These construction plans detail a water transmission line project for the Springs Hill Special Utility District (SHSUD) in Seguin, Guadalupe County, Texas. The project involves installing approximately 1,858 linear feet of 16-inch PVC water transmission line (C-909 pipe) with multiple components including 30-inch steel casing (open cut method), gate valves, bends, air release valves, and temporary blow-offs. The project area traverses multiple properties owned by entities including Seguin ISD, Caterpillar Inc., and various real estate holdings, with the transmission line running along W. Kingsbury Street near Governor Ireland Park.
The engineering plans, prepared by Malone/Wheeler Inc. and signed by Licensed Professional Engineer James Inocencio (Registration No. 143607), are dated 6/13/2025 and consist of seven detailed sheets covering project location, general notes, transmission line details, profiles, and standard construction details. The plans include specific technical requirements such as maintaining minimum 4-foot pipe cover, performing hydrostatic testing, disinfecting waterlines according to AWWA standards, and following Texas Commission on Environmental Quality (TCEQ) regulations for public water systems. The project includes specific safety, excavation, and utility protection requirements, with contractors responsible for verifying existing utilities, maintaining site safety, and restoring any damaged infrastructure.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
X O
G
M
AI
LB
OX
M
AI
LB
OX
M
AI
LB
OX
M
AI
L
BO
X
M
AI
L
BO
X
M
AI
L
BO
X
SI
G N
M
AI
L
BO
X
W. COURT STW. KINGSBURY ST
LA
KE
VI
EW
D R
G U
AD
ALU
PE
R
IVER
GUAD
AL
UPE
RIVER
143607
JAMES INOCENCIO
L I C E N S E D
PROFESS I ONAL ENGIN
EE
R
ST
ATE OF TEXAS
SE
G
U
IN
, T
EX
AS
G
U
AD
AL
U
PE
C
O U
N
TY
CONSTRUCTION PLANS
FOR
SPRINGS HILL SPECIAL UTILITY DISTRICT
SEGUIN ISD TRANSMISSION LINE
CITY OF SEGUIN,
GUADALUPE COUNTY, TEXAS
ENGINEER:
JAMES INOCENCIO, P.E.
SPRINGS HILL SPECIAL UTILITY DISTRICT DATE
REVISE (R), ADD (A),
VOID (V) - SHEET #
TOTAL #
SHEETSREVISION DESCRIPTIONNO.
JAMES INOCENCIO
REGISTERED PROFESSIONAL ENGINEER NO. 143607
MALONE/WHEELER INC.
5113 SOUTHWEST PKWY.,
SUITE 260
AUSTIN, TEXAS, 78735
OFFICE: 512-899-0601
FAX: 512-899-0655
DATE
CIVIL
CONSULTING MANAGEMENTDEVELOPMENTENGINEERING PROJECT
5113 Southwest Pkwy, Suite 260 Austin, Texas 78735
Phone: (512) 899-0601 Fax: (512) 899-0655 Firm Registration No. F-786
INC.SINCE
OWNER/DEVELOPER:
SPRINGS HILL SPECIAL UTILITY DISTRICT
5510 S. HWY 123 BYPASS
SEGUIN, TEXAS 78155
PROJECT ADDRESS:
W. KINGSBURY ST
SEGUIN, TEXAS 78155
WARNING !!!!
CONTRACTOR TO FIELD VERIFY ALL EXIST. UTILITIES
VERTICALLY AND HORIZONTALLY PRIOR TO
CONSTRUCTION.
SH
SU
D S
EG
U
IN
IS
D T
R
AN
SM
IS
SI
O
N L
IN
E
C O
N
ST
R U
C
TI
O N
P
LA
N S
SHEET 01 OF 07
Know what's below.
Call before you dig.
N 00 2000'
SCALE: 1" = 2000'
PROJECT
LOCATION
LOCATION MAP
1" = 2000'
DATE OF SUBMITTAL:
6/13/2025
SHEET INDEX
01 COVER
02 GENERAL NOTES
03 OVERALL TRANSMISSION LINE AND QUANTITIES
04 TRANSMISSION LINE STA 1+00 TO STA 10+00
05 TRANSMISSION LINE STA 10+00 TO END
06 STANDARD DETAILS 1
07 STANDARD DETAILS 2
06/13/2025
OF
SHEET
D
AT
E N
O
R
EV
IS
IO
N
BY
APPROVED BY :
DATE :
DESIGN BY :
CHECKED BY :
C
IV
IL
C O
N
SU
LT
IN
G M
A N
A G
EM
EN
T D
EV
EL
O
PM
EN
T
EN
G
IN
EE
RI
N
G
PR
O
JE
C T
S ou th w es t P kw y, S ui te
A us tin
, T ex as
Ph on e:
(5
) 8
-0
F ax
2)
-0
Fi rm
R eg ist ra tio n
N o.
F -7
IN
C
SI
N
C E
F:
\S
PR
IN
G S
H
IL
L W
SC
\P
R O
JE
C
TS
\2
2-
7-
AU
S-
SH
R
IV
ER
B O
R E\
D R
AW
IN
G S\
PL
AN
SE
T\
SC
H
O O
L\
G
EN
ER
AL
N O
TE
S.
D W
G , 6
/1 3/
, C H
R
IS
T
IN
O C
O
G
EN
ER
AL
N O
TE
S
CT
JT
JI
6/13/2025
NOTE: CONTOURS ARE DERIVED FROM LIDAR DATA. SURVEY WAS PROVIDED BY THE CITY OF SEGUIN.
WARNING !!!!
CONTRACTOR TO FIELD VERIFY ALL EXIST. UTILITIES
VERTICALLY AND HORIZONTALLY PRIOR TO
CONSTRUCTION.
143607
JAMES INOCENCIO
L I C E N S E D
PROFESS I ONAL ENG I N
EE
R
ST
ATE OF TEXAS
SHSUD GENERAL NOTES
1. ALL MATERIALS AND CONSTRUCTION PROCEDURES WITHIN THE SCOPE OF THE PROJECT SHALL BE
APPROVED BY SHSUD AND COMPLY WITH ALL APPLICABLE STANDARDS AND REGULATIONS.
2. THE CONTRACTOR SHALL NOT PROCEED WITH ANY WORK UNTIL WRITTEN APPROVAL IS OBTAINED FROM
SHSUD. WORK COMPLETED BY THE CONTRACTOR, WHICH HAS NOT RECEIVED AN APPROVAL WILL BE SUBJECT TO REMOVAL AND REPLACEMENT BY AND AT THE EXPENSE OF THE CONTRACTOR AT THE
PREROGATIVE OF SHSUD.
3. UPON COMPLETION BY THE CONTRACTOR AND ACCEPTANCE BY SHSUD, SHSUD WILL OWN AND MAINTAIN
SAID WATER MAINS WHICH ARE LOCATED WITHIN SEGUIN ISD PROPERTY.
4. CONTRACTOR AGREES TO ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE CONSTRUCTION OF THE PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY.
THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS.
THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD THE OWNERS AND THE ENGINEER AND HIS EMPLOYEES, PARTNERS OFFICERS, DIRECTORS, OR CONSULTANTS HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF THE WORK ON THIS PROJECT, EXCEPTING FROM LIABILITY ARISING FROM SOLE NEGLIGENCE OF THE OWNER OR ENGINEER, ENGINEER'S DIRECTORS, OFFICERS, EMPLOYEES, OR CONSULTANTS.
5. CONTRACTOR AND / OR CONTRACTOR'S INDEPENDENTLY RETAINED EMPLOYEE OR SAFETY CONSULTANT SHALL IMPLEMENT A TRENCH SAFETY PROGRAM IN ACCORDANCE WITH OSHA STANDARDS GOVERNING THE PRESENCE AND ACTIVITIES OF INDIVIDUALS WORKING IN AND AROUND TRENCH EXCAVATION.
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR RESTORING TO ITS ORIGINAL OR BETTER CONDITION, ANY DAMAGES DONE TO EXISTING FENCES, CURBS, STREETS, DRIVEWAYS, LANDSCAPING AND
STRUCTURES, AND EXISTING UTILITIES (NOT ADJUSTED ON PLANS). COST OF RESTORATIONS, IF ANY, SHALL BE THE CONTRACTOR'S ENTIRE EXPENSE.
7. THE CONTRACTOR SHALL AVOID CUTTING ROOTS LARGER THAN ONE INCH IN DIAMETER WHEN EXCAVATING NEAR EXISTING TREES. EXCAVATION IN VICINITY OF TREES SHALL PROCEED WITH CAUTION.
8. THE CONTRACTOR SHALL PROCURE ALL PERMITS AND LICENSES, PAY ALL CHARGES, FEES AND TAXES AND GIVE ALL NOTICES NECESSARY AND INCIDENTAL TO THE DUE AND LAWFUL PROSECUTION OF THE
WORK.
9. NO EXTRA PAYMENT SHALL BE ALLOWED FOR WORK CALLED FOR ON THE PLANS BUT NOT INCLUDED ON THE BID SCHEDULE. THIS INCIDENTAL WORK WILL BE REQUIRED AND SHALL BE INCLUDED UNDER THE
PAY ITEM TO WHICH IT RELATES.
10. BARRICADES AND WARNING SIGNS SHALL CONFORM TO THE "TEXAS MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES" AND SHALL BE LOCATED TO PROVIDE MAXIMUM PROTECTION TO THE PUBLIC AS WELL AS CONSTRUCTION PERSONNEL AND EQUIPMENT WHILE ALWAYS PROVIDING CONTINUOUS TRAFFIC FLOW DURING CONSTRUCTION. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING ALL DEVICES
DURING CONSTRUCTION.
11. THE CONTRACTOR IS REQUIRED TO VERIFY PROJECT ELEVATIONS. THE TERM "MATCH EXISTING" SHALL
BE UNDERSTOOD TO SIGNIFY BOTH HORIZONTAL AND VERTICAL ALIGNMENT.
12. THE LOCATION OF UTILITIES, EITHER UNDERGROUND OR OVERHEAD, SHOWN WITHIN THE RIGHT OF WAY ARE APPROXIMATE AND SHALL BE VERIFIED BY THE CONTRACTOR BEFORE BEGINNING CONSTRUCTION
OPERATIONS.
13. OSHA REGULATIONS PROHIBIT OPERATIONS THAT WILL BRING PERSONS OR EQUIPMENT WITHIN 10 FEET
OF AN ENERGIZED LINE. WHERE WORKMEN AND/OR EQUIPMENT HAVE TO WORK CLOSE TO AN
ENERGIZED ELECTRICAL LINE, THE CONTRACTOR SHALL NOTIFY THE ELECTRICAL POWER COMPANY
INVOLVED AND MAKE WHATEVER ADJUSTMENTS NECESSARY TO ENSURE THE SAFETY OF THOSE
WORKMEN.
14. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO LOCATE UTILITY SERVICE LINES AS REQUIRED FOR CONSTRUCTION. UTILITY COMPANIES ARE ALSO PREVIOUSLY MENTIONED IN "UTILITY COMPANY
NOTIFICATION".
15. DUE TO FEDERAL REGULATIONS TITLE 49, PART 192 (8), GAS COMPANIES MUST ALWAYS MAINTAIN ACCESS TO GAS VALVES. THE CONTRACTOR MUST PROTECT AND WORK AROUND ANY GAS VALVES THAT
ARE IN THE PROJECT AREA.
16. THE CONTRACTOR IS FULLY RESPONSIBLE FOR THE TRAFFIC CONTROL AND WILL BE RESPONSIBLE FOR FURNISHING ALL TRAFFIC CONTROL DEVICES, AND FLAGGERS. THE CONSTRUCTION METHODS SHALL BE CONDUCTED TO PROVIDE THE LEAST POSSIBLE INTERFERENCE TO TRAFFIC TO ALWAYS PERMIT THE CONTINUOUS MOVEMENT OF THE TRAFFIC IN ONE DIRECTION. THE CONTRACTOR SHALL CLEAN UP AND REMOVE FROM THE WORK AREA ANY LOOSE MATERIAL RESULTING FROM CONTRACT OPERATIONS AT
THE END OF EACH WORKDAY.
17. PRIOR TO ORDERING MATERIALS TO BE USED IN CONSTRUCTION, CONTRACTOR SHALL PROVIDE SHSUD WITH FOUR (4) COPIES OF THE SOURCE, TYPE, GRADATION, MATERIAL SPECIFICATION DATA AND / OR SHOP DRAWINGS, AS APPLICABLE, TO SATISFY THE REQUIREMENTS OF THE FOLLOWING ITEMS AND ALL
MATERIAL ITEMS REFERRED TO IN THESE LISTED ITEMS:
A. WATER MAINS
18. NO VALVES, TO BE SET IN DRIVEWAYS OR SIDEWALKS. ANY VALVES SET IN THESE AREAS WILL BE
RELOCATED AT CONTRACTOR'S AND/OR DEVELOPER'S EXPENSE.
19. WHERE THE MINIMUM 9-FOOT SEPARATION DISTANCE BETWEEN SEWER LINES AND WATER LINES / MAINS
CANNOT BE MAINTAINED, THE INSTALLATION OF WATER LINES SHALL BE IN STRICT ACCORDANCE WITH
TCEQ.
20. CONTRACTOR AND/OR CONTRACTOR'S INDEPENDENTLY RETAINED EMPLOYEE OR STRUCTURAL
DESIGN/GEOTECHNICAL/SAFETY/EQUIPMENT CONSULTANT, IF ANY, SHALL REVIEW THESE PLANS AND AVAILABLE GEOTECHNICAL INFORMATION AND THE ANTICIPATED INSTALLATION SITE(S) WITHIN THE
PROJECT WORK AREA IN ORDER TO IMPLEMENT CONTRACTOR'S TRENCH EXCAVATION SAFETY
PROTECTION SYSTEMS, PROGRAMS AND/OR PROCEDURES. THE CONTRACTOR'S IMPLEMENTATION OF THE SYSTEMS, PROGRAMS AND/OR PROCEDURES SHALL PROVIDE FOR ADEQUATE TRENCH EXCAVATION
SAFETY PROTECTION THAT COMPLIES WITH AS A MINIMUM, OSHA STANDARDS FOR TRENCH
EXCAVATIONS. SPECIFICALLY, CONTRACTOR AND/OR CONTRACTOR'S INDEPENDENTLY RETAINED
EMPLOYEE OR SAFETY CONSULTANT SHALL IMPLEMENT A TRENCH SAFETY PROGRAM IN ACCORDANCE WITH OSHA STANDARDS GOVERNING THE PRESENCE AND ACTIVITIES OF INDIVIDUALS WORKING IN AND
AROUND TRENCH EXCAVATION.
21. UTILITY TRENCH COMPACTION.
A. ALL UTILITY TRENCH COMPACTION TEST SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR'S
GEO-TECHNICAL ENGINEER.
B. FILL MATERIAL SHALL BE PLACED IN UNIFORM LAYERS NOT TO EXCEED TWELVE INCHES (12") LOOSE.
C. EACH LAYER OF MATERIAL SHALL BE COMPACTED AS SPECIFIED AND TESTED FOR DENSITY AND
MOISTURE IN ACCORDANCE WITH TEST METHODS TEX-113-E, TEX-114-E, TEX-115-E.
D. THE NUMBER AND LOCATION OF REQUIRED TESTS SHALL BE DETERMINED BY THE GEO-TECHNICAL
ENGINEER AND APPROVED BY SHSUD.
E. UPON COMPLETION OF TESTING THE GEO-TECHNICAL ENGINEER SHALL PROVIDE SHSUD INSPECTOR
WITH ALL TESTING DOCUMENTATION AND A CERTIFICATION STATING THAT THE PLACEMENT OF FILL
MATERIAL HAS BEEN COMPLETED IN ACCORDANCE WITH THE PLANS.
24. A HYDROSTATIC TEST SHALL BE PERFORMED AFTER SERVICES ARE CONNECTED AND FINAL GRADING
AND PLACEMENT ARE COMPLETE.
25. SPRINGS HILL WILL NOT ACCEPT OR PROVIDE SERVICE VIA ANY INFRASTRUCTURE THAT VIOLATES ANY OF THE STANDARDS, CONDITIONS, OR REQUIREMENTS OF THESE NOTES, THE GENERAL NOTES, THE STANDARD DETAILS, STANDARD SPECIFICATIONS, AND/OR ANY APPLICABLE AGREEMENTS REGARDING
SERVICE.
TCEQ GENERAL CONSTRUCTION NOTES
1. THIS WATER DISTRIBUTION SYSTEM MUST BE CONSTRUCTED IN ACCORDANCE WITH THE CURRENT
TEXAS COMMISSION ON ENVIRONMENTAL QUALITY (TCEQ) RULES AND REGULATIONS FOR PUBLIC WATER SYSTEMS 30 TEXAS ADMINISTRATIVE CODE (TAC) CHAPTER 290 SUBCHAPTER D. WHEN CONFLICTS ARE NOTED WITH LOCAL STANDARDS, THE MORE STRINGENT REQUIREMENT SHALL BE APPLIED. AT A MINIMUM, CONSTRUCTION FOR PUBLIC WATER SYSTEMS MUST ALWAYS MEET TCEQ'S "RULES AND
REGULATIONS FOR PUBLIC WATER SYSTEMS."
2. ALL NEWLY INSTALLED PIPES AND RELATED PRODUCTS MUST CONFORM TO AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)/NSF INTERNATIONAL STANDARD 61 AND MUST BE CERTIFIED BY AN
ORGANIZATION ACCREDITED BY ANSI [§290.44(A)(1)].
3. PLASTIC PIPE FOR USE IN PUBLIC WATER SYSTEMS MUST BEAR THE NSF INTERNATIONAL SEAL OF APPROVAL (NSF-pw) AND HAVE AN ASTM DESIGN PRESSURE RATING OF AT LEAST 150 PSI OR A STANDARD
DIMENSION RATION OF 26 OR LESS [§290.44(A)(2)].
4. NO PIPE WHICH HAS BEEN USED FOR ANY PURPOSE OTHER THAN THE CONVEYANCE OF DRINKING
WATER SHALL BE ACCEPTED OR RELOCATED FOR USE IN ANY PUBLIC DRINKING WATER SUPPLY
[§290.44(A)(3)].
5. ALL WATER LINE CROSSINGS OF WASTEWATER MAINS SHALL BE PERPENDICULAR [§290.44(E)(4)(B)].
6. WATER TRANSMISSION AND DISTRIBUTION LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE
MANUFACTURER'S INSTRUCTIONS. HOWEVER, THE TOP OF THE WATER LINE MUST BE LOCATED BELOW THE FROST LINE AND IN NO CASE SHALL THE TOP OF THE WATER LINE BE LESS THAN 24 INCHES BELOW
GROUND SURFACE [§290.44(A)(4)].
7. THE MAXIMUM ALLOWABLE LEAD CONTENT OF PIPES, PIPE FITTINGS, PLUMBING FITTINGS, AND FIXTURES
IS 0.25 PERCENT [§290.44(B)].
8. THE CONTRACTOR SHALL INSTALL APPROPRIATE AIR RELEASE DEVICES WITH VENT OPENINGS TO THE ATMOSPHERE COVERED WITH 16-MESH OR FINER, CORROSION RESISTANT SCREENING MATERIAL OR AN
ACCEPTABLE EQUIVALENT [§290.44(D)(1)].
9. THE CONTRACTOR SHALL NOT PLACE THE PIPE IN WATER OR WHERE IT CAN BE FLOODED WITH WATER
OR SEWAGE DURING ITS STORAGE OR INSTALLATION [§290.44(F)(1)].
10. PURSUANT TO 30 TAC §290.44(A)(5), THE HYDROSTATIC LEAKAGE RATE SHALL NOT EXCEED THE AMOUNT ALLOWED OR RECOMMENDED BY THE MOST CURRENT AWWA FORMULAS FOR PVC PIPE, CAST IRON AND
DUCTILE IRON PIPE. INCLUDE THE FORMULAS IN THE NOTES ON THE PLANS.
· THE HYDROSTATIC LEAKAGE RATE FOR POLYVINYL CHLORIDE (PVC) PIPE AND APPURTENANCES
SHALL NOT EXCEED THE AMOUNT ALLOWED OR RECOMMENDED BY FORMULAS IN AMERICA WATER
WORKS ASSOCIATION (AWWA) C-605 AS REQUIRED IN 30 TAC §290.44(A)(5). PLEASE ENSURE THAT
THE FORMULA FOR THIS CALCULATION IS CORRECT AND MOST CURRENT FORMULA IS IN USE;
WHERE:
§ Q = THE QUANTITY OF MAKEUP WATER IN GALLONS PER HOUR,
§ L = THE LENGTH OF THE PIPE SECTION BEING TESTED, IN FEET,
§ D = THE NOMINAL DIAMETER OF THE PIPE IN INCHES, AND
§ P = THE AVERAGE TEST PRESSURE DURING THE HYDROSTATIC TEST IN POUNDS PER SQUARE INCH
(PSI).
· THE HYDROSTATIC LEAKAGE RATE FOR DUCTILE IRON (DI) PIPE AND APPURTENANCES SHALL NOT
EXCEED THE AMOUNT ALLOWED OR RECOMMENDED BY FORMULAS IN AMERICA WATER WORKS
ASSOCIATION (AWWA) C-600 AS REQUIRED IN 30 TAC §290.44(A)(5). PLEASE ENSURE THAT THE
FORMULA FOR THIS CALCULATION IS CORRECT AND MOST CURRENT FORMULA IS IN USE;
WHERE:
§ L = THE QUANTITY OF MAKEUP WATER IN GALLONS PER HOUR,
§ S = THE LENGTH OF THE PIPE SECTION BEING TESTED, IN FEET,
§ D = THE NOMINAL DIAMETER OF THE PIPE IN INCHES, AND
§ P = THE AVERAGE TEST PRESSURE DURING THE HYDROSTATIC TEST IN POUNDS PER SQUARE INCH
(PSI).
11. THE CONTRACTOR SHALL MAINTAIN A MINIMUM SEPARATION DISTANCE IN ALL DIRECTIONS OF NINE FEET
BETWEEN THE PROPOSED WATERLINE AND WASTEWATER COLLECTION FACILITIES INCLUDING
MANHOLES. IF THIS DISTANCE CANNOT BE MAINTAINED, THE CONTRACTOR MUST IMMEDIATELY NOTIFY THE PROJECT ENGINEER FOR FURTHER DIRECTION. SEPARATION DISTANCES, INSTALLATION METHODS, AND MATERIALS UTILIZED MUST MEET §290.44(E)(1)-(4).
12. THE SEPARATION DISTANCE FROM A POTABLE WATERLINE TO A WASTEWATER MAIN OR LATERAL MANHOLE OR CLEANOUT SHALL BE A MINIMUM OF NINE FEET. WHERE THE NINE-FOOT SEPARATION DISTANCE CANNOT BE ACHIEVED, THE POTABLE WATERLINE SHALL BE ENCASED IN A JOINT OF AT LEAST 150 PSI PRESSURE CLASS PIPE AT LEAST 18 FEET LONG AND TWO NOMINAL SIZES LARGER THAN THE NEW CONVEYANCE. THE SPACE AROUND THE CARRIER PIPE SHALL BE SUPPORTED AT FIVE-FOOT INTERVALS WITH SPACERS OR BE FILLED TO THE SPRING LINE WITH WASHED SAND. THE ENCASEMENT
PIPE SHALL BE CENTERED ON THE CROSSING AND BOTH ENDS SEALED WITH CEMENT GROUT OR
MANUFACTURED SEALANT [§290.44(E)(5)].
13. SUCTION MAINS TO PUMPING EQUIPMENT SHALL NOT CROSS WASTEWATER MAINS, WASTEWATER LATERALS, OR WASTEWATER SERVICE LINES. RAW WATER SUPPLY LINES SHALL NOT BE INSTALLED
WITHIN FIVE FEET OF ANY TILE OR CONCRETE WASTEWATER MAIN, WASTEWATER LATERAL, OR
WASTEWATER SERVICE LINE [§290.44(E)(7)].
14. THE CONTRACTOR SHALL DISINFECT THE NEW WATERLINES IN ACCORDANCE WITH AWWA STANDARD C651-14 OR MOST RECENT, THEN FLUSH AND SAMPLE THE LINES BEFORE BEING PLACED INTO SERVICE.
SAMPLES SHALL BE COLLECTED FOR MICROBIOLOGICAL ANALYSIS TO CHECK THE EFFECTIVENESS OF THE DISINFECTION PROCEDURE WHICH SHALL BE REPEATED IF CONTAMINATION PERSISTS. A MINIMUM OF ONE SAMPLE FOR EACH 1,000 FEET OF COMPLETED WATERLINE WILL BE REQUIRED OR AT THE NEXT
AVAILABLE SAMPLING POINT BEYOND 1,000 FEET AS DESIGNATED BY THE DESIGN ENGINEER
[§290.44(F)(3)].
15. DECHLORINATION OF DISINFECTING WATER SHALL BE IN STRICT ACCORDANCE WITH CURRENT AWWA
STANDARD C655-09 OR MOST RECENT.
RECORD DRAWINGS
1. WHEN ALL OF THE IMPROVEMENTS ARE FOUND TO BE CONSTRUCTED AND COMPLETED IN ACCORDANCE
WITH THE APPROVED PLANS AND SPECIFICATIONS AND WITH THE CITY'S STANDARDS, AND UPON RECEIPT OF ONE SET OF “RECORD DRAWING” PLANS, AND A DIGITAL COPY OF ALL PLANS (PDF COPY), THE CITY ENGINEER SHALL ACCEPT SUCH IMPROVEMENTS FOR THE CITY OF SEGUIN, SUBJECT TO THE GUARANTY
OF MATERIAL AND WORKMANSHIP PROVISIONS IN THIS SECTION.
Q = LD P
148,000
L = SD P
148,000
SP
R
IN
G
S H
IL
L
SP
EC
IA
L
U
TI
LI
TY
D
IS
TR
IC
T
G U
AD
AL
U
PE
C O
U N
TY
SE
G U
IN
IS
D T
R
AN
SM
IS
SI
O
N L
IN
E
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
EXIST. G
AS PLANT
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
W
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GAS
GA
S
GAS
GAS G
A S
G A S
G A S
GAS
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GAS
GAS
GAS
GAS
GAS GAS
PP
LP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
OE
OE
OE
OE
OE
OE
OE
FIBER
FIBER
FIBER
FIBER
FIBER
FIBER
FIBER
FIBER
FIBER
FIBER
FIBER
FIBER
FIBER
FIBER
FIBER
FIBER
FIBER
D R
IV
EW
AY
DRIVEWAY
D R
IV
EW
AY
DRIVEWAY
DRIVEWAY
O O
O O
O O
O O
O O
O O
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
EXIST. SIDEWALK
EXIST. SIDEWALK
EXIST. SIDEWALK
W
1+00
2+00 3+00
4+00
5+00
6+00
7+00
8+00
9+00
10+00
11+00
12+00
13+00
14+00
15+00
16+00
17+00
18+00
18+58
ROBERT BLESSON
IRREVOCABLE TRUST DTD 11-29-2023
ACREAGE: 23.87
GCAD ID: 53256
SHEET 04 OF 07
OWNER: CATERPILLAR INC
ACREAGE: 139.67
GCAD ID: 53143
OWNER: DEZAVALA
MARKETPLACE LLC
ACREAGE: 1.50
GCAD ID: 129019
OWNER: YALKIN REAL
ESTATE HOLDINGS, LP
ACREAGE: 6.38
GCAD ID: 167362
OWNER: YALKIN REAL
ESTATE HOLDINGS, LP
ACREAGE: 7.34
GCAD ID: 167363
OWNER: SEGUIN ISD
ACREAGE: 40.33
GCAD ID: 133837
OWNER: KENNETH & JACQUELINE
JANDT LIFE ESTATE
ACREAGE: 0.67
GCAD ID: 53002
OWNER: ENTERPRISE
TEXAS PIPELINE LP
ACREAGE: 0.21
GCAD ID: 53059
ALT 90
W. KINGSBURY ST
G O
VE
R
N O
R
IR
EL
AN
D P
AR
K
SHEET 05 OF 07
OF
SHEET
D
AT
E N
O
R
EV
IS
IO
N
BY
APPROVED BY :
DATE :
DESIGN BY :
CHECKED BY :
C
IV
IL
C O
N
SU
LT
IN
G M
A N
A G
EM
EN
T D
EV
EL
O
PM
EN
T
EN
G
IN
EE
RI
N
G
PR
O
JE
C T
S ou th w es t P kw y, S ui te
A us tin
, T ex as
Ph on e:
(5
) 8
-0
F ax
2)
-0
Fi rm
R eg ist ra tio n
N o.
F -7
IN
C
SI
N
C E
F:
\S
PR
IN
G S
H
IL
L W
SC
\P
R O
JE
C
TS
\2
2-
7-
AU
S-
SH
R
IV
ER
B O
R E\
D R
AW
IN
G S\
PL
AN
SE
T\
SC
H
O O
L\
O
VE
R
AL
L W
AT
ER
P
LA
N .D
W G
, 6 /1
3/
, C
H R
IS
T
IN
O
C O
O
VE
R
AL
L
TR
AN
SM
IS
SI
O N
L
IN
E
AN
D Q
U
AN
TI
TI
ES
CT
JT
JI
6/13/2025
N 00 100'
SCALE: 1" = 100'
143607
JAMES INOCENCIO
L I C E N S E D
PROFESS I ONAL ENG I N
EE
R
ST
ATE OF TEXAS
LEGEND
PROP. WATER LINE
PROP. FIRE HYDRANT
EXIST. GATE VALVE
EXIST. FIRE HYDRANT
EXIST. WATER SERVICE
PROPERTY BOUNDARY
OE OE OE EXIST. OVERHEAD ELECTRIC
PROP. EASEMENT
EXIST. POWER POLE
PROP. GATE VALVE
PROP. AIR RELEASE VALVE
GAS EXIST. GAS LINE
EXIST. PAVEMENT
EXIST. CONCRETE
R.O.W.
W
EXIST. SIGN
EXIST. GAS METERG
PP
EXIST. WATER LINE
EXIST. TREE
CALCULATED POINT
TXDOT TYPE I CONCRETE MONUMENT FOUND
(UNLESS NOTED)
1/2" IRON PIPE FOUND
(UNLESS NOTED)
1/2" IRON ROD FOUND
(UNLESS NOTED)
IRON ROD WITH "B&A RPLS 2633" CAP FOUND
(UNLESS NOTED)
SURVEY CONTROL POINT
PROP. WATER LINE (FUTURE)
FIBER PROP. FIBER OPTIC
SP
R
IN
G
S H
IL
L
SP
EC
IA
L
U
TI
LI
TY
D
IS
TR
IC
T
G U
AD
AL
U
PE
C O
U N
TY
SE
G U
IN
IS
D T
R
AN
SM
IS
SI
O
N L
IN
OO
OO
O O
O O
O O
O O
O O
O O
O O
OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO
OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OEGAS GAS GAS GAS GAS GAS GAS GAS GASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGAS
GAS GAS GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
LP
PP
PP PP
PPPP
PP
PP
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
1+00 2+00
3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00
FIBERFIBERFIBERFIBERFIBERFIBERFIBERFIBERFIBERFIBERFIBERFIBERFIBERFIBERFIBERFIBER
FIBERFIBER
OWNER: SEGUIN ISD
ACREAGE: 40.33
GCAD ID: 133837
OWNER: CATERPILLAR INC
ACREAGE: 139.67
GCAD ID: 53143
OWNER:
CHAN & KIM PROPERTY INC
ACREAGE: 2.32
GCAD ID: 52988
ALT 90
W. KINGSBURY ST
G O
VE
RN
O R
IR
EL
AN
D
PA
RK
OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OEGAS GAS GAS GAS GAS GAS GAS GAS GASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGAS
GAS GAS GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
LP
PP
PP PP
PPPP
PP
PP
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
PROPOSED 25' JOINT
WATER LINE EASEMENT
8'
STA: 2+25.85
INSTALL: 45° BEND, MJ
STA: 2+54.21
INSTALL: 45° BEND, MJ
PROPOSED 28 LF - 16" PVC (C-909)
STA: 1+17.84
BEGIN 30" STEEL
CASING (OPEN CUT) STA: 1+74.81
END 30" STEEL
CASING (OPEN CUT)
PROPOSED 57 LF 30" STEEL CASING
(OPEN CUT)
PROPOSED 51 LF - 16" PVC (C-909)
PROPOSED 42 LF 30" STEEL CASING
(OPEN CUT)
STA: 8+00.00
BEGIN 30" STEEL CASING (OPEN CUT) STA: 8+41.51
END 30" STEEL CASING (OPEN CUT)
17'9'
PROPOSED 57 LF - 16" PVC (C-909)
PROPOSED 746 LF - 16" PVC (C-909)
PROPOSED 16" PVC WATER
LINE (BY OTHERS)
FUTURE TRANSMISSION
MAIN (BY OTHERS)
TRENCH REPAIR
48 S.Y. ASPHALT
REMOVE & REPLACE
35 S.Y. ASPHALT DRIVEWAY
EXISTING CULVERT
REMOVE AND REPLACE 10
LF OF CURB AND GUTTER REMOVE AND REPLACE 10
LF OF CURB AND GUTTER
EXISTING DRIVEWAY
EXISTING DRIVEWAY
EXISTING DRIVEWAY
REMOVE AND REPLACE 10
LF OF CURB AND GUTTER
SEE CITY OF SEGUIN'S PLANS FOR
CONTINUATION OF PROPOSED 16" WATER
EXISTING FENCE
8'
EXISTING POST
EXISTING SIDEWALK EXISTING SIDEWALK
8'
8'
9'
8'
2.6' 2.82'
14'
PROPOSED 18 LF - 16" PVC (C-909)
STA. 1+00.00
INSTALL:
BEGIN 16" TRANSMISSION LINE
1 - 16" PLUG
1 - 2" TEMP. BLOW OFF
STA. 1+05.00
INSTALL:
1 - 16" GATE VALVE, MJ
SEGUIN ISD TRANSMISSION LINE
0+50 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00
EXIST. GROUND
4' MIN. COVER
1.91'
0+50 1+00
4.
8.
5.
8.
5.
8.
5.
9.
2+00
5.
9.
5.
0.
5.
0.
5.
0.
3+00
5.
0.
5.
0.
5.
0.
5.
0.
4+00
5.
0.
6.
0.
6.
0.
6.
0.
5+00
6.
0.
6.
1.
6.
1.
6.
1.
6+00
6.
1.
6.
1.
6.
1.
6.
1.
7+00
7.
1.
7.
1.
7.
1.
8.
1.
8+00
8.
1.
8.
1.
8.
1.
8.
2.
9+00
8.
2.
8.
2.
8.
2.
8.
2.
10+00
8.
2.
18'
JOINT
RESTRAINT
4' MIN. COVER
4' MIN.COVER
70'
JOINT RESTRAINT
ST
A:
+0
ST
A:
+7
30'
JOINT
RESTRAINT
ST
A:
9+
ST
A:
+1
7.
BE
G
IN
0" S
TE
EL
C
AS
IN
G
(O
PE
N C
U T)
ST
A:
+7
4.
EN
D
0"
S
TE
EL
C
AS
IN
G (O
PE
N
C U
T)
ST
A:
+2
5.
IN
ST
AL
L:
5°
B
EN
D , M
J
FL
6"
P
VC
.0
ST
A:
+5
4.
IN
ST
AL
L:
5°
B
EN
D , M
J
FL
6"
P
VC
.3
ST
A:
+0
0.
BE
G
IN
0" S
TE
EL
C
AS
IN
G
(O
PE
N C
U T)
ST
A:
+4
1.
EN
D
0"
S
TE
EL
C
AS
IN
G (O
PE
N
C U
T)
IN
V.
E
LE
V.
EX
IS
T.
G R
AD
E
57 LF 30" STEEL CASING
(OPEN CUT)
28 LF 16" PVC @ 1.34%
346 LF 16" PVC @ 0.24% 200 LF 16" PVC @ 0.24%
100 LF 16" PVC @ 0.30%
42 LF 30" STEEL CASING
(OPEN CUT)
5 LF 16" PVC @ 0.84%
51 LF 16" PVC
@ 1.35% 58 LF 16" PVC @ 0.36%
57 LF 16" PVC @ 1.40%
42 LF 16" PVC @ 0.53%
ST
A:
+0
0.
SE
G U
IN
IS
D T
R
AN
SM
IS
SI
O
N L
IN
E
IN
ST
AL
L:
B
EG
IN
6" T
R
AN
SM
IS
SI
O
N L
IN
E
- 1
6" P
LU
G
- 2
" T
EM
P.
B
LO
W
O
FF
STA: 1+84.32
PROP. 8" PVC BY OTHERS
CONTRACTOR SHALL REMAIN A MINIMUM
OF 1' BELOW PROPOSED 16" LINE
FL=526.82
ST
A:
+0
5.
SE
G U
IN
IS
D T
R
AN
SM
IS
SI
O
N L
IN
E
IN
ST
AL
L:
" G
AT
E
VA
LV
E, M
J
FL
(i n)
6"
P
VC
.4
FL
(o ut
) 1 6"
P
VC
.4
13 LF 16" PVC @ 0.84%
OF
SHEET
D
AT
E N
O
R
EV
IS
IO
N
BY
APPROVED BY :
DATE :
DESIGN BY :
CHECKED BY :
C
IV
IL
C O
N
SU
LT
IN
G M
A N
A G
EM
EN
T D
EV
EL
O
PM
EN
T
EN
G
IN
EE
RI
N
G
PR
O
JE
C T
S ou th w es t P kw y, S ui te
A us tin
, T ex as
Ph on e:
(5
) 8
-0
F ax
2)
-0
Fi rm
R eg ist ra tio n
N o.
F -7
IN
C
SI
N
C E
F:
\S
PR
IN
G S
H
IL
L W
SC
\P
R O
JE
C
TS
\2
2-
7-
AU
S-
SH
R
IV
ER
B O
R E\
D R
AW
IN
G S\
PL
AN
SE
T\
SC
H
O O
L\
W
LA
S
TA
+0
TO
E N
D .D
W G
, 6 /1
3/
, C
H R
IS
T
IN
O
C O
TR
AN
SM
IS
SI
O
N L
IN
E
ST
A
1+
T O
S
TA
0+
CT
JT
JI
6/13/2025
N 00 50'
SCALE: 1" = 50'
SCALE:
1" = 50' HORIZ.
1" = 5' VERT.
PROFILE LEGEND:
EXIST GND
ALL RESPONSIBILITY FOR THE ADEQUACY OF THESE PLANS
REMAINS WITH THE ENGINEER WHO PREPARED THEM.
WARNING !!!!
CONTRACTOR TO FIELD VERIFY ALL EXIST. UTILITIES
VERTICALLY AND HORIZONTALLY PRIOR TO
CONSTRUCTION.
PROPOSED WL
143607
JAMES INOCENCIO
L I C E N S E D
PROFESS I ONAL ENG I N
EE
R
ST
ATE OF TEXAS
SP
R
IN
G
S H
IL
L
SP
EC
IA
L
U
TI
LI
TY
D
IS
TR
IC
T
LEGEND
PROP. WATER LINE
PROP. FIRE HYDRANT
EXIST. GATE VALVE
EXIST. FIRE HYDRANT
EXIST. WATER SERVICE
PROPERTY BOUNDARY
OE OE OE EXIST. OVERHEAD ELECTRIC
PROP. EASEMENT
EXIST. POWER POLE
PROP. GATE VALVE
PROP. AIR RELEASE VALVE
GAS EXIST. GAS LINE
EXIST. PAVEMENT
EXIST. CONCRETE
R.O.W.
W
EXIST. SIGN
EXIST. GAS METERG
PP
EXIST. WATER LINE
EXIST. TREE
CALCULATED POINT
TXDOT TYPE I CONCRETE MONUMENT FOUND
(UNLESS NOTED)
1/2" IRON PIPE FOUND
(UNLESS NOTED)
1/2" IRON ROD FOUND
(UNLESS NOTED)
IRON ROD WITH "B&A RPLS 2633" CAP FOUND
(UNLESS NOTED)
SURVEY CONTROL POINT
PROP. ENCASEMENT
PROP. WATER LINE (FUTURE)
LP EXIST. LIGHT POLE
FIBER PROP. FIBER OPTIC
G U
AD
AL
U
PE
C O
U N
TY
SE
G U
IN
IS
D T
R
AN
SM
IS
SI
O
N L
IN
E
SHSUD NOTES:
1. ANY EASEMENT DESIGNATED AS A SHSUD UTILITY
EASEMENT SHALL REMAIN OPEN FOR ACCESS AT ALL
TIMES AND SHALL NOT BE WITHIN A FENCED AREA.
2. ALL SHSUD EASEMENTS ARE FOR CONSTRUCTION,
MAINTENANCE (INCLUDING BUT NOT LIMITED TO
REMOVAL OF TREES AND OTHER OBSTRUCTIONS),
AND REPAIR OF ANY SHSUD FACILITY LOCATED
WITHIN SAID EASEMENT.
3. REPAIR AND POSSIBLE RECONSTRUCTION OF PUBLIC
ROADWAYS DAMAGES BY UTILITY CONSTRUCTION
MAY BE REQUIRED COST FOR ANY
RECONSTRUCTION OR REPAIR WILL BE AT THE
CONTRACTOR'S EXPENSE.
4. ALL VALVES, HYDRANTS, CLEAN OUTS OR OTHER
UTILITY APPURTENANCES SHALL CONSTRUCTION
OUTSIDE THE LIMITS OF DRIVEWAY APRONS, CURB
AND GUTTER, AND SIDEWALKS.
5. CONTRACTOR MUST MAINTAIN 4 FEET COVER TO
TOP OF PROPOSED PIPE OR PROPOSED CASING
FROM EXISTING SURFACE, UNLESS OTHERWISE
NOTED IN THE PLANS.
TRENCH EXCAVATION SAFETY PROTECTION
CONTRACTOR AND/OR CONTRACTOR'S INDEPENDENTLY
RETAINED EMPLOYEE OR STRUCTURAL
DESIGN/GEOTECHNICAL/SAFETY/EQUIPMENT
CONSULTANT, IF ANY SHALL REVIEW THESE PLANS AND
AVAILABLE GEOTECHNICAL INFORMATION AND THE
ANTICIPATED INSTALLATION SITES WITHIN THE PROJECT
WORK AREA IN ORDER TO IMPLEMENT CONTRACTOR'S
TRENCH EXCAVATION SAFETY PROTECTION SYSTEMS,
PROGRAMS AND/OR PROCEDURES. THE CONTRACTOR'S
IMPLEMENTATION OF THESE SYSTEMS, PROGRAMS
AND/OR PROCEDURES SHALL PROVIDE FOR ADEQUATE
TRENCH EXCAVATION SAFETY PROTECTION THAT
COMPLIES WITH AS A MINIMUM, OSHA STANDARDS FOR
TRENCH EXCAVATIONS. SPECIFICALLY, CONTRACTOR
AND/OR CONTRACTOR'S INDEPENDENTLY RETAINED
EMPLOYEE OR SAFETY CONSULTANT SHALL IMPLEMENT
A TRENCH SAFETY PROGRAM IN ACCORDANCE WITH
OSHA STANDARDS GOVERNING THE PRESENCE AND
ACTIVITIES OF INDIVIDUALS WORKING IN AND AROUND
TRENCH EXCAVATION.
CAUTION!!:
THE CONTRACTOR SHALL BE REQUIRED TO LOCATE ALL
PUBLIC OR PRIVATE UTILITIES INCLUDING BUT NOT
LIMITED TO: WATER, SEWER, TELEPHONE AND FIBER
OPTIC LINES, SITE LIGHTING ELECTRIC, SECONDARY
ELECTRIC, PRIMARY ELECTRICAL DUCTBANKS,
LANDSCAPE IRRIGATION FACILITIES, AND GAS LINES. ANY
UTILITY CONFLICTS THAT ARISE SHOULD BE
COMMUNICATED TO THE ENGINEER IMMEDIATELY AND
PRIOR TO THE START OF CONSTRUCTION. ANY DAMAGE
TO EXISTING UTILITIES SHALL BE THE SOLE
RESPONSIBILITY OF THE CONTRACTOR AND THE REPAIR
SHALL BE AT CONTRACTOR'S SOLE EXPENSE WHETHER
THE UTILITY IS SHOWN ON THESE PLANS OR NOT.
SEGUIN ISD NOTES:
1. DRIVEWAY OPEN CUT WORK MUST BE PERFORMED
ON NIGHTS AND/OR WEEKENDS.
2. DRIVEWAY OPEN CUTS MUST BE PERFORMED ONE
AT A TIME.
3. CONTRACTOR SHALL GIVE TWO WEEKS NOTICE TO
CITY OF SEGUIN PRIOR TO EACH DRIVEWAY OPEN
CUT WORK.
4. NO OPEN CUT TRENCHES ARE ALLOWED WHEN
WORKERS ARE NOT PRESENT.
5. CONTRACTOR SHALL INSTALL TEMPORARY
CONSTRUCTION FENCING AROUND WORK AREA.
6. ALL DRIVEWAYS WILL USE FLOWABLE FILL AS
BACKFILL.
OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO
OE OE OE OE OE OE OE OE OE OE OE OE OEOE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OEGAS GAS GAS GASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGAS
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
PP
PP PP PP PP
PP
PP
PP
PP
O E
O E
O E
O E
O E
O E
O E
O E
10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00
+5
FIBERFIBERFIBERFIBERFIBERFIBERFIBERFIBERFIBERFIBERFIBERFIBERFIBERFIBERFIBERFIBERFIBERFIBER
CAUTION!
PROPOSED WATER LINE
OWNER: SEGUIN ISD
ACREAGE: 40.33
GCAD ID: 133837
OWNER: CATERPILLAR INC
ACREAGE: 139.67
GCAD ID: 53143
OWNER: DEZAVALA
MARKETPLACE LLC
ACREAGE: 1.50
GCAD ID: 129019
OWNER: YALKIN REAL
ESTATE HOLDINGS, LP
ACREAGE: 6.38
GCAD ID: 167362
OWNER: YALKIN REAL
ESTATE HOLDINGS, LP
ACREAGE: 7.34
GCAD ID: 167363
ALT 90
W. KINGSBURY ST
OE OE OE OE OE OE OE OE OE OE OE OE OEOE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OEGAS GAS GAS GASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGAS
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
PP
PP PP PP PP
PP
PP
PP
PP
O E
O E
O E
O E
O E
O E
O E
O E
PROPOSED 25' JOINT
WATER LINE EASEMENT
STA. 11+00.00
INSTALL:
1- 16" GATE VALVE, MJ
STA. 16+00.00
INSTALL:
11.25° VERTICAL BEND, MJ
PROPOSED 45 LF 30" STEEL CASING
(OPEN CUT)
STA. 18+16.90
INSTALL:
45° BEND, MJ
STA. 18+32.00
INSTALL:
45° VERTICAL BEND, MJ
STA. 18+45.00
INSTALL:
45° VERTICAL BEND, MJ
17'
STA: 16+60.31
BEGIN 30" STEEL
CASING (OPEN CUT)
STA: 17+04.82
END 30" STEEL
CASING (OPEN CUT)
9'8'
STA. 18+29.29
INSTALL:
45° ROLLED BEND, MJ
REMOVE AND REPLACE 10
LF OF CURB AND GUTTER
REMOVE AND REPLACE 10
LF OF CURB AND GUTTER
FUTURE 16" WATER
MAIN BY OTHERS
EXISTING DRAINAGE
STRUCTURE
EXISTING DRAINAGE
STRUCTURE
EXISTING DRIVEWAY
8'
EXISTING CULVERT
EXISTING FENCE
REMOVE & REPLACE
35 S.Y. CONCRETE DRIVEWAY AND
4 S.Y. OF EXISTING CONCRETE SIDEWALK
PROPOSED 16" PVC WATER
LINE (BY OTHERS)
STA. 18+00.00
INSTALL:
2" ARV
STA. 18+58.11
INSTALL:
END TRANSMISSION LINE
1 - 16" PLUG
1 - 2" TEMP. BLOW OFF
REMOVE AND REPLACE 5 S.Y.
OF CONCRETE SIDEWALK
14'
STA. 18+10.00
INSTALL:
1 - 16" GATE VALVE, MJ
CAUTION!
PROPOSED FIBER OPTIC
PROPOSED 817 LF - 16" PVC (C-909)
PROPOSED 29 LF - 16" PVC (C-909)
PROPOSED 12 LF - 16" PVC (C-909)
STA. 18+48.00
INSTALL:
45° VERTICAL BEND, MJ
EXIST. GROUND
SEGUIN ISD TRANSMISSION LINE
10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00
10+00
8.
2.
8.
2.
8.
2.
8.
2.
11+00
8.
2.
8.
2.
8.
2.
8.
2.
12+00
8.
2.
8.
2.
8.
2.
8.
2.
13+00
8.
2.
8.
3.
8.
3.
8.
3.
14+00
8.
3.
8.
3.
8.
3.
8.
3.
15+00
8.
3.
8.
3.
8.
3.
8.
3.
16+00
8.
3.
9.
3.
0.
4.
0.
4.
17+00
1.
4.
1.
4.
0.
4.
0.
4.
18+00
0.
3.
0.
3.
1.
3.
19+00 20+00
153.27' JOINT RESTRAINT
ST
A:
8+
STA: 18+40.46
SEE PROP. 16" WATER MAIN BY CITY OF
SEGUIN PLANS. CONTRACTOR SHALL
REMAIN A MINIMUM OF 1' BELOW
PROPOSED 16" LINE
FL=534.52
ST
A:
7+
ST
A:
8+
.1
- S
EG
U
IN
IS
D T
R
AN
SM
IS
SI
O
N L
IN
E
IN
ST
AL
L:
E N
D T
R
AN
SM
IS
SI
O
N L
IN
E
- 1
6" P
LU
G
- 2
" T
EM
P.
B
LO
W
O
FF
FL
(i n)
6" P
VC
.9
FL
(o ut ) 1
6" P
VC
.6
ST
A:
8+
.0
- S
EG
U
IN
IS
D T
R
AN
SM
IS
SI
O
N L
IN
E
IN
ST
AL
L:
5°
V
ER
TI
C
AL
B
EN
D
, M J
FL
(o ut ) 1
6" P
VC
.2
FL
(o ut ) 1
6" P
VC
.2
ST
A:
8+
.0
- S
EG
U
IN
IS
D T
R
AN
SM
IS
SI
O
N L
IN
E
IN
ST
AL
L:
5°
V
ER
TI
C
AL
B
EN
D
, M J
FL
(i n)
6" P
VC
.2
FL
(o ut ) 1
6" P
VC
.2
ST
A:
8+
.2
- S
EG
U
IN
IS
D T
R
AN
SM
IS
SI
O
N L
IN
E
IN
ST
AL
L:
5°
R O
LL
ED
B
EN
D , M
J
FL
(i n)
6"
P
VC
.9
FL
(o ut
) 1 6"
P
VC
.9
ST
A:
8+
.9
- S
EG
U
IN
IS
D T
R
AN
SM
IS
SI
O
N L
IN
E
IN
ST
AL
L:
5°
B
EN
D , M
J
FL
(i n)
6"
P
VC
.9
FL
(i n)
6"
P
VC
.9
ST
A:
7+
.8
EN
D
0" S
TE
EL
C
AS
IN
G
(O
PE
N C
U T)
ST
A:
6+
.3
BE
G
IN
0"
S
TE
EL
C
AS
IN
G (O
PE
N
C U
T)
ST
A:
6+
.0
- S
EG
U
IN
IS
D T
R
AN
SM
IS
SI
O
N L
IN
E
IN
ST
AL
L:
1.
° V
ER
TI
C
AL
B
EN
D , M
J
FL
(i n)
6"
P
VC
.4
FL
(o ut
) 1 6"
P
VC
.4
ST
A:
1+
.0
- S
EG
U
IN
IS
D T
R
AN
SM
IS
SI
O
N L
IN
E
IN
ST
AL
L:
- 1
6" G
AT
E
VA
LV
E, M
J
FL
(i n)
6"
P
VC
.7
FL
(o ut
) 1 6"
P
VC
.7
231' JOINT RESTRAINT
ST
A:
2+
4' MIN. COVER
100 LF 16" PVC @ 0.29%
IN
V.
E
LE
V.
EX
IS
T.
G R
AD
E
12 LF 16" PVC
@ 0.24%
45 LF 30" STEEL CASING
(OPEN CUT)
40'
JOINT
RESTRAINT
50 LF 16" PVC
@ 0.70%
10 LF 16" PVC
@ 0.10%
13 LF 16" PVC @ 0.21%
3 LF 16" PVC @ 55.89%
500 LF 16" PVC @ 0.14%
60 LF 16" PVC @ 1.80%
3 LF 16" PVC @ 63.43%
45 LF 16" PVC
@ 0.63%
4' MIN. COVER
ST
A:
5+
ST
A:
6+
1'
ST
A:
8+
.0
- S
EG
U
IN
IS
D T
R
AN
SM
IS
SI
O
N L
IN
E
IN
ST
AL
L:
" A
R V
FL
(i n)
6" P
VC
.8
FL
(o ut ) 1
6" P
VC
.8
ST
A:
8+
.0
- S
EG
U
IN
IS
D T
R
AN
SM
IS
SI
O
N L
IN
E
IN
ST
AL
L:
5°
V
ER
TI
C
AL
B
EN
D
, M J
FL
(i n)
6" P
VC
.9
FL
(o ut ) 1
6" P
VC
.9
10 LF 16" PVC @ 0.37%
STA: 18+45.46
PROPOSED FIBER OPTIC BY CITY.
(APPROXIMATE)
FL=537.38
ST
A:
8+
.0
- S
EG
U
IN
IS
D T
R
AN
SM
IS
SI
O
N L
IN
E
IN
ST
AL
L:
" G
AT
E
VA
LV
E, M
J
FL
(i n)
6"
P
VC
.9
FL
(o ut
) 1 6"
P
VC
.9
6.88'
7 LF 16" PVC @ 0.11%
45 LF 16" PVC
@ 0.08%
10.53'
OF
SHEET
D
AT
E N
O
R
EV
IS
IO
N
BY
APPROVED BY :
DATE :
DESIGN BY :
CHECKED BY :
C
IV
IL
C O
N
SU
LT
IN
G M
A N
A G
EM
EN
T D
EV
EL
O
PM
EN
T
EN
G
IN
EE
RI
N
G
PR
O
JE
C T
S ou th w es t P kw y, S ui te
A us tin
, T ex as
Ph on e:
(5
) 8
-0
F ax
2)
-0
Fi rm
R eg ist ra tio n
N o.
F -7
IN
C
SI
N
C E
F:
\S
PR
IN
G S
H
IL
L W
SC
\P
R O
JE
C
TS
\2
2-
7-
AU
S-
SH
R
IV
ER
B O
R E\
D R
AW
IN
G S\
PL
AN
SE
T\
SC
H
O O
L\
W
LA
S
TA
+0
TO
E N
D .D
W G
, 6 /1
3/
, C
H R
IS
T
IN
O
C O
TR
AN
SM
IS
SI
O
N L
IN
E
ST
A
+0
TO
E N
D
CT
JT
JI
6/13/2025
N
SCALE:
1" = 50' HORIZ.
1" = 5' VERT.
PROFILE LEGEND:
EXIST GND
ALL RESPONSIBILITY FOR THE ADEQUACY OF THESE PLANS
REMAINS WITH THE ENGINEER WHO PREPARED THEM.
WARNING !!!!
CONTRACTOR TO FIELD VERIFY ALL EXIST. UTILITIES
VERTICALLY AND HORIZONTALLY PRIOR TO
CONSTRUCTION.
PROPOSED WL
143607
JAMES INOCENCIO
L I C E N S E D
PROFESS I ONAL ENG I N
EE
R
ST
ATE OF TEXAS
00 50'
SCALE: 1" = 50'
LEGEND
PROP. WATER LINE
PROP. FIRE HYDRANT
EXIST. GATE VALVE
EXIST. FIRE HYDRANT
EXIST. WATER SERVICE
PROPERTY BOUNDARY
OE OE OE EXIST. OVERHEAD ELECTRIC
PROP. EASEMENT
EXIST. POWER POLE
PROP. GATE VALVE
PROP. AIR RELEASE VALVE
GAS EXIST. GAS LINE
EXIST. PAVEMENT
EXIST. CONCRETE
R.O.W.
W
EXIST. SIGN
EXIST. GAS METERG
PP
EXIST. WATER LINE
EXIST. TREE
CALCULATED POINT
TXDOT TYPE I CONCRETE MONUMENT FOUND
(UNLESS NOTED)
1/2" IRON PIPE FOUND
(UNLESS NOTED)
1/2" IRON ROD FOUND
(UNLESS NOTED)
IRON ROD WITH "B&A RPLS 2633" CAP FOUND
(UNLESS NOTED)
SURVEY CONTROL POINT
PROP. ENCASEMENT
PROP. WATER LINE (FUTURE)
LP EXIST. LIGHT POLE
FIBER PROP. FIBER OPTIC
SP
R
IN
G
S H
IL
L
SP
EC
IA
L
U
TI
LI
TY
D
IS
TR
IC
T
G U
AD
AL
U
PE
C O
U N
TY
SE
G U
IN
IS
D T
R
AN
SM
IS
SI
O
N L
IN
E
SHSUD NOTES:
1. ANY EASEMENT DESIGNATED AS A SHSUD UTILITY
EASEMENT SHALL REMAIN OPEN FOR ACCESS AT ALL
TIMES AND SHALL NOT BE WITHIN A FENCED AREA.
2. ALL SHSUD EASEMENTS ARE FOR CONSTRUCTION,
MAINTENANCE (INCLUDING BUT NOT LIMITED TO
REMOVAL OF TREES AND OTHER OBSTRUCTIONS),
AND REPAIR OF ANY SHSUD FACILITY LOCATED
WITHIN SAID EASEMENT.
3. REPAIR AND POSSIBLE RECONSTRUCTION OF PUBLIC
ROADWAYS DAMAGES BY UTILITY CONSTRUCTION
MAY BE REQUIRED COST FOR ANY
RECONSTRUCTION OR REPAIR WILL BE AT THE
CONTRACTOR'S EXPENSE.
4. ALL VALVES, HYDRANTS, CLEAN OUTS OR OTHER
UTILITY APPURTENANCES SHALL CONSTRUCTION
OUTSIDE THE LIMITS OF DRIVEWAY APRONS, CURB
AND GUTTER, AND SIDEWALKS.
5. CONTRACTOR MUST MAINTAIN 4 FEET COVER TO
TOP OF PROPOSED PIPE OR PROPOSED CASING
FROM EXISTING SURFACE, UNLESS OTHERWISE
NOTED IN THE PLANS.
TRENCH EXCAVATION SAFETY PROTECTION
CONTRACTOR AND/OR CONTRACTOR'S INDEPENDENTLY
RETAINED EMPLOYEE OR STRUCTURAL
DESIGN/GEOTECHNICAL/SAFETY/EQUIPMENT
CONSULTANT, IF ANY SHALL REVIEW THESE PLANS AND
AVAILABLE GEOTECHNICAL INFORMATION AND THE
ANTICIPATED INSTALLATION SITES WITHIN THE PROJECT
WORK AREA IN ORDER TO IMPLEMENT CONTRACTOR'S
TRENCH EXCAVATION SAFETY PROTECTION SYSTEMS,
PROGRAMS AND/OR PROCEDURES. THE CONTRACTOR'S
IMPLEMENTATION OF THESE SYSTEMS, PROGRAMS
AND/OR PROCEDURES SHALL PROVIDE FOR ADEQUATE
TRENCH EXCAVATION SAFETY PROTECTION THAT
COMPLIES WITH AS A MINIMUM, OSHA STANDARDS FOR
TRENCH EXCAVATIONS. SPECIFICALLY, CONTRACTOR
AND/OR CONTRACTOR'S INDEPENDENTLY RETAINED
EMPLOYEE OR SAFETY CONSULTANT SHALL IMPLEMENT
A TRENCH SAFETY PROGRAM IN ACCORDANCE WITH
OSHA STANDARDS GOVERNING THE PRESENCE AND
ACTIVITIES OF INDIVIDUALS WORKING IN AND AROUND
TRENCH EXCAVATION.
CAUTION!!:
THE CONTRACTOR SHALL BE REQUIRED TO LOCATE ALL
PUBLIC OR PRIVATE UTILITIES INCLUDING BUT NOT
LIMITED TO: WATER, SEWER, TELEPHONE AND FIBER
OPTIC LINES, SITE LIGHTING ELECTRIC, SECONDARY
ELECTRIC, PRIMARY ELECTRICAL DUCTBANKS,
LANDSCAPE IRRIGATION FACILITIES, AND GAS LINES. ANY
UTILITY CONFLICTS THAT ARISE SHOULD BE
COMMUNICATED TO THE ENGINEER IMMEDIATELY AND
PRIOR TO THE START OF CONSTRUCTION. ANY DAMAGE
TO EXISTING UTILITIES SHALL BE THE SOLE
RESPONSIBILITY OF THE CONTRACTOR AND THE REPAIR
SHALL BE AT CONTRACTOR'S SOLE EXPENSE WHETHER
THE UTILITY IS SHOWN ON THESE PLANS OR NOT.
SEGUIN ISD NOTES:
1. DRIVEWAY OPEN CUT WORK MUST BE PERFORMED
ON NIGHTS AND/OR WEEKENDS.
2. DRIVEWAY OPEN CUTS MUST BE PERFORMED ONE
AT A TIME.
3. CONTRACTOR SHALL GIVE TWO WEEKS NOTICE TO
CITY OF SEGUIN PRIOR TO EACH DRIVEWAY OPEN
CUT WORK.
4. NO OPEN CUT TRENCHES ARE ALLOWED WHEN
WORKERS ARE NOT PRESENT.
5. CONTRACTOR SHALL INSTALL TEMPORARY
CONSTRUCTION FENCING AROUND WORK AREA.
6. ALL DRIVEWAYS WILL USE FLOWABLE FILL AS
BACKFILL.
CASING DETAIL
SPRINGS HILL SPECIAL UTILITY DISTRICT
30" MIN.
60" MIN.
DRAINAGE DITCH
M.J. FITTING WITH
JOINT RESTRAINT SEE NOTE 4
NATURAL
GRADE
WATER MAIN
END SEAL, FOR USE
WITH CERTA-LOK PIPE
(BOTH ENDS)
PAVEMENT
RESTRAINED
JOINT
CASING SPACERCARRIER
PIPE
STEEL
CASING
NOMINAL
SIZE (IN)
PIPE OUTSIDE
DIAMETER (IN)
RESTRAINT
OUTSIDE
DIA.(IN)
MIN.
NOMINAL
SIZE(IN)
OUTSIDE
DIAMETER
(IN)
WALL
THICKNESS
(IN)
WEIGHT
CLASS
4.80 6.90 9.05
13.20 17.40
9.25 11.25 14.75 16.90 25.51
17.25 17.25 23.25 23.24 29.25
0.375 0.375 0.375 0.375 0.375
STANDARD
STANDARD
STANDARD
STANDARD
STANDARD
INSIDE
DIAMETER
(IN)
CARRIER PIPE STEEL CASING
NOT TO SCALE
60" MIN.
2' MAX 10' MAX
A
A
CASING SPACERS
BAND
WIDTH
8" 8" 8" 8" 8"
No. OF
RUNNERS
PER TIE
2 TOP, 2 BOTTOM
2 TOP, 2 BOTTOM
2 TOP, 2 BOTTOM
2 TOP, 2 BOTTOM
2 TOP, 4 BOTTOM
1.5" RUNNERS
AS REQUIRED
STEEL BAND
CARRIER PIPE
SIZES 4" THRU 12"
SIZE 16"
STEEL
RISERS
STEEL
CASING
45° 45°
45°45°
45°
30°
15°15°
45°
1.5" RUNNERS
AS REQUIRED
STEEL
CASING
CARRIER PIPE
STEEL BAND
STEEL
RISERS
NOTES:
1. CARRIER PIPE SIZES ARE BASED ON CERTA-LOK C900/RJ FOR 4" TO 12" PIPE DIAMETER AND CERTA-LOK C905/RJ FOR 14" TO 24" PIPE DIAMETER.
2. STEEL CASING SHALL BE STANDARD WEIGHT OR HEAVIER PIPE CONFORMING TO ASTM A-36, ASTM A-568, ASTM A-135, ASTM A-139 OR OTHER ACCEPTABLE STANDARD SPECIFICATION. PIPE SHALL BE COATED AND LINED IN ACCORDANCE WITH AWWA C-210 OR APPROVED EQUAL. PIPE JOINTS SHALL BE WELDED IN ACCORDANCE WITH AWWA C-206. STEEL CASING SHALL BE NEW OR USED IN GOOD CONDITION ACCEPTABLE TO SPRINGS HILL
SPECIAL UTILITY DISTRICT AND TO THE ROADWAY AUTHORITY.
3. SUBSEQUENT CASING SPACERS ARE REQUIRED FOR 4" TO 14" PIPE SIZES TO BE AT 10 FEET APART AND FOR 16" TO 30" PIPE SIZES TO BE AT 8 FEET APART WITHIN THE CASING WITH AT LEAST 3 SPACERS PER JOINT ON PIPE. ONE CASING SPACER SHALL BE REPLACED WITHIN 2 FEET OF ENDS OF
CASING FOR ALL PIPE SIZES.
4. CASING PIPE SHALL EXTEND A MINIMUM OF 10 FT. PAST EDGE OF PAVEMENT ALONG TXDOT ROADWAYS AND A MINIMUM OF 5 FT. PAST EDGE OF PAVEMENT ALONG ALL OTHER ROADWAYS UNLESS OTHERWISE DIRECTED BY ENGINEER OR REGULATORY AUTHORITY.
5. CASING SPACERS SHALL BE MADE FROM T-304 STEEL OF A MINIMUM 14 GAUGE THICKNESS.
6. CASING SPACERS SHALL HAVE A SYNTHETIC RUBBER OR PVC LINER TO INSULATE THE PIPELINE FROM THE SPACER.
7. CASING SPACERS SHALL HAVE A 1.5" WIDE GLASS REINFORCED PLASTIC OR UHMW POLYMER RUNNERS TO INSULATE THE SPACER FROM THE
CASING
F:
\S
PR
IN
G S
H
IL
L W
SC
\P
R O
JE
C
TS
\2
2-
7-
AU
S-
SH
R
IV
ER
B O
R E\
D R
AW
IN
G S\
PL
AN
SE
T\
SC
H
O O
L\
S
TA
N D
AR
D
D
ET
AI
LS
.D
W G
F:
\S
PR
IN
G S
H
IL
L W
SC
\P
R O
JE
C
TS
\2
2-
7-
AU
S-
SH
R
IV
ER
B O
R E\
D R
AW
IN
G S\
PL
AN
SE
T\
SC
H
O O
L\
S
TA
N D
AR
D
D
ET
AI
LS
.D
W G
F:
\S
PR
IN
G S
H
IL
L W
SC
\P
R O
JE
C
TS
\2
2-
7-
AU
S-
SH
R
IV
ER
B O
R E\
D R
AW
IN
G S\
PL
AN
SE
T\
SC
H
O O
L\
S
TA
N D
AR
D
D
ET
AI
LS
.D
W G
F:
\S
PR
IN
G S
H
IL
L W
SC
\P
R O
JE
C
TS
\2
2-
7-
AU
S-
SH
R
IV
ER
B O
R E\
D R
AW
IN
G S\
PL
AN
SE
T\
SC
H
O O
L\
S
TA
N D
AR
D
D
ET
AI
LS
.D
W G
F:
\S
PR
IN
G S
H
IL
L W
SC
\P
R O
JE
C
TS
\2
2-
7-
AU
S-
SH
R
IV
ER
B O
R E\
D R
AW
IN
G S\
PL
AN
SE
T\
SC
H
O O
L\
S
TA
N D
AR
D
D
ET
AI
LS
.D
W G
F:
\S
PR
IN
G S
H
IL
L W
SC
\P
R O
JE
C
TS
\2
2-
7-
AU
S-
SH
R
IV
ER
B O
R E\
D R
AW
IN
G S\
PL
AN
SE
T\
SC
H
O O
L\
S
TA
N D
AR
D
D
ET
AI
LS
.D
W G
SPRINGS HILL SPECIAL UTILITY DISTRICT SPRINGS HILL SPECIAL UTILITY DISTRICT SPRINGS HILL SPECIAL UTILITY DISTRICT
F:
\S
PR
IN
G S
H
IL
L W
SC
\P
R O
JE
C
TS
\2
2-
7-
AU
S-
SH
R
IV
ER
B O
R E\
D R
AW
IN
G S\
PL
AN
SE
T\
SC
H
O O
L\
S
TA
N D
AR
D
D
ET
AI
LS
.D
W G
F:
\S
PR
IN
G S
H
IL
L W
SC
\P
R O
JE
C
TS
\2
2-
7-
AU
S-
SH
R
IV
ER
B O
R E\
D R
AW
IN
G S\
PL
AN
SE
T\
SC
H
O O
L\
S
TA
N D
AR
D
D
ET
AI
LS
.D
W G
SPRINGS HILL SPECIAL UTILITY DISTRICT
SIDEWALK
1'
2'
SEE NOTE 4
3' MIN
R .O
.W
14" x1" (16 GA)
GALVANIZED STRAPS
DRILLED TO POST
VENT PIPE
GALV IRON PIPE SCREEN
COVER VENT CAP No
401 CLAY AND BAILEY
MFG.CO. OR APPROVED
EQUAL
1' C
VR
M
IN
1" OR 2" GALV
IRON PIPE
BOLTED CAST
COUPLING
PER PLAN DIMENSIONS
OR AS DETERMINED BY
SHSUD PERSONAL
PROP WATER MAIN
STANDARD DOUBLE CONC
METER BOX COVER
1" OR 2" COMBINATION
AIR/VACUUM RELEASE
VALVE
CLASS "A" CONC
SLOPE TO DRAIN
BRICK OR PIPE
EXTENSION IF
REQUIRED
3" MIN. AT
RISER PIPE
CORPORATION COCK
OPERATING NOT TO
BE LOCATED ON SIDE
PROP WATER MAIN
* THREAD TO COMPRESSION BRASS
ELBOW ALLOWED IF NECESSARY DUE
TO DEPTH LIMITATIONS.
1" OR 2" TUBING SHALL
BE COPPER OR HDPE
PIPE
BALL VALVE
1" PIPE (WEEP HOLE)
WITH 1'x1'x1' ROCK OR
GRAVEL DRAIN POCKET
1' MIN.
1'
4" CONC FILLED DI PIPE
WITH CONC BASE
DATE: REVISIONS: STANDARD NO.
1" OR 2" VENTED AUTOMATIC COMBINATION
AIR/VACUUM RELEASE VALVE
06/15/2010 WA-9
NOTES:
1. EXTERIOR SURFACES OF EXPOSED AIR VENT PIPE AND D.I. SUPPORT PIPE SHALL BE PAINTED WITH RUST-OLEUM ACRYLIC 5225 (SAFETY BLUE), OR EQUAL, PER COATING MANUFACTURER INSTRUCTIONS PRIOR TO INSTALLATION.
2. AIR VENT PIPE INSTALLATION SHALL BE AS NEAR AS PRACTICAL TO RIGHT-OF-WAY LINE OR EASEMENT LINE AS
INDICATED ON PLANS (VERIFY LOCATION WITH SHSUD PERSONNEL
3. CONCRETE METER BOX PENETRATION SHALL BE CORE BIT DRILLED. VOID SHALL BE FILLED BY PRESS-SEAL
GASKET CORP. PSX RESILIENT CONNECTOR MEETING ASTM C923 OR APPROVED EQUAL.
4. IN UNDEVELOPED AND DEVELOPED AREAS, THE AIR RELEASE SHALL BE 5 FEET IN HEIGHT SUPPORTED BY 4" STEEL PIPE WHICH HAS BEEN PAINTED BLUE AND FILLED WITH CONCRETE. IN DEVELOPED AREAS THE AIR RELEASE SHALL
BE 8" TO 12" IN HEIGHT AND LOCATED NOT TO CONFLICT WITH SIDEWALK.
5. AUTOMATIC COMBINATION AIR/VACUUM VALVE SHALL BE INSTALLED IN A MANNER WHICH WILL ALLOW REMOVAL OF
ASSEMBLY WITHOUT REMOVAL OF THE CONCRETE METER BOX.
GALVANIZED IRON PIPE
PIPE
SIZE
AUTOMATIC
COMBINATION
AIR/RELEASE
VALVE
BALL
VALVE
VENT
PIPE
UP TO 10"
12" AND OVER
1" 2"
1" 2"
1" 2"
11/18/2024
6. NO VALVES SHALL BE CONSTRUCTED WITHIN CURBS, SIDEWALKS, DRIVEWAYS, OR ROADWAYS. S.H.S.U.D. WILL NOT BE RESPONSIBLE FOR ANY DAMAGES TO CONCRETE OR PAVED AREAS IF DEVELOPER DOES NOT COMPLY.
F:
\S
PR
IN
G S
H
IL
L W
SC
\P
R O
JE
C
TS
\2
2-
7-
AU
S-
SH
R
IV
ER
B O
R E\
D R
AW
IN
G S\
PL
AN
SE
T\
SC
H
O O
L\
S
TA
N D
AR
D
D
ET
AI
LS
.D
W G
F:
\S
PR
IN
G S
H
IL
L W
SC
\P
R O
JE
C
TS
\2
2-
7-
AU
S-
SH
R
IV
ER
B O
R E\
D R
AW
IN
G S\
PL
AN
SE
T\
SC
H
O O
L\
S
TA
N D
AR
D
D
ET
AI
LS
.D
W G
SPRINGS HILL SPECIAL UTILITY DISTRICT
F:
\S
PR
IN
G S
H
IL
L W
SC
\P
R O
JE
C
TS
\2
2-
7-
AU
S-
SH
R
IV
ER
B O
R E\
D R
AW
IN
G S\
PL
AN
SE
T\
SC
H
O O
L\
S
TA
N D
AR
D
D
ET
AI
LS
.D
W G
SPRINGS HILL SPECIAL UTILITY DISTRICT
F:
\S
PR
IN
G S
H
IL
L W
SC
\P
R O
JE
C
TS
\2
2-
7-
AU
S-
SH
R
IV
ER
B O
R E\
D R
AW
IN
G S\
PL
AN
SE
T\
SC
H
O O
L\
S
TA
N D
AR
D
D
ET
AI
LS
.D
W G
F:
\S
PR
IN
G S
H
IL
L W
SC
\P
R O
JE
C
TS
\2
2-
7-
AU
S-
SH
R
IV
ER
B O
R E\
D R
AW
IN
G S\
PL
AN
SE
T\
SC
H
O O
L\
S
TA
N D
AR
D
D
ET
AI
LS
.D
W G
SPRINGS HILL SPECIAL UTILITY DISTRICT
F:
\S
PR
IN
G S
H
IL
L W
SC
\P
R O
JE
C
TS
\2
2-
7-
AU
S-
SH
R
IV
ER
B O
R E\
D R
AW
IN
G S\
PL
AN
SE
T\
SC
H
O O
L\
S
TA
N D
AR
D
D
ET
AI
LS
.D
W G
F:
\S
PR
IN
G S
H
IL
L W
SC
\P
R O
JE
C
TS
\2
2-
7-
AU
S-
SH
R
IV
ER
B O
R E\
D R
AW
IN
G S\
PL
AN
SE
T\
SC
H
O O
L\
S
TA
N D
AR
D
D
ET
AI
LS
.D
W G
NOTES:
1. MARKERS SHALL BE 66" COMPOSITE POSTS SIMILAR TO RHINO
FIBERCURVE COMPOSITE MARKER POST.
2. MARKERS SHALL BE PLACED AT ALL GATE VALVES, FLUSHING
VALVES, & AIR RELEASE VALVES PER ITEM DETAIL.
3. MARKERS SHALL BE PLACED AT WATER METERS AS SPECIFIED
ON PLANS
4. PIPELINE MARKERS SHALL BE PLACED ON R.O.W./FENCE LINE AT
ALL ROAD CROSSINGS.
BLUE
66"
4"
ORANGE AND
WHITE
REFLECTIVE
TAPE
4"
6"
A
V
S H S U D
M
AIR RELEASE VALVE
METER VALVES
DECALS MARKER
DETAIL
DECAL
V
DECAL
DETAIL
3"
3"
212" WHITE
LETTER (TYP)
BLUE BACKGROUND
WATER CROSSING
10.75"
1" WHITE
LETTERING
1" BLUE
LETTERING
18"
BURY
DEPTH
3.2"
6"
BLUE
66"
4"
ORANGE AND
WHITE
REFLECTIVE
TAPE
6"
WATER
CROSSING
DECAL
18"
BURY
DEPTH
3.2"
3"
BLUE BACKGROUND
WHITE BACKGROUND
DATE: REVISIONS: STANDARD NO.
WATER LINE MARKER
07/26/2010 08/05/2021 WA-34
SPRINGS HILL SPECIAL UTILITY DISTRICT
W A T E R
C R O S S I N G
OF
SHEET
D
AT
E N
O
R
EV
IS
IO
N
BY
APPROVED BY :
DATE :
DESIGN BY :
CHECKED BY :
C
IV
IL
C O
N
SU
LT
IN
G M
A N
A G
EM
EN
T D
EV
EL
O
PM
EN
T
EN
G
IN
EE
RI
N
G
PR
O
JE
C T
S ou th w es t P kw y, S ui te
A us tin
, T ex as
Ph on e:
(5
) 8
-0
F ax
2)
-0
Fi rm
R eg ist ra tio n
N o.
F -7
IN
C
SI
N
C E
F:
\S
PR
IN
G S
H
IL
L W
SC
\P
R O
JE
C
TS
\2
2-
7-
AU
S-
SH
R
IV
ER
B O
R E\
D R
AW
IN
G S\
PL
AN
SE
T\
SC
H
O O
L\
S
TA
N D
AR
D
D
ET
AI
LS
.D
W G
, 6 /1
3/
, C
H R
IS
T
IN
O
C O
ST
AN
D
AR
D D
ET
AI
LS
CT
JT
JI
6/13/2025
143607
JAMES INOCENCIO
L I C E N S E D
PROFESS I ONAL ENG IN
EE
R
ST
ATE OF TEXAS
SP
R
IN
G
S H
IL
L
SP
EC
IA
L
U
TI
LI
TY
D
IS
TR
IC
T
G U
AD
AL
U
PE
C O
U N
TY
SE
G U
IN
IS
D T
R
AN
SM
IS
SI
O
N L
IN
E
3' MAX.
PER PLAN PROFILE
FROM NATURAL
GROUND OR SUBGRADE
IF NO PROFILE
SEE DETAIL
WTR-2 OR WW-8
TRENCH PAY LIMIT
SEE DETAIL PIPE
O.D.T12" 12"
PAVEMENT PAY LIMIT
EMBEDMENT SEE DETAIL
WTR-2 OR WW-8
MATERIAL AND DIMENSION
UNDISTURBED EARTH
PROPOSED MAIN
12" WIDE INDUCTIVELY AND
CONDUCTIVELY DETECTABLE
MARKING TAPE PLACED WITHIN
3' OF FINAL SURFACE (OR PER
MANUFACTURER'S
RECOMMENDATIONS)
SAWCUT
EXISTING BASE
TYPE D HMAC
2" MIN. THK.
TACK COAT
12"
FLOWABLE FILL
(2 SACK MIN.
300 PSI. MAX.)
F:
\S
PR
IN
G S
H
IL
L W
SC
\P
R O
JE
C
TS
\2
2-
7-
AU
S-
SH
R
IV
ER
B O
R E\
D R
AW
IN
G S\
PL
AN
SE
T\
SC
H
O O
L\
S
TA
N D
AR
D
D
ET
AI
LS
.D
W G
F:
\S
PR
IN
G S
H
IL
L W
SC
\P
R O
JE
C
TS
\2
2-
7-
AU
S-
SH
R
IV
ER
B O
R E\
D R
AW
IN
G S\
PL
AN
SE
T\
SC
H
O O
L\
S
TA
N D
AR
D
D
ET
AI
LS
.D
W G
SPRINGS HILL SPECIAL UTILITY DISTRICT
F:
\S
PR
IN
G S
H
IL
L W
SC
\P
R O
JE
C
TS
\2
2-
7-
AU
S-
SH
R
IV
ER
B O
R E\
D R
AW
IN
G S\
PL
AN
SE
T\
SC
H
O O
L\
S
TA
N D
AR
D
D
ET
AI
LS
.D
W G
F:
\S
PR
IN
G S
H
IL
L W
SC
\P
R O
JE
C
TS
\2
2-
7-
AU
S-
SH
R
IV
ER
B O
R E\
D R
AW
IN
G S\
PL
AN
SE
T\
SC
H
O O
L\
S
TA
N D
AR
D
D
ET
AI
LS
.D
W G
F:
\S
PR
IN
G S
H
IL
L W
SC
\P
R O
JE
C
TS
\2
2-
7-
AU
S-
SH
R
IV
ER
B O
R E\
D R
AW
IN
G S\
PL
AN
SE
T\
SC
H
O O
L\
S
TA
N D
AR
D
D
ET
AI
LS
.D
W G
SPRINGS HILL SPECIAL UTILITY DISTRICTSPRINGS HILL SPECIAL UTILITY DISTRICT
F:
\S
PR
IN
G S
H
IL
L W
SC
\P
R O
JE
C
TS
\2
2-
7-
AU
S-
SH
R
IV
ER
B O
R E\
D R
AW
IN
G S\
PL
AN
SE
T\
SC
H
O O
L\
S
TA
N D
AR
D
D
ET
AI
LS
.D
W G
F:
\S
PR
IN
G S
H
IL
L W
SC
\P
R O
JE
C
TS
\2
2-
7-
AU
S-
SH
R
IV
ER
B O
R E\
D R
AW
IN
G S\
PL
AN
SE
T\
SC
H
O O
L\
S
TA
N D
AR
D
D
ET
AI
LS
.D
W G
SPRINGS HILL SPECIAL UTILITY DISTRICT SPRINGS HILL SPECIAL UTILITY DISTRICT
F:
\S
PR
IN
G S
H
IL
L W
SC
\P
R O
JE
C
TS
\2
2-
7-
AU
S-
SH
R
IV
ER
B O
R E\
D R
AW
IN
G S\
PL
AN
SE
T\
SC
H
O O
L\
S
TA
N D
AR
D
D
ET
AI
LS
.D
W G
F:
\S
PR
IN
G S
H
IL
L W
SC
\P
R O
JE
C
TS
\2
2-
7-
AU
S-
SH
R
IV
ER
B O
R E\
D R
AW
IN
G S\
PL
AN
SE
T\
SC
H
O O
L\
S
TA
N D
AR
D
D
ET
AI
LS
.D
W G
SPRINGS HILL SPECIAL UTILITY DISTRICT
F:
\S
PR
IN
G S
H
IL
L W
SC
\P
R O
JE
C
TS
\2
2-
7-
AU
S-
SH
R
IV
ER
B O
R E\
D R
AW
IN
G S\
PL
AN
SE
T\
SC
H
O O
L\
S
TA
N D
AR
D
D
ET
AI
LS
.D
W G
F:
\S
PR
IN
G S
H
IL
L W
SC
\P
R O
JE
C
TS
\2
2-
7-
AU
S-
SH
R
IV
ER
B O
R E\
D R
AW
IN
G S\
PL
AN
SE
T\
SC
H
O O
L\
S
TA
N D
AR
D
D
ET
AI
LS
.D
W G
SPRINGS HILL SPECIAL UTILITY DISTRICT
OF
SHEET
D
AT
E N
O
R
EV
IS
IO
N
BY
APPROVED BY :
DATE :
DESIGN BY :
CHECKED BY :
C
IV
IL
C O
N
SU
LT
IN
G M
A N
A G
EM
EN
T D
EV
EL
O
PM
EN
T
EN
G
IN
EE
RI
N
G
PR
O
JE
C T
S ou th w es t P kw y, S ui te
A us tin
, T ex as
Ph on e:
(5
) 8
-0
F ax
2)
-0
Fi rm
R eg ist ra tio n
N o.
F -7
IN
C
SI
N
C E
F:
\S
PR
IN
G S
H
IL
L W
SC
\P
R O
JE
C
TS
\2
2-
7-
AU
S-
SH
R
IV
ER
B O
R E\
D R
AW
IN
G S\
PL
AN
SE
T\
SC
H
O O
L\
S
TA
N D
AR
D
D
ET
AI
LS
.D
W G
, 6 /1
3/
, C
H R
IS
T
IN
O
C O
ST
AN
D
AR
D D
ET
AI
LS
CT
JT
JI
6/13/2025
143607
JAMES INOCENCIO
L I C E N S E D
PROFESS I ONAL ENG IN
EE
R
ST
ATE OF TEXAS
SP
R
IN
G
S H
IL
L
SP
EC
IA
L
U
TI
LI
TY
D
IS
TR
IC
T
G U
AD
AL
U
PE
C O
U N
TY
SE
G U
IN
IS
D T
R
AN
SM
IS
SI
O
N L
IN
File details come from the government source that posted it. Updated .