGABLE WATERS
CHAPTER I--COAST GUARD, DEPARTMENT OF HOMELAND SECURITY
(CONTINUED)
PART 154_FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK
--Table of Contents
Subpart A_General
Sec. 154.105 Definitions.
As used in this part:
Barrel means a quantity of liquid equal to 42 U.S. gallons. Boundary Line means any of the lines described in 46 CFR part 7. Captain of the Port (COTP) means the U.S. Coast Guard officer commanding a Captain of the Port Zone described in Part 3 of this chapter, or that person's authorized representative.
Caretaker Status denotes a facility where all piping, hoses, loading arms, storage tanks, and related equipment in the marine transfer area are completely free of oil or hazardous materials, where these components have been certified as being gas free, where piping, hoses, and loading arms terminating near any body of water have been blanked, and where the facility operator has notified the COTP that the facility will be in caretaker status.
Commandant means the Commandant of the Coast Guard or an authorized representative.
Contiguous Zone means the entire zone established by the United States under Article 24 of the Convention on the Territorial Sea and the Contiguous Zone, but not extending beyond 12 miles from the baseline from which the breadth of the territorial sea is measured.
District Commander means the officer of the Coast Guard designated by the Commandant to command a Coast Guard District, as described in Part 3 of this chapter or an authorized representative.
Facility means either an onshore or offshore facility, except for an offshore facility operating under the jurisdiction of the Secretary of the Department of Interior, and includes, but is not limited to, structure, equipment, and appurtenances thereto, used or capable of being used to
00 90 01 ATT. D- 2
transfer oil or hazardous materials to or from a vessel or public vessel. Also included are facilities that tank clean or strip and any floating structure that is used to support an integral part of the facility's operation. A facility includes federal, state, municipal, and private facilities.
Facility operator means the person who owns, operates, or is responsible for the operation of the facility. Hazardous material means a liquid material or substance, other than oil or liquefied gases, listed under 46 CFR 153.40 (a), (b), (c), or (e).
Marine transfer area means that part of a waterfront facility handling oil or hazardous materials in bulk between the vessel, or where the vessel moors, and the first manifold or shutoff valve on the pipeline encountered after the pipeline enters the secondary containment required under 40 CFR 112.7 or 49 CFR 195.264 inland of the terminal manifold or loading arm, or, in the absence of secondary containment, to the valve or manifold adjacent to the bulk storage tank, including the entire pier or wharf to which a vessel transferring oil or hazardous materials is moored.
MARPOL 73/78 means the International Convention for the Prevention of Pollution from Ships, 1973 (done at London, November 2, 1973) as modified by the Protocol of 1978 relating to the International Convention for the Prevention of Pollution from Ships, 1973 (done at London, February 17, 1978).
Mobile facility means any facility that can readily change location, such as a tank truck or tank car, other than a vessel or public vessel.
Monitoring device means any fixed or portable sensing device used to monitor for a discharge of oil or hazardous material onto the water, within or around a facility, and designed to notify operating personnel of a discharge of oil or hazardous material.
Officer in Charge, Marine Inspection (OCMI) means the U.S. Coast Guard officer commanding a Marine Inspection Zone described in Part 3 of this chapter, or an authorized representative.
Offshore facility means any facility of any kind located in, on, or under, any of the navigable waters of the United States, and any facility of any kind which is subject to the jurisdiction of the United States and is located in, on, or under any other waters, other than a vessel or a public vessel.
Oil means oil of any kind or in any form, including but not limited to, petroleum, fuel oil, sludge, oil refuse, and oil mixed with wastes other than dredged spoil.
Onshore facility means any facility (including, but not limited to, motor vehicles and rolling stock) of any kind located in, on, or under any land within the United States other than submerged land.
Person in charge means an individual designated as a person in charge of transfer operations under Sec. 154.710 (for facilities) or Sec. 155.700 (for vessels) of this chapter.
00 90 01 ATT. D - 3
STCW means the International Convention on Standards of Training, Certification, and Watchkeeping for Seafarers, 1978.
Self-propelled tank vessel means a self-propelled tank vessel other than a tankship.
Tank barge means a non-self-propelled tank vessel.
Tankship means a self-propelled tank vessel constructed or adapted primarily to carry oil or hazardous material in bulk in the cargo spaces.
Tank vessel means a vessel that is constructed or adapted to carry, or that carries, oil or hazardous material in bulk as cargo or cargo residue, and that--
(a) Is a vessel of the United States;
(b) Operates on the navigable waters of the United States; or
(c) Transfers oil or hazardous material in a port or place subject to the jurisdiction of the
United States.
Transfer means any movement of oil or hazardous material to, from, or within a vessel by means of pumping, gravitation, or displacement. A transfer is considered to begin when the person in charge on the transferring vessel or facility and the person in charge on the receiving facility or vessel first meet to begin completing the declaration of inspection as required by Sec. 156.150 of this chapter. A transfer is considered to be complete when all the connections for the transfer have been uncoupled and secured with blanks or other closure devices and both of the persons in charge have completed the declaration of inspection to include the date and time the transfer was complete.
Vessel operator means a person who owns, operates, or is responsible for the operation of a vessel.
[CGD 75-124, 45 FR 7169, Jan. 31, 1980, as amended by CGD 86-034, 55 FR 36252, Sept. 4, 1990; CGD 79-116, 60 FR 17141, Apr. 4, 1995; CGD 93-056, 61 FR 41458, Aug. 8, 1996; 62 FR 3610, Jan. 24, 1997; CGD 79-116, 62 FR 25125, May 8, 1997]
TRANSFER OPERATIONS--Table of Contents
Subpart A_Oil and Hazardous Material Transfer Operations
Sec.
156.100 Applicability.
156.105 Definitions.
156.107 Alternatives.
156.110 Exemptions.
156.111 Incorporation by reference.
00 90 01 ATT. D - 4
156.112 Suspension order.
156.113 Compliance with suspension order.
156.115 Person in charge: Limitations.
156.118 Advance notice of transfer.
156.120 Requirements for transfer.
156.125 Discharge cleanup.
156.130 Connection.
156.150 Declaration of inspection.
156.160 Supervision by person in charge.
156.170 Equipment tests and inspections.
Subpart B_Special Requirements for Lightering of Oil and Hazardous Material Cargoes
156.200 Applicability.
156.205 Definitions.
156.210 General.
156.215 Pre-arrival notices.
156.220 Reporting of incidents.
156.225 Designation of lightering zones.
156.230 Factors considered in designating lightering zones.
Subpart C_Lightering Zones and Operational Requirements for the Gulf of Mexico
156.300 Designated lightering zones.
156.310 Prohibited areas.
156.320 Maximum operating conditions.
156.330 Operations.
Authority: 33 U.S.C. 1231, 1321(j); 46 U.S.C. 3703a, 3715; E.O.11735, 3 CFR 1971-1975 Comp., p. 793. Section 156.120(bb) and (ee) are also issued under 46 U.S.C. 3703.
This subpart applies to the transfer of oil or hazardous material on the navigable waters or contiguous zone of the United States to, from, or within each vessel with a capacity of 250 barrels or more; except that, this subpart does not apply to transfer operations within a public vessel.
00 90 01 ATT. D - 5
[CGD 86-034, 55 FR 36255, Sept. 4, 1990]
Sec. 156.105 Definitions.
Except as specifically stated in a section, the definitions in Sec. 154.105 of this chapter apply to this subpart.
[CGD 90-071a, 59 FR 53291, Oct. 21, 1994]
Sec. 156.107 Alternatives.
(a) The COTP may consider and approve alternative procedures, methods, or equipment standards to be used by a vessel or facility operator in lieu of any requirements in this part if:
(1) Compliance with the requirement is economically or physically impractical;
(2) The vessel or facility operator submits a written request for the alternative at least 30 days before operations under the alternative are proposed, unless the COTP authorizes a shorter time;
and
(3) The alternative provides an equivalent level of safety and protection from pollution by oil or hazardous material, which is documented in the request.
(b) The COTP takes final approval or disapproval action on any alternative requested, in writing, within 30 days of receipt of the request.
[CGD 75-124, 45 FR 7177, Jan. 31, 1980, as amended by CGD 86-034, 55 FR 36255, Sept. 4, 1990]
Sec. 156.110 Exemptions.
(a) The Assistant Commandant for Marine Safety, Security and Environmental Protection, acting for the Commandant, may grant an exemption or partial exemption from compliance with any requirement in this part, and the District Commander may grant an exemption or partial exemption from compliance with any operating condition or requirement in subpart C of this part, if:
(1) The vessel or facility operator submits an application for exemption via the COTP at least 30 days before operations under the exemption are proposed, unless the COTP authorizes a shorter time; and
(2) It is determined, from the application, that:
00 90 01 ATT. D - 6
(i) Compliance with a specific requirement is economically or physically impractical;
(ii) No alternative procedures, methods, or equipment standards exist that would provide an equivalent level of safety and protection from pollution by oil or hazardous material; and
(iii) The likelihood of oil or hazardous material being discharged as a result of the exemption is minimal.
(b) If requested, the applicant must submit any appropriate information, including an environmental and economic assessment of the effects of and reasons for the exemption and proposed procedures, methods or equipment standards.
(c) The exemption may specify the procedures, methods, or equipment standards that will apply.
(d) An exemption is granted or denied in writing. The decision of the Assistant Commandant for Marine Safety, Security and Environmental Protection is a final agency action.
[CGD 75-124, 45 FR 7177, Jan. 31, 1980, as amended by CGD 88-052, 53 FR 25122, July 1, 1988; CGD 86-034, 55 FR 36255, Sept. 4, 1990; CGD 93-081, 60 FR 45017, Aug. 29, 1995;
CGD 96-026, 61 FR 33666, June 28, 1996; CGD 93-056, 61 FR 41461, Aug. 8, 1996; CGD0 97- 023, 62 FR 33364, June 19, 1997; USCG-2002-12471, 67 FR 41333, June 18, 2002]
Sec. 156.111 Incorporation by reference.
(a) Certain material is incorporated by reference into this part with the approval of the Director of the Federal Register under 5 U.S.C. 552(a) and 1 CFR part 51. To enforce any edition other than that specified in paragraph (b) of this section, the Coast Guard must publish notice of the change in the Federal Register; and the material must be available to the public. All approved material is available for inspection at the U.S. Coast Guard, Office of Compliance (G-MOC), 2100 Second Street, SW, Washington, DC 20593-0001 and at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202- 741-6030, or go to: http://www.archives.gov/federal--register/code--of--federal-- regulations/ibr- -locations.html. All approved material is available from the sources indicated in paragraph (b) of this section.
(b) The material approved for incorporation by reference in this part and the sections affected are as follows:
Oil Companies International Marine Forum (OCIMF) 15th Floor, 96 Victoria Street, London SW1E 5JW, England.
Ship to Ship Transfer Guide (Petroleum), Second Edition, 1988-- 156.330.
International Chamber of Shipping
12 Carthusian Street, London EC1M 6EB, England.
Guide to Helicopter/Ship Operations, Third Edition, 1989--156.330.
00 90 01 ATT. D - 7
[CGD 93-081, 60 FR 45017, Aug. 29, 1995, as amended by CGD 96-026, 61 FR 33666, June 28, 1996; 69 FR 18803, Apr. 9, 2004]
Sec. 156.112 Suspension order.
The COTP or OCMI may issue a suspension order to suspend transfer operations to the vessel or facility operator when the COTP or OCMI finds there is a condition requiring action to prevent the discharge or threat of discharge of oil or hazardous material, or when the COTP or OCMI is unable to verify compliance with the regulations through an inspection. A suspension order:
(a) May be effective immediately;
(b) Is issued in writing unless it is effective immediately and then it may be issued orally and followed up in writing;
(c) Includes a statement of each condition requiring correction to--
(1) Prevent the discharge of oil or hazardous material; or
(2) Comply with Sec. 154.735 of this chapter; and
(d) Is withdrawn when the COTP, OCMI, or District Commander, as applicable, determines that the condition requiring action to prevent the discharge or threat of discharge of oil or hazardous material has been corrected or no longer exists.
[CGD 75-124, 45 FR 7177, Jan. 31, 1980, as amended by CGD 86-034, 55 FR 36255, Sept. 4, 1990]
Sec. 156.113 Compliance with suspension order.
(a) No vessel or facility operator to whom a suspension order has been issued may conduct transfer operations from the time the order is effective until that order is withdrawn by the applicable COTP, OCMI, or by the District Commander.
(b) The vessel or facility operator may request reconsideration of the suspension order either orally or in writing to the COTP or OCMI who issued it. The request may contain supporting documentation and evidence that the vessel or facility operator wishes to have considered.
(c) Any person not satisfied with a ruling made under the procedure contained in paragraph (b) of this section may appeal that ruling in writing, except as allowed under paragraph (e) of this section, to the Coast Guard District Commander of the district in which the suspension order was issued. The appeal may contain supporting documentation and evidence that the appellant wishes to have considered. The appeal does not stay the effect of the suspension order while the COTP or OCMI ruling is being reviewed. The District Commander issues a ruling after reviewing the appeal.
(d) The ruling by the District Commander is final agency action.
(e) If the delay in presenting a written appeal under paragraph (c)
00 90 01 ATT. D - 8
of this section would have a significant adverse impact on the appellant, the appeal may initially be presented orally. If an initial presentation of the appeal is made orally, the appellant must submit the appeal in writing within five days of the oral presentation to the District Commander to whom the oral appeal was made, containing, at a minimum the basis for the appeal and a summary of the material presented orally.
Sec. 156.115 Person in charge: Limitations.
(a) No person may serve as the person in charge of transfer operations on more than one vessel at a time during transfers between vessels or between two or more vessels and a facility unless authorized by the COTP.
(b) No person may serve as the person in charge of both a vessel and a facility during transfer operations unless authorized by the COTP.
Sec. 156.118 Advance notice of transfer.
(a) The COTP may require a facility operator to notify the COTP of the time and place of each transfer operation at least 4 hours before it begins for facilities that:
(1) Are mobile;
(2) Are in a remote location;
(3) Have a prior history of oil or hazardous material spills; or
(4) Conduct infrequent transfer operations.
(b) In the case of a vessel to vessel transfer, the COTP may require a vessel operator of a lightering or fueling vessel to notify the COTP of the time and place of each transfer operation, as specified by the COTP, at least 4 hours before it begins.
(c) No person may conduct such transfer operations until advance notice has been given as specified by the COTP.
Note: The notification may be accomplished by submitting a written schedule, periodically updated to be current.
00 90 01 ATT. D - 9
Sec. 156.120 Requirements for transfer.
A transfer is considered to begin when the person in charge on the transferring vessel or facility and the person in charge on the receiving facility or vessel first meet to begin completing the declaration of inspection, as required by Sec. 156.150 of this part. No person shall conduct an oil or hazardous material transfer operation unless:
(a) The vessel's moorings are strong enough to hold during all expected conditions of surge, current, and weather and are long enough to allow adjustment for changes in draft, drift, and tide during the transfer operation;
(b) Transfer hoses and loading arms are long enough to allow the vessel to move to the limits of its moorings without placing strain on the hose, loading arm, or transfer piping system;
(c) Each hose is supported to prevent kinking or other damage to the hose and strain on its coupling.
(d) Each part of the transfer system is aligned to allow the flow of oil or hazardous material;
(e) Each part of the transfer system not necessary for the transfer operation is securely blanked or shut off;
(f) The end of each hose and loading arm that is not connected for the transfer of oil or hazardous material is blanked off using the closure devices required by Sec. Sec. 154.520 and
155.805 of this chapter;
(g) The transfer system is attached to a fixed connection on the vessel and the facility except that when a vessel is receiving fuel, an automatic back pressure shutoff nozzle may be used;
(h) Each overboard discharge or sea suction valve that is connected to the vessel's transfer or cargo tank system is sealed or lashed in the closed position; except when used to receive or discharge ballast in compliance with 33 CFR Part 157;
(i) Each transfer hose has no unrepaired loose covers, kinks, bulges, soft spots, or any other defect which would permit the discharge of oil or hazardous material through the hose material and no gouges, cuts, or slashes that penetrate the first layer of hose reinforcement (``reinforcement'' means the strength members of the hose, consisting of fabric, cord and/or metal);
(j) Each hose or loading arm in use meets Sec. Sec. 154.500 and 154.510 of this chapter, respectively;
(k) Each connection meets Sec. 156.130;
(l) Any monitoring devices required by Sec. 154.525 of this chapter are installed and operating properly;
(m) The discharge containment equipment required by Sec. 154.545 of this chapter is readily accessible or deployed as applicable;
(n) The discharge containment required by Sec. Sec. 154.530, 155.310, and 155.320 of this chapter, as applicable, is in place and periodically drained to provide the required capacity;
(o) Each drain and scupper is closed by the mechanical means required by Sec. 155.310;
(p) All connections in the transfer system are leak free except that a component in the transfer system, such as the packing glands of a pump, may leak at a rate that does not exceed the capacity of the discharge containment provided during the transfer operation;
(q) The communications required by Sec. Sec. 154.560 and 155.785 of this chapter are operable for the transfer operation;
00 90 01 ATT. D - 10
(r) The emergency means of shutdown required by Sec. Sec. 154.550 and 155.780 of this chapter, as applicable, is in position and operable;
(s) There is a person in charge on the transferring vessel or facility and the receiving vessel or facility except as otherwise authorized under Sec. 156.115;
(t) Each person in charge required by paragraph (s) of this section:
(1) Is at the site of the transfer operation and immediately available to the transfer personnel;
(2) Has in his or her possession a copy of the facility operations manual or vessel transfer procedures, as appropriate; and
(3) Conducts the transfer operation in accordance with the facility operations manual or vessel transfer procedures, as appropriate;
(u) The personnel required, under the facility operations manual and the vessel transfer procedures, to conduct the transfer operation:
(1) Are on duty; and
(2) Conduct the transfer operation in accordance with the facility operations manual or vessel transfer procedures, as appropriate;
(v) At least one person is at the site of the transfer operation who fluently speaks the language or languages spoken by both persons in charge;
(w) The person in charge of the transfer on the transferring vessel or facility and the person in charge of it on the receiving vessel or facility have held a conference, to ensure that each person in charge understands--
(1) The identity of the product to be transferred;
(2) The sequence of transfer operations;
(3) The transfer rate;
(4) The name or title and location of each person participating in the transfer operation;
(5) Details of the transferring and receiving systems including procedures to ensure that the transfer pressure does not exceed the maximum allowable working pressure (MAWP) for each hose assembly, loading arm and/or transfer pipe system;
(6) Critical stages of the transfer operation;
(7) Federal, state, and local rules that apply to the transfer of oil or hazardous material;
(8) Emergency procedures;
(9) Discharge containment procedures;
(10) Discharge reporting procedures;
(11) Watch or shift arrangement;
(12) Transfer shutdown procedures; and,
(13) If the persons use radios, a predetermined frequency for communications during the transfer, agreed upon by both.
(x) The person in charge of transfer operations on the transferring vessel or facility and the person in charge of transfer operations on the receiving vessel or facility agree to begin the transfer operation;
(y) Between sunset and sunrise the lighting required by Sec. Sec. 154.570 and 155.790 of this chapter is provided; and
(z) For transfer operations between tank barges from sunset to sunrise, lighting is provided as described in Sec. 155.790 of this chapter.
(aa) A transfer operation which includes collection of vapor emitted from a vessel's cargo tanks through a venting system not located on the vessel must have the following verified by the person in charge:
00 90 01 ATT. D - 11
(1) Each manual valve in the vapor collection system is correctly positioned to allow the collection of cargo vapor;
(2) A vapor collection hose or arm is connected to the vessel's vapor connection;
(3) The electrical insulating device required by Sec. 154.810(g) of this chapter or 46 CFR 39.40-3(c) is fitted between the facility vapor connection and the vessel vapor connection;
(4) The initial loading rate and the maximum transfer rate are determined;
(5) The maximum and minimum operating pressures at the facility vapor connection are determined;
(6) The tank barge overfill control system, if installed, is connected to the facility, tested, and operating properly;
(7) The following have been performed not more than 24 hours prior to the start of the transfer operation:
(i) Each alarm and automatic shutdown system required by subpart E of part 154 of this chapter and 46 CFR part 39 has been tested and found to be operating properly, and
(ii) Analyzers required by Sec. 154.820(a), Sec. 154.824 (d) and (e) of this chapter or 46 CFR 39.40-3(a) have been checked for calibration by use of a span gas;
(8) Each vapor recovery hose has no unrepaired loose covers, kinks, bulges, soft spots, or any other defect which would permit the discharge of vapor through the hose material, and no external gouges, cuts, or slashes that penetrate the first layer of hose reinforcement; and
(9) The oxygen content of the vessel's cargo tanks, if inerted, is at or below 8 percent by volume.
(bb) If the transfer operation involves loading oil, as defined in Sec. 151.05 of this chapter, into a cargo tank, the overfill device required by Sec. 155.480 of this chapter is installed and operating properly.
(cc) Smoking is not permitted in the facilities marine transfer area except in designated smoking areas.
(dd) Welding, hot work operations and smoking are prohibited on vessels during the transfer of flammable or combustible materials, except that smoking may be permitted in accommodation areas designated by the master.
(ee) Each tank level or pressure monitoring device required under 33 CFR 155.490 must be activated and monitored whenever the tank is not actively being subjected to cargo operations.
(Approved by the Office of Management and Budget under control number 2115-0506)
[CGD 75-124, 45 FR 7177, Jan. 31, 1980, as amended by CGD 88-102, 55 FR 25445, June 21, 1990; CGD 86-034, 55 FR 36255, Sept. 4, 1990; CGD 90-071a, 59 FR 53291, Oct. 21, 1994;
CGD 93-056, 61 FR 41461, Aug. 8, 1996; CGD 79-116, 62 FR 25127, May 8, 1997; USCG- 2001-9046, 67 FR 58524, Sept. 17, 2002]
Subpart A--Oil and Hazardous Material Transfer Operations
Sec. 156.125 Discharge cleanup.
(a) Each person conducting the transfer operation shall stop the transfer operation whenever oil or hazardous material from any source is discharged:
00 90 01 ATT. D - 12
(1) In the transfer operation work area; or
(2) Into the water or upon the adjoining shoreline in the transfer area.
(b) Except as permitted under paragraph (c) of this section, no person may resume the transfer operation after it has been stopped under paragraph (a) of this section, unless:
(1) Oil or hazardous material discharged in the transfer operation work area is cleaned up; and
(2) Oil or hazardous material discharged into the water or upon the adjoining shoreline is cleaned up, or is contained and being cleaned up.
(c) The COTP may authorize resuming the transfer operation if it is deemed appropriate.
Sec. 156.130 Connection.
(a) Each person who makes a connection for transfer operations shall:
(1) Use suitable material in joints and couplings to ensure a leak-free seal;
(2) Use a bolt in at least every other hole, and in no case less than four bolts, in each temporary bolted connection that uses a flange that meets American National Standards Institute (ANSI) standard flange requirements under Sec. 154.500(d)(2) of this chapter;
(3) Use a bolt in each hole in each temporary bolted connection that uses a flange other than one that meets ANSI standards;
(4) Use a bolt in each hole of each permanently connected flange;
(5) Use bolts of the correct size in each bolted connection; and
(6) Tighten each bolt and nut uniformly to distribute the load and sufficiently to ensure a leak free seal.
(b) A person who makes a connection for transfer operations must not use any bolt that shows signs of strain or is elongated or deteriorated.
(c) Except as provided in paragraph (d) of this section, no person may use a connection for transfer operations unless it is:
(1) A bolted or full threaded connection; or
(2) A quick-connect coupling acceptable to the Commandant.
(d) No person may transfer oil or hazardous material to a vessel that has a fill pipe for which containment cannot practically be provided unless an automatic back pressure shutoff nozzle is used.
[CGD 75-124, 45 FR 7177, Jan. 31, 1980, as amended by CGD 86-034, 55 FR 36256, Sept. 4, Sec. 156.150 Declaration of inspection.
00 90 01 ATT. D
-13
(a) No person may transfer oil or hazardous material to or from a vessel unless each person in charge, designated under Sec. Sec. 154.710 and 155.700 of this chapter, has filled out and signed the declaration of inspection form described in paragraph (c) of this section.
(b) No person in charge may sign the declaration of inspection unless he or she has determined by inspection, and indicated by initialling in the appropriate space on the declaration of inspection form, that the facility or vessel, as appropriate, meets Sec. 156.120.
(c) The declaration of inspection may be in any form but must contain at least:
(1) The name or other identification of the transferring vessel or facility and the receiving vessel or facility;
(2) The address of the facility or location of the transfer operation if not at a facility;
(3) The date and time the transfer operation is started;
(4) A list of the requirements in Sec. 156.120 with spaces on the form following each requirement for the person in charge of the vessel or facility to indicate by initialling that the requirement is met for the transfer…