Summary: Plans for Proposed Project - West Beach Parking Pedestrian Bridge Replacement
This document contains construction plans and specifications prepared by the Federal Highway Administration's Eastern Federal Lands Highway Division for the replacement of a flood-damaged wooden pedestrian bridge at West Beach Parking in Sandy Point National Wildlife Refuge on the Island of St. Croix, U.S. Virgin Islands. The project, designated VI ERFO FW SOP 2022-1(1) and authorized under Disaster No. VI2022-1-FWS, addresses damage from Hurricane Fiona. The bridge replacement is a 0.003-mile project with a total disturbed area of approximately 73.33 square feet. Construction will utilize Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-24, and includes design loads of 50 psf dead load and 90 psf live load for pedestrian use with a 1,600 lb uniform traffic load capacity.
The work scope encompasses removing the existing timber boardwalk, excavating for substructure, installing four helical piles, installing timber headers and rim joists with glacial stringers, installing wood-plastic composite decking, constructing backfill and grade approach ramps, and implementing erosion and sediment control measures. Key estimated quantities include four helical piles, four Type 3 barricades for temporary traffic control, 32 linear feet of silt fence, and various construction support activities including mobilization, survey and staking, third-party compensation, and contractor testing. The project includes detailed specifications for structural steel, timber materials (Southern Pine No. 2 with pressure treatment and composite components), welding standards conforming to AASHTO/AWS codes, and composite decking samples requiring 30-day pre-construction approval. The receiving waters for stormwater runoff are the West End Salt Pond or Caribbean Sea, with no new impervious surfaces created by the replacement work.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PLANS FOR PROPOSED PROJECT
U.S. VIRGIN ISLANDS
THE ISLAND OF ST. CROIX
PLANS PREPARED BY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
FEBRUARY, 2026
ASHBURN, VIRGINIA
EASTERN FEDERAL LANDS HIGHWAY DIVISION
R
E N
O R
A I
N
N
ST F
R
I
D
D E P A
T
NTOFT A SP
T T
O
U
TE
ATESO
AM
E R
IC
A
M
Project Manager
JATINDER BAINS
Lead Designer
CHRIS BURNELL
Highway Design Manager
BRADLEY PROCTOR
Symbols And Abbreviations
Location Map and Temporary Traffic Control Plan
Tabulation of Quantities
Erosion and Sediment Control Narrative
DESCRIPTION
INDEX TO SHEETS
SHEET
NO
A01
A02-A03
A04
C01
M01
M02 Erosion and Sediment Control Plan
Title Sheet
LANE MILES:
and Bridges on Federal Highway Projects", FP-24.
"Standard Specifications for Construction of Roads
BRIDGE: West Beach Parking Pedestrian Bridge
Hurricane Fiona.
Replacement of flood damaged wooden bridge from
DESCRIPTION OF PROJECT
IMPROVEMENT:
PROJECT LENGTH: 0.003 Miles
SPECIFICATIONS:
DESIGN DESIGNATION:
Know what'sbelow.
before you dig.Call
R
VI ERFO FW SOP 2022-1(1)
WOODEN BRIDGE REPLACEMENT
N
ISLAND
ST. JOHN
ISLAND
ST. THOMAS
ISLAND
ST. CROIX
ISLAND
BUCK
ATLANTIC OCEAN
SEA
CARIBBEAN
(PUERTO RICO)
CULEBRA ISLAND
ISLAND
TORTOLA
18 00 N 18 00 N
18 30 N18 30 N
65 00'W 64 30'W
65 00'W 64 30'W
1100 MILES
TO MIAMI
M
ILE
S
TO
N
E W Y
O R K
UNITED KINGDOMUNITED STATES
VIRGIN ISLANDS
UNITED STATES
THE
KEY MAP
NOT TO SCALE
FW SOP 2022-1(1)
PROJECT VI ERFO
SCALE IN FEET
0 500 1000
PROJECT VI ERFO FW SOP 2022-1(1)
N
S an dy P oi nt R d
W e s te n d S a lt p o n d
Refuge
National Widlife
Sandy Point
Ce nte rlin e R d
Melvin H. E vans Hwy
H a n n a h 's R e s t R d
N ie ls e n B y p
A lo y W e n ty
Whites Bay
Caribbean Sea
Caribbean Sea
C a m p o R ic o R d
N/A
N/A
Standards And Details
R01-R05
S01
Bridge Plans
Disaster No. VI2022-1-FWS
WILDLIFE REFUGE
SANDY POINT NATIONAL
U.S. FISH AND WILDLIFE SERVICE
U.S. DEPARTMENT OF THE INTERIOR
:2
A
M
J a n u a r y
T it le
S h e e t
F W
S
P R
O J E
C T
S
F W
S \S
A N
D \V
I E
R F
O F
W S
O P
-1
(1
H W
Y D
E S
\C A
D D
\A V
I E
R F
O F
W S
O P
-1
(1 tt l.
d g n
PROJECT
NUMBER
SHEET
A01
ERFO Disaster No. VI2022-1-FWS
VI ERFO FW SOP 2022-1(1)
0.00EL.
BH TP
mon.
min.
max.
MP
MOD
ML
monument minimum maximum mile post modification main line
No.
NMSA
NC
N number nominal maximum size aggregate normal crown north
OG
OD
o. to o.
ohwm
o. c.
original ground outside diameter out to out ordinary high water mark on center pvmt.
PT
PST
PSC
PS
prop.
POT
POS
POE
POC
POB
pl.
PI
PGL
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral proposed point on tangent point on spiral point of ending point on curve point of beginning plate point of intersection profile grade line point of curve to spiral point of compound curve point of curve rte.
rt. or RT reqd.
reinf.
RECP
rdwy.
R/W
R.
R route right required reinforcement rolled erosion control product roadway right-of-way range radius spa.
shldr.
sec.
SC
SADT
S spacing, spaces or spaced shoulder section point of spiral to curve seasonal average daily traffic south sidewalk symmetrical solid white point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent stopping sight distance point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot
S/W sym.
SW or SDW
STS
struc.
stiff.
stgr.
std.
Sta.
ST
SSD
SS
SRS
sqyd sqft typ.
Ts
TS
traf.
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral traffic thread temporary bench mark township tangent distance
VPI
vph var.
VC
V vertical point of intersection vehicles per hour varies vertical curve design speed
W west sidewalk symmetrical solid white point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent stopping sight distance point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot
S/W sym.
SW or SDW
STS
struc.
stiff.
stgr.
std.
Sta.
ST
SSD
SS
SRS
sqyd sqft
1 6
1 6
SEC.
SEC.
E
N 0
00000
JH
RBAR
NO. DATE BY REVISIONS
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION SANDY POINT NATIONAL WILDLIFE REFUGE
flg.
fin.
flange finish θs Ø ∆c
DY or DTY DW or DTW
DSY
drwg(s).
dist.
diaph.
diag.
dia.
DHV
D ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
CL
cc or c. to c.
BW
brg.
br.
BP
BM
bldg.
BL
BK
Asph
ASC
appr.
AMD
AH
Agg
ADT
ACP
abut.
spiral central angle diameter curve central angle total central angle dotted yellow dotted white double solid yellow drawing(s) distance diaphragm diagonal diameter design hourly volume directional distribution factor centers curve to spiral continuous construction joint connection concrete column corrugated metal pipe centerline center to center broken white bearing bridge balance point bench mark building baseline back asphalt aggregate surface course approach amendment ahead aggregate average daily traffic asphalt concrete pavement abutment expansion joint excavation existing edge of water equivalent single axle load edge of road equation edge of travel way edge of shoulder edge of pavement embankment elevation electric superelevation rate east exp. jt.
exc.
ex. or exist.
EW
ESAL
ER
EQ or eq.
EOT
EOS
EOP
emb.
elev.
elec.
e E
HW
HLSD
hex.
hdwl.
inv.
INF
ID
K jt.
high water headlight sight distance hexagon headwall invert infinite inside diameter
K-Value joint lat.
lam.
L latitude lamination length of curve
LW
lt. or LT Ls
LPSM
long.
LOD
low water left length of spiral lump sum longitudinal Limits of Disturbance ftg.
gnd or grnd galv.
GAB
ga.
HW
HLSD
hex.
hdwl.
footing ground galvanized graded aggregate base gage (gauge) high water headlight sight distance hexagon headwall
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
Section Line
Section Corner (Found, Projected)
Section Line4
Section Corner (Found, Projected)4
Section Line16
Section Corner (Found, Projected)16
Property Line w/Found Property Corner
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
BLM Lands Boundary
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Railroad
Trail
Intermittent Drainage or Small Creek
Large Creek or River
Lake, Pond or Reservoir
Spring or Seep
Treeline; Individual Trees
Material Source; Bore Hole; Test Pit
Spot Elevation; Coordinate Grid Tick
Control Point (Terrestrial and GPS); Jump Hub
Sheet 1 of 2
:5
J u ly
S
H E
E T
P
R O
J E
C T
S
F W
S \S
A N
D \V
I E
R F
O F
W S
O P
-1 (1
H
W Y
D
E S
\C A
D D
\A
-A
V
I E
R F
O F
W S
O P
-1 (1 s y m
.d g n
SYMBOLS AND ABBREVIATIONS
PROJECT
A02
N
AREA PATTERN
WETLAND BOUNDARY
PROJECT SPECIFIC SYMBOLS AND ABBREVIATIONS:
U.S. DEPARTMENT OF TRANSPORTATION SANDY POINT NATIONAL WILDLIFE REFUGE
Fiber Roll or Wattle
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Concrete Barrier
Slope Stake Limits
Delineators
Signs (single, double post; portable)
Transition
Toe of Fill
Top of Cut
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Pipe Culvert with Drop Inlet
Box Culvert
Underground Utilities
Overhead/Above Ground Utilities
STEAM = steam, T = telephone, TV = CATV, W = water
P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use, Miscellaneous Utility Features
UP = transformer or junction box, WF = water fountain
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
EXISTING PROPOSED
DI
Pavement Removal / Roadway Obliteration
Full Depth Pavement
Sidewalk Asphalt/Concrete
Mill and Overlay
Overlay
Silt Fence
Diversion Berm
Drainage Divide
Check Dam
Limits of Disturbance
Sheet 2 of 2
:1
F e b r u a r y
S
H E
E T
P R
O J E
C T
S
F W
S \S
A N
D \V
I E
R F
O F
W S
O P
-1 (1
H
W Y
D
E S
\C A
D D
\A
-A
V
I E
R F
O F
W S
O P
-1 (1 s y m .d g n
SYMBOLS AND ABBREVIATIONS
PROJECT
A03
U.S. DEPARTMENT OF TRANSPORTATION SANDY POINT NATIONAL WILDLIFE REFUGE
SCALE IN FEET
0 100 200
N
(17.677194, -64.901778)
VI ERFO FW SOP 2022-1(1)
Sandy Point Rd
SEA
CARIBBEAN
Barricade Type 3 the CO for the final location of the barricades.
Place signs and Type 3 Barricades at the bridge ends. Coordinate with
NOTE:
SCALE IN FEET
0 500 1000
N
S an dy P oi nt R d
W e s te n d S a lt p o n d
Refuge
National Widlife
Sandy Point
Ce nte rlin e R d
Melvin H. E vans Hwy
H a n n a h 's R e s t R d
N ie ls e n B y p
A lo y W e n ty
Whites Bay
Caribbean Sea
Caribbean Sea
C a m p o R ic o R d
West Beach Parking
Staging Area
AREA
CLOSED
EM2-1
2 ROAD
CLOSED
:4
F e b r u a r y
U n ti tl e d
S h e e t
P R
O J E
C T
S
F W
S \S
A N
D \V
I E
R F
O F
W S
O P
-1
(1
H W
Y D
E S
\C A
D D
\A V
I E
R F
O F
W S
O P
-1
(1 lo c .d g n
CONTROL PLAN
TEMPORARY TRAFFIC
LOCATION MAP AND
PROJECT
A04
U.S. DEPARTMENT OF TRANSPORTATION SANDY POINT NATIONAL WILDLIFE REFUGE
:5
P
M a r c h
Q u a n ti ty T a b
P R
O J E
C T
S
F W
S \S
A N
D \V
I E
R F
O F
W S
O P
-1 (1
H
W Y
D
E S
\C A
D D
\C
V I
E R
F O
F W
S O
P
-1
(1 d g n
TABULATION OF QUANTITIES
PROJECT
C01 soon as possible if the disturbance exceeds 1 acre.
to construction and after construction will remain the same. Notify the Contracting Officer (CO) as
No new impervious surface will be created by the bridge replacement. The Runoff Coefficient prior approximately 73.33 sqft. The receiving water is the West End Salt Pond or the Carribean Sea.
Soil disturbing activities include installing helical piles. The total disturbed area for the project is
This project consists of bridge replacement.
Project Description
Response Center at 1-800-424-8802.
requirements under 40 CFR 112. Report spills large enough to discharge to surface waters to the National
Develop and implement a Spill Prevention Control and Countermeasures (SPCC) plan following the material according to Federal, State, and local regulations.
waste materials. Do not dispose of hazardous waste materials into the on-site dumpsters. Dispose of
Store all hazardous waste materials in appropriate and clearly marked containers away from other non-battery fluid. If feasible, conduct these activities in a covered area to avoid contact with storm water.
maintenance could generate spills, leaks, and hazardous wastes like motor oil, diesel, gasoline, and
Hazardous waste will not be generated from normal construction activities. Equipment fueling and containers. Collect and store all waste in dumpsters, or in metal or plastic drums, as appropriate.
Solid waste generated from the project will consist of construction debris, garbage, and empty prevent contamination from fuels, lubricants, hydraulic fluids, or other toxic materials.
Inspect and maintain on a regular basis, all mechanized equipment used in or near surface water to
Waste, garbage, sanitary waste
Soaps, solvents used for vehicle washing
Fuels, oils, equipment-related compounds
Wash-water from concrete, paint, curing compounds, and other construction materials
The following discharges are prohibited:
Prohibited Discharges
Direct storm water to vegetated buffer areas and do not discharge directly into surface waters.
measures.
Do not allow any construction equipment to operate on or access the down-slope side of the perimeter control
Do not allow construction vehicles to track sediment outside the project limits.
No construction access will be permitted through a wetland or waterway.
Officer (CO).
Do not modify the type, size, or location of any control or practice without prior approval from the Contracting for Construction of Roads and Bridges on Federal Highway Projects, FP-24, and the Special Contract Requirements.
measures consist of soil erosion control measures which are also defined and outlined in the Standard Specifications sedimentation of rivers, streams, and impoundments such as lakes, reservoirs, bays, and coastal waters. The
The work consists of applying measures throughout the life of the project to control erosion and to minimize the
The Erosion & Sediment Control Narrative is meant as a guideline for preventing erosion and controlling sediment.
General Guidelines construction limits.
does not leave the project site. Perimeter controls include silt fence and other specified measures outside the
Prior to any clearing, grubbing, or excavation, construct perimeter controls to ensure that disturbed sediment
Phase I Establish Perimeter Controls
Sequence of Construction
Remove all other perimeter controls when directed by the CO.
Phase III Final Construction / Stabilization and staging areas.
Provide watering for dust control within the construction limits, on active haul roads, and in pits storm runoff.
At the end of each day’s grading operations, shape earthwork to minimize and control erosion from bridge.
Apply intermediate controls during rough grading operations. Install silt fence on both sides of the
Phase II Intermediate Controls
Record the inspection date and summary of findings within 24 hours of completing a site inspection.
it becomes 0.5 feet deep at the fence.
becomes damaged, repair or replace as necessary. Remove sediment from behind the silt fence when Silt fence - inspect for buildup of excess sediment, undercutting, sags, and other failures. If the fabric end of the day.
0.25 inches or more, and daily during wet weather. Repair or replace any damaged measures by the Check and maintain erosion control measures once every 7 days and within 24 hours after a rain of according to Section 157, the details shown in the plans, and the individual permitting requirements.
Unless stated otherwise, construct and maintain all vegetated and structural erosion control practices
Maintenance and Inspection Procedures
U.S. DEPARTMENT OF TRANSPORTATION SANDY POINT NATIONAL WILDLIFE REFUGE
:2
P
J a n u a ry
M
P
R O
J E
C T
S
F W
S \S
A N
D \V
I E
R F
O F
W S
O P
-1
(1
H W
Y D
E S
\C A
D D
\M V
I E
R F
O F
W S
O P
-1
(1 d g n
CONTROL NARRATIVE
EROSION AND SEDIMENT
PROJECT
M01
N
SCALE IN FEET
0 20 40
U.S. DEPARTMENT OF TRANSPORTATION SANDY POINT NATIONAL WILDLIFE REFUGE
Wetland boundary
Limit of disturbance
Proposed structure
Place silt fence
© 2026 Microsoft Corporation © 2026 Maxar ©CNES (2026) Distribution Airbus DS
:4
F e b r u a r y
M
P R
O J E
C T
S
F W
S \S
A N
D \V
I E
R F
O F
W S
O P
-1
(1
H W
Y D
E S
\C A
D D
\M V
I E
R F
O F
W S
O P
-1
(1 d g n
CONTROL PLAN
EROSION AND SEDIMENT
PROJECT
PROJECT
M02
9.
8.
7.
6.
5.
4.
3.
2.
1.
into trench.
Extend reinforcement mesh and geotextile diameter wood posts.
Use 70-inch minimum height by 3-inch of the self-fastener angle steel type.
Use 60-inch minimum height steel posts to the reinforcement mesh as directed.
inches in width and fasten adequately
Use geotextile that is a minimum of 45 of 6 line wires with 12-inch stay spacing.
of 32 inches in width and has a minimum
Use reinforcement mesh that is a minimum approval.
detail for attaching to steel posts for so they do not slide down posts. Provide
Attach geotextile and reinforcement mesh water from running around the ends.
Curve ends of silt fence upgrade to prevent
Install silt fence along ground contours.
to the manufacturer's recommendations.
Install pre-assembled silt fence according on the Erosion and Sediment Control Plan.
low-flow drainage ditches where shown
Install silt fence with Class 1 riprap only in
6"
8" trench
6"
24"
A A
JOINING TWO ADJACENT SILT FENCE SECTIONS
Flow
Staple
Posts Staple
Section A
A A
T o e o f s lo p e
Flow
Varies
Fi ll slo pe
SECTION A-A
PLAN
Varies
Flow
ELEVATION
F lo w m in
Flow
Backfilled and compacted soil
Limits of clearing vertical wires
" dia. middle and32 3Min.
6' long post (max.)
m a x im u m
S p a c in g
Geotextile
(See Note 4) reinforcement mesh
Spacing 4' (max.) with Reinforcement mesh
Spacing 10' max. with reinforcement mesh g r o u n d m in
P o s t a b o v e
Section B
Section B
PLAN
ELEVATION
of the silt fence.
flowing around the end to prevent water from
Provide sufficient length
(undisturbed)
Existing ground of the silt fence water from flowing around the end
Provide sufficient length to prevent bottom strand
" dia. top and8 1Min.
Section A
(typ.)
Geotextile
Geotextile (typ.)
6" (max.)
Staple spacing
Installation Detail (this sheet)
See Post and Geotextile into ground (min.)
Steel post driven 24"
Wood post driven 35"
Geotextile (typ.)
Geotextile (typ.)
Staple (typ.)
F lo w
WIRE-BACKED SILT FENCE WITH CHECK DAM
INSTALLATION
POST AND GEOTEXTILE
INSTALLATION AT TOE OF FILL
WIRE-BACKED SILT FENCE
vertical wires
" dia. middle and32 3Min.
bottom strand
" dia. top and8 1Min.
See Note 1 of silt fence check dam) (Use only with installation Riprap, Class 1
NOTES:
NO SCALE
APPROVED FOR USE
E157-02
WIRE-BACKED SILT FENCE
FP-24, FP-14
EFLHD DETAIL
:1
J u ly
S h e e t
P R
O J E
C T
S
F W
S \S
A N
D \V
I E
R F
O F
W S
O P
-1
(1
H W
Y D
E S
\C A
D D
\S td
-D e t\
E -0
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
SPECIFICATION
05/2024
PROJECT
S01
| C01_VI ERFO FW SOP 2022-1(1)-Quantity Tab |
| VI ERFO FW SOP 2022-1(1)_plans_adv |
| A01 |
| VI ERFO FW SOP 2022-1(1)_plans_adv.pdf |
| VI ERFO FW SOP 2022-1(1)_plans_adv |
| A Sheets |
| A02-A03_VI ERFO FW SOP 2022-1(1)_sym |
| A02-A03_VI ERFO FW SOP 2022-1(1)_sym |
| C Sheets |
| C01_VI ERFO FW SOP 2022-1(1) |
| M Sheets |
| M01_VI ERFO FW SOP 2022-1(1) |
| S Sheets |
| E157-02 |
| A04 |
| VI ERFO FW SOP 2022-1(1) - PLANS 100% |
| M02 |