Plans_Texico Brown Well_9-26-2025.pdf
PDF 4 MB Posted
- Solicitation number
- 2025/26-03
- Issued by
- Catron County, New Mexico
About this file
This document is a comprehensive set of engineering design and construction drawings for the Texico Brown Well Improvements project, prepared for Curry County, located in Texico, New Mexico. The project involves improvements to an existing water well facility, including demolition of the current concrete masonry unit (CMU) building, installation of a new fiberglass shelter, disinfection system, electrical upgrades, and associated site work. The drawings, dated September 26, 2025, are prepared by DBS&A (a Geo-Logic company) and The Response Group, Inc., and cover civil, electrical, and detailed site plans across 10 sheets.
The project scope includes replacing existing electrical infrastructure with a new 100-amp service, relocating the meter socket, installing a new mini power zone, combination starter/disconnect for the well pump, and a chlorination system enclosure. Electrical improvements involve upgrading the grounding system, installing a transient voltage surge suppression device, and implementing a new exhaust fan and control system for the chlorination room. The drawings provide detailed specifications for concrete foundations, pipe trenches, electrical riser diagrams, and grounding requirements, with careful attention to New Mexico electrical and construction standards. The project appears to be fully funded and ready for implementation, with comprehensive technical specifications to guide the construction process.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Las Cruces
Santa Fe
Albuquerque
Socorro
Taos
Site
COVER SHEETAND INDEX
TEXICO BROWN WELL IMPROVEMENTS
SITE MAP
NTS
VICINITY MAP
NTS
REVISION
GENERAL
1 G-1 COVER SHEET AND INDEX 0
2 G-2 GENERAL NOTES AND LEGEND 0
CIVIL
3 C-1 OVERALL SITE PLAN 0
4 C-2 DEMOLITION PLAN 0
5 C-3 DISINFECTION SYSTEM AND ENCLOSURE 0
6 C-4 CIVIL DETAILS 1 0
ELECTRICAL
7 E-1 ELECTRICAL NOTES AND LEGEND 0
8 E-2 ELECTRICAL PLANS 0
9 E-3 POWER RISER AND PANEL SCHEDULE 0
10 E-4 ELECTRICAL DETAILS 0
SITE MAP
NTS
VICINITY MAP
NTS
TEXICO, NEW MEXICO
PREPARED FOR CURRY COUNTY
CLOVIS, NEW MEXICO
TEXICO BROWN WELL
809 ANDERSON ST
TEXICO, NM 88135
INDEX OF DRAWINGS
G-1
REV. NO. DATE DESCRIPTION APPROVED BY
JOB NO.
SHT.
DWG NO.
DB25.1018
TEXICO BROWN WELL
IMPROVEMENTS
TEXICO, NM
CURRY COUNTY
CLOVIS, NM
9/26/2025
NA
JB
JH
NA
800-933-3105 www.dbstephens.com
CENTERLINE
PROFILE DRAWINGS, AND INDICATE APPROXIMATE LOCATION ONLY.
NOTE: SYMBOLS ARE NOT SHOWN TO SCALE ON PLAN OR
EXISTING POWER POLE
EXISTING SIGN
EXISTING ELECTRICAL BOX
GUY WIRE
EXISTING WATER VALVE
ABBREVIATIONS:
LEGEND:
SEE NOTE 1
SHEETS, ALL SHEETS SHOULD BE LISTED TO THE OUTSIDE RIGHT OF THE DETAIL-
2. IF THE SECTION, DETAIL, SCHEMATIC, OR DIAGRAM IS REFERENCED ON MULTIPLE
1. IF SECTION, DETAIL, SCHEMATIC, OR DIAGRAM IS DRAWN ON THE SAME SHEET
THAT IT IS TAKEN FROM, THE SHEET NUMBER SHALL BE REPLACED WITH A HYPHEN.
NOTES:
TITLE BUBBLE, AND SEPARATED WITH A COMMA.
SEE NOTES 1&2
EXIST WIRE FENCE
EXIST CHAIN LINK FENCE
SURVEY MONUMENT
EXISTING STRUCTURE
DEPRESSION CONTOUR
EXISTING CONTOUR LINE
SPOT ELEVATION (FT MSL)
AND ELEVATION DESIGNATION
XX
MISCELLANEOUS SYMBOLS:
(PREVIOUS PROJECT)
EXISTING MANHOLE
GENERAL CONSTRUCTION NOTES:
A. ALL WORK ON THIS PROJECT SHALL BE PERFORMED IN ACCORDANCE WITH APPLICABLE
FEDERAL, STATE AND LOCAL LAWS, ORDINANCES, AND REGULATIONS CONCERNING
CONSTRUCTION SAFETY AND HEALTH.
B. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL REQUIRED CONSTRUCTION PERMITS
AND APPROVALS OF LIKE KIND PRIOR TO START OF CONSTRUCTION.
C. PROJECT DOCUMENTS CONSIST OF THESE DRAWINGS, PROJECT SPECIFICATIONS, PROJECT
CONTRACTS, AND ANY AND ALL SUBSEQUENT EXECUTED PROJECT DOCUMENTATION ISSUED AS,
OR WITH, CHANGE ORDERS, AND RFI'S (REQUEST FOR INFORMATION.) THE CONTRACTOR SHALL
REVIEW ALL PROJECT DOCUMENTS AND VERIFY ALL DIMENSIONS, QUANTITIES, AND FIELD
CONDITIONS. ANY CONFLICTS OR OMISSIONS WITH THE DOCUMENTS SHALL BE REPORTED TO
THE ENGINEER/PROJECT MANAGER FOR CLARIFICATION PRIOR TO PERFORMANCE OF ANY WORK
IN QUESTION. IN THE EVENT THE CONTRACTOR DOES NOT NOTIFY THE ENGINEER/PROJECT
MANAGER, THE CONTRACTOR ASSUMES FULL RESPONSIBILITY AND ANY AND ALL EXPENSE FOR
ANY REVISIONS NECESSARY OR CORRECTIONAL WORK REQUIRED.
D. THE LOCATION OF BURIED UTILITIES ARE BASED UPON INFORMATION PROVIDED TO THE
ENGINEER BY OTHERS AND MAY NOT REFLECT ACTUAL FIELD CONDITIONS. EXISTING BURIED
UTILITIES SHALL BE VERIFIED BY THE CONTRACTOR PRIOR TO CONSTRUCTION. THE
CONTRACTOR SHALL USE ANY MEANS APPROVED BY THE ENGINEER/PROJECT MANAGER TO
LOCATE UNDERGROUND UTILITIES INCLUDING, BUT NOT LIMITED TO, ELECTRONIC LOCATING
EQUIPMENT AND/OR POT HOLING. ANY DAMAGE TO ANY OTHER UTILITIES AND/OR COLLATERAL
DAMAGE CAUSED BY THE CONTRACTOR SHALL BE THE FULL RESPONSIBILITY OF THE
CONTRACTOR.
E. EXISTING FENCING THAT IS NOT DESIGNATED FOR REMOVAL SHALL NOT BE DISTURBED. ANY
FENCING THAT IS DISTURBED OR ALTERED BY THE CONTRACTOR SHALL BE RESTORED TO ITS
ORIGINAL CONDITION AT THE CONTRACTOR'S EXPENSE. IF THE CONTRACTOR DESIRES TO
REMOVE FENCING TO ACCOMMODATE CONSTRUCTION ACTIVITIES, THE CONTRACTOR SHALL
OBTAIN THE OWNER'S WRITTEN PERMISSION BEFORE FENCE IS REMOVED. CONTRACTOR SHALL
RESTORE THE FENCE TO ITS ORIGINAL CONDITION AT THE EARLIEST OPPORTUNITY TO THE
SATISFACTION OF THE OWNER. WHILE ANY FENCING IS REMOVED, THE CONTRACTOR SHALL BE
SOLELY RESPONSIBLE FOR SECURITY OF THE SITE UNTIL THE FENCE IS RESTORED.
F. AT THE END OF EACH WORK DAY, THE CONTRACTOR SHALL CLEAN AND PICK UP THE WORK AREA TO THE SATISFACTION OF THE ENGINEER/PROJECT MANAGER. AT NO TIME SHALL THE WORK BE
LEFT IN A MANNER THAT COULD ENDANGER THE WORKERS OR THE PUBLIC.
G. ALL MATERIALS AND WORKMANSHIP SHALL CONFORM TO PROJECT SPECIFICATIONS AND PLANS, AS AMENDED AND REVISED BY THE ENGINEER. ALL INSTALLATION DETAILS ARE TYPICAL AND
MAY BE CHANGED TO BETTER FIT EXISTING LOCAL CONDITIONS UPON APPROVAL BY THE
ENGINEER.
H. ONLY THE CONTRACTOR SHALL BE RESPONSIBLE FOR SAFETY OF ALL WORK. ALL WORK,
INCLUDING WORK WITHIN TRENCHES, SHALL BE IN ACCORDANCE WITH THE OCCUPATIONAL
SAFETY AND HEALTH ACT (OSHA).
I. THE CONTRACTOR SHALL NOT INSTALL ITEMS AS SHOWN ON THESE PLANS WHEN IT IS OBVIOUS THAT FIELD CONDITIONS ARE DIFFERENT THAN SHOWN IN THE PLANS. SUCH CONDITIONS SHALL
BE BROUGHT TO THE ATTENTION OF THE ENGINEER IN A TIMELY MANNER. IN THE EVENT THE
CONTRACTOR DOES NOT NOTIFY THE ENGINEER IN A TIMELY MANNER, THE CONTRACTOR
ASSUMES FULL RESPONSIBILITY AND EXPENSE FOR ANY REVISIONS NECESSARY, INCLUDING
ENGINEERING DESIGN FEES.
J. EXISTING SITE IMPROVEMENTS WHICH ARE DAMAGED OR DISPLACED BY THE CONTRACTOR
SHALL BE REMOVED AND REPLACED BY THE CONTRACTOR AT THE CONTRACTOR'S EXPENSE.
REPAIRS SHALL BE APPROVED BY THE OWNER PRIOR TO CONSTRUCTION OF THE REPAIRS.
REPAIRS SHALL BE ACCEPTED BY THE OWNER PRIOR TO FINAL PAYMENT.
WORK WITHIN ADJACENT RIGHT-OF-WAY
K. PRIOR TO BEGINNING ANY CONSTRUCTION ACTIVITIES WITHIN ADJACENT RIGHT-OF-WAYS OR
WITHIN PROPERTY NOT OWNED BY THE OWNER OF THE PROJECT SITE, THE CONTRACTOR SHALL
ASSURE THAT ALL PERMITS AND PERMISSIONS REQUIRED HAVE BEEN OBTAINED IN WRITING.
SURVEY MONUMENTS, PROPERTY CORNERS, BENCHMARKS
L. THE CONTRACTOR SHALL NOTIFY THE OWNER AT LEAST SEVEN (7) DAYS BEFORE BEGINNING
ANY CONSTRUCTION ACTIVITY THAT COULD DAMAGE OR DISPLACE SURVEY MONUMENTS,
PROPERTY CORNERS, OR PROJECT BENCHMARKS SO THESE ITEMS MAY BE RELOCATED.
M. ANY SURVEY MONUMENTS, PROPERTY CORNERS, OR BENCHMARKS THAT ARE NOT IDENTIFIED
FOR RELOCATION ARE THE RESPONSIBILITY OF THE CONTRACTOR TO PRESERVE AND PROTECT,
RELOCATION OR REPLACEMENT OF THESE ITEMS SHALL BE DONE BY THE OWNER'S SURVEYOR
AT THE EXPENSE OF THE CONTRACTOR.
DESIGN SURVEY
N. DESIGN SURVEY NOT COMPLETED FOR THIS PROJECT. IF FIELD CONDITIONS DIFFER
SIGNIFICANTLY FROM THE DESIGN, THE CONTRACTOR SHOULD NOTIFY THE ENGINEER BEFORE
PROCEEDING WITH WORK.
PAVEMENT
O. WHEN ABUTTING NEW PAVEMENT TO EXISTING PAVEMENT, CUT EXISTING PAVEMENT EDGE TO A
NEAT, STRAIGHT LINE AS NECESSARY TO REMOVE ANY BROKEN OR CRACKED PAVEMENT AND
MATCH NEW PAVEMENT ELEVATION TO EXISTING.
P. ALL UTILITIES AND UTILITY SERVICE LINES SHALL BE INSTALLED AND APPROVED PRIOR TO
PAVING.
CONSTRUCTION LIMITS
Q. STAGING AREAS MUST BE APPROVED BY OWNER PRIOR TO USE.
UTILITIES
UTILITY LINES, PIPELINES, OR UNDERGROUND UTILITY LINES SHOWN ON THESE DRAWINGS ARE
SHOWN IN AN APPROXIMATE LOCATION ONLY BASED ON THE INFORMATION PROVIDED TO THE
ENGINEER BY OTHERS. THIS INFORMATION MAY BE INACCURATE OR INCOMPLETE. ADDITIONALLY, UNDERGROUND LINES MAY EXIST THAT ARE NOT SHOWN. THE CONTRACTOR SHALL VERIFY THE
LOCATION OF ANY UTILITY LINE, PIPELINE, OR UNDERGROUND UTILITY LINE IN OR NEAR THE AREA OF
THE WORK IN ACCORDANCE WITH LOCAL REGULATIONS
R. THE CONTRACTOR SHALL CONTACT THE STATEWIDE UTILITY LOCATOR SERVICE AT 811 AT LEAST
FIVE WORKING DAYS BEFORE BEGINNING CONSTRUCTION. AFTER THE UTILITIES ARE SPOTTED, THE CONTRACTOR SHALL EXPOSE ALL PERTINENT UTILITIES TO VERIFY THEIR VERTICAL AND
HORIZONTAL LOCATION. IF A CONFLICT EXISTS BETWEEN EXISTING UTILITIES AND PROPOSED
CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY THE ENGINEER SO THAT THE CONFLICT CAN
BE RESOLVED WITH MINIMAL DELAY.
S. THE CONTRACTOR SHALL EXERCISE DUE CARE TO AVOID DISTURBING ANY EXISTING UTILITIES, ABOVE OR BELOW GROUND. UTILITIES THAT ARE DAMAGED BY CARELESS CONSTRUCTION
SHALL BE REPAIRED OR REPLACED AT THE CONTRACTOR'S EXPENSE.
T. THE CONTRACTOR SHALL COORDINATE ANY REQUIRED UTILITY INTERRUPTIONS WITH THE
OWNER AND AFFECTED UTILITY COMPANY A MINIMUM OF FIVE (5) WORKING DAYS BEFORE THE
INTERRUPTION.
U. THE CONTRACTOR SHALL MAINTAIN A RECORD DRAWING SET OF PLANS AND PROMPTLY LOCATE ALL UTILITIES, EXISTING OR NEW, IN THEIR CORRECT LOCATION, HORIZONTAL AND VERTICAL.
THIS RECORD SET OF DRAWINGS SHALL BE MAINTAINED ON THE PROJECT SITE AND SHALL BE
AVAILABLE TO THE OWNER AND ENGINEER AT ANY TIME DURING CONSTRUCTION. RECORD
INFORMATION SHALL INCLUDE HORIZONTAL AND VERTICAL COORDINATE CALLOUTS, LINE SIZES, LINE TYPES, BURIAL DEPTHS, AND ALL OTHER PERTINENT INSTALLATION INFORMATION. IN
ADDITION ALL ITEMS THAT ARE INSTALLED EXACTLY AS DESIGNED SHALL BE NOTED AS SUCH.
EROSION CONTROL, ENVIRONMENTAL PROTECTION, AND STORM WATER POLLUTION PREVENTION
PLAN
V. THE CONTRACTOR SHALL CONFORM TO ALL CURRY COUNTY, STATE OF NEW MEXICO, AND
FEDERAL DUST AND EROSION CONTROL REGULATIONS. THE CONTRACTOR SHALL PREPARE AND
OBTAIN ANY DUST CONTROL OR EROSION CONTROL PERMITS FROM THE APPROPRIATE
REGULATORY AGENCIES.
W. THE CONTRACTOR SHALL PROMPTLY REMOVE OR STABILIZE ANY MATERIAL EXCAVATED WITHIN
THE RIGHT-OF-WAY OR ADJACENT PROPERTY TO KEEP IT FROM WASHING OFF THE PROJECT
SITE.
X. THE CONTRACTOR SHALL ENSURE THAT NO SOIL ERODES FROM THE SITE ONTO ADJACENT
PROPERTY BY CONSTRUCTION OF TEMPORARY EROSION CONTROL BERMS OR INSTALLING SILT
FENCES AT THE PROPERTY LINES (OR LIMITS OF CONSTRUCTION WHERE DESIGNATED) AND
WETTING SOIL TO PREVENT IT FROM BLOWING.
Y. WATERING, AS REQUIRED FOR CONSTRUCTION DUST CONTROL, SHALL BE CONSIDERED
INCIDENTAL TO CONSTRUCTION AND NO MEASUREMENT OR PAYMENT SHALL BE MADE.
CONSTRUCTION AREAS SHALL BE WATERED FOR DUST CONTROL IN COMPLIANCE WITH CITY,
COUNTY AND STATE ORDINANCES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
COORDINATING WITH THE VILLAGES, FOR AVAILABILITY AND USE OF WATER. THE CONTRACTOR
SHALL BE RESPONSIBLE FOR SUPPLYING ALL EQUIPMENT AND MATERIALS NECESSARY FOR
OBTAINING, METERING, AND PAYING FOR WATER.
Z. THE CONTRACTOR SHALL PROPERLY HANDLE AND DISPOSE OF ALL ASPHALT AND CONCRETE
REMOVED ON THE PROJECT BY HAULING TO AN APPROVED DISPOSAL SITE IN ACCORDANCE
WITH THE REQUIREMENTS OF CURRY COUNTY AND NMDOT.
AA. ALL WASTE PRODUCTS FROM THE CONSTRUCTION SITE, INCLUDING ITEMS DESIGNED FOR
REMOVAL, CONSTRUCTION WASTE, CONSTRUCTION EQUIPMENT WASTE PRODUCTS (OIL, GAS,
TIRES, ETC.), DRILLING MUD AND WATER, GARBAGE, GRUBBING, EXCESS CUT MATERIAL,
VEGETATIVE DEBRIS, ETC. SHALL BE APPROPRIATELY DISPOSED OF OFFSITE AT NO ADDITIONAL
COST TO THE OWNER. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO OBTAIN ANY
PERMITS REQUIRED FOR HAUL OR DISPOSAL OF WASTE PRODUCTS. IT SHALL BE THE
CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT THE WASTE DISPOSAL SITE COMPLIES WITH
APPROPRIATE REGULATIONS REGARDING THE ENVIRONMENT, ENDANGERED SPECIES, AND
ARCHAEOLOGICAL RESOURCES.
AB. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CLEANUP AND REPORTING OF SPILLS OF
HAZARDOUS MATERIALS ASSOCIATED WITH THE CONSTRUCTION SITE. HAZARDOUS MATERIALS
INCLUDES GASOLINE, DIESEL FUEL, MOTOR OIL, SOLVENTS, CHEMICALS, PAINT, ETC. WHICH MAY
BE A THREAT TO THE ENVIRONMENT. THE CONTRACTOR SHALL REPORT THE DISCOVERY OF
PAST OR PRESENT SPILLS TO THE NEW MEXICO HAZARDOUS WASTE BUREAU AT 1-505-476-6000
AND THE ENGINEER.
AC. THE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE REGULATIONS CONCERNING SURFACE
AND UNDERGROUND WATER. CONTACT WITH SURFACE WATER BY CONSTRUCTION EQUIPMENT
AND PERSONNEL SHALL BE MINIMIZED. EQUIPMENT MAINTENANCE AND REFUELING OPERATIONS
SHALL BE PERFORMED IN AN ENVIRONMENTALLY SAFE MANNER IN COMPLIANCE WITH CITY,
COUNTY, STATE, AND EPA REGULATIONS.
AD. THE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE REGULATIONS CONCERNING
CONSTRUCTION NOISE AND HOURS OF OPERATION AS STATED IN THE SPECIFICATIONS OR
IMPOSED BY THE OWNER, CITY OR COUNTY AUTHORITIES.
EXISTING WOOD FENCE
EXISTING WATER LINE
EXISTING SANITARY SEWER LINE
EXISTING NATURAL GAS LINE
EXISTING TELEPHONE LINE
Ø NOMINAL DIAMETER
ARV AIR RELIEF VALVE
ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS
C-C CENTER TO CENTER
CMP CORRUGATED METAL PIPE
CMU CONCRETE MASONRY UNIT
CS CARBON STEEL
DI DUCTILE IRON
DIA DIAMETER
DW DRIVEWAY
E EASTING
EA EACH
EL ELBOW
EOP EDGE OF PAVEMENT
EXIST EXISTING
FH FLUSH HYDRANT
FT FEET
FT MSL FEET ABOVE MEAN SEA LEVEL
H HEIGHT
HDPE HIGH DENSITY POLYETHYLENE
HOR HORIZONTAL
INV INVERT ELEVATION
LB POUND
LF LINEAR FEET
MAX MAXIMUM
MIN MINIMUM
MSL MEAN SEA LEVEL
N NORTHING
N/A NOT APPLICABLE
NMAC NEW MEXICO ADMINISTRATIVE CODE
NMDOT NEW MEXICO DEPARTMENT OF TRANSPORTATION
NMED NEW MEXICO ENVIRONMENT DEPARTMENT
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
P/L PROPERTY LINE
PERF PERFORATED
POT POTABLE WATER
PSI POUNDS PER SQUARE INCH
PVC POLYVINYL CHLORIDE
RED REDUCER
ROW RIGHT OF WAY
SCH SCHEDULE
STA STATION
STD STANDARD
TBD TO BE DETERMINED
THR THREADED
TYP TYPICAL
VERT VERTICAL
W WIDTH
W/ WITH
WL WATER LINE
EXISTING POWER POLE
EXISTING LIGHT POLE
NEW WATER VALVE
EXISTING SAS CLEANOUT
EXISTING STRUCTURE
DETAIL - TITLE
LIMITS OF CONSTRUCTION BOUNDARY
X X
NEW SANITARY SEWER LINE
NEW WATER LINE
DISCHARGE WATER
NEW FIRE HYDRANT
UNDERGROUND ELECTRIC
OVERHEAD ELECTRIC
CORRUGATED METAL PIPE
PB EXISTING ELECTRIC PULL BOX
EXISTING STREET LIGHT
NEW FORCED MAIN 2" SEWER LINE LINE
REV. NO. DATE DESCRIPTION APPROVED BY
JOB NO.
SHT.
DWG NO.
DB25.1018
TEXICO BROWN WELL
IMPROVEMENTS
TEXICO, NM
CURRY COUNTY
CLOVIS, NM
9/26/2025
NA
JB
JH
NA
800-933-3105 www.dbstephens.com GENERAL NOTES AND LEGEND
G-2
TRUEBLUE
OVERALL SITE PLAN
GENERAL NOTES:
1. DESIGN SURVEY NOT COMPLETED. THE
DRAWING COORDINATES ARE IN NEW MEXICO
STATE PLANE NAD83 EAST
C-1
REV. NO. DATE DESCRIPTION APPROVED BY
JOB NO.
SHT.
DWG NO.
DB25.1018
TEXICO BROWN WELL
IMPROVEMENTS
TEXICO, NM
CURRY COUNTY
CLOVIS, NM
9/26/2025
NA
JB
JH
NA
800-933-3105 www.dbstephens.com
EXISTING OVERHEAD
ELECTRIC TO BE
REMOVED, SEE
ELECTRICAL DWGS
FOR UGE
EXISTING CMU
BLDG TO BE
DEMOLISHED
PER DWG C-2
ENCLOSURE FOR GAS
CHLORINATION SYSTEM
PER DWG C-4
EXISTING FENCE
EXISTING DOUBLE
SWING GATE
EXISTING WELL HEAD
EXISTING PIPE MANIFOLD
AN
D
ER
SO
N S
T.
CONCRETE PAD
CUT AND CAP
EXISTING DRAIN PIPE
PER DWG C-2
EXISTING CONCRETE
TO BE DEMOLISHED
PER DWG C-2
EXISTING GAS CHLORINE
PIPES TO BE REPLACED
PER DWG C-2
DEMOLITION PLAN
GENERAL NOTES:
1. ALL MATERIAL TO BE DEMOLISHED SHALL BE
DISPOSED OF OFF SITE.
2. ALL INTERNAL ELECTRICAL EQUIPMENT SHALL
BE SALVAGED BACK TO OWNER AT THE
OWNER'S DISCRETION.
3. INTERNAL ELECTRICAL DISTRIBUTION
EQUIPMENT INCLUDES, BUT NOT LIMITED TO, (3)
30 AMP DISCONNECT SWITCHES, MOTOR
STARTER, STEP DOWN TRANSFORMER,
PANELBOARD / LOADCENTER, ELECTRIC
HEATERS.
4. THE MISSION COMMUNICTION REMOTE
TERMINAL UNIT SHALL BE REMOVED AND
PROTECTED DURING DEMOLITION AND RE-
INSTALLED ON THE NEW ELECTRICAL
EQUIPMENT UNISTRUT RACK. REFER TO
ELECTRICAL DRAWINGS.
5. THE EXTERNAL 200 AMP SERVICE DISCONNECT
SWITCH SHALL BE SALVAGED BACK TO THE
OWNER AT THE OWNER'S DISCRETION.
6. THE EXISTING METER SOCKET SHALL BE
REMOVED AND PROTECTED DURING
DEMOLITION AND RE-INSTALLED ON THE NEW
ELECTRICAL EQUIPMENT UNISTRUT RACK.
REFER TO ELECTRICAL DRAWINGS.
C-2
REV. NO. DATE DESCRIPTION APPROVED BY
JOB NO.
SHT.
DWG NO.
DB25.1018
TEXICO BROWN WELL
IMPROVEMENTS
TEXICO, NM
CURRY COUNTY
CLOVIS, NM
9/26/2025
NA
JB
JH
NA
800-933-3105 www.dbstephens.com
EXISTING PIPE MAINFOLD AND
WELL HEAD TO REMAIN
KEY NOTES:
DEMO OVERHEAD ELECTRIC, WEATHERHEAD,
AND DISCONNECT
DEMO EXISTING CMU BUILDING AND CONCRETE
FOUNDATION
DEMO EXISTING CONCRETE
CUT AND CAP EXISTING DRAIN PIPE
REMOVE EXISTING GAS CHLORINE INLET/
OUTLET PIPES
DEMO ALL INTERNAL PLUMBING, ELECTRICAL,
AND MECHANICAL
12.00' 16.00' 4.00'
10.66'
4.00'10.67'17.40'
EXISTING CONCRETE
EXISTING CONCRETE
EXISTING CMU BUILDING
TRUEBLUE
3/8" Vacuum Tubing
Cylinder Chain
3/8" Vent Tubing
Series 300 Series 300
SN
Al ar m (R el ay
SN
R ea di ng
(4 -2
0m A)
NET #1 = 1234
NET #2 = 5678
Sch.80 PVC
Supply Water
TRUEBLUE
Chlorine Solution
3/8" Vacuum Tubing
3/8" Vacuum Tubing
DISINFECTION SYSTEM AND ENCLOSURE
GENERAL NOTES:
1. MINIMUM PIPE BURIAL 3' TO TOP OF PIPE
KEY NOTES:
VRH-CP2 SERIES 300 VACUUM REGULATOR (UP
TO 10 PPD CI2)
SCALE INDICATOR
SP-100 SWITCHOVER MODULE
RM-401 3" GAS FLOW METER (10 PPD CI2)
EJ-1000 EJECTOR WITH #3 NOZZLE
WIA-PVC-075-BV 34" WATER INLET ASSEMBLY W/
Y-STRAINER, 0-160# PRESSURE GAUGE AND
TUBV
PGL-200-EW DIAGRAM PROTECTED PRESSURE
GAUGE, 2.5" DIAL, 100 PSI
CS-111-PVC 1" CORPORATION STOP ASSEMBLY
W/ PVC SOLUTION WETTED PARTS
GA-180 GAS ALARM MONITOR
EMERGENCY SHUTOFF CONTROLLER
150 LBS. UPRIGHT CHLORINE CYLINDER
BOOSTER PUMP
RECONNECT INLET/ OUTLET PIPES TO EXISTING
PIPE MANIFOLD
SCALE PAD
CHLORINE GAS SENSOR
EMERGENCY SHUTOFF CONTROLLER
CONCRETE FOUNDATION PER DET 3, DWG C-4
C-3
REV. NO. DATE DESCRIPTION APPROVED BY
JOB NO.
SHT.
DWG NO.
DB25.1018
TEXICO BROWN WELL
IMPROVEMENTS
TEXICO, NM
CURRY COUNTY
CLOVIS, NM
9/26/2025
NA
JB
JH
NA
800-933-3105 www.dbstephens.com
DISINFECTION SYSTEM SCHEMATIC 2
TREATMENT SYSTEM FLOOR PLAN 1
INLETOUTLET
4.00'
0.50'
0.50'
0.50'
0.50'
7.00'
3" TYP
4 SIDES
7/16"Ø HOLE (REF)
TYP.
2X @ 4'-0" OC
5'-8" LONG
12"CC
3" 4"
2" FLAT
@ PEAK
6'-0"
7'-0"
7'-6"
2" FLAT @ PEAK
6"
TYP.
6"
TYP.
7/16"Ø HOLE
@ 12" CENTERS R. TYP.
6'-0"
39"
30" DOOR 21"
12"12"
2 38" 1 34"
8"
4"
16"
16"
8"
4"
16"
1 58"
16"
16"
16"
8"
NTS
NTS
NTS
TYP.
TYP.
C J
CJ
TYP.
TYP.
1' - 4"
6"
#4 @ 12" O.C. EA WAY
1'
6" M
IN
(3) #4 T&B
(2) #4 CONT.
#4 TIES @ 24" O.C.
SLOPE GRADE AWAY
FROM BLDG MIN. 15'-0"
CONT. 1" NON SHRINK GROUT
3/4" CHAMFER TYP.
C
LR3"
4000 PSI AIR
ENTRAINED
CONCRETE
SEE DTL FOR REINF.
D
TL
SE
E
NOTE:
PROVIDE 1/8" WIDE x
1/3 DEPTH OF SLAB
CONTROL JOINTS.
CONTRACTOR IS TO
SAW JOINT WITHIN 7
HOURS OF POURING
SLAB.
SEE DTL FOR REINF.
D
TL
SE
E
PROVIDE TOOLED
CONTROL JOINTS.
TOOLED JOINT
SAWN JOINT
1. CONTRACTOR CAN USE EITHER, SAWN OR TOOLED JOINT
2. TROWEL OUT ROLLER MARKS AFTER TOOLING.
3. SEE PLAN FOR LOCATION AND QUANTITY.
10.50'
7.00'
SECURE BUILDING PER
MANUFACTURER'S
RECOMENDATIONS
REV. NO. DATE DESCRIPTION APPROVED BY
CIVIL DETAILS 1
GENERAL NOTES:
1. NO GEOTECHNICHAL ENGINEERING REPORT
PROVIDED, CONTRACTOR RESPONSIBLE FOR
OVEREXCAVATION, SUITABLE BACKFILL PER
SPECIFICATIONS, AND COMPACTION OF 95
PERCENT OF STANDARD PROCTOR.
800-933-3105 www.dbstephens.com
C-4
REV. NO. DATE DESCRIPTION APPROVED BY
JOB NO.
SHT.
DWG NO.
DB25.1018
TEXICO BROWN WELL
IMPROVEMENTS
TEXICO, NM
CURRY COUNTY
CLOVIS, NM
9/26/2025
NA
JB
JH
NA
800-933-3105 www.dbstephens.com
KEY NOTES:
SHELTER - ONE PIECE MOLDED FIBERGLASS
CONSTRUCTION - WHITE
INSULATION - 4' X 8' SHEET - 1" THK RIGID
POLYISOCYANURATE FOAM
LINEAR FEET - FLOOR GASKET- 4" X
3/8"NEOPRENE SPONGE
LINEAR FEET - DOOR & FRAME
REINFORCEMENT- ENCAPSULATED
LINEAR FEET - DOOR GASKET NEOPRENE
HOLLOW BULB TRIM SEAL
POP RIVET - S.S. - #SSB6-8S
LIFTING EYE BOLT - GALVANIZED STEEL - 3/4-10
NC - BOLTED THRU
DOOR - FIBERGLASS 36" W X 76" H
PANIC HARDWARE (INTERIOR), STAINLESS
STEEL - CAL ROYAL #9800EO36
DOOR HINGE - S.S. - 2-1/2" OPWN PIANO
TYPE - 6' LG
DOOR STOP - ZINC PLATED - CHAIN & SPRING
ASSEMBLY
DOOR WINDOW - SAFETY GLASS 12" X 12" X 1/4"
W/ GASKET
MTG CHANNEL - GALV. STL. - POWER-STRUT
#PS-500
MECHANICAL LOUVRE OPEN WHEN EXHAUST FAN
IS ON, 6" DIA
EXHAUST FAN PER ELECTRICAL DRWAINGS
ONE PIECE MOLDED FIBERGLASS SHELTER
C-4
PIPE TRENCH DETAIL
C-4
CONCRETE PAD PLAN 2
C-4
C-4
C-4
C-4
PIPE TRENCH DETAIL
C-4
PERIMETER FOUNDATION SECTION 3
PIPE TRENCH DETAIL
C-4
TYPICAL SLAB/ CONTROL JOINT 4
REV. NO. DATE DESCRIPTION APPROVED BY
JOB NO.
SHT.
DWG NO.
DB25.1018
TEXICO BROWN WELL
IMPROVEMENTS
TEXICO, NM
CURRY COUNTY
CLOVIS, NM
9/26/2025
TRG/rhp
TRG/rhp
TRG/tfr
TRG/tfr 800-933-3105 www.dbstephens.com
THE RESPONSE GROUP, INC.
An Electrical Engineering Corporation 6705 Academy N.E. Suite B Albuquerque, New Mexico 87109 Phone:(505) 323-7629 Fax:(505) 323-7594 E-mail: theresponsegroup@trg-inc.net
9/2 6/2
25025
OF 10
GENERAL NOTES
SPECIFICATIONS
EXISTING UTILITIES & OBSTACLES TO WORK
SITE CONDITIONS
STAGING STORAGE & DEBRIS DISPOSAL
PHASE AND SCHEDULE
SUBMITTALS
COMMUNICATION
RECORD DRAWINGS
SITE DESIGN
T
WALL OUTLET AND SURFACE MOUNTED FIXTURE
FLUORESCENT OUTLET AND FIXTURE
SINGLE POLE SWITCH, FLUSH MOUNTED 48" A.F.F.
DUPLEX CONVENIENCE OUTLET, 18" A.F.F.
WEATHERPROOF DUPLEX CONVENIENCE OUTLET, 18" A.F.F.
DUPLEX CONVENIENCE OUTLET, GROUND FAULT CIRCUIT INTERRUPTER, 18" A.F.F.
JUNCTION BOX INSTALLED ABOVE LAY-IN CEILING WITH FLEXIBLE CONDUIT
CONNECTION TO LAY-IN FIXTURES. MAXIMUM 4'-0" LENGTH OF CONDUIT, WITH
REQUIRED CONDUCTORS ALONG WITH GREEN GROUND CONDUCTOR
JUNCTION BOX FLUSH IN WALL, HEIGHT AS INDICATED ON DRAWINGS, WITH
CONNECTION TO EQUIPMENT
CONCEALED BRANCH CIRCUIT WITH CONDUCTORS AS INDICATED. NEUTRAL, HOT,
SWITCH LEG AND GROUND RESPECTIVELY
BRANCH CIRCUIT OR CONDUIT INSTALLED UNDERGROUND OR UNDER FLOOR
HOMERUN TO PANELBOARD WITH BRANCH CIRCUIT NUMBERS INDICATED
DESCRIPTIONSYMBOL
ELECTRICAL SYMBOL LEGEND
WP
GFCI
J
J
P2-2,4
NOTES:
FIRE ALARM SMOKE AND HEAT DETECTOR, PHOTOELECTRIC TYPE, 120V AUX CONTACTS
MOTOR CONNECTION FOR FRACTIONAL HP MOTOR (1/3 HP OR LESS). PROVIDE
THERMAL OVERLOAD SWITCH (WEATHERPROOF IF OUTSIDE) ADJACENT TO MOTOR
UNLESS SWITCH IS SHOWN ELSEWHERE ON PLANS
MOTOR CONNECTION FOR MOTOR WITH HP INDICATED
DISCONNECT SWITCH, POLES AND RATING AS INDICATED OR AS REQUIRED, NEMA
3R IF INSTALLED OUTSIDE
FUSED DISCONNECT SWITCH, FUSE, POLES AND RATING AS INDICATED OR AS
REQUIRED, NEMA 3R IF INSTALLED OUTSIDE
COMBINATION MAGNETIC MOTOR CONTROLLER/DISCONNECT SWITCH. SIZE, POLES,
FUSES AND OVERLOADS PER MOTOR SERVED
MAGNETIC MOTOR CONTROLLER, SIZE AND POLES PER MOTOR SERVED
TRANSFORMER, DRY TYPE, SIZE AS INDICATED
THERMOSTAT(M), 48" A.F.F.
120V PANELBOARD, REFER TO PANEL SCHEDULE
277V PANELBOARD, REFER TO PANEL SCHEDULE
SPECIAL PURPOSE CABINET, AS INDICATED ON DRAWINGS
INTRUSION ALARM DOOR CONTACT MAGNETIC
NORMALLY OPEN CONTACT
NORMALLY CLOSED CONTACT
CONTACTOR
MOTOR OVERLOADS
RED PILOT LIGHT
GREEN PILOT LIGHT
TRANSFORMER
RELAY
SWITCH
FUSE(S)
CIRCUIT BREAKER
WEATHERPROOF (NEMA 3R)
LIGHTING FIXTURES ARE OF TYPE AS INDICATED ON LIGHT FIXTURE SCHEDULE U.N.O.
MOUNTING HEIGHTS FOR DEVICES CALLED OUT AT 18" A.F.F. ARE TO THE BOTTOM OF THE
DEVICE UNLESS OTHERWISE NOTED.
MOUNTING HEIGHTS FOR DEVICES CALLED OUT AT 48" A.F.F. ARE TO THE TOP OF THE DEVICE
UNLESS OTHERWISE NOTED.
ANY SPECIFIC DETAILS ABOVE (MOUNTING HEIGHTS, PART NUMBERS, CONNECTION
METHODS, ETC.) MAY BE MODIFIED OR REPLACED BY INFORMATION ON PLANS, SCHEDULES,
DETAILS, RISERS, ETC. DETAILS NOT SPECIFICALLY MODIFIED REMAIN AS GIVEN ABOVE.
F
OL'S
DC
T
SV SOLENOID VALVE
LIMIT SWITCHLS
PT PRESSURE TRANSMITTER
PROGRAMMABLE LOGIC CONTROLLER
REMOTE TERMINAL UNIT
THERMOSTAT
PLC
RTU
T
1. IF THERE IS A CONFLICT BETWEEN PLANS/SPECIFICATIONS AND MANUFACTURER'S RECOMMENDATIONS FOR ANY DEVICE, PART, OR MATERIAL USED IN THE PROJECT, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY IN WRITING THE
ENGINEER FOR CLARIFICATION.
2. THE CONTRACTOR SHALL FAMILIARIZE HIM/HERSELF WITH THE PLANS, AND THE SITE CONDITIONS PRIOR TO BID OPENING AND SHALL IMMEDIATELY NOTIFY THE ENGINEER IN WRITING OF ANY AMBIGUITIES, CONTRADICTIONS OR IRREGULARITIES
IN THE PLANS.
3. IF, DURING BIDDING OR CONSTRUCTION, THE CONTRACTOR IS IN DOUBT AS TO THE TRUE MEANING OF ANY PART OF THE PLANS, SPECIFICATIONS, OR OTHER CONTRACT DOCUMENTS, OR DISCREPANCIES IN OR POSSIBLE OMISSIONS FROM THE DRAWINGS OR SPECIFICATIONS, THEY SHALL IMMEDIATELY NOTIFY THE ENGINEER IN WRITING AND REQUEST AN INTERPRETATION OF CORRECTION THEREOF. DURING THE BIDDING PROCESS AN ADDENDUM (IF NEEDED) WILL BE
ISSUED.
4. THE CONTRACT, IF AWARDED, WILL BE ON THE BASIS OF MATERIAL AND EQUIPMENT SPECIFIED OR DESCRIBED IN THE BIDDING DOCUMENTS WITHOUT CONSIDERATION OF POSSIBLE SUBSTITUTE OR "OR EQUAL" ITEMS. WHEREVER A BRAND NAME IS SPECIFIED OR DESCRIBED IN THE BIDDING DOCUMENTS A SUBSTITUTE OR "OR EQUAL" ITEM OF MATERIAL OR EQUIPMENT MAY BE FURNISHED OR USED BY CONTRACTOR IF ACCEPTABLE TO ENGINEER, APPLICATION FOR SUCH ACCEPTANCE WILL NOT BE CONSIDERED BY ENGINEER UNTIL AFTER THE EFFECTIVE DATE OF AGREEMENT. THE PROCEDURE FOR SUBMISSION OF ANY SUCH APPLICATION BY CONTRACTOR AND CONSIDERATION BY ENGINEER IS SET
FORTH IN THE GENERAL CONDITIONS.
5. THE CONTRACTOR IS RESPONSIBLE TO INSTALL ALL ITEMS DESCRIBED IN THESE PLANS IN A MANNER THAT PROTECTS THE EXISTING FACILITY. THE CONTRACTOR MUST CONTACT THE ENGINEER IMMEDIATELY IF HE IS UNABLE TO PERFORM THIS WORK WITHOUT DAMAGE TO THE EXISTING FACILITY. THE CONTRACTOR MUST FIELD VERIFY ALL EXISTING INFORMATION SHOWN ON THESE PLANS. DESIGN ELEMENTS OF THIS PROJECT WILL NOT CHANGE WITHOUT CHANGE ORDER UNLESS THE CONTRACTOR NOTIFIES THE ENGINEER IN A TIMELY MANNER REGARDING ITEMS DESCRIBED IN THIS NOTE. CHANGES IN ALIGNMENT CAUSED BY UNKNOWN OR UNANTICIPATED SITE CONDITIONS SHALL BE ACCOUNTED FOR BY THE APPROPRIATE UNIT PRICES, AS RECOMMENDED BY THE ENGINEER AND APPROVED BY THE OWNER.
6. THE EXISTENCE, CONDITION AND LOCATION OF ANY UNDERGROUND UTILITIES OR STRUCTURES SHOWN IN THESE PLANS WAS OBTAINED BY A CAREFUL SEARCH OF AVAILABLE RECORDS. THE CONTRACTOR IS REQUIRED TO TAKE ALL PRECAUTIONARY MEASURES TO PROTECT THE UTILITIES SHOWN, AND ANY OTHER LINES OR STRUCTURES NOT SHOWN ON THESE PLANS, AND IS RESPONSIBLE FOR THEIR LOCATING, PROTECTION OF, OR ANY DAMAGE TO THESE LINES OR STRUCTURES. THIS DOES NOT RELIEVE THE CONTRACTOR FROM HIS RESPONSIBILITY TO NOTIFY ALL UTILITY COMPANIES
AND OBTAIN LINE SPOTS.
7. THE FOLLOWING IS A LIST OF POSSIBLE OBSTRUCTIONS AND SHALL NOT BE CONSIDERED A COMPLETE LIST OF POSSIBLE OBSTRUCTIONS: EXISTING UTILITIES, STRUCTURE, GEOTECHNICAL FEATURES, ALL CONDUIT, CABLES, PIPES, WATERLINES, SEWER LINES, GAS LINES, POWER LINES, TELEPHONE AND TELEGRAPH LINES, TREES, MONUMENTS, TRAFFIC CONTROL DEVICES AND OTHER STRUCTURES, BOTH BELOW AND ABOVE GROUND.
8. CONTRACTOR SHALL BE HELD RESPONSIBLE FOR COSTS OF REPAIR OF ANY AND ALL DAMAGE TO ANY UTILITY (WHICH IS PREVIOUSLY KNOWN AND DISCLOSED TO HIM BY THE UTILITY OR SHOWN ON THESE PLANS) AS MAY BE CAUSED BY HIS
OPERATIONS.
9. FIVE (5) WORKING DAYS PRIOR TO ANY EXCAVATION, CONTRACTOR MUST CONTACT NEW MEXICO ONE-CALL SYSTEM, INC.
(505) 260-1990, FOR LOCATION OF EXISTING UTILITIES.
10. CONTRACTOR SHALL GIVE ALL PUBLIC AND PRIVATE UTILITY COMPANIES NOTICE AS SOON AS POSSIBLE, IN NO EVENT LESS THAN FORTY EIGHT (48) HOURS, FOR ANY WORK THAT IS UNDERSTOOD TO INTERFERE WITH THE SERVICE OF ANY EXISTING PUBLIC OR PRIVATE UTILITY. IF SUCH PUBLIC OR PRIVATE UTILITY DOES NOT COOPERATE FOR THE
PROTECTION OF ITS SERVICES, CONTRACTOR SHALL NOTIFY ENGINEER.
11. CONTRACTOR SHALL IMMEDIATELY REPORT ANY DAMAGES TO PUBLIC OR PRIVATE PROPERTY TO THE OWNER OF THE PROPERTY INVOLVED AND TO THE ENGINEER. CONTRACTOR SHALL REPAIR OR RESTORE AT HIS OWN EXPENSE ANY DAMAGE TO PUBLIC OR PRIVATE PROPERTY, FOR WHICH THEY ARE DIRECTLY OR INDIRECTLY RESPONSIBLE, TO A CONDITION EQUAL TO THAT EXISTING BEFORE DAMAGE. CONTRACTOR SHALL PROMPTLY NOTIFY HIS INSURANCE CARRIER OF SUCH DAMAGE. IF CONTRACTOR FAILS TO GIVE SUCH NOTICE TO HIS INSURANCE CARRIER OR REFUSES TO EFFECT SUCH REPAIRS OR RESTORATION UPON RECEIPT OF NOTICE, THE ENGINEER MAY CAUSE SUCH REPAIRS OR RESTORATION AND DEDUCT THE COST THEREOF FROM MONEYS DUE, OR WHICH MAY BECOME DUE, TO THE
CONTRACTOR.
12. CONTRACTOR IS RESPONSIBLE FOR RECORDING EXISTING CONDITIONS IN ACCORDANCE WITH THE SUPPLEMENTARY CONDITIONS OF THE CONTRACT BEFORE CONSTRUCTION BEGINS. THE RECORD OF EXISTING CONDITIONS SHALL BE USED AS THE "EQUAL CONDITION BEFORE DAMAGE" IN THE EVENT OF DAMAGE TO PUBLIC OR PRIVATE PROPERTY.
CONTRACTOR FAILURE TO RECORD EXISTING CONDITIONS WILL MAKE THE OWNERS CLAIM OF "EQUAL CONDITION BEFORE DAMAGE" THE STANDARD THE CONTRACTOR SHALL BE RESPONSIBLE FOR MEETING AND THE ENGINEER WILL BE IN THE POSITION OF NOT BEING ABLE TO SUPPORT THE CONTRACTOR IN THE MEDIATION OF ANY DISPUTE.
13. UTILITY LOCATION CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATION OF LOCATION OF ALL EXISTING UTILITIES.
14. CONTRACTOR SHALL MAINTAIN ACCESS TO ALL FACILITIES ADJACENT TO THE CONSTRUCTION AREA.
15. EPA STORM WATER DISCHARGE REGULATIONS. THE CONTRACTOR IS RESPONSIBLE FOR COMPLIANCE TO APPLICABLE
PORTIONS OF THE EPA STORM WATER DISCHARGE REGULATIONS.
16. UST ABATEMENT. THE CONTRACTOR SHALL USE WATERING EQUIPMENT FOR DUST POLLUTION ABATEMENT AS REQUIRED OR AS DIRECTED BY THE ENGINEER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND
SUPPLYING WATER. THIS WORK SHALL BE CONSIDERED INCIDENTAL TO CONSTRUCTION.
17. SUBGRADE. ALL ELECTRICAL SUBGRADE AND TRENCH BACKFILL SHALL BE COMPACTED TO 95 % OF STANDARD PROCTOR. ALL SUBGRADE AND BACKFILL SHALL BE COMPACTED IN MAXIMUM 8" LOOSE LIFTS. MOISTURE CONTENT AT THE TIME OF COMPACTION SHALL NOT EXCEED OPTIMUM OR BE LESS THAN 5 PERCENTAGE POINTS BELOW OPTIMUM.
DRIVEWAYS, APRONS, FILLETS, CURB AND GUTTER, AND OTHER CONCRETE PAVEMENT SHALL BE PLACED ON 6" OF
COMPACTED SUBGRADE.
18. RESTORE SURFACE AT TRENCH TO EXISTING CONDITIONS.
19. CONTRACTOR SHALL KEEP THE OWNER AND THE ENGINEER UPDATED WEEKLY ON THE CONSTRUCTION
SCHEDULE AND/OR PHASE SCHEDULE, AND PROGRESS TO DATE.
20. DEBRIS GENERATED BY CONSTRUCTION ACTIVITIES SHALL BE DISPOSED OF AT A PERMITTED LANDFILL OR OTHER
DULY CERTIFIED REFUSE FACILITY. THE DISPOSAL OF DEBRIS IS NOT A PAY ITEM.
21. THE CONTRACTOR SHALL PROVIDE A RECORD SKETCH ON THESE PLANS FOR THE AS-CONSTRUCTED
CONDITIONS.
22. CONTRACTOR SHALL PHASE AND SCHEDULE WORK IN SUCH A WAY AS TO PROVIDE MINIMAL POWER OUTAGES AT THE FACILITY. A PROJECT SCHEDULE SHALL BE SUBMITTED TO THE OWNER FOR REVIEW PRIOR TO ISSUANCE OF NOTICE-TO-PROCEED. CHANGES IN SCHEDULE SHALL BE PRESENTED TO OWNER AND ENGINEER AT LEAST 7 DAYS PRIOR TO PROPOSED IMPLEMENTATION. THESE SCHEDULES, SCHEMATICS AND DIAGRAMS SHALL BE UPDATED WEEKLY AS THE WORK PROGRESSES. MOST CHANGE OVER SHALL BE DONE ON WEEKENDS OR AFTER HOURS.
23. CONTRACTOR SHALL PROVIDE SUBMITTALS FOR ALL EQUIPMENT, MATERIALS, PROCESSES AND SCHEDULES AND
AS REQUESTED BY ENGINEER.
GENERAL NOTES
SPECIFICATIONS
EXISTING UTILITIES & OBSTACLES TO WORK
SITE CONDITIONS
STAGING STORAGE & DEBRIS DISPOSAL
PHASE AND SCHEDULE
SUBMITTALS
COMMUNICATION
RECORD DRAWINGS
SITE DESIGN
T
WALL OUTLET AND SURFACE MOUNTED FIXTURE
FLUORESCENT OUTLET AND FIXTURE
SINGLE POLE SWITCH, FLUSH MOUNTED 48" A.F.F.
DUPLEX CONVENIENCE OUTLET, 18" A.F.F.
WEATHERPROOF DUPLEX CONVENIENCE OUTLET, 18" A.F.F.
DUPLEX CONVENIENCE OUTLET, GROUND FAULT CIRCUIT INTERRUPTER, 18" A.F.F.
JUNCTION BOX INSTALLED ABOVE LAY-IN CEILING WITH FLEXIBLE CONDUIT
CONNECTION TO LAY-IN FIXTURES. MAXIMUM 4'-0" LENGTH OF CONDUIT, WITH
REQUIRED CONDUCTORS ALONG WITH GREEN GROUND CONDUCTOR
JUNCTION BOX FLUSH IN WALL, HEIGHT AS INDICATED ON DRAWINGS, WITH
CONNECTION TO EQUIPMENT
CONCEALED BRANCH CIRCUIT WITH CONDUCTORS AS INDICATED. NEUTRAL, HOT,
SWITCH LEG AND GROUND RESPECTIVELY
BRANCH CIRCUIT OR CONDUIT INSTALLED UNDERGROUND OR UNDER FLOOR
HOMERUN TO PANELBOARD WITH BRANCH CIRCUIT NUMBERS INDICATED
DESCRIPTIONSYMBOL
ELECTRICAL SYMBOL LEGEND
GFCI
J
J
P2-2,4
NOTES:
FIRE ALARM SMOKE AND HEAT DETECTOR, PHOTOELECTRIC TYPE, 120V AUX CONTACTS
MOTOR CONNECTION FOR FRACTIONAL HP MOTOR (1/3 HP OR LESS). PROVIDE
THERMAL OVERLOAD SWITCH (WEATHERPROOF IF OUTSIDE) ADJACENT TO MOTOR
UNLESS SWITCH IS SHOWN ELSEWHERE ON PLANS
MOTOR CONNECTION FOR MOTOR WITH HP INDICATED
DISCONNECT SWITCH, POLES AND RATING AS INDICATED OR AS REQUIRED, NEMA
3R IF INSTALLED OUTSIDE
FUSED DISCONNECT SWITCH, FUSE, POLES AND RATING AS INDICATED OR AS
REQUIRED, NEMA 3R IF INSTALLED OUTSIDE
COMBINATION MAGNETIC MOTOR CONTROLLER/DISCONNECT SWITCH. SIZE, POLES,
FUSES AND OVERLOADS PER MOTOR SERVED
MAGNETIC MOTOR CONTROLLER, SIZE AND POLES PER MOTOR SERVED
TRANSFORMER, DRY TYPE, SIZE AS INDICATED
THERMOSTAT(M), 48" A.F.F.
120V PANELBOARD, REFER TO PANEL SCHEDULE
277V PANELBOARD, REFER TO PANEL SCHEDULE
SPECIAL PURPOSE CABINET, AS INDICATED ON DRAWINGS
INTRUSION ALARM DOOR CONTACT MAGNETIC
NORMALLY OPEN CONTACT
NORMALLY CLOSED CONTACT
CONTACTOR
MOTOR OVERLOADS
RED PILOT LIGHT
GREEN PILOT LIGHT
TRANSFORMER
RELAY
SWITCH
FUSE(S)
CIRCUIT BREAKER
WEATHERPROOF (NEMA 3R)
LIGHTING FIXTURES ARE OF TYPE AS INDICATED ON LIGHT FIXTURE SCHEDULE U.N.O.
MOUNTING HEIGHTS FOR DEVICES CALLED OUT AT 18" A.F.F. ARE TO THE BOTTOM OF THE
DEVICE UNLESS OTHERWISE NOTED.
MOUNTING HEIGHTS FOR DEVICES CALLED OUT AT 48" A.F.F. ARE TO THE TOP OF THE DEVICE
UNLESS OTHERWISE NOTED.
ANY SPECIFIC DETAILS ABOVE (MOUNTING HEIGHTS, PART NUMBERS, CONNECTION
METHODS, ETC.) MAY BE MODIFIED OR REPLACED BY INFORMATION ON PLANS, SCHEDULES,
DETAILS, RISERS, ETC. DETAILS NOT SPECIFICALLY MODIFIED REMAIN AS GIVEN ABOVE.
OL'S
DC
T
SV SOLENOID VALVE
LIMIT SWITCHLS
PT PRESSURE TRANSMITTER
PROGRAMMABLE LOGIC CONTROLLER
REMOTE TERMINAL UNIT
THERMOSTAT
PLC
RTU
T
1. IF THERE IS A CONFLICT BETWEEN PLANS/SPECIFICATIONS AND MANUFACTURER'S RECOMMENDATIONS FOR ANY DEVICE, PART, OR MATERIAL USED IN THE PROJECT, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY IN WRITING THE
ENGINEER FOR CLARIFICATION.
2. THE CONTRACTOR SHALL FAMILIARIZE HIM/HERSELF WITH THE PLANS, AND THE SITE CONDITIONS PRIOR TO BID OPENING AND SHALL IMMEDIATELY NOTIFY THE ENGINEER IN WRITING OF ANY AMBIGUITIES, CONTRADICTIONS OR IRREGULARITIES
IN THE PLANS.
3. IF, DURING BIDDING OR CONSTRUCTION, THE CONTRACTOR IS IN DOUBT AS TO THE TRUE MEANING OF ANY PART OF THE PLANS, SPECIFICATIONS, OR OTHER CONTRACT DOCUMENTS, OR DISCREPANCIES IN OR POSSIBLE OMISSIONS FROM THE DRAWINGS OR SPECIFICATIONS, THEY SHALL IMMEDIATELY NOTIFY THE ENGINEER IN WRITING AND REQUEST AN INTERPRETATION OF CORRECTION THEREOF. DURING THE BIDDING PROCESS AN ADDENDUM (IF NEEDED) WILL BE
ISSUED.
4. THE CONTRACT, IF AWARDED, WILL BE ON THE BASIS OF MATERIAL AND EQUIPMENT SPECIFIED OR DESCRIBED IN THE BIDDING DOCUMENTS WITHOUT CONSIDERATION OF POSSIBLE SUBSTITUTE OR "OR EQUAL" ITEMS. WHEREVER A BRAND NAME IS SPECIFIED OR DESCRIBED IN THE BIDDING DOCUMENTS A SUBSTITUTE OR "OR EQUAL" ITEM OF MATERIAL OR EQUIPMENT MAY BE FURNISHED OR USED BY CONTRACTOR IF ACCEPTABLE TO ENGINEER, APPLICATION FOR SUCH ACCEPTANCE WILL NOT BE CONSIDERED BY ENGINEER UNTIL AFTER THE EFFECTIVE DATE OF AGREEMENT. THE PROCEDURE FOR SUBMISSION OF ANY SUCH APPLICATION BY CONTRACTOR AND CONSIDERATION BY ENGINEER IS SET
FORTH IN THE GENERAL CONDITIONS.
5. THE CONTRACTOR IS RESPONSIBLE TO INSTALL ALL ITEMS DESCRIBED IN THESE PLANS IN A MANNER THAT PROTECTS THE EXISTING FACILITY. THE CONTRACTOR MUST CONTACT THE ENGINEER IMMEDIATELY IF HE IS UNABLE TO PERFORM THIS WORK WITHOUT DAMAGE TO THE EXISTING FACILITY. THE CONTRACTOR MUST FIELD VERIFY ALL EXISTING INFORMATION SHOWN ON THESE PLANS. DESIGN ELEMENTS OF THIS PROJECT WILL NOT CHANGE WITHOUT CHANGE ORDER UNLESS THE CONTRACTOR NOTIFIES THE ENGINEER IN A TIMELY MANNER REGARDING ITEMS DESCRIBED IN THIS NOTE. CHANGES IN ALIGNMENT CAUSED BY UNKNOWN OR UNANTICIPATED SITE CONDITIONS SHALL BE ACCOUNTED FOR BY THE APPROPRIATE UNIT PRICES, AS RECOMMENDED BY THE ENGINEER AND APPROVED BY THE OWNER.
6. THE EXISTENCE, CONDITION AND LOCATION OF ANY UNDERGROUND UTILITIES OR STRUCTURES SHOWN IN THESE PLANS WAS OBTAINED BY A CAREFUL SEARCH OF AVAILABLE RECORDS. THE CONTRACTOR IS REQUIRED TO TAKE ALL PRECAUTIONARY MEASURES TO PROTECT THE UTILITIES SHOWN, AND ANY OTHER LINES OR STRUCTURES NOT SHOWN ON THESE PLANS, AND IS RESPONSIBLE FOR THEIR LOCATING, PROTECTION OF, OR ANY DAMAGE TO THESE LINES OR STRUCTURES. THIS DOES NOT RELIEVE THE CONTRACTOR FROM HIS RESPONSIBILITY TO NOTIFY ALL UTILITY COMPANIES
AND OBTAIN LINE SPOTS.
7. THE FOLLOWING IS A LIST OF POSSIBLE OBSTRUCTIONS AND SHALL NOT BE CONSIDERED A COMPLETE LIST OF POSSIBLE OBSTRUCTIONS: EXISTING UTILITIES, STRUCTURE, GEOTECHNICAL FEATURES, ALL CONDUIT, CABLES, PIPES, WATERLINES, SEWER LINES, GAS LINES, POWER LINES, TELEPHONE AND TELEGRAPH LINES, TREES, MONUMENTS, TRAFFIC CONTROL DEVICES AND OTHER STRUCTURES, BOTH BELOW AND ABOVE GROUND.
8. CONTRACTOR SHALL BE HELD RESPONSIBLE FOR COSTS OF REPAIR OF ANY AND ALL DAMAGE TO ANY UTILITY (WHICH IS PREVIOUSLY KNOWN AND DISCLOSED TO HIM BY THE UTILITY OR SHOWN ON THESE PLANS) AS MAY BE CAUSED BY HIS
OPERATIONS.
9. FIVE (5) WORKING DAYS PRIOR TO ANY EXCAVATION, CONTRACTOR MUST CONTACT NEW MEXICO ONE-CALL SYSTEM, INC.
(505) 260-1990, FOR LOCATION OF EXISTING UTILITIES.
10. CONTRACTOR SHALL GIVE ALL PUBLIC AND PRIVATE UTILITY COMPANIES NOTICE AS SOON AS POSSIBLE, IN NO EVENT LESS THAN FORTY EIGHT (48) HOURS, FOR ANY WORK THAT IS UNDERSTOOD TO INTERFERE WITH THE SERVICE OF ANY EXISTING PUBLIC OR PRIVATE UTILITY. IF SUCH PUBLIC OR PRIVATE UTILITY DOES NOT COOPERATE FOR THE
PROTECTION OF ITS SERVICES, CONTRACTOR SHALL NOTIFY ENGINEER.
11. CONTRACTOR SHALL IMMEDIATELY REPORT ANY DAMAGES TO PUBLIC OR PRIVATE PROPERTY TO THE OWNER OF THE PROPERTY INVOLVED AND TO THE ENGINEER. CONTRACTOR SHALL REPAIR OR RESTORE AT HIS OWN EXPENSE ANY DAMAGE TO PUBLIC OR PRIVATE PROPERTY, FOR WHICH THEY ARE DIRECTLY OR INDIRECTLY RESPONSIBLE, TO A CONDITION EQUAL TO THAT EXISTING BEFORE DAMAGE. CONTRACTOR SHALL PROMPTLY NOTIFY HIS INSURANCE CARRIER OF SUCH DAMAGE. IF CONTRACTOR FAILS TO GIVE SUCH NOTICE TO HIS INSURANCE CARRIER OR REFUSES TO EFFECT SUCH REPAIRS OR RESTORATION UPON RECEIPT OF NOTICE, THE ENGINEER MAY CAUSE SUCH REPAIRS OR RESTORATION AND DEDUCT THE COST THEREOF FROM MONEYS DUE, OR WHICH MAY BECOME DUE, TO THE
CONTRACTOR.
12. CONTRACTOR IS RESPONSIBLE FOR RECORDING EXISTING CONDITIONS IN ACCORDANCE WITH THE SUPPLEMENTARY CONDITIONS OF THE CONTRACT BEFORE CONSTRUCTION BEGINS. THE RECORD OF EXISTING CONDITIONS SHALL BE USED AS THE "EQUAL CONDITION BEFORE DAMAGE" IN THE EVENT OF DAMAGE TO PUBLIC OR PRIVATE PROPERTY.
CONTRACTOR FAILURE TO RECORD EXISTING CONDITIONS WILL MAKE THE OWNERS CLAIM OF "EQUAL CONDITION BEFORE DAMAGE" THE STANDARD THE CONTRACTOR SHALL BE RESPONSIBLE FOR MEETING AND THE ENGINEER WILL BE IN THE POSITION OF NOT BEING ABLE TO SUPPORT THE CONTRACTOR IN THE MEDIATION OF ANY DISPUTE.
13. UTILITY LOCATION CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATION OF LOCATION OF ALL EXISTING UTILITIES.
14. CONTRACTOR SHALL MAINTAIN ACCESS TO ALL FACILITIES ADJACENT TO THE CONSTRUCTION AREA.
15. EPA STORM WATER DISCHARGE REGULATIONS. THE CONTRACTOR IS RESPONSIBLE FOR COMPLIANCE TO APPLICABLE
PORTIONS OF THE EPA STORM WATER DISCHARGE REGULATIONS.
16. UST ABATEMENT. THE CONTRACTOR SHALL USE WATERING EQUIPMENT FOR DUST POLLUTION ABATEMENT AS REQUIRED OR AS DIRECTED BY THE ENGINEER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND
SUPPLYING WATER. THIS WORK SHALL BE CONSIDERED INCIDENTAL TO CONSTRUCTION.
17. SUBGRADE. ALL ELECTRICAL SUBGRADE AND TRENCH BACKFILL SHALL BE COMPACTED TO 95 % OF STANDARD PROCTOR. ALL SUBGRADE AND BACKFILL SHALL BE COMPACTED IN MAXIMUM 8" LOOSE LIFTS. MOISTURE CONTENT AT THE TIME OF COMPACTION SHALL NOT EXCEED OPTIMUM OR BE LESS THAN 5 PERCENTAGE POINTS BELOW OPTIMUM.
DRIVEWAYS, APRONS, FILLETS, CURB AND GUTTER, AND OTHER CONCRETE PAVEMENT SHALL BE PLACED ON 6" OF
COMPACTED SUBGRADE.
18. RESTORE SURFACE AT TRENCH TO EXISTING CONDITIONS.
19. CONTRACTOR SHALL KEEP THE OWNER AND THE ENGINEER UPDATED WEEKLY ON THE CONSTRUCTION
SCHEDULE AND/OR PHASE SCHEDULE, AND PROGRESS TO DATE.
20. DEBRIS GENERATED BY CONSTRUCTION ACTIVITIES SHALL BE DISPOSED OF AT A PERMITTED LANDFILL OR OTHER
DULY CERTIFIED REFUSE FACILITY. THE DISPOSAL OF DEBRIS IS NOT A PAY ITEM.
21. THE CONTRACTOR SHALL PROVIDE A RECORD SKETCH ON THESE PLANS FOR THE AS-CONSTRUCTED
CONDITIONS.
22. CONTRACTOR SHALL PHASE AND SCHEDULE WORK IN SUCH A WAY AS TO PROVIDE MINIMAL POWER OUTAGES AT THE FACILITY. A PROJECT SCHEDULE SHALL BE SUBMITTED TO THE OWNER FOR REVIEW PRIOR TO ISSUANCE OF NOTICE-TO-PROCEED. CHANGES IN SCHEDULE SHALL BE PRESENTED TO OWNER AND ENGINEER AT LEAST 7 DAYS PRIOR TO PROPOSED IMPLEMENTATION. THESE SCHEDULES, SCHEMATICS AND DIAGRAMS SHALL BE UPDATED WEEKLY AS THE WORK PROGRESSES. MOST CHANGE OVER SHALL BE DONE ON WEEKENDS OR AFTER HOURS.
23. CONTRACTOR SHALL PROVIDE SUBMITTALS FOR ALL EQUIPMENT, MATERIALS, PROCESSES AND SCHEDULES AND
AS REQUESTED BY ENGINEER.
R
G
C
R
E1
ELECTRICAL NOTES AND LEGEND
TRUEBLUE
EXISTING UTILITY POLE WITH
POLE MOUNTED TRANSFORMERS11
1 2
TRUEBLUE
A
T F
MPZ-4
B
J
B
MPZ-2
GFCI/WP
GFCI/WP
MPZ-1
J
MPZ-6 18
GFCI
GFCI
GFCI GFCI
GFCI
GFCI
GFCIGFCI
HP
DC14
T
MPZ-3
MPZ-5
J
MPZ-7
GENERAL NOTES
A. REFER TO SHEET E1 FOR "PROJECT GENERAL NOTES" AND "ELECTRICAL SYMBOL LEGEND".
B. REFER TO SHEET E3 FOR "POWER RISER DIAGRAM" AND PANEL SCHEDULE.
C. ALL CONDUIT SHOWN DASHED SHALL BE BURIED A MINIMUM OF 36" BELOW FINISHED GRADE
WITH RED WARNING TAPE BURIED 12" ABOVE CONDUIT.
D. THE CONTRACTOR SHALL PROVIDE AND INSTALL ALL CONDUIT THAT IS REQUIRED FOR LOW
VOLTAGE CABLING BETWEEN TREATMENT EQUIPMENT. PROVIDE AND INSTALL ALL DATA
CABLING PER MANUFACTURERS RECOMMENDATION. REFER TO MANUFACTURER'S
DRAWINGS FOR ADDITIONAL INFORMATION.
KEYED NOTES
1. APPROXIMATE LOCATION OF NEW CHLORINATION SYSTEM ENCLOSURE. REFER TO
"ENLARGED CHLORINATION SYSTEM ENCLOSURE ELECTRICAL PLAN" ON THIS SHEET FOR
ADDITIONAL INFORMATION.
2. NEW UNISTRUT MOUNTING RACK FOR ELECTRICAL GEAR. REFER TO "ELECTRICAL
EQUIPMENT RACK DETAIL" ON SHEET E4 FOR ADDITIONAL INFORMATION.
3. APPROXIMATE LOCATION OF RELOCATED 200 AMP, 480 VOLT, THREE PHASE METER SOCKET.
CONTRACTOR SHALL COORDINATE ALL REQUIREMENTS WITH XCEL ENERGY PRIOR TO
COMMENCEMENT OF WORK.
4. PROVIDE AND INSTALL A NEW 100 AMP, 3-POLE, 600 VOLT, HEAVY DUTY FUSIBLE DISCONNECT
SWITCH IN A NEMA 3R ENCLOSURE. PROVIDE WITH 100 AMP RK5 FUSES. DISCONNECT
SWITCH SHALL BE SERVICE ENTRANCE RATED.
5. PROVIDE AND INSTALL A TRANSIENT VOLTAGE SURGE SUPPRESSION DEVICE. THE TVSS
SHALL BE MANUFACTURED BY RAYCAP #480-3D-M3-3-06-D-H OR APPROVED EQUAL, NEMA 3R
ENCLOSURE.
6. PROVIDE AND INSTALL A NEW 5 KVA MINI POWER ZONE. 480V-1Ø INPUT, 120/240V-1Ø OUTPUT, 15 AMP PRIMARY MAIN CIRCUIT BREAKER, 30 AMP SECONDARY MAIN CIRCUIT BREAKER, 16
CIRCUIT, NEMA 3R ENCLOSURE. MINI POWER ZONE TO BE SQUARE D #MPZB5S40F OR OWNER
AND ENGINEER APPROVED EQUAL.
7. APPROXIMATE LOCATION OF RELOCATED MISSIONS COMMUNICATIONS RTU UNIT.
CONTRACTOR SHALL REINSTALL EXISTING RTU, ANTENNA, AND ALL ASSOCIATED
COMPONENTS FOR A COMPLETE AND OPERATIONAL SYSTEM.
8. PROVIDE AND INSTALL A NEW COMBINATION STARTER / DISCONNECT FOR SUBMERSIBLE
WELL PUMP. SQUARE D #8538SCASP6 OR ENGINEER AND OWNER APPROVED EQUAL.
HAND-OFF-AUTO SELECTOR SWITCH, NEMA SIZE 1 MOTOR STARTER, 2 N.O. AUXILIARY
CONTACT, 2 N.C. AUXILIARY CONTACT, RED PILOT LIGHT, GREEN PILOT LIGHT, AND RESET
PUSHBUTTON, 30 AMP FUSES.
9. UNDERGROUND FEEDER CONDUIT AND CONDUCTORS FROM THE COMBINATION MOTOR
STARTER TO THE SUBMERSIBLE WELL PUMP. CONTRACTOR SHALL WIRE WITH #10 THWN Cu
CONDUCTORS THROUGHOUT CIRCUIT IN 1" CONDUIT.
10. APPROXIMATE LOCATION OF EXISTING 5 HORSEPOWER SUBMERSIBLE WELL PUMP.
11. EXISTING UTILITY POLE WITH POLE MOUNTED TRANSFORMERS, CURRENTLY SERVING THE
EXISTING ELECTRICAL SERVICE TO THE CMU BUILDING. CONTRACTOR SHALL COORDINATE
WORK WITH XCEL ENERGY PRIOR TO COMMENCEMENT OF THE PROJECT.
12. NEW UNDERGROUND SERVICE CONDUIT AND CONDUCTORS FROM THE POLE MOUNTED
TRANSFORMERS TO THE RELOCATED METER SOCKET. REFER TO "POWER RISER DIAGRAM"
ON SHEET E3 FOR CONDUIT AND CONDUCTOR SIZE. CONDUIT AND CONDUCTORS TO BE
BURIED 36" BELOW FINISHED GRADE WITH RED WARNING TAPE BURIED 12" ABOVE CONDUIT.
13. PROVIDE AND INSTALL A WEATHER PROOF SWITCH WITH PILOT LIGHT FOR THE CONTROL OF
THE CHLORINE ROOM LIGHT FIXTURE. REFER TO "CHLORINATOR ROOM EXHAUST FAN
CONTROL DIAGRAM" ON SHEET E4 FOR ADDITIONAL INFORMATION.
14. PROVIDE AND INSTALL A MAGNETIC 120 VOLT CONTACT SWITCH AT DOOR FOR THE CONTROL
OF THE ROOM EXHAUST FAN. REFER TO "CHLORINATOR ROOM EXHAUST FAN CONTROL
DIAGRAM" ON SHEET E4 FOR ADDITIONAL INFORMATION.
15. PROVIDE AND INSTALL NEW LINE VOLTAGE THERMOSTAT FOR CONTROL OF EXHAUST FAN.
REFER TO "CHLORINATOR ROOM EXHAUST FAN CONTROL DIAGRAM" ON SHEET E4 FOR
ADDITIONAL INFORMATION.
16. PROVIDE AND INSTALL A DIRECT DRIVE EXHAUST FAN, 430 CFM, 120 VOLTS, SINGLE PHASE, BACKDRAFT DAMPER. FAN SHALL BE CONTROLLED BY THE DOOR CONTACTOR. PROVIDE ALL
EQUIPMENT AND ACCESSORIES TO A COMPLETE SYSTEM. EXHAUST FAN SHALL BE MOUNTED
ON THE WALL AT 12" ABOVE FINISHED FLOOR. EXHAUST FAN SHALL BE GREENHECK
#CUBE-160-LMD122GQD OR ENGINEER AND OWNER APPROVED EQUAL.
17. EXHAUST FAN SHALL BE CONTROLLED VIA WEATHERPROOF TOGGLE SWITCH. REFER TO
"CHLORINATOR ROOM EXHAUST FAN CONTROL DIAGRAM" ON SHEET E4 FOR ADDITIONAL
INFORMATION.
18. PROVIDE AND INSTALL NEW 120 VOLT RELAY FOR AUTOMATIC CONTROL OF CHEMICAL FEED
PUMP. REFER TO "CHEMICAL FEED PUMP CONTROL DIAGRAM" ON SHEET E4 FOR ADDITIONAL
INFORMATION.
19. PROVIDE AND INSTALL NEW NEMA 5-20 GFCI TYPE RECEPTACLE FOR POWER CONNECTION
TO CHEMICAL FEED PUMP. REFER TO "CHEMICAL FEED PUMP CONTROL DIAGRAM ON SHEET
E4 FOR ADDITIONAL INFORMATION.
20. WEATHERPROOF JUNCTION BOX FOR POWER CONNECTION TO MOTORIZED LOUVRE.
MOTORIZED LOUVRE SHALL BE INTERLOCKED WITH THE EXHAUST FAN SO THAT WHEN THE
EXHAUST FAN IS ON, MOTORIZED LOUVRE SHALL BE IN THE OPEN POSITION.
21. CONTRACTOR SHALL EXTEND 1" CONDUIT WITH REQUIRED CONTROL CONDUCTORS FOR
BETWEEN THE GAS ALARM MONITOR AND THE MISSIONS COMMUNICATIONS UNIT. THE GAS
ALARM SHALL HAS A RELAY OUTPUT (ALARM) AND A 4-20mA OUTPUT (READING). THE
CONTRACTOR SHALL PROVIDE AND INSTALL ALL CONTROL CABLING PER MANUFACTURER'S
RECOMMENDATION AND MAKE ALL REQUIRED CONNECTIONS FOR A COMPLETE AND
OPERATIONAL SYSTEM. REFER TO "ENLARGED CHLORINATION SYSTEM ENCLOSURE
ELECTRICAL PLAN" ON THIS SHEET FOR ADDITIONAL INFORMATION.
22. (2) JUNCTION BOXES FOR GAS ALARM. (1) JUNCTION BOX FOR POWER. HOMERUN CIRCUIT AS
SHOWN ON PLANS. THE OTHER JUNCTION BOX IS FOR LOW VOLTAGE CABLING TO THE
MISSION COMMUNICATIONS SCADA UNIT. EXTEND 1" CONDUIT TO MISSION COMMUNICATIONS
UNIT PER KEYED NOTE 21.
23. PROVIDE AND INSTALL A NEW COMBINATION STARTER / DISCONNECT FOR
SUBMERSIBLE WELL PUMP. SQUARE D #8538SCASP6 OR ENGINEER AND OWNER
APPROVED EQUAL. HAND-OFF-AUTO SELECTOR SWITCH, NEMA SIZE 1 MOTOR
STARTER, 2 N.O. AUXILIARY CONTACT, 2 N.C. AUXILIARY CONTACT, RED PILOT LIGHT,
GREEN PILOT LIGHT, AND RESET PUSHBUTTON, 30 AMP FUSES. REFER TO "POWER
RISER DIAGRAM ON SHEET E3 FOR ADDITIONAL INFORMATION. THE WELL MOTOR
STARTER SHALL BE CONTROLLED VIA MISSIONS COMMUNICATIONS UNIT. PROVIDE
AND INSTALL A 1" CONDUIT WITH REQUIRED CONTROL CONDUCTORS BETWEEN
MOTOR STARTER AND MISSIONS COMMUNICATIONS UNIT. MAKE ALL REQUIRED
CONNECTIONS FOR A COMPLETE AND OPERATIONAL SYSTEM. REFER TO "POWER
RISER DIAGRAM" ON SHEET E3 FOR INCOMING POWER AND ADDITIONAL
INFORMATION.
REV. NO. DATE DESCRIPTION APPROVED BY
JOB NO.
SHT.
DWG NO.
DB25.1018
TEXICO BROWN WELL
IMPROVEMENTS
TEXICO, NM
CURRY COUNTY
CLOVIS, NM
9/26/2025
TRG/rhp
TRG/rhp
TRG/tfr
TRG/tfr 800-933-3105 www.dbstephens.com
THE RESPONSE GROUP, INC.
An Electrical Engineering Corporation 6705 Academy N.E. Suite B Albuquerque, New Mexico 87109 Phone:(505) 323-7629 Fax:(505) 323-7594 E-mail: theresponsegroup@trg-inc.net
9/2 6/2
25025
OF 10
E2
ELECTRICAL PLANS
ELECTRICAL SITE PLAN
SCALE: 1" = 10'-0"
ENLARGED CHLORINATION SYSTEM ENCLOSURE ELECTRICAL PLAN
SCALE: 1" = 1'-0"
KEYED NOTES
1. RELOCATED METER SOCKET. REFER TO "ELECTRICAL SITE PLAN" ON SHEET E2 FOR
APPROXIMATE LOCATION.
2. PROVIDE AND INSTALL A NEW 100 AMP, 3-POLE, 600 VOLT, HEAVY DUTY FUSIBLE
DISCONNECT SWITCH IN A NEMA 3R ENCLOSURE. PROVIDE WITH 100 AMP RK5 FUSES.
DISCONNECT SWITCH SHALL BE SERVICE ENTRANCE RATED. REFER TO "ELECTRICAL
SITE PLAN" ON SHEET E2 FOR APPROXIMATE LOCATION.
3. DISCONNECT SWITCH SHALL BE PROVIDED WITH A MECHANICAL LUG KIT SIZED FOR
THE OUTGOING CONDUCTORS (KEYED NOTES 8, 9, AND 10).
4. PROVIDE AND INSTALL A TRANSIENT VOLTAGE SURGE SUPPRESSION DEVICE. THE
TVSS SHALL BE MANUFACTURED BY RAYCAP #480-3D-M3-3-06-D-H OR APPROVED
EQUAL, NEMA 3R ENCLOSURE. REFER TO "ELECTRICAL SITE PLAN" ON SHEET E2 FOR
APPROXIMATE LOCATION.
5. PROVIDE AND INSTALL A NEW 5 KVA MINI POWER ZONE. 480V-1Ø INPUT, 120/240V-1Ø
OUTPUT, 15 AMP PRIMARY MAIN CIRCUIT BREAKER, 30 AMP SECONDARY MAIN CIRCUIT
BREAKER, 16 CIRCUIT, NEMA 3R ENCLOSURE. MINI POWER ZONE TO BE SQUARE D
#MPZB5S40F OR OWNER AND ENGINEER APPROVED EQUAL. REFER TO "ELECTRICAL
SITE PLAN" ON SHEET E2 FOR APPROXIMATE LOCATION.
6. PROVIDE AND INSTALL A NEW COMBINATION STARTER / DISCONNECT FOR
SUBMERSIBLE WELL PUMP. SQUARE D #8538SCASP6 OR ENGINEER AND OWNER
APPROVED EQUAL. HAND-OFF-AUTO SELECTOR SWITCH, NEMA SIZE 1 MOTOR
STARTER, 2 N.O. AUXILIARY CONTACT, 2 N.C. AUXILIARY CONTACT, RED PILOT LIGHT,
GREEN PILOT LIGHT, AND RESET PUSHBUTTON, 30 AMP FUSES. REFER TO
"ELECTRICAL SITE PLAN" ON SHEET E2 FOR APPROXIMATE LOCATION.
7. 3#2 THWN Cu IN 1-1/4" CONDUIT (OR AS REQUIRED BY UTILITY COMPANY).
8. 3#2 THWN Cu AND 1#2 THWN Cu GROUND IN 1-1/4" CONDUIT.
9. 2#10 THWN Cu AND 1#10 THWN Cu GROUND IN 1" CONDUIT.
10. 3#10 THWN Cu AND 1#10 THWN Cu GROUND IN 1" CONDUIT.
11. CONDUCTOR LENGTH SHALL BE 10 FEET OR LESS TO COMPLY WITH NEC 240.21(B)(1).
12. REFER TO "GROUNDING SYSTEM DIAGRAM" ON SHEET E4 FOR ADDITIONAL
INFORMATION.
REV. NO. DATE DESCRIPTION APPROVED BY
JOB NO.
SHT.
DWG NO.
DB25.1018
TEXICO BROWN WELL
IMPROVEMENTS
TEXICO, NM
CURRY COUNTY
CLOVIS, NM
9/26/2025
TRG/rhp
TRG/rhp
TRG/tfr
TRG/tfr 800-933-3105 www.dbstephens.com
THE RESPONSE GROUP, INC.
An Electrical Engineering Corporation 6705 Academy N.E. Suite B Albuquerque, New Mexico 87109 Phone:(505) 323-7629 Fax:(505) 323-7594 E-mail: theresponsegroup@trg-inc.net
9/2 6/2
25025
OF 10
E3
POWER RISER AND PANEL SCHEDULE
POWER RISER DIAGRAM
TT T
EXISTING
POLE MOUNTED
TRANSFORMERS
480V DELTA
EXISTING
UTILITY POLE
M
RELOCATED
METER
SOCKET
100AF
100A/3P
NEW
SERVICE
DISCONNECT
NEMA 3R
TVSS
5KVA MINI
POWER ZONE
15A/2P PRI
30A/2P SEC
PUMP
STARTER
DISCONNECT
30A FUSES
5 6
10 119 11
10HP BOOSTER PUMP (MAXIMUM)
ESTIMATED DEMAND PER NEC 220
100A SERVICE FUSIBLE DISCONNECT SWITCH
DESCRIPTION
LOAD SUMMARY - SERVICE DISC
MINIMUM RECOMMENDED SERVICE SIZE =
MINIMUM SERVICE CAPACITY
TOTAL ESTIMATED LOAD:
22 AMPERES AT 277/480V-3Ø-4W
=125% x TOTAL ESTIMATED LOAD
27 AMPERES AT 277/480V-3Ø-4W
KVA14.5
17.9 KVA
KVA22.4
100 AMPS
PANEL "MPZ" CALCULATED LOAD KVA3.4
(11.6 KVA CONNECTED AT 125%)
REV. NO. DATE DESCRIPTION APPROVED BY
JOB NO.
SHT.
DWG NO.
DB25.1018
TEXICO BROWN WELL
IMPROVEMENTS
TEXICO, NM
CURRY COUNTY
CLOVIS, NM
9/26/2025
TRG/rhp
TRG/rhp
TRG/tfr
TRG/tfr 800-933-3105 www.dbstephens.com
THE RESPONSE GROUP, INC.
An Electrical Engineering Corporation 6705 Academy N.E. Suite B Albuquerque, New Mexico 87109 Phone:(505) 323-7629 Fax:(505) 323-7594 E-mail: theresponsegroup@trg-inc.net
9/2 6/2
25025
OF 10
E4
ELECTRICAL DETAILS
EXHAUST FAN CONTROL DIAGRAM
NO SCALE
M
C
CHEMICAL
ROOM LIGHT
FIXTURE
AUX. C.
AUX. C.
SELECTOR
SWITCH
HAND
AUTO
2-POLE WALL SWITCH
THERMOSTAT
STARTER
Ø
CHLORINATION ROOM EXHAUST FAN OPERATES AS FOLLOWS:
WITH THE STARTER SWITCH IN AUTO:
1. THE FAN WILL TURN ON WHEN THE DOOR IS OPEN VIA THE DOOR
SWITCH.
2. WITH THE DOOR CLOSED THE FAN WILL TURN ON WHEN THE
LIGHTING SWITCH IS SWITCHED ON.
3. WITH THE DOOR CLOSED THE FAN WILL TURN ON BY THERMOSTAT.
CHLORINATION
ROOM
DOOR SWITCH
CHLORINATOR ROOM
N
PHASE BUS
NEUTRAL BUS
GROUND BUS
G N Ø
SERVICE ENTRANCE EQUIPMENT
MOTOR STARTER
G Ø
Ø
G MOTORØ
G
FOR MULTIPLE SERVICES
(WHERE APPLICABLE)
Ø N
GG
Ø
Ø
N
G
20' min.
G G G G G G
A
C
B
D
G E
H
F
K I
J
M
NOT TO SCALE
GROUNDING SYSTEM GENERAL NOTES
JIH
D
E FDCBA GA. THE GROUNDING ELECTRODE SYSTEM SHALL CONSIST OF ITEMS AND , WHERE APPLICABLE.
B. ITEMS AND MUST BE BONDED TOGETHER AND TO THE GROUNDING ELECTRODE SYSTEM WHEN THEY ARE PRESENT.
C. ITEM , CONCRETE ENCASED ELECTRODE (UFER) SHALL HAVE UFER SUPPORT CONSISTING OF 5/8" x 10' COPPER GROUND ROD CUT INTO 2' SECTIONS AND DRIVEN FOR SUPPORT OF UFER CONDUCTOR.