Plans - VA ST TFHRC 50(5).pdf
PDF 20 MB Posted
- Attached to
- Turner-Fairbank Highway Research Center
- Solicitation number
- 693C73-22-R-000017
About this file
This document provides details for a federal solicitation for reconstruction work at the Turner-Fairbank Highway Research Center in Fairfax County, Virginia. The solicitation seeks proposals for excavating existing test lanes, constructing underground walls and drainage systems, and resurfacing areas at the Pavement Test Facility. Work is also required for utility and lighting systems. The project value is estimated between $2 million to $5 million. Offerors must demonstrate experience completing similar projects. Proposals are due as specified in the solicitation to be issued on May 2, 2022. The solicitation will be posted on www.sam.gov under number 693C73-22-R-000017. Annual representations and certifications must also be completed at www.sam.gov and www.dol.gov/vets/vets4212.htm.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0001 - VA ST TFHRC 50(5).pdf | ||
| Categorical Exclusion Form (NEPA).pdf | ||
| FP14_Eng.pdf | ||
| ADV_Offeror Qualifications Form.doc | DOC document | |
| DAD 2021-02_A1.pdf | ||
| ADV_Subcontracting Plan - VA ST TFHRC 50(5).doc | DOC document | |
| RFP Solicitation - VA ST TFHRC 50(5).pdf | ||
| VETS-4212 Form.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PLANS FOR PROPOSED PROJECT
VA ST TFHRC 50(5) Symbols And Abbreviations
Location Map
Typical Section
Tabulation of Quantity
Drainage Plan
Erosion Control Narrative
Standards And Details
Cross Sections
DESCRIPTION
INDEX TO SHEETS
Title Sheet
SHEET
NO
A01
A04
K01-K04
M04
S01-S20
T01-T11
Erosion And Sediment Control Plan
Project Manager
Jatinder Bains
Lead Designer
Shoukat Nawaz
Highway Design Manager
Thang Nguyen
PLANS PREPARED BY
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
ASHBURN, VIRGINIA
April, 2022
R
E N
O R
A I
N
N
ST F
R
I
D
D E P A
T
NTOFT A SP
T T
O
U
TE
ATESO
AM
E R
IC
A
M e(max)
C/A
DESCRIPTION OF PROJECT
miscellaneous work.
system, aggregate base, and hot asphalt concrete pavement. The work also
N/APROJECT LENGTH:
ADT (2021)
ADT (2041)
DHV
%Truck
D
V (MPH)
SPECIFICATIONS:
DESIGN DESIGNATION:
N/ALANE MILES:
and Bridges on Federal Highway Projects", FP-14.
"Standard Specifications for Construction of Roads
N/ABRIDGE:
PAVEMENT TEST FACILITY:
Width
150'
Surface Base
Know what'sbelow.
before you dig.Call
R
N
0 4040
SCALE IN MILES
Richmond
Charlottesville
Front
Royal
KEY MAP
STATE OF VIRGINIA
Project VA ST TFHRC 50(5)
Length
175' 4" 26"
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
FAIRFAX, VIRGINIA
TURNER-FAIRBANK HIGHWAY RESEARCH CENTER
Control Point PreferencesA05
Geometry & Control PointsD02
D01 Construction Plan
Plan-Profile Utilities
E01 Electrical Conduits And Panels
G01-G04
M01-M03
A02-A03
B01-B03
D03 Utilities Layout
Storm Drain ProfileK05-K06
Underdrain ProfileK07-K11
DIP Underdrain ProfileK12-K14
P01 Pavement Markings
R01-R18 R Sheets
Proposed Pavement StructureB04
D04 Pavement Work Limits
C01-C03
FEDERAL HIGHWAY ADMINISTRATION
U. S. DEPARTMENT OF TRANSPORTATION
RECONSTRUCTION OF THE
PAVEMENT TESTING FACILITY
N
SCALE IN MILES
0 2.5 5
Project VA ST TFHRC 50(5)
:1
P
M
A p r il
T it le
S h e e t]
C
P R
O J E
C T
S
S P
E C
IA
L
\T u rn e r_
F a ir b a n k \5
(5
H
W Y
D
E S
\C A
D D
\A T
F H
R C
(5 tt l.
d g n
STATE PROJECT
NUMBER
SHEET
VA VA ST TFHRC 50(5) A01
or CL point of curve point of compound curve point of curve to spiral point of intersection plate point on curve point on spiral point on tangent point of tangent to spiral point of spiral to curve point of spiral to tangent point of tangent pavement on center ordinary high water mark out to out outside diameter original ground north normal crown nominal maximum size aggregate
ML
MP
max.
min.
mon.
main line mile post maximum minimum monument south seasonal average daily traffic point of spiral to curve section shoulder spacing, spaces or spaced
S
SADT
SC
sec.
shldr.
spa.
N
NC
NMSA
o. c.
ohwm
o. to o.
OD
OG
PC
PCC
PCS
PI
pl.
POC
POS
POT
PS
PSC
PST
PT
pvmt.
R
R.
R/W rdwy.
RECP
reinf.
reqd.
rt. or RT rte.
radius range right-of-way roadway rolled erosion control product reinforcement required right route square foot square yard point of spiral to reverse spiral point of spiral to spiral (no curve) point of spiral to tangent station standard stringer stiffener structural point of spiral to tangent spiral symmetrical sqft sqyd
SRS
SS
ST
Sta.
std.
stgr.
stiff.
struc.
STS
sym.
T
T.
TBM
thd.
TS
Ts typ.
tangent distance township temporary bench mark thread point of tangent to spiral tangent distance (spiraled curve) typical
V vph
VPI
design speed vehicles per hour vertical point of intersection
W west
1 6
1 6
SEC.
SEC.
0.00EL. E
N 0
NO. DATE BY REVISIONS
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
SYMBOLS AND ABBREVIATIONS
TURNER-FAIRBANK HIGHWAY RESEARCH CENTER
abut.
ACP
ADT
AH
appr.
BK
BM
BP
br.
brg.
cc or c. to c.
CL
CMP
CO
col.
conc.
conn.
constr. jt.
cont.
CS
ctrs.
D
DHV
dia.
diag.
diaph.
dist.
drwg(s).
DSY
abutment asphalt concrete pavement average daily traffic ahead approach back benck mark balance point bridge bearing center to center centerline corrugated metal pipe contracting officer column concrete connection construction joint continuous curve to spiral centers diameter design hourly volume diameter diagonal diaphragm distance drawing(s) double solid yellow east superelevation rate elevation with number elevation embankment edge of pavement edge of shoulder edge of travel way equation edge of road equivalent single axle load edge of water excavation expansion joint fin.
flg.
finish flange
E e elev.
elev.
emb.
EOP
EOS
EOT
EQ or eq.
ER
ESAL
EW
exc.
exp. jt.
∆c Ø θs total central angle curve central angle diameter spiral central angle ftg.
ga.
galv.
hdwl.
hex.
HW
ID
jt.
footing gage (gauge) galvanized headwall hexagon high water inside diameter joint
L lam.
lat.
length of curve lamination latitude
LOD
long.
LPSM
Ls
lt. or LT
LW
Limits of Disturbance longitudinal lump sum length of spiral left low water
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
Section Line
Section Corner (Found, Projected)
Section Line4
Section Corner (Found, Projected)4
Section Line16
Section Corner (Found, Projected)16
Property Line w/Found Property Corner
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
BLM Lands Boundary
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Railroad
Trail
Intermittent Drainage or Small Creek
Large Creek or River
Lake, Pond or Reservoir; Marshland
Spring or Seep
Treeline; Individual Trees, Pine
Material Source; Bore Hole; Test Pit
Spot Elevation; Coordinate Grid Tick
Control Point (Terrestrial and GPS); Jump Hub
:5
S e p te m b e r
S y m b o l
S h e
P R
O J E
C T
S
S P
E C
IA
L
\T u rn e r_ F a ir b a n k \5
(5
H
W Y
D
E S
\C A
D D
\A
A
T F
H R
C
(5 s y m
.d g n
STATE PROJECT
NUMBER
VA VA ST TFHRC 50(5) A02
I-x (no.)
Waterline & Meter
Waterline
Yard hydrant
W-x (no.)
H-x (no.)
N
AREA PATTERN
U.S. DEPARTMENT OF TRANSPORTATION TURNER-FAIRBANK HIGHWAY RESEARCH CENTER
SYMBOLS AND ABBREVIATIONS
Sheet 2 of 2
Project specific symbols and abbreviations:
Wall or wall
Var. or var.
TOW
TOG
TOF
Off. or off.
Inv. or inv.
HGL
DIP
Det. or det.
CI or ci
Bot. or bot.
Aggr. or aggr.
structural concrete wall varies top of wall top of grate top of footing offset invert hydraulic grade line ductile iron pipe detail cast iron bottom aggregate
Inlet x (no.)
Structural concrete wall (Wall)
Wall x (no.)
Headwall x (no.)
Fiber Roll or Wattle
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Concrete Barrier
Slope Stake Limits
Delineators
Signs (single, double post; portable)
Transition
Toe of Fill
Top of Cut
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Pipe Culvert with Drop Inlet
Box Culvert
Underground Utilities
Overhead/Above Ground Utilities
STEAM = steam, T = telephone, TV = CATV, W = water
P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use, Miscellaneous Utility Features
UP = transformer or junction box, WF = water fountain
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
EXISTING PROPOSED
DI
Pavement Removal / Roadway Obliteration
Full Depth Pavement
Sidewalk Asphalt/Concrete
Mill and Overlay
Overlay
Silt Fence
Diversion Berm
Drainage Divide
Check Dam
Limits of Disturbance
DETAILS REFERENCE:
Det. E636-D: Pull Box
Det. E619-09: Chain Link Fence And Gate;
Det. E612-B: Sewer Cleanout;
Det. E612-A: Interior Drop Manhole;
Det. E611-B: Yard Hydrant;
Det. E608-A: Paved Waterway;
Det. E605-A: Valve Box With Riser;
Det. 604-8A: Inlet For 12" To 36" Culvert;
Det. ET 601-4: Concrete Headwall For Small Pipe Culvert;
Det. ET501-2: Minor Concrete Pavement Joints;
Det. ET501-1: Minor Concrete Pavement;
Det. E251-01: Loose Riprap At Culvert;
Det. E157-02: Wire-Backed Silt Fence;
Det. E157-A: On-Site Concrete Washout Structure
:2
S e p te m b e r
S y m b o l
S h e
P R
O J E
C T
S
S P
E C
IA
L
\T u rn e r_
F a ir b a n k \5
(5
H
W Y
D
E S
\C A
D D
\A A
T
F H
R C
(5 s y m
.d g n
STATE PROJECT
NUMBER
VA VA ST TFHRC 50(5) A03
E 11867476.3429
N 7034149.3224
Project VA ST TFHRC 50(5)
SCALE IN FEET
0 1000 2000
LOCATION MAP
:4 a y
L o c a ti o n M a p
S h e
P R
O J E
C T
S
S P
E C
IA
L
\T u rn e r_
F a ir b a n k \5
(5
H
W Y
D
E S
\C A
D D
\A
T F
H R
C
(5 lo c .d g n
STATE PROJECT
NUMBER
VA VA ST TFHRC 50(5) A04
LEVEL 'D'
QUALITY
N
Project Site : THFRC 50(5)
Geoid Model : GEOID12A(Conus)
Vert. Datum : NAVD 1988 (Conus)
Hor. Datum : NAD 1983 (Conus)
Zone : Virginia North 4501
Coordinate System : US State Plane 1983
.9
.6
.0
.2
.7
.8
.6
.0
.8
.9
.9
TBAR
NAIL
TBAR
TBAR242.06611867583.7607034342.1567002
NAIL234.35111867382.9387034174.1247001
TBAR240.24711867613.1767033961.8937000
TypeElevationEastingNorthingName
PROJECT COORDINATE SYSTEM: SURVEY CONTROL POINTS
Azimuth shown is based on north axis at clockwise rotation.
NOTE:
TBAR
TBAR
NAIL
NOT TO SCALE
CONTROL POINT PREFERENCES
:1 e p te m b e r
C o n tr o l P o in t P r e f e r e n c s
P R
O J E
C T
S
S P
E C
IA
L
\T u rn e r_
F a ir b a n k \5
(5
H
W Y
D
E S
\C A
D D
\A
T F
H R
C
(5
S u r In fo .d g n
STATE PROJECT
NUMBER
VA VA ST TFHRC 50(5) A05
1. Work limits may be changed to fit field conditions as approved by the CO.
2. Apply turf establishment to disturbed areas and as directed by the CO.
3. See Utilities Layout sheet for utilities details.
Edge of Test Lanes
Edge of Test Lanes
Edge of pavement
Existing ground
0.5%
Limits of Test Lanes area Longitudinal, 150'
Paved waterway, type 4 (concrete)
PROPOSED PAVEMENT STRUCTURE:
Roadway excavation (Test Lanes excavation)
0.0%
Asphalt concrete pavement, 6" & var.
UnderdrainUnderdrain
NOTES:
Limits of construction
Shoulder, 5'
Waterline
DIP pipe
72-inch height
Install fence, chain link
Remove fence, chain link
Remove existing underdrain (no pay) wires installed by other), see R sheets
Instrumentation trough (for instrumentation
Relocate sewerline
Varies
Test Lanes Baseline (South)Test Lanes Baseline (North)
3+25.00 (North East)
5+00.00 (North West) 0+00.00 (South West)
1+75.00 (South East)
EXISTING PAVEMENT STRUCTURE:
Aggregate base, 18" & var.
(asphalt) type 5 waterway, Paved
¹See Resurfacing Pavement
Structure (sheet B03)
Pipe culvert
Electrical PVC conduits
For Test Lanes sheet B04
See Proposed Pavement Structure
Minor reinforced concrete pavement
(shoulder), 6-inch depth
Resurfacing¹Resurfacing¹, 10'
U.S. DEPARTMENT OF TRANSPORTATION TURNER-FAIRBANK HIGHWAY RESEARCH CENTER
TYPICAL SECTION
NORTH - SOUTH CROSS SECTION
NORMAL AREAS
:4
A
S e p te m b e r
B
S h e
P R
O J E
C T
S
S P
E C
IA
L
\T u rn e r_
F a ir b a n k \5
(5
H
W Y
D
E S
\C A
D D
\B
B
T F
H R
C
(5
T y p .d g n
STATE PROJECT
NUMBER
VA VA ST TFHRC 50(5) B01
End Wall Centerline See sheet B03
Edge of Test Lanes
Edge of Test Lanes
Edge of pavement
Limits of Test Lanes area Longitudinal, 150'
Waterline
Connector pipe culvert
Wall footing
Shoulder, 5'
Limits of construction
Existing ground
Varies
1. See R sheets for wall details and layout of instrumentation system.
2. Work limits may be changed to fit field conditions as approved by the CO.
3. Apply turf establishment to disturbed areas and as directed by the CO.
4. See Utilities Layout sheet for utilities details.
NOTES:
Wall stem
Wall trench
0.0% 0.5%
Trench grate
Test Lanes Baseline South
EXISTING PAVEMENT STRUCTURE:
Aggregate base, 18" & var.
Asphalt concrete pavement, 6" & var.
(asphalt) type 5 waterway, Paved
Inlet
¹See Resurfacing Pavement
Structure (sheet B03) wires installed by other), see R sheets
Instrumentation trough (for instrumentation
Relocate sewerline
Remove existing underdrain (no pay) fence, chain link 72-inch height
Remove fence, chain link. Install
Electrical PVC conduits
Paved waterway, type 4 (concrete)
Instrumentation cabinet (installed by other)
See R sheets
Begin Wall Centerline See sheet B03
Test Lanes Baseline North
Resurfacing¹Resurfacing¹, 10'
Minor reinforced concrete pavement
(shoulder), 6-inch depth
U.S. DEPARTMENT OF TRANSPORTATION TURNER-FAIRBANK HIGHWAY RESEARCH CENTER
TYPICAL SECTION
NORTH - SOUTH CROSS SECTION
WALL SECTIONS
:4
S e p te m b e r
B
S h e
P R
O J E
C T
S
S P
E C
IA
L
\T u rn e r_
F a ir b a n k \5
(5
H
W Y
D
E S
\C A
D D
\B
B
T F
H R
C
(5
T y p .d g n
STATE PROJECT
NUMBER
VA VA ST TFHRC 50(5) B02
Existing ground
Varies
Underdrain (typ.)
Edge of Test Lanes
Edge of pavement/
12' Lane 2, 14' Lane 3, 14' Lane 1, 14' Lane 4, 12' Lane 5, 14' Lane 6, 14' Lane 9, 12' Lane 8, 14' Lane 7, 14'-2" Lane 11, 14'-2" Lane 10, 14'-2" Lane 12, Limits of Test Lanes area Transverse, 175'
Limits of construction
Section A Section DSection B Section C
1.0% sewer to remain
Existing sanitary
1. See R sheets for wall details and layout of instrumentation system.
2. Work limits may be changed to fit field conditions as approved by the CO.
3. Apply turf establishment to disturbed areas and as directed by the CO.
4. See Utilities Layout sheet for utilities details.
5. For resurfacing pavement work, match existing cross slope and provide positive drainage as approved by the
CO.
NOTES:
conduits
PVC
Electrical
PROPOSED PAVEMENT STRUCTURE:
for work limits Plan see Construction Facility Area, Pavement Testing
Tack coat
4-inch +/- depth
Asphalt pavement milling, type IV roughness -inch NMSA, <0.3 million ESAL, 2-inch, 2
Asphalt concrete pavement, gyratory mix, -inch NMSA, <0.3 million esal, 2-inch2
Asphalt concrete pavement, gyratory mix, RESURFACING PAVEMENT STRUCTURE:
See
Note
Water line
Daylight, variable slope
72-inch height
Install fence, chain link
Remove fence, chain link
Wall 2 Centerline
Begin 4+56.25 (North)
End 0+43.75 (South)
Test Lanes
Baseline (West) 5+00.00 (North West)
0+00.00 (South West)
Test Lanes
Baseline (East) 1+75.00 (South East)
3+25.00 (North East)
W a ll
Wall 1 Centerline
Begin 4+98.75 (North West)
End 0+01.25 (South West)
W a ll
Wall 3 Centerline
Begin 4+13.75 (North)
End 0+86.25 (South)
Wall 4 Centerline
Begin 3+71.25 (North)
End 1+28.75 (South)
Wall 5 Centerline
Begin 3+40.42 (North East)
End 1+59.58 (South East)
W a ll
W a ll
W a ll
W a ll
Asphalt concrete pavement, 6" & var.
Aggregate base, 18" & var.
EXISTING PAVEMENT STRUCTURE:
conduits
PVC
Electrical
For Test Lanes sheet B04
See Proposed Pavement Structure
Roadway excavation (Test Lanes excavation)
U.S. DEPARTMENT OF TRANSPORTATION TURNER-FAIRBANK HIGHWAY RESEARCH CENTER
TYPICAL SECTION
WEST - EAST CROSS SECTION
:4
S e p te m b e r
B
S h e
P R
O J E
C T
S
S P
E C
IA
L
\T u rn e r_
F a ir b a n k \5
(5
H
W Y
D
E S
\C A
D D
\B
B
T F
H R
C
(5
T y p .d g n
STATE PROJECT
NUMBER
VA VA ST TFHRC 50(5) B03
1. Before performing work, verify the limits and pavement structure as indicated with the CO.
2. Coordinate with the CO before performing the work according to
Sections 155, 301, and 401.
NOTES:
Base 21A¹ (aggr. base)
Subbase²
W a ll
W a ll
W a ll
W a ll
W a ll
¹ Use suitable excavation material according to Section 204.
² Government-provided material stockpile.
Blended base 21A² (aggr. base)
Subbase²
Asphalt stabilized open graded material (aggr. base)
Cement stabilized aggr. base² (subbase)
Base 21A¹ (aggr. base) class 2, type E (typ.)
Separation-stabilization geotextile, ACP, Mix A² ACP, Mix B
Roadbed reconditioning Roadbed reconditioning Roadbed reconditioning
Roadbed reconditioning
1 14 sensors installed by others
12 sensors installed by others2
1 2 days 1 2 days 1 2 days
34 sensors installed by others3
3 4 days
3 4 days 3 4 days
4 days5
24 sensors installed by others4
4 days5 4 days5
Unbounded aggregate base²
3 days4
36 sensors installed by others5
ACP,
Mix A²
ACP,
Mix B
ACP,
Mix B
ACP,
Mix B
ACP, Mix BACP, Mix C
ACP,
Mix C
ACP,
Mix D²
ACP,
Mix E²
2 days
3 days
Subbase²
U.S. DEPARTMENT OF TRANSPORTATION TURNER-FAIRBANK HIGHWAY RESEARCH CENTER
STRUCTURE
PROPOSED PAVEMENT
4"
12' Lane 2
14' Lane 1, 14' Lane 3, 14' Lane 6, 12' Lane 5, 14' Lane 4, 14' Lane 9, 12' Lane 8, 14' Lane 7, 14'-2" Lane 11, 14'-2" Lane 12, 40' Section A
40' Section B
40' Section C
28'-4" Section D
12"
8"
12"
8"
12"
8"
12"
1.75" 4"
12"
6"
1.25"
6"
8"
14'-2" Lane 10, :2
F e b r u a r y
B
S h e
P R
O J E
C T
S
S P
E C
IA
L
\T u rn e r_
F a ir b a n k \5
(5
H
W Y
D
E S
\C A
D D
\B T
F H
R C
(5
T y p .d g n
STATE PROJECT
NUMBER
VA VA ST TFHRC 50(5) B04
U.S. DEPARTMENT OF TRANSPORTATION
TABULATION OF QUANTITY
Sheet 1 of 3
TURNER-FAIRBANK HIGHWAY RESEARCH CENTER
:2
S e p te m b e r
C
P R
O J E
C T
S
S P
E C
IA
L
\T u rn e r_
F a ir b a n k \5
(5
H
W Y
D
E S
\C A
D D
\C
-C
T
F H
R C
(5
T a b u la ti o n .d g n
STATE PROJECT
NUMBER
VA VA ST TFHRC 50(5) C01
U.S. DEPARTMENT OF TRANSPORTATION
Sheet 2 of 3
:0
F e b r u a r y
C
P R
O J E
C T
S
S P
E C
IA
L
\T u rn e r_
F a ir b a n k \5
(5
H
W Y
D
E S
\C A
D D
\C
-C
T
F H
R C
(5
T a b u la ti o n .d g n
STATE PROJECT
NUMBER
VA VA ST TFHRC 50(5) C02
U.S. DEPARTMENT OF TRANSPORTATION
Sheet 3 of 3
:3
S e p te m b e r
C
P R
O J E
C T
S
S P
E C
IA
L
\T u rn e r_
F a ir b a n k \5
(5
H
W Y
D
E S
\C A
D D
\C
-C
T
F H
R C
(5
T a b u la ti o n .d g n
STATE PROJECT
NUMBER
VA VA ST TFHRC 50(5) C03
WV
S67°48'38"E
N '2
E
N67°48'38"W
S
'2
W
N
0 15 30
CONSTRUCTION PLAN
:5
S e p te m b e r
C o n s tr u c ti o n P la
P R
O J E
C T
S
S P
E C
IA
L
\T u rn e r_
F a ir b a n k \5
(5
H
W Y
D
E S
\C A
D D
\D T
F H
R C
(5
P la n .d g n
STATE PROJECT
NUMBER
VA VA ST TFHRC 50(5) D01
1. Obtain CO approval for limits of pavement resurfacing and chain link fence replacement.
2. Verify the locations of gates (chain link).
3. See Utilities Layout for utilities layout.
4. See Drainage Plan for underdrain and storm drain.
Install chain link fence, 200 lnft see R sheets
Wall (typ.), W a ll 1
W a ll 2
W a ll 3
W a ll 4
W a ll 5
0+00.00
1+00.00
2+00.00
3+00.00
4+00.00
5+00.00
Mill and overlay
Edge of shoulder plates), typ.
& survey
(strain gauges obstructions
Remove
6+00.00 storage bins
Remove structures, Install storage bins, see R sheets
Edge of Test Lanes
Paved waterway, type 4 (concrete), 36 sqyd posts. Install chain link fence, 320 lnft
Remove chain link fence, 320 lnft and
Remove chain link fence, 173 lnft and posts and posts fence, 170 lnft
Remove chain link
8'8' to remain
Existing rail
B r id g e g ir d e r s o v e r c o n c r e te p a d
Pile test pitBuilding
Building
Test box
Reconstruction pavement
Shoulder, minor reinforced concrete pavement
Remove pipe culvert see Drainage Plan sheets
Install pipe culvert (typ.), Plan sheets see Drainage
Install inlet (typ.)
leaf), chain link
Install gates (double chain link
(double leaf), Install gates
(asphalt), 110 sqyd
Paved waterway, type 5
DETAILS REFERENCE:
Det. E608-A: Paved Waterway;
Det. E619-09: Chain Link Fence And Gate;
Det. ET501-1: Minor Concrete Pavement;
Det. ET501-2: Minor Concrete Pavement Joints.
trench, 20 lnft
Remove drain
Remove electrical panel
Remove electrical panel (typ.)
Install chain link fence, 40 lnft
40 lnft and posts.
Remove chain link fence, TBAR
TBAR
NAI
L
CP
N
S67°48'38"E
N '2
E
N67°48'38"W
S
'2
W
9 223
233 231
231233
0 2
232 231
GEOMETRY & CONTROL POINTS
:4 e p te m b e r
G e o m e tr y C o n tr o l
P o in ts
P R
O J E
C T
S
S P
E C
IA
L
\T u rn e r_
F a ir b a n k \5
(5
H
W Y
D
E S
\C A
D D
\D
T F
H R
C
(5
C tr l.
d g n
STATE PROJECT
NUMBER
VA VA ST TFHRC 50(5) D02
I-1
E 11867474.028
N 7034150.267
0+00.00, elev. 232.50
E 11867636.068
N 7034084.175
1+75.00, elev. 230.75
E 11867692.718
N 7034223.066
3+25.00, elev. 230.75
E 11867530.678
N 7034289.158 elev. 232.50
5+00.00
0+00.00
1+00.00
2+00.00
3+00.00
4+00.00
5+00.00
1%
Proposed contour (typ.)
elev. 232.00
0+00.00
(asphalt) waterway
Begin paved elev. 230.75
1+64.42
(asphalt) waterway
End paved
175'
E 11867701.282
N 7034230.557 at centerline, elev. 228.40
End paved waterway (concrete)
131' off. 7.5' elev. 229.98 at centerline, 3+29.00
Paved waterway (concrete)
5'
Edge of paved waterway elev. 232.45
0+00.00, elev. 230.75
1+63.00, 6+00.00
Shoulder
Storage bin (typ.)
E 11867412.005
N 7034345.662 elev. 233.00
(concrete) at centerline, Begin paved waterway
Proposed contour (typ.)
WV
UTILITIES LAYOUT
:0
J u ly
U ti li ty
L a y o u t
P R
O J E
C T
S
S P
E C
IA
L
\T u rn e r_
F a ir b a n k \5
(5
H
W Y
D
E S
\C A
D D
\D T
F H
R C
(5
U
T L
L a y o u t.
d g n
STATE PROJECT
NUMBER
VA VA ST TFHRC 50(5) D03
Waterline, 160 lnft
Pipe culvert (typ.)
Underdrain (typ.)
Inlet (typ.)
311 lnft (no pay)
Remove underdrain, pipe culvert
Remove
Electrical panel A
Light pole 1
Existing waterline to remain (typ.)
0+00.00
1+00.00
2+00.00
4+00.00
6+00.00
3+00.00
5+00.00
Edge of Test Lanes Install waterline 17 lnft, and valve gate
Light pole 2 founation and light pole
Remove
Install yard hydrant 2
Remove water spigot.
Yard hydrant 5
Yard hydrant 4
Yard hydrant 3 to remain (typ.)
Existing sewerline
Yard hydrant 1 W a ll 2
W a ll 3
W a ll 1
W a ll 4
NOTES:
1. See R sheets for details of walls, instrumentation box, cabinet, and storage bins.
2. Limits of proposed utilities may be changed to fit field conditions as approved by the CO.
3. See E sheet for electrical conduits and panels.
4. See G sheets for details of offsets and elevations of proposed utilities.
5. See K sheets for details of underdrain and storm drain.
Electrical panel (east)
Storage bin (typ.)
Electrical pull box (208V) conduit (electrical), 260'
Remove existing utility manhole
Connect new sewerline, 66 lnft, to
Remove existing sewerline, 66 lnft.
manhole to remain
Sanitary cleanout 3
Electrical panel (west)
Electrical 408V splice box
Electrical panel B
Electrical pull box
Light pole 3
Light pole 4 connecting to manhole, 170 lnft connecting to the and install new sewerline and
Begin to remove existing sewerline. Install elbow
Sanitary cleanout 1 Sanitary cleanout 2
Remove sewerline, 165 lnft
W a ll 5
Remove utility conduit (electrical)
Building
Remove light pole and founation and founation
Remove light pole and founation
Remove light pole
Remove light pole and founation
Pipe culvert (typ.)
sheets
(typ.), see R trough box
Instrumentation
Install electrical PVC conduits (typ.)
Install waterline, 200 lnft
Shoulder, minor reinforced concrete pavement
:0
S e p te m b e r
R e s u r f a c in g A r e a
S h e
P R
O J E
C T
S
S P
E C
IA
L
\T u rn e r_
F a ir b a n k \5
(5
H
W Y
D
E S
\C A
D D
\D
T F
H R
C
(5
R e s u rf a c in g .d g n
PAVEMENT WORK LIMITS
STATE PROJECT
NUMBER
VA VA ST TFHRC 50(5) D04
175'
New building
B r id g e g ir d e r s o v e r c o n c r e te p a d
Test pit 1
Test pit 2
Building
102'
1. Limits of resurfacing area and overlay may be changed to fit field conditions as approved or directed by the CO.
2. For the resurfacing work, match existing slope.
NOTES:
Full depth pavement
(resurfacing) area
Mill and Overlay
Existing rail to remain
86'
0+00.00
1+00.00
2+00.00
6+00.00
3+00.00
4+00.00
5+00.00
Pavement Testing Facility Area
Concrete blocks to remain asphalt (typ.)
Match existing edge of
Test Lanes Area
South Test Lanes Area
U.S. DEPARTMENT OF TRANSPORTATION TURNER-FAIRBANK HIGHWAY RESEARCH CENTER
AND PANELS
ELECTRICAL CONDUITS
6+00.00
2+00.001+00.00
3+00.00
4+00.00
.0
5+00.00
:2
J u ly
E le c tr ic a l
C o n d u it
P R
O J E
C T
S
S P
E C
IA
L
\T u rn e r_
F a ir b a n k \5
(5
H
W Y
D
E S
\C A
D D
\E T
F H
R C
(5
E le c D ia g ra m .d g n
STATE PROJECT
NUMBER
VA VA ST TFHRC 50(5) E01
Light pole 1
Light pole 2
NOTES:
1. See R sheets for details of walls, instrumentation box, cabinet, and storage bins.
2. Limits of proposed utilities may be changed to fit field conditions as approved by the CO.
3. See G sheets for details of offsets and elevations of proposed utilities.
4. See K sheets for details of underdrain and storm drain.
Det. E636-D, Pull Box)
Electrical 480V splice box (see box
Electrical pull
Light pole 3
Light pole 4
Building trough box 5
Instrumentation
Trench cover (typ.)¹
6"
24"
V
A
V
Wiring trough (typ.)¹
SECTION W-W
3' R (typ.)
1' R
W
W
P P
128"
44" min. (typ.)
Bottom trench
4"
4" (408V A)
PVC conduit, 4" (408V B)
PVC conduit, " (208V)2
PVC conduit, 2
A A B B
6" (typ.)
6' 10" 6' 10"
10" (typ.)
36" (typ.)
6"
(for light pole 1) " 4
PVC conduit, 1
4"
18"
4"
4"
4"
(typ.)
2"
(typ.)
4"
(typ.)
4"
(typ.)
10" (typ.)
8"
(typ.)
E
E
2 4
PVC conduit, 1 4" (for light pole or instrumentation box)
PVC conduit, 4" (408V B)
3 PVC conduit, 2 2" (208V)
4 PVC conduit, 4" (408V A)
For underground, furnish rigid 1 4-inch PVC conduit
Schedule 40 with 1250 lbf ( 2-inch) mull tape.
For aboveground, furhish rigid 2 2-inch PVC conduit
Schedule 80 with 2500 lbf ( 4-inch) mull tape.
¹ Installation of electrical panels and supporting posts, instrumentation wiring, and reusable templates will be performed by others.
24"
(West)¹
At Electrical Panel
Reusable Template
Reusable Template At
Electrical Panel B¹
Reusable Template At
Electrical Panel A¹
6"
36"
12"
Box (208V)¹
At Electrical Pull
Reusable Template
V
B
V
SECTION P-P
(East)¹
At Electrical Panel
Reusable Template
" (208V)2
PVC conduit, 2
(for light pole 1) " 4
PVC conduit, 1
4" (408V B)
PVC conduit, V
A
V
V
B
Electrical panel (typ.)¹
Wiring trough (typ.)¹
Trench cover (typ.)¹
3' R (typ.)
1' R
Bottom trench
4" (408V A)
PVC conduit, SECTION E-E
V
A
V
Electrical panel (typ.)¹ trough box 1
Instrumentation trough box 2
Instrumentation trough box 3
Instrumentation trough box 4
Instrumentation
Bottom trench
1 1 1
SECTION A-A
To trough box 1
To trough box 2 To trough box 3
To light pole 1
To light pole 2
To light pole 4 existing
Connect to
V
V
B
Bottom trench
To trough box 5
1To trough box 1
To trough box 4
To light pole 3
SECTION B-B
Trench for PVC conduits, 100'
DETAILS REFERENCE:
Det. E636-A: Lighting Pole;
Det. E636-B: Lighting Pole Foundation;
Det. E636-C: Underground Installation;
Det. E636-D: Pull Box
Trench for PVC conduits, 185'
90' conduits, for PVC
Trench
25' conduits, for PVC
Trench see R sheets for details Instrumentation cabinet (typ.), see R sheets for detail Communication conduit, N
DETAIL REFERENCE:
Det. E611-A: Backflow Assembly;
Det. E611-B: Yard Hydrant;
Det. E612-A: Interior Drop Manhole;
Det. E612-B: Sewer Cleanout;
Det. E619-09: Chain Link Fence And Gate;
0 10 20
U.S. DEPARTMENT OF TRANSPORTATION TURNER-FAIRBANK HIGHWAY RESEARCH CENTER
PLAN-PROFILE UTILITIES
WEST TEST LANES
5+00 5+50 6+00 6+50
214 214
216 216
218 218
220 220
222 222
224 224
226 226
228 228
230 230
232 232
234 234
236 236
238 238
240 240
242 242
244 244
246 246
248 248
250 250
252 252
254 254
256 256
:3
J u ly
W e s t
P n P
S h e
P R
O J E
C T
S
S P
E C
IA
L
\T u rn e r_
F a ir b a n k \5
(5
H
W Y
D
E S
\C A
D D
\G T
F H
R C
(5
W e s t.
d g n
STATE PROJECT
NUMBER
VA VA ST TFHRC 50(5) G01
Wall 1
.0
.0
12.5' Underdrain (typ.)
6' off. 6' Install sewerline12.5' conduits, off.
Install PVC off. 9.15' 5+85.35 Install light pole 1
1. Verify limits of removal of existing sewerlines, waterlines, electrical conduits and panels.
2. Verify the locations of sanitary cleanouts. Final location, skew, length, elevations, and grade of sewerlines may be changed to fit field conditions as approved or directed by the CO.
3. Verify the locations of yard hydrant and gate valves. Final length and elevations of waterlines may be changed to fit field conditions as approved or directed by the CO. See Section 611.
4. Verify limits of excavating trench and elevations may be changed to fit field conditions as approved or directed by the CO.
5. Obtain approval for methods of connecting existing sewerline, waterline, and electrical.
6. See R sheets for instrumentation trough details.
off. 2.5' 5+75.02 Electrical panel (west), NOTES:
6+40.48, off. 5' Install yard hydrant 2 Remove existing water spigot.
Install waterline, off. 2'
2'-0"
(typ.)
foundation pole and Remove light powerline underground Remove off. 19.63' 5+43.94 Electrical pull box (208V)
Install water valve gate Remove electrical pannel.
Existing fence to remain
5+50.8, off. 5' Install yard hydrant 1
4+99.05, off. 6' Sewerline connection, .0 horizontal elbow Watereline, install 90°
Building sewerline Remove existing
Install fence Remove fence.
off. 2.5' Install PVC conduits
480V splice box Install electrical
Install waterline, off. 2' box 1 Instrumentation
Instrumentation trough footing 226.5 Wall 1, bottom elev. 226.5 Install waterline
5+75.02 Electrical panel (west)
5+85.35 Install light pole 1
5+50.8, inv. 226.5 Install yard hydrant 1, 6+40.48, inv. 226.5
Install yard hydrant 2
Install gate valves ground Existing inv. 226.5 Waterline, install 90° horizontal elbow
Finished surface Test Lanes inv. out 227.97 and bend down to meet 135° horizontal elbow in 229.97 +/-. Install 4+99.05 at existing inv.
Sewerline connection elev. 228.68 Electrical 480V splice box, elev. 228.68 Electrical PVC conduits
1. Verify the locations of yard hydrant. Final length and elevations of waterlines may be changed to fit field conditions as approved or directed by the CO. See Section 611.
2. See Details Yard Hydrant and Backflow Assembly for requirements.
NOTES:
6+40.48, off. 5' Install yard hydrant 2
Existing waterline to remain
Remove existing utility conduit (electrical) fence chain link Remove
0+00.00
N
Install storage bins
Remove existing fence
Existing sanitary sewerline to remain
Storm drain (typ.)
1+00.00
1+75.00, off. 2' Install yard hydrant 3
14'
Underdrain (typ.)
W a ll 1
W a ll 2
W a ll 3
W a ll 4
W a ll 5
Waterline, install 90° elbow i Waterline, install 90° elbow
Install waterline waterline Install
5'
DETAIL REFERENCE:
Det. E611-B: Yard Hydrant;
Det. E611-A: Backflow Assembly.
Wall 1 Wall 2 Wall 3 Wall 4 Wall 5
Underdrain (typ.)
Existing ground
Install waterline inv. 226.50 Install 90° horizontal elbow, inv. 224.75 Install 90° horizontal elbow, 1%
Existing sewerline to remain
Finished surface Test Lanes inv. 224.75 1+75.00 Install yard hydrant 3
U.S. DEPARTMENT OF TRANSPORTATION TURNER-FAIRBANK HIGHWAY RESEARCH CENTER
SOUTH TEST LANES
0+00 0+50 1+00 1+50 2+00
210 210
212 212
214 214
216 216
218 218
220 220
222 222
224 224
226 226
228 228
230 230
232 232
234 234
236 236
238 238
240 240
242 242
244 244
246 246
248 248
250 250
252 252
:4
M a y
S o u th P n P
S h e
P R
O J E
C T
S
S P
E C
IA
L
\T u rn e r_
F a ir b a n k \5
(5
H
W Y
D
E S
\C A
D D
\G T
F H
R C
(5
S o u th
.d g n
STATE PROJECT
NUMBER
VA VA ST TFHRC 50(5) G02
N
W all 5
Underdrain (typ.)
Install sewerline
Remove sewerline
N
1. Verify limits of removal of existing sewerlines, waterlines, and electrical conduits.
2. Verify the locations of sanitary cleanouts. Final location, skew, length, elevations, and grade of sewerlines may be changed to fit field conditions as approved or directed by the CO.
3. Verify the locations of yard hydrant and gate valves. Final length and elevations of waterlines may be changed to fit field conditions as approved or directed by the CO. See Section 611.
4. Excavate trench at least 12 inches wide and backfill (no pay) according to Section 209. Verify limits of excavating trench and elevations may be changed to fit field conditions as approved or directed by the CO. Excavated trench is for electrical conduits system installed by other.
5. See R sheets for instrumentation trough details.
3+22.11, off. 12.44' Electrical pull box
NOTES:
conduit (electrical) Remove existing utility
3+26.34, off. 6' down to meet inv. 223.52.
horizontal elbow and bend Sewerline, install 135°
2+00.00
3+00.00
Remove existing fence
Install waterline
Install waterline bins storage Install off. 2' 1+75.00 hydrant 3 Install yard
2' elbow, 2+40.00, off. 5' Install 90° horizontal Install yard hydrant 4.
off. 14' elbow, 2+40.00, 90° horizontal Waterline, install elbow horizontal install 90° Waterline, 3+15.00, off. 5'
Install yard hydrant 5 to remain Existing sewerline remain manhole to Existing sanitary manhole connect to existing Install sewerline and
12.5'
3+34.05, off. 6' Install sanitary cleanout 3, 6' existing sewerline (no pay) Plug the opening after removal of
Install PVC conduits off. 12.5' sewerline Remove existing (fiberglass drop bowl) interior drop manhole existing manhole. Install Connect new sewerline to
2+55.38, off. 2.5' Electrical panel (east)
2+65.73, off. 6.65' Install light pole 4 off. 2.5' conduits Install PVC
Instrumentation box 5
Instrumentation trough
DETAIL REFERENCE:
Det. E605-A: Valve Box With Riser;
Det. E611-A: Backflow Assembly;
Det. E611-B: Yard Hydrant;
Det. E612-A: Interior Drop Manhole;
Det. E612-B: Sewer Cleanout;
edge of Test Lanes Existing ground at off. 14' Existing ground
Install waterline inv. 224.75 1+75.00 Install yard hydrant 3
2+65.73 Install light pole 4 elbow inv. 224.75 90° horizontal Waterline, install
Storm drain inv. 224.75 2+40.00 Install yard hydrant 4 inv. 224.75 3+15.00 Install yard hydrant 5
226.50 conduits, elev.
Electrical PVC box 3+22.11 to electrical junction 90° horizontal elbow
Electrical panel (east) 2+55.38, Finished surface Test Lanes
3+26.34, inv. in 224.67 Install sanitary cleanout 3, meet inv. out 223.52 elbow and bend down to Install 135° horizontal elbows, inv. 224.75 Install 90° horizontal
U.S. DEPARTMENT OF TRANSPORTATION TURNER-FAIRBANK HIGHWAY RESEARCH CENTER
PLAN-PROFILE UTILITIES
1+50 2+00 2+50 3+00 3+50
202 202
204 204
206 206
208 208
210 210
212 212
214 214
216 216
218 218
220 220
222 222
224 224
226 226
228 228
230 230
232 232
234 234
236 236
238 238
240 240
242 242
244 244
:5
J u ly
E a s t
P n P
S h e
P R
O J E
C T
S
S P
E C
IA
L
\T u rn e r_
F a ir b a n k \5
(5
H
W Y
D
E S
\C A
D D
\G T
F H
R C
(5
E a s t.
d g n
STATE PROJECT
NUMBER
VA VA ST TFHRC 50(5) G03
EAST TEST LANES
220 225
WV
N
W a ll
4+00.00
3+82.07, off. 9.5' Install light pole 3
N
1. Verify limits of removal of existing sewerlines, waterlines, and electrical conduits.
2. Verify the locations of sanitary cleanouts. Final location, skew, length, elevations, and grade of sewerlines may be changed to fit field conditions as approved or directed by the CO.
3. Verify the locations of yard hydrant and gate valves. Final length and elevations of waterlines may be changed to fit field conditions as approved or directed by the CO. See Section 611.
4. Obtain approval for methods of connecting existing sewerline and electrical.
5. See R sheets for instrumentation trough details.
NOTES:
off. 12.5' Install PVC conduits
4+99.05, off. 6' Sewerline connection, W a ll
W a ll
W a ll
W a ll
Install yard hydrant 5 3+15.00, off. 5'
.0
5+00.006 off. 9.5' 4+44.05 cleanout 1 Install sanitary off. 6' 3+89.05, cleanout 2 sanitary Install
3+34.05, off. 6' Install sanitary cleanout 3
Remove existing sewerline sewerline Install new off. 6' sewerline, Install
Remove existing utilities (sewerline and electrical)
Remove fence. Install fence
.5
2.5'
2.5'
3+26.34, off. 6' 135° elbow Sewerline, install
Building
Install 480V electrical splice box trough Instrumentation box 1 Instrumentation
Instrumentation box 2
Instrumentation box 3 box 4 Instrumentation box 5 Instrumentation
4+49.71, off. 3.50' Install light pole 2
Install PVC conduits, off. 2.5' off. 12.44' box 3+22.11, Electrical pull
4+35.00, off. 6.50' Electrical panel A3+56.00, off. 6.50'
Electrical panel B
Remove light pole and foundation (typ.)
DETAIL REFERENCE:
Det. E611-A: Backflow Assembly;
Det. E611-B: Yard Hydrant;
Det. E612-A: Interior Drop Manhole;
Det. E612-B: Sewer Cleanout;
Det. E619-09: Chain Link Fence And Gate.
inv. out 227.97 and bend down to meet 135° horizontal elbow in 229.97 +/-. Install 4+99.05 at existing inv.
Sewerline connection
Wall 1Wall 2Wall 3Wall 4Wall 5
Existing ground at off. 12.5'
Existing ground at edge of Test Lanes Electrical PVC conduits
Bottom paved waterway at off. 7'
Install sewerline, off. 6' to meet inv. out 223.52 elbow and bend down Install 135° horizontal inv. 226.87 off. 6', 4+44.05 cleanout SC-1 Install sanitary inv. 225.77 off. 6', 3+89.05 cleanout SC-2 Install sanitary inv. in 223.52 off. 6', 3+34.05 cleanout SC-3 Install sanitary
2% Sewerline
Test Lanes Finished surface
1% Paved waterway
226.50 box, 3+22.11, elev.
from electrical pull 90° horizontal elbow
3+56.00 Electrical panel B
Install light pole 3, 3+82.07
4+49.7 Install light pole 2
4+35.00' Electrical panel A elev. 228.68 Electrical 480V splice box, U.S. DEPARTMENT OF TRANSPORTATION TURNER-FAIRBANK HIGHWAY RESEARCH CENTER
NORTH TEST LANES
3+50 4+00 4+50 5+00
206 206
208 208
210 210
212 212
214 214
216 216
218 218
220 220
222 222
224 224
226 226
228 228
230 230
232 232
234 234
236 236
238 238
240 240
242 242
244 244
246 246
248 248
:0
J u ly
N o r th
P n P
S h e
P R
O J E
C T
S
S P
E C
IA
L
\T u rn e r_
F a ir b a n k \5
(5
H
W Y
D
E S
\C A
D D
\G T
F H
R C
(5
N o rt h .d g n
STATE PROJECT
NUMBER
VA VA ST TFHRC 50(5) G04
Sheet 1 of 4
Match line, see K02
N
0 5 10
U.S. DEPARTMENT OF TRANSPORTATION TURNER-FAIRBANK HIGHWAY RESEARCH CENTER
DRAINAGE PLAN
:3
J u ly
D r a in a g e P la
P R
O J E
C T
S
S P
E C
IA
L
\T u rn e r_
F a ir b a n k \5
(5
H
W Y
D
E S
\C A
D D
\K
T F
H R
C
(5
D ra in a g e
.d g n
STATE PROJECT
NUMBER
VA VA ST TFHRC 50(5) K01
1.00 %
230.10
Endcap inv.
inv. = 231.67
TOF = 228.50
TOW = 232.50
Wall 1
229.68
Endcap inv.
inv. = 231.25
TOF = 228.08
TOW = 232.08
Wall 2
W a ll 1
W a ll 2
W a ll 3
229.25
Endcap inv.
inv. = 230.82
TOF = 227.65
TOW = 231.65
Wall 3
1.00 % 1.00 %
229.32
Encap inv.
229.61
Encap inv.
228.93
Tee inv.
Offset (2 @ 45° elbows)
5+00.00
228.89
Encap inv.
229.61
Encap inv.
229.18
Encap inv.
228.47
Encap inv.
229.18
Encap inv.
228.76
Encap inv.
228.50
Tee inv.
NOTE:
See R sheets for more underdrain details.
M a tc h lin e , s e e K
PVC 4-inch, 75'
Schedule 80 perforated
PVC 4-inch, 39'
Schedule 80 perforated
4+00.00 min. below subbase bottom (typ.)
57 stone envelope around UD, 12" spacing (long x rad.). Provide no.
dia. holes @ 6"x3.14" "2
UD
Schedule 80 perforated PVC 4-inch
PVC 4-inch, 75'
Schedule 80 perforated
PVC 4-inch, 166'
Schedule 80 perforated PVC 4-inch, 39'
Schedule 80 perforated
Offset (2 @ 45° elbows)
Match line, see K01
0 50 10
DRAINAGE PLAN
Sheet 2 of 4
:2
S e p te m b e r
D r a in a g e P la
P R
O J E
C T
S
S P
E C
IA
L
\T u rn e r_
F a ir b a n k \5
(5
H
W Y
D
E S
\C A
D D
\K
T F
H R
C
(5
D ra in a g e
.d g n
STATE PROJECT
NUMBER
VA VA ST TFHRC 50(5) K02
% 1
.9 between UD (typ.)
Provide 2" min. horizontal clearance
PVC 4-inch, 74' perforated
Schedule 80
.9
M a tc h lin e , s e e K elbow inv. 228.92
90° longsweep
0+00.00
0.93% 1.36%
90° longsweep elbow inv. 228.92
Tee inv. 228.69 Tee inv. 228.26 elbow inv. 228.49
90° longsweep
1.36%
6+00.00
1. See R sheets for more underdrain details.
2. See Storm Drain Profiles and
DIP Underdrain Profiles for more details.
NOTES:
W a ll 1
W a ll 2
W a ll 3 inv. = 230.17
TOF = 228.50
TOW = 232.50
Wall 1
I-1
10" PVC
18" RCP
inv. = 229.75
TOF = 228.08
TOW = 232.08
Wall 2 inv. = 229.32
TOF = 227.65
TOW = 231.65
Wall 3
10" PVC 10" PVC
I-3
18" RCP
1+00.00
Coupler
4" PVC/DIP
elbow
DIP 45°
top lid 232.17
Valve box & riser
1 Extend 4" DIP outlet for visibility thru grate as required.
2 4" DIP pipe unlined Class 350 with joint type per profile.
Obtain approval from the CO for alternative joint types.
Approximately 22' total per valve, including fittings.
3 4" gate valve (non-rising stem) resilient wedge, MJ x MJ meeting AWWA C515 and C550. Obtain approval from the CO for alternative joint type.
1%
1%
24"x24"x4" PCC collar
4" PVC 22.5° elbow
4" DIP 45° elbow
2 228.01
PVC UD inv.
228.45
DIP UD inv.
I-2
PVC 24'
perforated
Schedule 80
PVC UD inv. 228.43
(typ.)
between UD clearance vertical
Provide 4" min.
PVC 24'
perforated
Schedule 80
Coupler
4" PVC/DIP
elbow
DIP 45°
1%
1%
4" PVC 22.5° elbow
24"x24"x4" PCC collar top lid 231.74
Valve box & riser
4" DIP 45° elbow
2 227.58
PVC UD inv.
228.01
DIP UD inv.
18" RCP
0.93%
PVC 4-inch, 90'
Schedule 80 nonperforated
PVC 4-inch perforated
Schedule 80
PVC 4-inch, 73' perforated
Schedule 80
PVC 4-inch, 74' perforated
Schedule 80
PVC 4-inch, 73' perforated
Schedule 80
PVC 4-inch, 74' perforated
Schedule 80
PVC 4-inch, 90'
Schedule 80 nonperforated
.9
%1 elbow inv. 228.49
90° longsweep
PVC 24'
perforated
Schedule 80
Schedule 80 perforated PVC 14' Schedule 80 perforated PVC 14'
90° longsweep elbow inv. 228.45
DETAILS REFERENCE:
Det. ET 602-7: Concrete Pipe Culvert Installation;
Det. 604-8A: Inlet For 12" To 36" Culvert;
Det. E605-A: Valve Box With Riser.
PVC 22.5° elbow
Match line, see K04
Sheet 3 of 4SCALE IN FEET
:5
J u ly
D r a in a g e P la
P R
O J E
C T
S
S P
E C
IA
L
\T u rn e r_
F a ir b a n k \5
(5
H
W Y
D
E S
\C A
D D
\K
T F
H R
C
(5
D ra in a g e
.d g n
STATE PROJECT
NUMBER
VA VA ST TFHRC 50(5) K03
inv. = 230.09
TOF = 226.92
TOW = 230.92
Wall 5 inv. = 230.40
TOF = 227.23
TOW = 231.23
Wall 4
228.52
Endcap inv.
228.83
Endcap inv.
M a tc h lin e , s e e K
228.76
Encap inv.
228.08
Tee inv.
Offset (2 x 45° elbows)
PVC 4-inch, 166'
Schedule 80 perforated
PVC 4-inch, 75'
Schedule 80 perforated
3+00.00
4+00.00
W a ll 4
W a ll 5
1.00 %
NOTE:
See R sheets for more underdrain details.
PVC 4-inch, 39'
Schedule 80 perforated
Finished elev. 230.75
Existing manhole to remain
Match line, see K03
Sheet 4 of 4SCALE IN FEET
:1
S e p te m b e r
D r a in a g e P la
P R
O J E
C T
S
S P
E C
IA
L
\T u rn e r_
F a ir b a n k \5
(5
H
W Y
D
E S
\C A
D D
\K
T F
H R
C
(5
D ra in a g e
.d g n
STATE PROJECT
NUMBER
VA VA ST TFHRC 50(5) K04
inv. = 228.90
TOF = 227.23
TOW = 231.23
Wall 4
I-4
18" RCP
1.36% 0.93%
227.83
Tee inv.
1. See R sheets for more underdrain details.
2. See Storm Drain Profiles and
DIP Underdrain Profiles for more details.
NOTES:
% 1
PVC 4-inch, 90'
Schedule 80 perforated
W a ll 4
PVC 4-inch, 73'
Schedule 80 perforated
W a ll 5
PVC 4-inch, 166''
Schedule 80 perforated
I-5 inv. = 228.59
TOF = 226.92
TOW = 230.92
Wall 5
Inlet, see Det. 604-8A and Note 2 (typ.)
M a tc h lin e , s e e K
1+00.00
2+00.00
24" RCP
Headwall
H-1
226.51
PVC UD inv.
227.58
DIP UD inv.
4" DIP 45° elbow
4" PVC 22.5° elbow
1%
.1 top lid 231.31
Valve box & riser
24"x24"x4" PCC collar
Coupler
4" PVC/DIP elbow
DIP 45°
24" RCP
90° longsweep elbow inv. 228.03
Schedule 80 perforated PVC 14' vertically to meet outlet inv. 226.51
Begin deflecting 4" PVC 02°23'
10" PVC
to meet outlet inv. 226.51
Begin deflecting 4" PVC 02°23' vertically
10" PVC
4" PVC 22.5° elbow
226.18
PVC UD inv.
230.75 elev.
Finished
.3
1 Extend 4" DIP outlet for visibility thru grate as required.
2 4" DIP pipe unlined Class 350 with joint type per profile.
Obtain approval from the CO for alternative joint types.
Approximately 22' total per valve, including fittings.
3 4" gate valve (non-rising stem) resilient wedge, MJ x MJ meeting AWWA C515 and C550. Obtain approval from the CO for alternative joint type.
Riprap, Class 3
DETAILS REFERENCE:
Det. E251-01: Loose Riprap At Culvert;
Det. ET 601-4: Concrete Headwall For Small Pipe Culvert;
Det. ET 602-7: Concrete Pipe Culvert Installation;
Det. 604-8A: Inlet For 12" To 36" Culvert;
Det. E605-A: Valve Box With Riser.
pipe culvert, 60'
Remove existing
218.00
220.00
222.00
224.00
226.00
228.00
230.00
232.00
234.00
-0+20 0+30 0+80
2.0 %
I-1
I-2
I-3
2.0 %
2.0 % inv. 229.72
10" PVC
10" PVC inv. 229.03
10" PVC inv. 228.18 t y p d e p r e s s io n
1.6 %
1.6 %
1.4 % extended stub
4" DIP 45° elbow w/
4" DIP, inv. 228.45
4" DIP, inv. 228.01
4" PVC, inv. 228.43
4" PVC, inv. 228.01
4" PVC, inv. 227.58
4" DIP 45° elbow w/ extended stub
(ditch bottom)
Proposed grade, typ.
18" RCP, 42.5'
18" RCP, 42.5'
18" RCP, 57.7'
Bot. 226.57
Bot. 225.87
Bot. 225.07 inv. 226.90
18" RCP
inv. 226.30
18" RCP
inv. 226.20
18" RCP
inv. 225.50
18" RCP
inv. 225.40
18" RCP
M a tc h lin e , s e e K
NOTE: Pipe lengths shown are measured from structure center.
TOG 231.88 TOG 231.03
TOG 230.18
(7.5' offset lt.)
Proposed grade
Det. 604-8A: Inlet For 12" To 36" Culvert.
Det. ET 602-7: Concrete Pipe Culvert Installation;
Det. ET 601-4: Concrete Headwall For Small Pipe Culvert;
DETAILS REFERENCE:
NO SCALE
STORM DRAIN PROFILE
Sheet 1 of 2
:2
S e p te m b e r
S to r m
D r a
P R
O J E
C T
S
S P
E C
IA
L
\T u rn e r_
F a ir b a n k \5
(5
H
W Y
D
E S
\C A
D D
\K
-T
F H
R C
(5
S to rm
D ra in P ro fi le s .d g n
STATE PROJECT
NUMBER
VA VA ST TFHRC 50(5) K05
218.00
220.00
222.00
224.00
226.00
228.00
230.00
232.00
234.00
1+30 1+80 2+30 2+50
I-4
I-5
H-1
2.0 %
Existing ground
(7.5' offset lt.)
Proposed grade
1.0 %
10" PVC inv. 227.02
10" PVC inv. 226.71
4" PVC, inv. 226.51
4" PVC, inv. 226.18 extended stub
4" dip 45° el w/
18" RCP, 30.8'
24" RCP, 81.0'
Bot. 224.27
Bot. 223.67
18" RCP inv. 224.70 18" RCP inv. 224.60
18" RCP inv. 224.10 inv. 224.00
18" RCP
inv. 223.00
24" RCP
4'8'
1V:2H fabric. Extend riprap 1' up side slopes at
Riprap (Class 3) apron, 12" thick w/ filter
10-yr. HGL
TOG 229.33
TOG 228.71
TOW 226.00
1.4 %
1.6 %
4" DIP, inv. 227.58
M a tc h lin e , s e e K
NOTE: Pipe lengths shown are measured from structure center.
(ditch bottom)
Proposed grade
Det. 604-8A: Inlet For 12" To 36" Culvert.
Det. ET 602-7: Concrete Pipe Culvert Installation;
Det. ET 601-4: Concrete Headwall For Small Pipe Culvert;
Det. E251-01: Loose Riprap At Culvert;
DETAILS REFERENCE:
STORM DRAIN PROFILE
Sheet 2 of 2
:3
S e p te m b e r
S to r m
D r a
P R
O J E
C T
S
S P
E C
IA
L
\T u rn e r_
F a ir b a n k \5
(5
H
W Y
D
E S
\C A
D D
\K
-T
F H
R C
(5
S to rm
D ra in P ro fi le s .d g n
STATE PROJECT
NUMBER
VA VA ST TFHRC 50(5) K06
224.00
226.00
228.00
230.00
232.00
234.00
236.00
-0+50 0+00 0+50
224.00
226.00
228.00
230.00
232.00
234.00
236.00
W-1
I-1
TOG 231.88
Existing ground 1V:3H typ.
1.0 %
TOW 232.50
10" PVC, inv. 229.72
10-yr. HGL
10" PVC, inv. 230.17
4" PVC, 22.5° elbow
4" PVC, inv. 228.43
Wall trench bot., 0.5%
Bot. 226.57
18" RCP, inv. 226.90
Shldr., 10'
Proposed grade
E d g e o f s h ld r
NOTE: Pipe lengths shown are measured from struture center.
UNDERDRAIN PROFILE
INLET I-1
:4
M a y
I n le t I
P R
O J E
C T
S
S P
E C
IA
L
\T u rn e r_
F a ir b a n k \5
(5
H
W Y
D
E S
\C A
D D
\K -T
F H
R C
(5
U n d e r
D ra in P ro fi le s .d g n
STATE PROJECT
NUMBER
VA VA ST TFHRC 50(5) K07
228.00
230.00
232.00
234.00
236.00
-0+50 0+00 0+50
224.00
226.00
228.00
230.00
232.00
234.00
236.00
W-2
I-2
TOG 231.03
Existing ground
10" PVC, inv. 229.03
4" PVC, 22.5° elbow
4" PVC, inv. 228.01 inv. out 226.20 inv. in 226.30, 18" RCP, Bot. 225.87
Wall trench bot., 0.5%
10" PVC, inv. 229.75
10-yr. HGL
1.0 %
Shldr., 10'
TOW 232.08
4" DIP (from valve), inv. 228.45
NOTE: Pipe lengths shown are measured from struture center.
E d g e o f s h ld r
INLET I-2
:0
J u n e
I n le t I
P R
O J E
C T
S
S P
E C
IA
L
\T u rn e r_
F a ir b a n k \5
(5
H
W Y
D
E S
\C A
D D
\K -T
F H
R C
(5
U n d e r
D ra in P ro fi le s .d g n
STATE PROJECT
NUMBER
VA VA ST TFHRC 50(5) K08
228.00
230.00
232.00
234.00
236.00
-0+50 0+00 0+50
224.00
226.00
228.00
230.00
232.00
234.00
236.00
I-3
W-3
TOG 230.18
Existing ground
10" PVC, inv. 228.18
4" DIP (from valve), inv. 228.45
4" PVC, inv. 227.58
10-yr. HGL
10" PVC, inv. 229.32
Wall trench bot., 0.5%
TOW 231.65
1.0 %
Shldr., 10'
4" PVC, 22.5° elbow inv. out 225.40 inv. in 225.50, 18" RCP, Bot. 225.07
NOTE: Pipe lengths shown are measured from struture center.
E d g e o f s h ld r
INLET I-3
:4
M a y
I n le t I
P R
O J E
C T
S
S P
E C
IA
L
\T u rn e r_
F a ir b a n k \5
(5
H
W Y
D
E S
\C A
D D
\K -T
F H
R C
(5
U n d e r
D ra in P ro fi le s .d g n
STATE PROJECT
NUMBER
VA VA ST TFHRC 50(5) K09
222.00
224.00
226.00
228.00
230.00
232.00
234.00
236.00
-0+50 0+00 0+50
222.00
224.00
226.00
228.00
230.00
232.00
234.00
236.00
I-4
W-4 inv. out 224.60 inv. in 224.70
18" RCP,
Bot. 224.27
4" PVC, inv. 226.51
4" DIP (from valve), inv. 227.58
10" PVC, inv. 227.02
Existing ground
TOG 229.33Shldr., 10'
1.0 %
TOW 231.23
10" PVC, inv. 228.90
Wall trench bot., 0.5%
10-yr. HGL
4" PVC, 22.5° elbow to meet outlet inv. 226.51
Deflect 4" PVC 2°23' vertically
Inv. 227.32
NOTE: Pipe lengths shown are measured from struture center.
E d g e o f s h ld r
INLET I-4
:4
M a y
I n le t I
P R
O J E
C T
S
S P
E C
IA
L
\T u rn e r_
F a ir b a n k \5
(5
H
W Y
D
E S
\C A
D D
\K -T
F H
R C
(5
U n d e r
D ra in P ro fi le s .d g n
STATE PROJECT
NUMBER
VA VA ST TFHRC 50(5) K10
222.00
226.00
228.00
230.00
232.00
234.00
236.00
-0+50 0+00 0+50
222.00
224.00
226.00
228.00
230.00
232.00
234.00
236.00
I-5
W-5
<3 inv. out 224.00 inv. in 224.10
18" RCP,
Bot. 223.67
4" PVC, inv. 226.18
10" PVC, inv. 226.71
Existing ground
TOG 228.71
Shldr., 10'
1.0 %
TOW 230.92
10" PVC, inv. 228.59
Wall trench bot., 0.5%
10-yr. HGL
4" PVC, 22.5° elbow to meet outlet inv. 226.18
Deflect 4" PVC 2°23' vertically
Inv. 227.02
NOTE: Pipe lengths shown are measured from struture center.
E d g e o f s h ld r
INLET I-5
:5
M a y
K
P R
O J E
C T
S
S P
E C
IA
L
\T u rn e r_
F a ir b a n k \5
(5
H
W Y
D
E S
\C A
D D
\K -T
F H
R C
(5
U n d e r
D ra in P ro fi le s .d g n
STATE PROJECT
NUMBER
VA VA ST TFHRC 50(5) K11
I-2
DIP UNDERDRAIN AND VALVE PROFILE (FROM TEST LANES TO I-2)
18"
RCP
236236 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28-2-4-6
0 2 4 6 8-2-4-6 10 12 14 16 18 20 22 24 26 28
4" PVC, 1'
4" Tee, inv. 228.69 push-on joints 45° hor. elbow
With Riser See Det. E605-A Valve Box
Existing ground
Proposed grade
4" DIP, 3.1'
4" DIP, 15'
1%1% push-on joints 45° hor. elbow grate as required) visibility from top of 4" DIP, 1.3' (extend for
Inv. 228.45
18" RCP (fr. I-1)
4" PVC (fr. W-2)
10" PVC (fr. W-2)
18" RCP (to I-3)
WEST NORTH
3'-0" (typ.)
(See Storm Drain Profiles and Underdrain
Plan for invert elevations)
I-1 BOX ELEVATIONS
2% min cross slope trowel smooth
PCC shaped invert 3" min above flowline
(to I-2)
18" RCP
4" PVC (fr. W-1)
10" PVC (fr. W-1)
4" PVC (fr. W-2)
10" PVC (fr. W-2)
NORTHWEST
(to I-3)
18" RCP
3'-0" (typ.)
2% min cross slope trowel smooth
PCC shaped invert 3" min above flowline
I-2 BOX ELEVATIONS
(See Storm Drain Profiles and Underdrain
Plan for invert elevations)
4" DIP
4" DIP
(fr. I-1)
18" RCP
4" PVC (fr. W-1)
18"
RCP
(R) 501 coupling or equal
DIP CL350 coupler Romac
4" schedule 80 PVC to 4"
4" DIP CL350
(unlined) 4" schedule 80 PVC
ShoulderTest Lanes
4" DIP, 1.8'
E d g e o f s h ld r
232.17 Top elev.
DIP UNDERDRAIN PROFILE
:3
S e p te m b e r
D
IP
U
D P ro fi le
P R
O J E
C T
S
S P
E C
IA
L
\T u rn e r_
F a ir b a n k \5
(5
H
W Y
D
E S
\C A
D D
\K
T F
H R
C
(5
D
IP
U D
P ro fi le s .d g n
STATE PROJECT
NUMBER
VA VA ST TFHRC 50(5) K12
I-3
DIP UNDERDRAIN AND VALVE PROFILE (FROM TEST LANES TO I-3)
236236 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28-2-4-6
0 2 4 6 8-2-4-6 10 12 14 16 18 20 22 24 26 28
4" PVC Sch. 80, 1'
4" Tee, inv. 228.26
With Riser See Det. E605-A Valve Box
Existing ground
Proposed grade
4" DIP, 15'
1%1% push-on joints 45° hor. elbow grate as required) visibility from top of 4" DIP, 1.3' (extend for
Inv. 228.01
18" RCP (fr. I-2) 4" PVC (fr. W-2)
10" PVC (fr. W-3)
18" RCP (to I-4)
4" PVC (fr. W-3)
10" PVC (fr. W-3)
(to I-4)
18" RCP
3'-0" (typ.)
2% min cross slope trowel smooth
PCC shaped invert 3" min above flowline
I-3 BOX ELEVATIONS
(See Storm Drain Profiles and Underdrain
Plan for invert elevations)
4" DIP
4" DIP
NORTHWEST
"8
(fr. I-1)
18" RCP
18"
RCP
4" DIP, 1.8'
(R) 501 coupling or equal
DIP CL350 coupler Romac
4" schedule 80 PVC to 4" push-on joints 45° hor. elbow
4" DIP, 3.1'
Shoulder
Test Lanes
(unlined) 4" schedule 80 PVC
E d g e o f s h ld r
231.74
:3
S e p te m b e r
D
IP
U
D P ro fi
P R
O J E
C T
S
S P
E C
IA
L
\T u rn e r_
F a ir b a n k \5
(5
H
W Y
D
E S
\C A
D D
\K
T F
H R
C
(5
D
IP
U D
P ro fi le s .d g n
STATE PROJECT
NUMBER
VA VA ST TFHRC 50(5) K13
I-4
DIP UNDERDRAIN AND VALVE PROFILE (FROM TEST LANES TO I-4)
I-4 BOX ELEVATIONS
WEST NORTH
(See Storm Drain Profiles and Underdrain
Plan for invert elevations)
4" PVC, 1'
4" Tee, inv. 227.83
4" DIP, 1.8'
push-on joints 45° hor. elbow
4" DIP, 3.1'
1% 1% With Riser Valve Box See Det. E605-A
4" DIP, 15'
Existing ground
Proposed grade push-on joints 45° hor. elbow grate as required) visibility from top of 4" DIP, 1.3' (extend for
18" RCP (fr. I-3)
18" RCP (to I-5)
4" PVC (fr. W-2)
Inv. 227.58
10" PVC (fr. W-3)
3'-0" (typ.)
2% min cross slope trowel smooth
PCC shaped invert 3" min above flowline
4" DIP
10" PVC (fr. W-4)
6"
(to I-5)
18" RCP
18" RCP (fr. I-3)
4" DIP
4" PVC (fr. W-4)
236236 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28-2-4-6
0 2 4 6 8-2-4-6 10 12 14 16 18 20 22 24 26 28
18"
RCP
4" PVC (fr. W-5)
10" PVC (fr. W-5)
NORTHWEST
(to H-1)
24" RCP
3'-0" (typ.)
I-5 BOX ELEVATIONS
(See Storm Drain Profiles and Underdrain
Plan for invert elevations)
2% min cross slope trowel smooth
PCC shaped invert 3" min above flowline
6" 18"
RCP
4" PVC
(fr. I-4)
18" RCP
Shoulder
Test Lanes
(unlined) 4" schedule 80 PVC
E d g e o f s h ld r
(R) 501 coupling or equal
DIP CL350 coupler Romac
4" schedule 80 PVC to 4"
231.31
:3
S e p te m b e r
D
IP
U
D P ro fi
P R
O J E
C T
S
S P
E C
IA
L
\T u rn e r_
F a ir b a n k \5
(5
H
W Y
D
E S
\C A
D D
\K
T F
H R
C
(5
D
IP
U D
P ro fi le s .d g n
STATE PROJECT
NUMBER
VA VA ST TFHRC 50(5) K14
U.S. DEPARTMENT OF TRANSPORTATION TURNER-FAIRBANK HIGHWAY RESEARCH CENTER
CONTROL NARRATIVE
EROSION & SEDIMENT
:2
J u ly
N a r r
P R
O J E
C T
S
S P
E C
IA
L
\T u rn e r_
F a ir b a n k \5
(5
H
W Y
D
E S
\C A
D D
\M
M
T F
H R
C
(5
E S
C N a rr
.d g n
STATE PROJECT
NUMBER
VA VA ST TFHRC 50(5) M01
U.S. DEPARTMENT OF TRANSPORTATION TURNER-FAIRBANK HIGHWAY RESEARCH CENTER
:1
S e p te m b e r
N a r r
P R
O J E
C T
S
S P
E C
IA
L
\T u rn e r_
F a ir b a n k \5
(5
H
W Y
D
E S
\C A
D D
\M
M
T F
H R
C
(5
E S
C N a rr
.d g n
STATE PROJECT
NUMBER
VA VA ST TFHRC 50(5) M02
U.S. DEPARTMENT OF TRANSPORTATION TURNER-FAIRBANK HIGHWAY…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .