- IH-10 AND FM 464 WATER LINE EXTENSION PROJECT
- Solicitation number
- AF-2025-32
- Issued by
- Grimes County, Texas
About this file
The document is a comprehensive set of engineering and construction plans for the IH-10 and FM 464 Water Line Extension Project, prepared for the Seguin Economic Development Corporation in Seguin, Texas. The project involves the installation of approximately 6,545 linear feet of 16-inch PVC water main, 185 linear feet of 8-inch PVC water main, 4,036 linear feet of 4-inch Schedule 40 PVC pipe, and 375 linear feet of 4-inch Schedule 80 PVC pipe by bore. Additional key components include 10 fire hydrant assemblies, 14 16-inch gate valves, 1 8-inch gate valve, 1 2-inch automatic flush valve, and various steel casing installations by bore and open cut methods. The project also includes connecting to existing water lines, removing and replacing signage, repairing infrastructure, and revegetation of the disturbed areas.
The total estimated project cost and specific funding sources are not explicitly detailed in the plans. The project involves multiple utility crossings and requires careful coordination with existing infrastructure, including telecommunications, gas, and electrical lines. The construction documents indicate a June 2025 timeline, with the plans issued for bid on 6/11/2025. Comprehensive details are provided for technical specifications, including water backfill methods, thrust block details, valve installations, and erosion control measures. The project area spans along IH-10 and FM 464 in Seguin, with multiple plan and profile sheets detailing the precise route and elevation changes. The Seguin City Council and Economic Development Corporation are overseeing the project, with engineering work performed by Trihydro.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
© 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS
© 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS
© 2022 Microsoft Corporation © 2022 TomTom
REV:
FI
LE
C H
EC
KE
D B
Y:
SC
AL
E:
D R
AW
N
B Y:
D
AT
E R
EV
IS
IO
N
S D
ES
C
R
IP
TI
O
N C
H K'
D
BY
R
EV
D
AT
E:
PR
. N O
D
ES
IG
N
ED
B
Y:
w w w .tr ih yd ro .c om
N ew
B ra un fe ls
In de pe nd en ce D riv e, S ui te
N ew B ra un fe ls
, T ex as
(P ) 8
/6
.3
(F ) 8
/6
.3
Te xa s Su rv ey
F irm
Te xa s
En gi ne er in g
Fi rm
F -1
Au st in
W
H ig hw ay
, S ui te
Au st in
, T ex as
(P ) 5
/4
.3
(F ) 5
/4
.7
0 1,000' 2,000'0 5 MILES 10 MILES1 PROJECT LOCATION MAP
SCALE: 1" = 5 MI 2 PROJECT VICINITY MAP
SCALE: 1" = 1,000'
PR
O
JE
C
T
LO
C A
TI
O
N A
N D
IN
D
EX
O
F
SH
EE
TS
IH
-1
A
N D
F M
W A
TE
R
L
IN
E
EX
TE
N
SI
O
N
SE
G U
IN
E
C O
N O
M
IC
D
EV
EL
O
PM
EN
T C
O R
PO
R
A
TI
O N
SE
G
U
IN
, T
EX
A S
SEGUIN ECONOMIC DEVELOPMENT CORPORATION
IH-10 AND FM 464 WATER LINE EXTENSION
SEGUIN, TEXAS
JUNE 2025
G
-P
1W L_
TI
TL
ES
H
EE
T
AS
S
H O
W N
6/
/2
5H C
JD
M
SHEET
H C
G -0
-0
PROJECT
LOCATION
ALT
10 90
CITY COUNCIL
JOE REA
DAVID EVELD
JIM LIEVENS
JOHN CARLSSON
PAUL GAYTAN
MONICA CARTER
JASON BIESENBACH
BILL KELLER
DISTRICT 1
DISTRICT 2
DISTRICT 3
DISTRICT 4
DISTRICT 5
DISTRICT 6/MAYOR PRO TEMPORE
DISTRICT 7
DISTRICT 8
STEVE PARKER
CITY MANAGER
DONNA DODGEN
MAYOR
RICK CORTES
DEPUTY CITY MANAGER
KRISTIN MUELLER
CITY SECRETARY
JOSH SCHNEUKER
DIRECTOR OF ECONOMIC DEVELOPMENT
6/
/2
IS
SU
E
FO
R B
ID
SC
H C
THE SEAL APPEARING ON THIS DOCUMENT WAS
AUTHORIZED BY HENRY L. CRIPPEN, P.E. LICENCE NO.
141188, JUNE 11, 2025. ALTERATION OF A SEALED
DOCUMENT WITHOUT PROPER NOTIFICATION TO THE
RESPONSIBLE ENGINEER IS AN OFFENSE UNDER THE
TEXAS ENGINEERING PRACTICE ACT.
TOTAL ESTIMATED QUANTITIES
ITEM DESCRIPTION UNIT TOTAL
QUANTITY
1 BONDING, MOBILIZATION, AND INSURANCE LS 1
ENVIRONMENTAL PROTECTION/ STORMWATER POLLUTION
PREVENTION PLAN (SWPPP) LS 1
3 SITE PREPARATION LS 1
4 BARRICADES, SIGNS, AND TRAFFIC HANDLING LS 1
5 TRENCH AND EXCAVATION SAFETY PROTECTION LF 6121
6 PRESSURE TEST WATER TRANSMISSON MAIN LS 1
7 DISINFECT WATER TRANSMISSION MAIN LS 1
8 16-INCH DR18 C900 PVC LF 6545
9 8-INCH DR18 C900 PVC LF 185
10 4-INCH SCH. 40 PVC LF 4036
11 4-INCH SCH. 80 PVC BY BORE LF 375
12 2' x 3' PULL BOX EA 4 13 2.5' x 4' PULL BOX EA 5
14 FIRE HYDRANT ASSEMBLY EA 10
15 16-INCH GATE VALVE EA 14
16 8-INCH GATE VALVE EA 1
17 2-INCH AUTOMATIC FLUSH VALVE ASSEMBLY EA 1
18 DUCTILE IRON FITTINGS TON 3.54
TOTAL ESTIMATED QUANTITIES
ITEM DESCRIPTION UNIT TOTAL
QUANTITY
19 30-INCH STEEL CASING BY BORE LF 609
20 30-INCH STEEL CASING BY OPEN CUT LF 184
21 24-INCH STEEL CASING BY OPEN CUT LF 60
22 CONNECT TO EXISTING 16-INCH WATER LINE EA 1
23 CONNECT TO EXISTING 8-INCH WATER LINE EA 1
24 REMOVE MONUMENT SIGN EA 2
25 REMOVE AND REPLACE SIGN EA 1
26 REPAIR WIRE FENCE LF 24
27 REPAIR ASPHALT PAVEMENT SY 303
28 REPAIR CONCRETE DRIVEWAY SY 44
29 FLOWABLE FILL CY 91
30 REPAIR GRAVEL DRIVEWAY SY 321
31 REPAIR CONCRETE SIDEWALK SY 63
32 REPAIR CONCRETE CURB AND GUTTER LF 172
33 3-INCH COMBINATION AIR-VACUUM RELEASE VALVE EA 3
34 REVEGETATION AC 2.70
35 SPRINGS HILL SUD SEGUIN ISD TRANSMISSION LINE LS 1
36 BID ALLOWANCE ALW 1
Sheet List Table Sheet
Number Sheet Title REV
1 PROJECT LOCATION AND INDEX OF SHEETS 1
2 EXPLANATION AND NOTES 1
3 GENERAL CONSTRUCTION AND SITE NOTES 1
4 PROJECT MAP 1
5 PLAN AND PROFILE STA. 4+30 TO 7+00 1
6 PLAN AND PROFILE STA. 7+00 TO 15+00 1
7 PLAN AND PROFILE STA. 15+00 TO 21+00 1
8 PLAN AND PROFILE STA. 21+00 TO 28+00 1
9 PLAN AND PROFILE STA. 28+00 TO 35+00 1
10 PLAN AND PROFILE STA. 35+00 TO 40+50 1
11 PLAN AND PROFILE STA. 40+50 TO 47+00 1
12 PLAN AND PROFILE STA. 47+00 TO 53+50 1
13 PLAN AND PROFILE STA. 53+50 TO 60+00 1
14 PLAN AND PROFILE STA. 60+00 TO 65+00 1
15 PLAN AND PROFILE STA. 65+00 TO 69+75 1
16 WATER DETAILS (1 OF 2) 1
17 WATER DETAILS (2 OF 2) 1
18 COMMUNICATION DETAILS 1
19 EROSION CONTROL DETAILS 1
20 TRAFFIC CONTROL AND BARRICADE DETAIL 1
REV:
FI
LE
C H
EC
KE
D B
Y:
SC
AL
E:
D R
AW
N
B Y:
D
AT
E R
EV
IS
IO
N
S D
ES
C
R
IP
TI
O
N C
H K'
D
BY
R
EV
D
AT
E:
PR
. N O
D
ES
IG
N
ED
B
Y:
w w w .tr ih yd ro .c om
N ew
B ra un fe ls
In de pe nd en ce D riv e, S ui te
N ew B ra un fe ls
, T ex as
(P ) 8
/6
.3
(F ) 8
/6
.3
Te xa s Su rv ey
F irm
Te xa s
En gi ne er in g
Fi rm
F -1
Au st in
W
H ig hw ay
, S ui te
Au st in
, T ex as
(P ) 5
/4
.3
(F ) 5
/4
.7
EX
PL
A N
A
TI
O N
A N
D N
O
TE
S
IH
-1
A
N D
F M
W A
TE
R
L
IN
E
EX
TE
N
SI
O
N
SE
G U
IN
E
C O
N O
M
IC
D
EV
EL
O
PM
EN
T C
O R
PO
R
A
TI
O N
SE
G
U
IN
, T
EX
A S
G
-P
1W L_
SW
PP
P_ N
O
TE
S
N O
N E
6/
/2
5H C
JD
M
SHEET
H C
G -0
-0
EXPLANATION
DIAMETERØ/DIA.
NORTHFEET ABOVE MEAN SEA LEVEL
POLYVINYL CHLORIDE
SANITARY
MINIMUM
RIGHT-OF-WAY
DIMENSION RATIO/DRIVE
LINEAR FEET
EA
FT AMSL
LF
MIN
N
PVC
ROW
SAN.
EAST
FM
TYPICALTYP.
SPECIAL UTILITY DISTRICTSUD
RIGHT-OF-WAY
TEXAS ADMINISTRATIVE CODETAC
POUNDS PER SQUARE INCHPSI
AMERICAN WATER WORKS ASSOCIATIONAWWA
GLOBAL POSITIONING SYSTEMGPS
FOOT/FEETFT.
MAXIMUMMAX
TEXAS COMMISSION ON
ENVIRONMENTAL QUALITYTCEQ
EXISTING PROPOSED
WATER METER
WATER VALVE
GRAVEL REPAIR
STEEL WATER LINE CASING
AVENUEAVE
OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATIONOSHA
FARM TO MARKET
E
TEXAS MANUAL ON UNIFORM TRAFFIC
CONTROL DEVICESTMUTCD
ROADRD
NUMBERNO
MECHANICAL JOINTMJ
OUTSIDE DIAMETEROD
2-INCH COMBINATION
AIR-VACUUM RELEASE VALVE
EACH
DR
SQUARE YARDSSY
REVISIONREV.
CITY OF SEGUINCoS
DUCTILE IRONDI
UTILITY POLE
GUY ANCHOR
WATER METER
FIRE HYDRANT
WATER VALVE
LUMINAIRE POLE
ASPHALT DRIVEWAY/PAVEMENT REPAIR
PROPERTY LINE
FENCE
OVERHEAD ELECTRIC LINE
UNDERGROUND TELECOMMUNICATIONS
STORM SEWER STRUCTURE
WATER LINE
ABBREVIATIONS
AMERICAN STANDARD CODE FOR INFORMATION INTERCHANGEASCII
AMERICAN SOCIETY OF TESTING AND MATERIALSASTM
AMERICAN NATIONAL STANDARD INSTITUTEANSI
ANTE MERIDIEMA.M.
BOULEVARDBLVD
HIGHWAYHWY
NATIONAL SANITATION FOUNDATIONNSF
POTABLE WATERPW
PAGEPG.
POST MERIDIEMP.M.
EASEMENT
WATER LINE
CABLE PEDESTAL
TELEPHONE PEDESTAL
BUSHTREE
ELECTRIC TRANSFORMER
ELECTRIC METER
MANHOLE
DITCH CENTERLINE
GAS LINE
STATIONSTA.
STREETST
STANDARDSTD.
SHEETSHT
STATE HIGHWAYS.H.
UNITED STATESU.S.
WATER SUPPLY CORPORATIONW.S.C.
CONCRETE REPAIR
FIRE HYDRANT
REPLACED FENCE
CONSTRUCTION EASEMENT
EXISTINGEXIST.
ELEV. ELEVATION
HORIZONTAL DIRECTIONAL DRILLINGHDD 1
6/
/2
IS
SU
E
FO
R B
ID
SC
H C
STORM WATER POLLUTION PREVENTION PLANSWPPP
1. THIS WATER DISTRIBUTION SYSTEM MUST BE CONSTRUCTED IN ACCORDANCE WITH THE
CURRENT TEXAS COMMISSION ON ENVIRONMENTAL QUALITY (TCEQ) RULES AND REGULATIONS
FOR PUBLIC WATER SYSTEMS 30 TEXAS ADMINISTRATIVE CODE (TAC) CHAPTER 290
SUBCHAPTER D. WHEN CONFLICTS ARE NOTED WITH LOCAL STANDARDS, THE MORE
STRINGENT REQUIREMENT SHALL BE APPLIED. AT A MINIMUM, CONSTRUCTION FOR PUBLIC
WATER SYSTEMS MUST ALWAYS MEET TCEQ'S "RULES AND REGULATIONS FOR PUBLIC WATER
SYSTEMS."
2. ALL NEWLY INSTALLED PIPES AND RELATED PRODUCTS MUST CONFORM TO AMERICAN
NATIONAL STANDARDS INSTITUTE (ANSI)/NATIONAL SANITATION FOUNDATION (NSF)
INTERNATIONAL STANDARD 61 AND MUST BE CERTIFIED BY AN ORGANIZATION ACCREDITED BY
ANSI [§290.44(a)(1)].
3. PLASTIC PIPE FOR USE IN PUBLIC WATER SYSTEMS MUST BEAR THE NSF INTERNATIONAL SEAL
OF APPROVAL (NSF-pw) AND HAVE AN ASTM DESIGN PRESSURE RATING OF AT LEAST 150 PSI OR
A STANDARD DIMENSION RATIO OF 26 OR LESS [§290.44(a)(2)].
4. NO PIPE WHICH HAS BEEN USED FOR ANY PURPOSE OTHER THAN THE CONVEYANCE OF
DRINKING WATER SHALL BE ACCEPTED OR RELOCATED FOR USE IN ANY PUBLIC DRINKING
WATER SUPPLY [§290.44(a)(3)].
5. ALL WATER LINE CROSSINGS OF WASTEWATER MAINS SHALL BE PERPENDICULAR
[§290.44(e)(4)(B)].
6. WATER TRANSMISSION AND DISTRIBUTION LINES SHALL BE INSTALLED IN ACCORDANCE WITH
THE MANUFACTURER'S INSTRUCTIONS. HOWEVER, THE TOP OF THE WATER LINE MUST BE
LOCATED BELOW THE FROST LINE AND IN NO CASE SHALL THE TOP OF THE WATER LINE BE
LESS THAN 24 INCHES BELOW GROUND SURFACE [§290.44(a)(4)].
7. THE MAXIMUM ALLOWABLE LEAD CONTENT OF PIPES, PIPE FITTINGS, PLUMBING FITTINGS, AND
FIXTURES IS 0.25 PERCENT [§290.44(b)].
8. THE CONTRACTOR SHALL INSTALL APPROPRIATE AIR/VACUUM RELEASE DEVICES WITH VENT
OPENINGS TO THE ATMOSPHERE COVERED WITH 16-MESH OR FINER, CORROSION RESISTANT
SCREENING MATERIAL OR AN ACCEPTABLE EQUIVALENT [§290.44(d)(1)].
9. THE CONTRACTOR SHALL NOT PLACE THE PIPE IN WATER OR WHERE IT CAN BE FLOODED WITH
WATER OR SEWAGE DURING ITS STORAGE OR INSTALLATION [§290.44(f)(1)].
10. WHEN WATERLINES ARE LAID UNDER ANY FLOWING OR INTERMITTENT STREAM OR
SEMI-PERMANENT BODY OF WATER THE WATERLINE SHALL BE INSTALLED IN A SEPARATE
WATERTIGHT PIPE ENCASEMENT. VALVES MUST BE PROVIDED ON EACH SIDE OF THE CROSSING
WITH FACILITIES TO ALLOW THE UNDERWATER PORTION OF THE SYSTEM TO BE ISOLATED AND
TESTED [§290.44(f)(2)].
11. PURSUANT TO 30 TAC §290.44(a)(5), THE HYDROSTATIC LEAKAGE RATE SHALL NOT EXCEED THE
AMOUNT ALLOWED OR RECOMMENDED BY THE MOST CURRENT AWWA FORMULAS FOR PVC
PIPE, CAST IRON AND DUCTILE IRON PIPE. INCLUDE THE FORMULAS IN THE NOTES ON THE
PLANS.
· THE HYDROSTATIC LEAKAGE RATE FOR POLYVINYL CHLORIDE (PVC) PIPE AND
APPURTENANCES SHALL NOT EXCEED THE AMOUNT ALLOWED OR RECOMMENDED BY
FORMULAS IN AMERICA WATER WORKS ASSOCIATION (AWWA) C-605 AS REQUIRED IN 30
TAC §290.44(a)(5). PLEASE ENSURE THAT THE FORMULA FOR THIS CALCULATION IS
CORRECT AND MOST CURRENT FORMULA IS IN USE;
Q = LD √P /148,000
WHERE:
· Q = THE QUANTITY OF MAKEUP WATER IN GALLONS PER HOUR,
· L = THE LENGTH OF THE PIPE SECTION BEING TESTED, IN FEET,
· D = THE NOMINAL DIAMETER OF THE PIPE IN INCHES, AND
· P = THE AVERAGE TEST PRESSURE DURING THE HYDROSTATIC TEST IN POUNDS PER
SQUARE INCH (PSI).
· THE HYDROSTATIC LEAKAGE RATE FOR DUCTILE IRON (DI) PIPE AND APPURTENANCES
SHALL NOT EXCEED THE AMOUNT ALLOWED OR RECOMMENDED BY FORMULAS IN AMERICA
WATER WORKS ASSOCIATION (AWWA) C-600 AS REQUIRED IN 30 TAC §290.44(a)(5). PLEASE
ENSURE THAT THE FORMULA FOR THIS CALCULATION IS CORRECT AND MOST CURRENT
FORMULA IS IN USE;
L = SD √P /148,000
WHERE:
· L = THE QUANTITY OF MAKEUP WATER IN GALLONS PER HOUR,
· S = THE LENGTH OF THE PIPE SECTION BEING TESTED, IN FEET,
· D = THE NOMINAL DIAMETER OF THE PIPE IN INCHES, AND
· P = THE AVERAGE TEST PRESSURE DURING THE HYDROSTATIC TEST IN POUNDS PER
SQUARE INCH (PSI).
12. THE CONTRACTOR SHALL MAINTAIN A MINIMUM SEPARATION DISTANCE IN ALL DIRECTION OF
NINE FEET BETWEEN THE PROPOSED WATERLINE AND WASTEWATER COLLECTION FACILITIES
INCLUDING MANHOLES. IF THIS DISTANCE CANNOT BE MAINTAINED, THE CONTRACTOR MUST
IMMEDIATELY NOTIFY THE PROJECT ENGINEER FOR FURTHER DIRECTION. SEPARATION
DISTANCES, INSTALLATION METHODS, AND MATERIALS UTILIZED MUST MEET §290.44(e)(1)-(4).
13. THE SEPARATION DISTANCE FROM A POTABLE WATERLINE TO A WASTEWATER MAIN OR
LATERAL MANHOLE OR CLEANOUT SHALL BE A MINIMUM OF NINE FEET. WHERE THE NINE-FOOT
SEPARATION DISTANCE CANNOT BE ACHIEVED, THE POTABLE WATERLINE SHALL BE ENCASED
IN A JOINT OF AT LEAST 150 PSI PRESSURE CLASS PIPE AT LEAST 18 FEET LONG AND TWO
NOMINAL SIZES LARGER THAN THE NEW CONVEYANCE. THE SPACE AROUND THE CARRIER PIPE
SHALL BE SUPPORTED AT FIVE-FOOT INTERVALS WITH SPACERS OR BE FILLED TO THE
SPRINGLINE WITH WASHED SAND. THE ENCASEMENT PIPE SHALL BE CENTERED ON THE
CROSSING AND BOTH ENDS SEALED WITH CEMENT GROUT OR MANUFACTURED SEALANT
[§290.44(e)(5)].
14. FIRE HYDRANTS SHALL NOT BE INSTALLED WITHIN NINE FEET VERTICALLY OR HORIZONTALLY
OF ANY WASTEWATER LINE, WASTEWATER LATERAL, OR WASTEWATER SERVICE LINE
REGARDLESS OR CONSTRUCTION [§290.44(e)(6)].
15. SUCTION MAINS TO PUMPING EQUIPMENT SHALL NOT CROSS WASTEWATER MAINS,
WASTEWATER LATERALS, OR WASTEWATER SERVICE LINES. RAW WATER SUPPLY LINES SHALL
NOT BE INSTALLED WITHIN FIVE FEET OF ANY TILE OR CONCRETE WASTEWATER MAIN,
WASTEWATER LATERAL, OR WASTEWATER SERVICE LINE [§290.44(e)(7)].
16. WATERLINES SHALL NOT BE INSTALLED CLOSER THAN TEN FEET TO SEPTIC TANK DRAINFIELDS
[§290.44(e)(8)].
17. THE CONTRACTOR SHALL DISINFECT THE NEW WATERLINES IN ACCORDANCE WITH AWWA
STANDARD C-651-14 OR MOST RECENT, THEN FLUSH AND SAMPLE THE LINES BEFORE BEING
PLACED INTO SERVICE. SAMPLES SHALL BE COLLECTED FOR MICROBIOLOGICAL ANALYSIS TO
CHECK THE EFFECTIVENESS OF THE DISINFECTION PROCEDURE WHICH SHALL BE REPEATED IF
CONTAMINATION PERSISTS. A MINIMUM OF ONE SAMPLE FOR EACH 1,000 FEET OF COMPLETED
WATER LINE WILL BE REQUIRED OR AT THE NEXT AVAILABLE SAMPLING POINT BEYOND 1,000
FEET AS DESIGNATED BY THE DESIGN ENGINEER [§290.44(f)(3)].
18. DECHLORINATION OF DISINFECTING WATER SHALL BE IN STRICT ACCORDANCE WITH CURRENT
AWWA STANDARD C655-09 OR MOST RECENT.
TCEQ WATER DISTRIBUTION SYSTEM GENERAL CONSTRUCTION NOTES TREE PROTECTION AND NATURAL AREA PROTECTION NOTES
1. CLEARING OF NATURAL VEGETATION OR REMOVAL OF ANY PROTECTED TREES IS PROHIBITED
WITHOUT FIRST SECURING WRITTEN APPROVAL FROM THE OWNER OR ENGINEER.
2. ALL TREES SHALL REMAIN IN PLACE UNLESS OTHERWISE NOTED.
3. ALL TREES AND NATURAL AREAS SHALL BE PROTECTED DURING CONSTRUCTION WITH
TEMPORARY FENCING.
4. PROTECTIVE FENCES SHALL BE INSTALLED PRIOR TO THE COMMENCEMENT OF ANY SITE
PREPARATION WORK (CLEARING, GRUBBING OR GRADING) AND SHALL BE MAINTAINED
THROUGHOUT ALL PHASES OF THE CONSTRUCTION PROJECT.
5. EROSION/SEDIMENTATION CONTROL BARRIERS SHALL BE INSTALLED OR MAINTAINED IN A
MANNER WHICH DOES NOT RESULT IN SOIL BUILDUP WITHIN TREE DRIP LINES.
6. PROTECTIVE FENCES SHALL COMPLETELY SURROUND THE TREE OR GROUP OF TREES AND
WILL BE LOCATED AT THE OUTERMOST LIMITS OF THE TREE BRANCHES (DRIP LINE); OR FOR
NATURAL AREAS. PROTECTIVE FENCES SHALL BE INSTALLED AROUND ALL TREES OR TREE
GROUPS WITHIN 30 FEET OF CONSTRUCTION IMPROVEMENTS IN ORDER TO PREVENT THE
FOLLOWING:
a. SOIL COMPACTION IN THE ROOT ZONE AREA RESULTING FROM VEHICULAR TRAFFIC OR
STORAGE OF EQUIPMENT OR MATERIALS.
b. ROOT ZONE DISTURBANCES DUE TO GRADE CHANGES (GREATER THAN SIX (6) INCHES CUT
OR FILL) OR TRENCHING NOT REVIEWED AND AUTHORIZED BY THE ENGINEER OR OWNER'S
REPRESENTATIVE.
c. WOUNDS TO EXPOSED ROOTS, TRUNK OR LIMBS BY MECHANICAL EQUIPMENT.
d. OTHER ACTIVITIES DETRIMENTAL TO TREES SUCH AS CHEMICAL STORAGE, TRUCK
CLEANING, AND FIRES.
6. EXCEPTIONS TO INSTALLING FENCES AT TREE DRIP LINES MAY BE PERMITTED IN THE
FOLLOWING CASES:
a. AT AN APPROVED GRADE CHANGE, IMPERMEABLE PAVING SURFACES, TREE WELLS, OR
OTHER SUCH SITE DEVELOPMENT, ERECT THE FENCE APPROXIMATELY 2 TO 4 FEET BEHIND
THE AREA DISTURBED.
b. WHERE PERMEABLE PAVING IS TO BE INSTALLED WITHIN A TREE'S DRIP LINE, INSTALL THE
FENCE AT THE OUTER LIMITS OF THE PERMEABLE PAVING AREA (PRIOR TO SITE GRADING
SO THAT THIS AREA IS GRADED SEPARATELY PRIOR TO PAVING INSTALLATION TO MINIMIZE
ROOT DAMAGE).
c. WHERE TREES ARE CLOSE TO PROPOSED BUILDINGS, INSTALL THE FENCE TO ALLOW 6 TO
10 FEET OF WORKSPACE BETWEEN THE FENCE AND THE BUILDING.
d. FOR THE PROTECTION OF NATURAL AREAS, NO EXCEPTIONS TO INSTALLING FENCES AT
THE LIMIT OF CONSTRUCTION LINE WILL BE PERMITTED.
7. WHERE ANY OF THE ABOVE EXCEPTIONS RESULT IN A FENCE BEING CLOSER THAN 4 FEET TO A
TREE TRUNK, PROTECT THE TRUNK WITH STRAPPED-ON PLANKING TO BE A HEIGHT OF 8 FEET
(OR TO THE LIMITS OF LOWER BRANCHING).
8. WHERE ANY OF THE ABOVE EXCEPTIONS TO FENCING AT A TREE'S DRIP LINE RESULT IN AREAS
OF UNPROTECTED ROOT ZONES (UNDER DRIP LINES) WHERE HEAVY TRAFFIC IS EXPECTED,
COVER THOSE AREAS WITH FOUR (4) INCHES OF ORGANIC MULCH OR GRAVEL TO MINIMIZE SOIL
COMPACTION.
9. TREES APPROVED FOR REMOVAL SHALL BE REMOVED IN A MANNER WHICH DOES NOT IMPACT
TREES TO BE PRESERVED.
10. ANY ROOTS EXPOSED BY CONSTRUCTION ACTIVITY SHALL BE PRUNED FLUSH WITH THE SOIL.
BACK-FILL ROOT AREAS WITH GOOD QUALITY TOPSOIL AS SOON AS POSSIBLE. IF EXPOSED
ROOT AREAS ARE NOT BACKFILLED WITHIN 2 DAYS, COVER THEM WITH ORGANIC MATERIAL IN A
MANNER WHICH REDUCES SOIL TEMPERATURE AND MINIMIZES WATER LOSS DUE TO
EVAPORATION.
11. ANY TRENCHING REQUIRED FOR THE INSTALLATION OF IRRIGATION SHALL BE PLACED AS FAR
FROM EXISTING TREE TRUNKS AS POSSIBLE.
12. NO TOPSOIL DRESSING GREATER THAN FOUR (4) INCHES SHALL BE PERMITTED WITHIN THE
DRIP LINES OF TREES. NO SOIL IS PERMITTED ON THE ROOT FLARE OF ANY TREE.
13. PRUNING TO PROVIDE CLEARANCE FOR STRUCTURES, VEHICULAR TRAFFIC AND EQUIPMENT
SHALL TAKE PLACE BEFORE DAMAGE OCCURS.
14. ALL FINISHED PRUNING MUST BE DONE ACCORDING TO RECOGNIZED, APPROVED STANDARDS
OF THE INDUSTRY (REFERENCE THE NATIONAL ARBORIST ASSOCIATION - "PRUNING
STANDARDS FOR SHADE TREES").
15. PRIOR TO EXCAVATION OR GRADE CUTTING WITHIN TREE DRIP LINES, MAKE A CLEAN CUT
BETWEEN THE DISTURBED AND UNDISTURBED ROOT ZONES WITH A ROCK SAW OR SIMILAR
EQUIPMENT TO MINIMIZE DAMAGE TO REMAINING ROOTS.
16. ALL GRADING WITHIN PROTECTED ROOT ZONE AREAS SHALL BE DONE BY HAND OR WITH SMALL
EQUIPMENT TO MINIMIZE ROOT DAMAGE. PRIOR TO GRADING, RELOCATED PROTECTIVE
FENCING TO TWO (2) FEET BEHIND THE GRADE CHANGE AREA.
17. TREES IMPACTED BY CONSTRUCTION ACTIVITIES SHALL BE WATERED DEEPLY ONCE A WEEK
DURING PERIODS OF HOT, DRY WEATHER. TREE CROWNS SHALL BE SPRAYED WITH WATER
PERIODICALLY TO REDUCE DUST ACCUMULATION ON THE LEAVES.
18. WHEN INSTALLING CONCRETE ADJACENT TO THE ROOT ZONE OF A TREE, USE A PLASTIC
VAPOR BARRIER BEHIND THE CONCRETE TO PROHIBIT LEACHING OF LIME INTO THE ROOT
ZONE.
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PREPARATION, IMPLEMENTATION, AND
MAINTENANCE OF THE STORMWATER POLLUTION PREVENTION PLAN (SWPPP) THROUGHOUT
PROJECTS DURATION, INCLUDING COMPLYING WITH ALL APPLICABLE REGULATIONS RELATED
TO NPDES AND TPDES, AND SUBMITTING REQUIRED NOTIFICATION OF INTENT AND
TERMINATION. THIS IS TO BE PAID FOR UNDER "STORM WATER POLLUTION PREVENTION PLAN"
ITEM.
2. TEMPORARY EROSION/SEDIMENTATION CONTROL ITEMS SHALL BE IN PLACE AND SHALL
ENCOMPASS ALL STAGING AND SPOIL AREAS BEFORE CONSTRUCTION BEGINS.
3. CONTRACTOR SHALL INSTALL SILT FENCE TO DELINEATE CONSTRUCTION EASEMENTS.
4. THE CONTRACTOR SHALL BE RESPOSIBLE FOR THE SITE CONDITIONS DURING CONSTRUCTION
AND UNTIL THE PROJECT IS ACCEPTED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
OBTAINING THE STORMWATER POLLUTION PREVENTION PLAN, UNDERSTAND THE
REQUIREMENTS FOR THE PLAN, AND SHALL BE RESPONSIBLE FOR IMPLEMENTING THE PLAN.
ALL FINES IMPOSED FOR NOT IMPLEMENTING OR MAINTAINING SWPPP MEASURES SHALL BE
THE RESPONSIBILITY OF THE CONTRACTOR.
5. THE CONTRACTOR SHALL INSTALL EROSION/SEDIMENTATION CONTROLS AND TREE/NATURAL
AREA PROTECTIVE FENCING PRIOR TO ANY SITE PREPARATION WORK (CLEARING, GRUBBING
OR EXCAVATION).
6. THE PLACEMENT OF EROSION/SEDIMENTATION CONTROLS SHALL BE IN ACCORDANCE WITH
THE APPROVED EROSION/SEDIMENTATION CONTROL PLAN.
TEMPORARY EROSION/SEDIMENTATION CONTROL NOTES
AND TREE/NATURAL AREA PROTECTION MEASURES
SPRINGS HILL SUD SEGUIN ISD
TRANSMISSION LINE
TREE PROTECTION
FIBER OPTIC CONDUIT
FIBER OPTIC STRUCTURE
GAS ENCLOSURE
MONUMENT REMOVAL
LE
C H
EC
KE
D B
Y:
SC
AL
E:
D R
AW
N
B Y:
D
AT
E R
EV
IS
IO
N
S D
ES
C
R
IP
TI
O
N C
H K'
D
BY
R
EV
D
AT
E:
PR
. N O
D
ES
IG
N
ED
B
Y:
w w w .tr ih yd ro .c om
N ew
B ra un fe ls
In de pe nd en ce D riv e, S ui te
N ew B ra un fe ls
, T ex as
(P ) 8
/6
.3
(F ) 8
/6
.3
Te xa s Su rv ey
F irm
Te xa s
En gi ne er in g
Fi rm
F -1
Au st in
W
H ig hw ay
, S ui te
Au st in
, T ex as
(P ) 5
/4
.3
(F ) 5
/4
.7
G
EN
ER
A
L C
O N
ST
R
U C
TI
O
N A
N D
S
IT
E N
O
TE
S
IH
-1
A
N D
F M
W A
TE
R
L
IN
E
EX
TE
N
SI
O
N
SE
G U
IN
E
C O
N O
M
IC
D
EV
EL
O
PM
EN
T C
O R
PO
R
A
TI
O N
SE
G
U
IN
, T
EX
A S
G
-P
1W L_
SW
PP
P_ N
O
TE
S
N O
N E
6/
/2
5H C
JD
M
SHEET
H C
G -0
-0
PROJECT LOCATION NOTES
1. BEGIN PROJECT:
LATITUDE: 29° 34' 41.58" N
LONGITUDE: 97° 59' 05.06" W
END PROJECT:
LATITUDE: 29° 34' 10.22" N
LONGITUDE: 98° 00' 03.74" W
HORIZONTAL CONTROL POINTS
C.P.(MAGNAIL) NO. 1
NORTHING: 1375049.08
EASTING: 2291180.37
ELEV: 540.58'
C.P.(MAGNAIL) NO. 3
NORTHING: 13758313.92
EASTING: 2289935.86
ELEV: 543.51'
C.P.(REBAR) NO. 4
NORTHING: 13757358.99
EASTING: 2288466.37
ELEV: 540.12'
C.P.(MAGNAIL) NO. 5
NORTHING: 13756884.49
EASTING: 2287750.58
ELEV: 534.93'
C.P.(MAGNAIL) NO. 6
NORTHING: 13756516.87
EASTING: 2287248.0316
ELEV: 533.18'
C.P.(MAGNAIL) NO. 7
NORTHING: 13757959.46
EASTING: 2289542.55
ELEV: 544.56'
NAD83 TEXAS STATE PLANE COORDINATE SYSTEM, SOUTH CENTRAL ZONE WAS USED
FOR THIS PROJECT.
C.P.(MAGNAIL) NO. 2
NORTHING: 13758714.84
EASTING: 2290532.90
ELEV: 543.94'
6/
/2
IS
SU
E
FO
R B
ID
SC
H C
1. A STAGING AREA FOR THIS PROJECT IS NOT PROVIDED BY THE OWNER. IT IS THE
RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN AND MAINTAIN ANY STAGING AREAS
FOR THE PROJECT.
2. ALL EXISTING DRAINS OR INLET STRUCTURES SHALL BE PROTECTED FROM DAMAGES.
ANY DAMAGES SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE.
3. THE EARTH BEARING SURFACE SHALL BE UNDISTURBED MATERIAL. IF THIS IS NOT
POSSIBLE, THE FILL BETWEEN THE BEARING SURFACE AND THE UNDISTURBED SOIL MUST
BE COMPACTED TO A MINIMUM OF 95% STANDARD PROCTOR DENSITY.
4. NO WATER JETTING IS ALLOWED UNDER PAVEMENT. COMPACTION OF THE UTILITY
TRENCH IS TO BE 95% STANDARD PROCTOR DENSITY, MOISTURE SHALL BE ± 2% OF THE
CORRESPONDING PROCTOR, AND SOIL SHALL BE HYDROTAMPED IN 1 FOOT LIFTS. SOIL
WILL ALSO BE PROOF ROLLED PRIOR TO INSPECTION AND APPROVAL OF THE UTILITY.
5. BORE PIT SIZING SHALL BE DETERMINED BY THE CONTRACTOR BASED ON CASING DEPTH
AND SOIL CONDITIONS.
6. NO BLASTING ALLOWED.
7. FOR AN ELECTRICAL LINE LOCATED CLOSE TO THE PROJECT, ATTENTION IS DIRECTED TO
THE STATE LAW (VERNON'S ANNOTATED TEXAS STATUES, ARTICLE 1436 (C), CONCERNING
OPERATIONS IN THE VICINITY OF ELECTRICAL LINES AND THE NEED FOR EFFECTIVE
PRECAUTIONARY MEASURES.
8. DUE TO FEDERAL REGULATIONS TITLE 49, PART 192.181, THE LOCAL GAS COMPANY MUST
MAINTAIN ACCESS TO GAS VALVES AT ALL TIMES. THE CONTRACTOR MUST PROTECT AND
WORK AROUND ANY GAS VALVES THAT ARE IN THE PROJECT AREA.
9. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REMOVE EROSION CONTROLS AND
REVEGETATE ALL DISTURBED AREAS. ALL AREAS EXPOSED DURING CONSTRUCTION
SHALL BE REVEGETATED AS DIRECTED BY THE ENGINEER. REVEGETATION OF ALL
EXPOSED AREAS SHALL CONSIST OF HYDROSEEDING OR SOD. ACCEPTABLE
REVEGETATION SHALL CONSIST OF A MINIMUM OF 1.5 INCHES OF GROWTH OVER 95% OF
DISTURBED AREAS. ANY VEGETATION OUTSIDE OF THE LIMITS OF CONSTRUCTION SHALL
REMAIN UNDISTURBED
10. AFTER SUBSTANTIAL COMPLETION IS AWARDED, IT IS THE RESPONSIBILITY OF THE
CONTRACTOR TO WARRANTY ALL MATERIALS AND WORKMANSHIP FOR A MINIMUM
PERIOD OF 2 YEARS.
11. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REPAIR AT THEIR OWN EXPENSE ANY
EXISTING FENCES, CONCRETE ISLANDS, PAVEMENT, CURBS, DRIVEWAYS, STRUCTURES,
FIRE HYDRANTS, VALVES OR ANY OTHER UTILITY RELATED DEVICES THAT ARE DAMAGED
OR REMOVED BEFORE FINAL APPROVAL OF CONSTRUCTION.
CONSTRUCTION PLAN GENERAL NOTES
1. CONTRACTOR MUST OBTAIN ALL NECESSARY PERMITS PRIOR TO BEGINNING CONSTRUCTION.
2. CLEAR RIGHT-OF-WAY, PROTECT FENCING AND GATES, AND LOCATE ALL EXISTING UTILITIES.
3. INSTALL EROSION/SEDIMENTATION CONTROLS AND TEMPORARY FENCING AS REQUIRED. THE
CONTRACTOR IS RESPONSIBLE FOR PROTECTION OF PETS AND LIVESTOCK. COORDINATION
WITH ALL PROPERTY OWNERS IS REQUIRED.
4. INSTALL TRAFFIC CONTROL AND PEDESTRIAN ALTERNATE PATHWAYS WHERE NECESSARY.
5. LOCATE EXISTING UTILITIES.
6. COMPLETE REQUIRED CONSTRUCTION STAKING FOR THE PROJECT TO INCLUDE EASEMENTS,
CENTER LINE OF PIPES, VALVES, APPURTENANCES, AND AS NECESSARY FOR OTHER
IMPROVEMENTS AS SHOWN IN THE PLANS.
7. CONSTRUCT INFRASTRUCTURE AND IMPROVEMENTS AS SHOWN IN THE PLANS.
8. RESTORE WORK AREA TO EXISTING GRADES, REPAIR FENCING, REPAIR/REPLACE DRIVEWAYS, REVEGETATE DISTURBED AREAS TO A 95% MINIMUM, AND COMPLETE ALL INCIDENTAL WORK.
9. REMOVE TEMPORARY EROSION/SEDIMENTATION CONTROLS.
SEQUENCE OF CONSTRUCTION
1. LIMITS OF TEMPORARY STAGING, STORAGE AND SPOIL AREAS SHALL BE LOCATED WITHIN
APPROVED SITES ALONG THE CONSTRUCTION. THE LOCATION OF THESE SITES SHALL MOVE
PERIODICALLY IN ORDER TO FOLLOW THE CONSTRUCTION ROUTE. EROSION/SEDIMENTATION
CONTROL MEASURES SHALL BE IN PLACE AT EACH SITE. EACH SITE IS SUBJECT TO APPROVAL
BY THE ENGINEER OR OWNER'S REPRESENTATIVE.
2. VEHICLES UTILIZED FOR CONSTRUCTION SHALL BE INSPECTED FOR TRACKING CONTROL. IF
NECESSARY WHEELS SHALL BE MANUALLY SCRAPED OR WASHED (IF WATER IS AVAILABLE)
BEFORE DRIVING ON ANY ROADWAY.
3. CONTRACTOR SHALL PREVENT BLOWING AND MOVEMENT OF DUST FROM EXPOSED SOIL
SURFACES TO REDUCE ON AND OFF-SITE HEALTH HAZARDS.
4. FIELD REVISIONS TO THE EROSION/SEDIMENTATION CONTROL PLAN MAY BE REQUIRED BY THE
ENGINEER OR THE OWNER'S REPRESENTATIVE DURING THE COURSE OF CONSTRUCTION TO
CORRECT CONTROL INADEQUACIES.
5. NO MORE THAN 2,000 FEET OF CONSTRUCTION ZONE SHALL BE OPEN AT ANY ONE TIME WITH
CLEAN-UP AND RESTORATION WORK OCCURRING BEFORE PROCEEDING TO THE NEXT SECTION.
THE CONTRACTOR IS REQUIRED TO RESTORE ALL DISTURBED AREAS AS WORK PROGRESSES.
6. A PRE-CONSTRUCTION MEETING SHALL BE HELD BEFORE CONSTRUCTION BEGINS.
7. CONTRACTOR SHALL LOCATE ROCK BERMS DOWN STREAM OF ALL WATERWAY CROSSINGS.
8. ALL AREAS WITHIN THE PUBLIC RIGHT-OF-WAY EXPOSED DURING CONSTRUCTION SHALL BE
REVEGETATED AS DIRECTED BY THE ENGINEER. REVEGETATION OF ALL EXPOSED AREAS
SHALL CONSIST OF SODDING, SEEDING OR HYDROSEEDING, AT CONTRACTOR'S OPTION.
9. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING CLEARANCES REQUIRED BY THE
NATIONAL ELECTRICAL SAFETY CODE, OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION
(OSHA) REGULATIONS AND TEXAS STATE LAW (VERNON'S ANNOTATED TEXAS STATUES,
ARTICLE 1436 (c)) PERTAINING TO CLEARANCES WHEN WORKING IN CLOSE PROXIMITY TO
OVERHEAD ELECTRICAL LINES AND EQUIPMENT. ALL COST INCURRED BECAUSE OF FAILING TO
COMPLY WITH THE REQUIRED CLEARANCES WILL BE CHARGED TO THE CONTRACTOR.
10. ANY EXISTING PAVEMENT, CURBS, SIDEWALKS, OR DRAINAGE STRUCTURES WITHIN PUBLIC
RIGHT-OF-WAY WHICH ARE DAMAGED, REMOVED, OR SILTED, WILL BE REPAIRED BY THE
CONTRACTOR AT THEIR EXPENSE BEFORE APPROVAL OF THE CONSTRUCTION.
11. THE CONTRACTOR WILL BE RESPONSIBLE FOR THE MAINTENANCE OF EACH
EROSION/SEDIMENTATION CONTROL DEVICES/SCHEME BEING USED ON THE PROJECT, AND
PROVIDE ADDITIONAL SILT FENCE FOR ANY OFF-SITE DISCHARGES OF SILTED WATER FROM
EXCAVATIONS.
12. ROAD DITCH SHALL BE GRADED EVENLY BETWEEN EXISTING CULVERTS. ALL CULVERTS SHALL
BE CLEAN AND FREE OF DEBRIS DURING AND AFTER CONSTRUCTION.
13. EXISTING VALVES AND METERS SHALL BE ADJUSTED TO PROPOSED GRADE ACCORDING TO
CONSTRUCTION SPECIFICATIONS OF THE PROJECT MANUAL.
14. ALL AREAS WHERE PROPOSED WATER LINE IS TO BE CONSTRUCTED WITHIN 10 FEET OF EDGE
OF PAVEMENT SHALL BE BACKFILLED WITH FLOWABLE FILL.
15. ANY DAMAGE TO EXISTING CONCRETE STRUCTURES MUST BE REPAIRED ACCORDING TO
CONSTRUCTION SPECIFICATIONS OF THE PROJECT MANUAL.
16. CONTRACTOR IS RESPONSIBLE FOR CLEANING UP AND PROPERLY DISPOSING ALL SPILLED
POLLUTANTS, INCLUDING OIL, PAINT, FUELS, ANTIFREEZE, SOLVENTS, ETC. CONTRACTOR
SHALL KEEP ACCURATE RECORDS (SUCH AS RECEIPTS, COPIES OF ANALYTICAL RESULTS, ETC.)
INDICATING PROPER DISPOSAL OF SPILLED MATERIALS. FURTHERMORE, CONTRACTOR IS
RESPONSIBLE FOR ENSURING THAT ALL DISCHARGES FROM THE CONSTRUCTION AREA ARE IN
COMPLIANCE WITH ALL APPLICABLE REGULATIONS. NO SUBSTANCE SHALL BE DUMPED OR
LEAKED ONTO THE GROUND OR ALLOWED TO RUNOFF FROM THE CONSTRUCTION SITE THAT
MIGHT CAUSE POLLUTION.
17. EQUIPMENT SHALL BE CLEANED IN A MANNER THAT DOES NOT CREATE ANY DISCHARGE OF
CLEANING AGENTS, PAINT, OIL OR OTHER POLLUTANTS TO A STORM SEWER OR WATERWAY.
1. IN CASE OF DISCREPANCY BETWEEN THE DRAWINGS AND THE TECHNICAL SPECIFICATIONS,
THE MOST STRINGENT DATA IN THE OPINION OF THE ENGINEER SHALL GOVERN. THE MATTER
SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER IMMEDIATELY.
2. THE CONTRACTOR SHALL COMPLY WITH PERMIT REQUIREMENTS OF THE CITY OF SEGUIN,
GUADALUPE COUNTY, STATE, FEDERAL AND OTHER UTILITY COMPANIES AS REQUIRED.
TXDOT GENERAL NOTES
CITY OF SEGUIN CONSTRUCTION NOTES
3. THE FOLLOWING IS A LIST OF THE LOCAL UTILITY COMPANIES THAT SHOULD BE CONTACTED
PRIOR TO CONSTRUCTION:
TEXAS 811……………………………………………………………………................800-344-8377
CITY OF SEGUIN EMERGENCY AND AFTER HOURS DISPATCH…………......830-401-2404
GUADALUPE VALLEY ELECTRIC COOPERATIVE………………........................ 800-223-4832
CENTER POINT ENERGY…………………………………………………................. 800-427-7142
AT&T……………………………………………………………………………...............855-497-3206
SPECTRUM……………………………………………………………………...............866-866-7509
SPRINGS HILL SPECIAL UTILITY DISTRICT.........………………………………...830-379-7683
GATEWAY ENERGY, MIKE HODGES...................................................................713-600-1044
4. THE UTILITY COMPANIES, PROPERTY OWNERS ADJACENT TO THE AREA AFFECTED, AND
OWNER SHALL BE NOTIFIED 72 HOURS PRIOR TO COMMENCING WORK AND 48 HOURS PRIOR
TO ANY UTILITY SHUTOFF.
5. THE LOCATIONS AND DEPTHS OF ALL EXISTING UTILITIES SHOWN ARE APPROXIMATE. THE
ACTUAL LOCATIONS AND DEPTHS MUST BE FIELD VERIFIED BY THE CONTRACTOR PRIOR TO
CONSTRUCTION. THE CONTRACTOR IS FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES
WHICH MIGHT OCCUR BY THE CONTRACTOR'S FAILURE TO LOCATE AND PRESERVE ANY
UNDERGROUND UTILITIES THAT MAY OR MAY NOT BE SHOWN ON THE PLANS. FINDINGS SHALL
BE DOCUMENTED BY THE CONTRACTOR IN RECORD DRAWINGS. THE CONTRACTOR SHALL
NOTIFY THE ENGINEER OF ANY CONFLICTS WITH THE PROPOSED WORK.
6. ENGINEER TO PROVIDE CONTRACTOR WITH COMPUTER AIDED DRAFTING FILE. IT IS THE
RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE ALL CONSTRUCTION STAKING.
7. WORK AREA SHALL BE LIMITED TO EASEMENT SHOWN OR EXISTING CITY RIGHT-OF-WAY. THE
CONTRACTOR SHALL GIVE 48 HOURS NOTICE TO HOMEOWNERS AND TO THE OWNER PRIOR
TO DISCONNECTING ANY SERVICES. SERVICE OUTAGE WILL BE LIMITED TO THE PERIOD OF
9:00 A.M. TO 4:00 P.M. MONDAY THROUGH THURSDAY. THE OWNER SHALL OPERATE ALL MAIN
VALVES.
8. THE CONTRACTOR SHALL REQUEST APPROVAL FROM THE OWNER FOR TIE-INS A MINIMUM OF
48-HOUR IN ADVANCE.
9. THE OWNER'S STAFF OR AUTHORIZED REPRESENTATIVE SHALL BE PRESENT DURING ALL
SAMPLING, TESTING, OR TIE-INS BY THE CONTRACTOR.
10. PROPERTY OWNERS SHALL BE NOTIFIED 48 HOURS PRIOR TO EXCAVATION THROUGH THEIR
PROPERTY, OPENING ANY FENCE GATES, REMOVAL OF FENCES, OR ANY LANDSCAPE
STRUCTURES.
11. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN ACCESS TO RESIDENTS, BUSINESSES, AND
OWNER'S REPRESENTATIVES. CONTRACTOR SHALL MAINTAIN ONE-HALF OF STREET OPEN TO
TRAFFIC AT ALL TIMES AND PROVIDE STEEL PLATE TRAFFIC COVERS OVER THE TRENCH AT
STREETS AND DRIVEWAYS AS REQUIRED.
12. THE CONTRACTOR SHALL MAINTAIN ACCESS FOR THE U.S. POSTAL SERVICE CARRIERS. ANY
DAMAGES INCURRED TO MAILBOXES SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE
AND SHALL BE RESTORED TO THEIR ORIGINAL OR IMPROVED CONDITION.
13. POWER POLES ADJACENT TO THE PROPOSED TRENCH SHALL BE SHORED OR SUPPORTED AT
THE CONTRACTORS EXPENSE. THE METHOD OF SUPPORT MUST BE APPROVED BY THE
APPROPRIATE UTILITY COMPANY. REPAIR OF ANY DAMAGES INCURRED SHALL BE AT THE
CONTRACTOR'S EXPENSE AND RESTORED TO THE ORIGINAL OR IMPROVED CONDITION.
14. THE CITY OF ITS AUTHORIZED REPRESENTATIVE WILL INSPECT AND APPROVE SAND BEDDING
BEFORE PIPE IS LAID AND INITIAL SAND BACKFILL BEFORE REMAINING BACKFILL IS INSTALLED.
15. PNEUMATIC TAMPING DEVICES ARE NOT ALLOWED.
16. UNACCEPTABLE MATERIAL SHALL BE DEFINED AS COHESIONLESS MATERIALS AND\OR LAYING
CONDITIONS ENCOUNTERED ANY TIME DURING EXCAVATION, TRENCHING OR BACKFILLING.
SUCH MATERIAL INCLUDES BUT ARE NOT LIMITED TO ANY SHARP ABRASIVE OBJECT, WATER,
SILT, MUCK, TRASH, DEBRIS, ROCK IN LEDGE, OR COARSE GRAVEL WITH PARTICLE SIZE
LARGER THAN 1-3/4" INCH DIAMETER. ANY SUCH MATERIAL SHALL BE REMOVED FROM THE
TRENCH AND THE JOBSITE.
17. CONTRACTOR MUST PROVIDE 24 HOURS NOTICE TO THE ENGINEER PRIOR TO BACKFILLING.
18. IF FAULTS, CAVERNS, OR SUBSIDENCE ARE DISCOVERED DURING CONSTRUCTION,
CONSTRUCTION SHALL BE HALTED TO ALLOW THE FEATURES TO BE INSPECTED BY THE
DESIGN ENGINEER OR GEOLOGICAL /GEOTECHNICAL PROFESSIONAL.
19. THE CONTRACTOR SHALL PROVIDE AS-BUILT INFORMATION AS SPECIFIED BY THE TECHNICAL
SPECIFICATIONS.
20. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING PROPERLY SIZED PIPE AND REPAIR
PARTS FOR THE REPAIR OF EXISTING WATER LINES THAT ARE EXPOSED AND EXCAVATED.
21. THE CONTRACTOR SHALL MAINTAIN 48 INCHES OF MINIMUM COVER THROUGHOUT ALL
DITCHES AND 42 INCHES OF MINIMUM COVER IN ALL OTHER AREAS UNLESS OTHERWISE
SPECIFIED ON THE PLANS.
22. FIRE HYDRANT INSTALLATION SHALL USE BREAK AWAY BOLTS (SHOE TYPE) THAT ARE SPACED
PROPERLY AND PLACED WITHIN EXTENSIONS, AS NEEDED, TO ACCOMMODATE THE FIRE
HYDRANTS. USE "CLASS A" CONCRETE BLOCKING WITH A MINIMUM 1 1/2 FT. SQUARED (0.15 M
SQUARED) BEARING AREA, BEING CAREFUL TO NOT BLOCK DRAIN HOLES.
23. HYDRANTS SHALL HAVE NO MORE THAN ONE 6-INCH EXTENSION
24. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO INSTALL ADEQUATE THRUST BLOCKING
AND JOINTS RESTRAINTS THAT MEETS THE OWNER'S REQUIREMENTS OR IN ACCORDANCE
WITH THE CONSTRUCTION PLANS
1. CONTRACTOR RESPONSIBLE FOR SUBMITTING A TRAFFIC CONTROL PLAN, PREPARED BY A
REGISTERED PROFESSIONAL ENGINEER, TO THE ENGINEER FOR APPROVAL 14 WORKING DAYS
PRIOR TO COMMENCING WORK. PLAN SHOULD FOLLOW REQUIREMENTS OF TMUTCD, LATEST
EDITION.
2. TRAFFIC CONTROL IN TXDOT RIGHT-OF-WAY SHALL CONFORM TO THE 2011 TEXAS MANUAL ON
UNIFORM TRAFFIC CONTROL DEVICES (TMUTCD) - REVISION 2, PART 6 TEMPORARY TRAFFIC
CONTROL (REVISED).
3. THE CONTRACTOR WILL BE REQUIRED TO FURNISH BARRICADES, WARNING SIGNS, LIGHTS,
FLARES, FLAGS, FLAGMEN, ETC. WHERE NECESSARY AND AS DIRECTED BY THE ENGINEER,
PARTICULARLY IN THOSE AREAS OF IMMEDIATE WORK.
4. BATTERY FLASHERS SHALL BE USED AND NUMBER SHALL BE EQUAL OR GREATER THAN
INDICATED ON BARRICADING STANDARDS. WHEN A CLASS I BARRICADE PANEL OR CLASS II
BARRICADE IS USED, EACH SHOULD BE EQUIPPED WITH A MINIMUM OF TWO (2) LIGHTS. ALL
WARNING SIGNS NOT MOUNTED ON BARRICADES SHALL HAVE ONE (1) LIGHT.
5. BATTERY FLASHERS SHALL CONFORM TO PART V, SECTION D, LIGHTING DEVICES, TEXAS
MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS.
6. ALL TRENCHING AND CUT PAVEMENT SHALL BE RESTORED SUCH THAT LOCAL ACCESS MAY BE
RESUMED AS SOON AS POSSIBLE.
7. RESTRICT TOTAL LENGTH OF DISTRIBUTED MATERIALS ALONG THE ROUTE OF CONSTRUCTION
TO 1,000 LINEAR FEET UNLESS OTHERWISE APPROVED IN WRITING BY THE OWNER.
TRAFFIC NOTES
25. ALL FITTINGS TO BE MECHANICAL JOINT UNLESS OTHERWISE NOTED. ALL DUCTILE IRON PIPE
AND FITTINGS TO BE WRAPPED WITH 8 MIL. POLYETHYLENE WRAPPING. USE RUST
PREVENTATIVE MEASURES ON ALL THREADS. USE MEGALUG RESTRAINTS ON ALL DUCTILE
IRON PIPE CONNECTIONS AND FITTINGS.
26. ALL NECESSARY APPURTENANCES OR MATERIALS NEEDED TO CONDUCT HYDROSTATIC
TESTING SHALL BE FURNISHED BY THE CONTRACTOR.
27. ALL WATER MAINS SHALL BE INSTALLED AND PROVIDED WITH HYDROSTATIC TESTING TO 150
PSI OR 1.5X WORKING PRESSURE, WHICHEVER IS GREATER, FOR FOUR (4) HOURS.
MICROBIOLOGICAL SAMPLING AND DISINFECTION BY THE CONTRACTOR MUST BE COMPLETED
IN STRICT ACCORDANCE WITH THE (T.C.E.Q.), TEXAS COMMISSION ON ENVIRONMENTAL
QUALITY, "RULES AND REGULATIONS FOR PUBLIC WATER SYSTEM", AMERICAN WATER WORKS
ASSOCIATION STANDARDS (AWWA) OR THE LATEST REVISIONS. NOTIFY THE OWNER PRIOR TO
TESTING OR SAMPLING. CONTRACTOR TO FURNISH TEST RESULTS TO THE OWNER BEFORE
CONNECTING TO EXISTING MAIN.
28. CONTRACTOR TO PROVIDE FINAL MEASUREMENTS AND GIS DATA FOR ALL PIPE INSTALLATION
IN ACCORDANCE WITH TECHNICAL SPECIFICATION 01410 - GIS SUBMITTALS
7. ANY MAJOR VARIATION IN MATERIALS OR LOCATIONS OF CONTROLS OR FENCES FROM THOSE
SHOWN ON THE APPROVED PLANS WILL REQUIRE A REVISION AND MUST BE APPROVED BY THE
ENGINEER AND TCEQ, AS NECESSARY. MINOR CHANGES TO BE MADE AS FIELD REVISIONS TO
THE EROSION/SEDIMENTATION CONTROL PLAN MAY BE REQUIRED BY THE ENGINEER DURING
THE COURSE OF CONSTRUCTION TO CORRECT CONTROL INADEQUACIES.
8. THE CONTRACTOR IS REQUIRED TO INSPECT THE CONTROLS AND FENCES AT WEEKLY
INTERVALS AND AFTER SIGNIFICANT RAINFALL EVENTS TO ENSURE THAT THEY HAVE NOT BEEN
SUBSTANTIALLY DISTURBED AND ARE FUNCTIONING PROPERLY. THE CONTRACTOR IS
RESPONSIBLE FOR MAINTENANCE OF CONTROLS AND FENCES AND SHALL IMMEDIATELY MAKE
ANY NECESSARY REPAIRS TO DAMAGED AREAS. SILT ACCUMULATION AT CONTROLS MUST BE
REMOVED WHEN THE DEPTH REACHES SIX (6) INCHES.
9. PRIOR TO FINAL ACCEPTANCE, HAUL ROADS AND WATERWAY CROSSING CONSTRUCTED FOR
TEMPORARY CONTRACTOR ACCESS MUST BE REMOVED, ACCUMULATED SEDIMENT REMOVED
FROM THE WATERWAY, AND THE AREA RESTORED TO THE ORIGINAL GRADE AND
REVEGETATED. ALL LAND CLEARING DEBRIS SHALL BE DISPOSED OF IN APPROVED SPOIL
DISPOSAL SITES.
10. IF DISCOVERY IS MADE OF ANY CAVERNS, SOLUTION CHANNELS, OR VOIDS IN THE ROCK
SUBSTRATE THAT: 1) ARE ONE SQUARE FOOT IN TOTAL AREA, OR GREATER; 2) BLOWS AIR FROM
WITHIN THE SUBSTRATE; 3) CONSISTENTLY RECEIVES WATER DURING ANY RAIN EVENT; THAT
DISCOVERY WILL IMMEDIATELY BE REPORTED TO THE ENGINEER AND THE OWNER. A REQUEST
FOR APPROVAL OF A NEW CONSTRUCTION DESIGN FOR THE PIPE OR FOUNDATION WILL BE
SUBMITTED BY THE ENGINEER, WHEN THE STRUCTURAL INTEGRITY OF THE PIPE OR
FOUNDATION IS NOT SUFFICIENT TO BRIDGE THE GAP.
TEMPORARY EROSION/SEDIMENTATION CONTROL NOTES AND TREE/
NATURAL AREA PROTECTION MEASURES (CONT.) 18. ANY TRASH OR DEBRIS MUST BE CONTAINED ON SITE AND DISPOSED IN A MANNER TO PREVENT
WIND OR RAIN FROM CARRYING IT OFF-SITE INTO A STORM DRAIN OR WATERWAY.
19. ALL CONSTRUCTION OPERATIONS SHALL BE ACCOMPLISHED IN ACCORDANCE WITH ALL
APPLICABLE REGULATIONS OF THE UNITED STATES OCCUPATIONAL SAFETY AND HEALTH
ADMINISTRATION (OSHA), IN COMPLIANCE WITH TEXAS HOUSE BILLS 662 AND 665.
20. CONTRACTOR SHALL PROVIDE "AS-BUILT" WATER LINE PLANS BEFORE FINAL INSPECTION. THE
PLANS SHALL LIST MATERIAL MANUFACTURERS, LINE LENGTH FROM FITTING TO FITTING, AND
GIS/GPS LOCATION.
© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS
FI
LE
C H
EC
KE
D B
Y:
SC
AL
E:
D R
AW
N
B Y:
D
AT
E R
EV
IS
IO
N
S D
ES
C
R
IP
TI
O
N C
H K'
D
BY
R
EV
D
AT
E:
PR
. N O
D
ES
IG
N
ED
B
Y:
w w w .tr ih yd ro .c om
N ew
B ra un fe ls
In de pe nd en ce D riv e, S ui te
N ew B ra un fe ls
, T ex as
(P ) 8
/6
.3
(F ) 8
/6
.3
Te xa s Su rv ey
F irm
Te xa s
En gi ne er in g
Fi rm
F -1
Au st in
W
H ig hw ay
, S ui te
Au st in
, T ex as
(P ) 5
/4
.3
(F ) 5
/4
.7
0 300' 600'
PR
O
JE
C
T M
A P
IH
-1
A
N D
F M
W A
TE
R
L
IN
E
EX
TE
N
SI
O
N
SE
G U
IN
E
C O
N O
M
IC
D
EV
EL
O
PM
EN
T C
O R
PO
R
A
TI
O N
SE
G
U
IN
, T
EX
A S
G
-P
1W L_
O
VE
R
AL
LM
AP
1"
6/
/2
5H
C
JD
M
SHEET
H C
G -0
-0
ALT
6/
/2
IS
SU
E
FO
R B
ID
SC
H C
FI
LE
C H
EC
KE
D B
Y:
SC
AL
E:
D R
AW
N
B Y:
D
AT
E R
EV
IS
IO
N
S D
ES
C
R
IP
TI
O
N C
H K'
D
BY
R
EV
D
AT
E:
PR
. N O
D
ES
IG
N
ED
B
Y:
w w w .tr ih yd ro .c om
N ew
B ra un fe ls
In de pe nd en ce D riv e, S ui te
N ew B ra un fe ls
, T ex as
(P ) 8
/6
.3
(F ) 8
/6
.3
Te xa s Su rv ey
F irm
Te xa s
En gi ne er in g
Fi rm
F -1
Au st in
W
H ig hw ay
, S ui te
Au st in
, T ex as
(P ) 5
/4
.3
(F ) 5
/4
.7
IH
-1
A
N D
F M
W A
TE
R
L
IN
E
EX
TE
N
SI
O
N
SE
G U
IN
E
C O
N O
M
IC
D
EV
EL
O
PM
EN
T C
O R
PO
R
A
TI
O N
SE
G
U
IN
, T
EX
A S
PL
A
N A
N D
P R
O
FI
LE
S
TA
. 4
+3
TO
+0
G
-P
1W L_
PL
AN
&P R
O
FI
LE
AS
S
H O
W N
6/
/2
5H C
JD
M
SHEET
H C
G -0
-0
0 30' 60'
0 30' 60'
HORIZONTAL
0 6' 12'
VERTICAL
6/
/2
IS
SU
E
FO
R B
ID
JD
M H
C
NOTE:
FI
LE
C H
EC
KE
D B
Y:
SC
AL
E:
D R
AW
N
B Y:
D
AT
E R
EV
IS
IO
N
S D
ES
C
R
IP
TI
O
N C
H K'
D
BY
R
EV
D
AT
E:
PR
. N O
D
ES
IG
N
ED
B
Y:
w w w .tr ih yd ro .c om
N ew
B ra un fe ls
In de pe nd en ce D riv e, S ui te
N ew B ra un fe ls
, T ex as
(P ) 8
/6
.3
(F ) 8
/6
.3
Te xa s Su rv ey
F irm
Te xa s
En gi ne er in g
Fi rm
F -1
Au st in
W
H ig hw ay
, S ui te
Au st in
, T ex as
(P ) 5
/4
.3
(F ) 5
/4
.7
IH
-1
A
N D
F M
W A
TE
R
L
IN
E
EX
TE
N
SI
O
N
SE
G U
IN
E
C O
N O
M
IC
D
EV
EL
O
PM
EN
T C
O R
PO
R
A
TI
O N
SE
G
U
IN
, T
EX
A S
PL
A
N A
N D
P R
O
FI
LE
S
TA
. 7
+0
TO
5+
G
-P
1W L_
PL
AN
&P R
O
FI
LE
AS
S
H O
W N
6/
/2
5H C
JD
M
SHEET
H C
G -0
-0
0 30' 60'
0 30' 60'
HORIZONTAL
0 6' 12'
VERTICAL
6/
/2
IS
SU
E
FO
R B
ID
JD
M H
C
© 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS
FI
LE
C H
EC
KE
D B
Y:
SC
AL
E:
D R
AW
N
B Y:
D
AT
E R
EV
IS
IO
N
S D
ES
C
R
IP
TI
O
N C
H K'
D
BY
R
EV
D
AT
E:
PR
. N O
D
ES
IG
N
ED
B
Y:
w w w .tr ih yd ro .c om
N ew
B ra un fe ls
In de pe nd en ce D riv e, S ui te
N ew B ra un fe ls
, T ex as
(P ) 8
/6
.3
(F ) 8
/6
.3
Te xa s Su rv ey
F irm
Te xa s
En gi ne er in g
Fi rm
F -1
Au st in
W
H ig hw ay
, S ui te
Au st in
, T ex as
(P ) 5
/4
.3
(F ) 5
/4
.7
IH
-1
A
N D
F M
W A
TE
R
L
IN
E
EX
TE
N
SI
O
N
SE
G U
IN
E
C O
N O
M
IC
D
EV
EL
O
PM
EN
T C
O R
PO
R
A
TI
O N
SE
G
U
IN
, T
EX
A S
PL
A
N A
N D
P R
O
FI
LE
S
TA
. 1
5+
T O
1+
G
-P
1W L_
PL
AN
&P R
O
FI
LE
AS
S
H O
W N
6/
/2
5H C
JD
M
SHEET
H C
G -0
-0
0 30' 60'
0 30' 60'
HORIZONTAL
0 6' 12'
VERTICAL
6/
/2
IS
SU
E
FO
R B
ID
JD
M H
C
FI
LE
C H
EC
KE
D B
Y:
SC
AL
E:
D R
AW
N
B Y:
D
AT
E R
EV
IS
IO
N
S D
ES
C
R
IP
TI
O
N C
H K'
D
BY
R
EV
D
AT
E:
PR
. N O
D
ES
IG
N
ED
B
Y:
w w w .tr ih yd ro .c om
N ew
B ra un fe ls
In de pe nd en ce D riv e, S ui te
N ew B ra un fe ls
, T ex as
(P ) 8
/6
.3
(F ) 8
/6
.3
Te xa s Su rv ey
F irm
Te xa s
En gi ne er in g
Fi rm
F -1
Au st in
W
H ig hw ay
, S ui te
Au st in
, T ex as
(P ) 5
/4
.3
(F ) 5
/4
.7
IH
-1
A
N D
F M
W A
TE
R
L
IN
E
EX
TE
N
SI
O
N
SE
G U
IN
E
C O
N O
M
IC
D
EV
EL
O
PM
EN
T C
O R
PO
R
A
TI
O N
SE
G
U
IN
, T
EX
A S
PL
A
N A
N D
P R
O
FI
LE
S
TA
. 2
1+
T O
8+
G
-P
1W L_
PL
AN
&P R
O
FI
LE
AS
S
H O
W N
6/
/2
5H C
JD
M
SHEET
H C
G -0
-0
0 30' 60'
0 30' 60'
HORIZONTAL
0 6' 12'
VERTICAL
6/
/2
IS
SU
E
FO
R B
ID
SC
H C
REV:
FI
LE
C H
EC
KE
D B
Y:
SC
AL
E:
D R
AW
N
B Y:
D
AT
E R
EV
IS
IO
N
S D
ES
C
R
IP
TI
O
N C
H K'
D
BY
R
EV
D
AT
E:
PR
. N O
D
ES
IG
N
ED
B
Y:
w w w .tr ih yd ro .c om
N ew
B ra un fe ls
In de pe nd en ce D riv e, S ui te
N ew B ra un fe ls
, T ex as
(P ) 8
/6
.3
(F ) 8
/6
.3
Te xa s Su rv ey
F irm
Te xa s
En gi ne er in g
Fi rm
F -1
Au st in
W
H ig hw ay
, S ui te
Au st in
, T ex as
(P ) 5
/4
.3
(F ) 5
/4
.7
IH
-1
A
N D
F M
W A
TE
R
L
IN
E
EX
TE
N
SI
O
N
SE
G U
IN
E
C O
N O
M
IC
D
EV
EL
O
PM
EN
T C
O R
PO
R
A
TI
O N
SE
G
U
IN
, T
EX
A S
PL
A
N A
N D
P R
O
FI
LE
S
TA
. 2
8+
T O
5+
G
-P
1W L_
PL
AN
&P R
O
FI
LE
AS
S
H O
W N
6/
/2
5H C
JD
M
SHEET
H C
G -0
-0
0 30' 60'
0 30' 60'
HORIZONTAL
0 6' 12'
VERTICAL
NOTES:
6/
/2
IS
SU
E
FO
R B
ID
SC
H C
FI
LE
C H
EC
KE
D B
Y:
SC
AL
E:
D R
AW
N
B Y:
D
AT
E R
EV
IS
IO
N
S D
ES
C
R
IP
TI
O
N C
H K'
D
BY
R
EV
D
AT
E:
PR
. N O
D
ES
IG
N
ED
B
Y:
w w w .tr ih yd ro .c om
N ew
B ra un fe ls
In de pe nd en ce D riv e, S ui te
N ew B ra un fe ls
, T ex as
(P ) 8
/6
.3
(F ) 8
/6
.3
Te xa s Su rv ey
F irm
Te xa s
En gi ne er in g
Fi rm
F -1
Au st in
W
H ig hw ay
, S ui te
Au st in
, T ex as
(P ) 5
/4
.3
(F ) 5
/4
.7
IH
-1
A
N D
F M
W A
TE
R
L
IN
E
EX
TE
N
SI
O
N
SE
G U
IN
E
C O
N O
M
IC
D
EV
EL
O
PM
EN
T C
O R
PO
R
A
TI
O N
SE
G
U
IN
, T
EX
A S
PL
A
N A
N D
P R
O
FI
LE
S
TA
. 3
5+
T O
0+
G
-P
1W L_
PL
AN
&P R
O
FI
LE
AS
S
H O
W N
6/
/2
5H C
JD
M
SHEET
H C
G -0
-0
0 30' 60'
0 30' 60'
HORIZONTAL
0 6' 12'
VERTICAL
6/
/2
IS
SU
E
FO
R B
ID
SC
H C
NOTES:
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
FI
LE
C H
EC
KE
D B
Y:
SC
AL
E:
D R
AW
N
B Y:
D
AT
E R
EV
IS
IO
N
S D
ES
C
R
IP
TI
O
N C
H K'
D
BY
R
EV
D
AT
E:
PR
. N O
D
ES
IG
N
ED
B
Y:
w w w .tr ih yd ro .c om
N ew
B ra un fe ls
In de pe nd en ce D riv e, S ui te
N ew B ra un fe ls
, T ex as
(P ) 8
/6
.3
(F ) 8
/6
.3
Te xa s Su rv ey
F irm
Te xa s
En gi ne er in g
Fi rm
F -1
Au st in
W
H ig hw ay
, S ui te
Au st in
, T ex as
(P ) 5
/4
.3
(F ) 5
/4
.7
IH
-1
A
N D
F M
W A
TE
R
L
IN
E
EX
TE
N
SI
O
N
SE
G U
IN
E
C O
N O
M
IC
D
EV
EL
O
PM
EN
T C
O R
PO
R
A
TI
O N
SE
G
U
IN
, T
EX
A S
PL
A
N A
N D
P R
O
FI
LE
S
TA
. 4
0+
T O
7+
G
-P
1W L_
PL
AN
&P R
O
FI
LE
AS
S
H O
W N
6/
/2
5H C
JD
M
SHEET
H C
G -0
-0
0 30' 60'
0 30' 60'
HORIZONTAL
0 6' 12'
VERTICAL
6/
/2
IS
SU
E
FO
R B
ID
SC
H C
16 4
16 5
NOTES:
FI
LE
C H
EC
KE
D B
Y:
SC
AL
E:
D R
AW
N
B Y:
D
AT
E R
EV
IS
IO
N
S D
ES
C
R
IP
TI
O
N C
H K'
D
BY
R
EV
D
AT
E:
PR
. N O
D
ES
IG
N
ED
B
Y:
w w w .tr ih yd ro .c om
N ew
B ra un fe ls
In de pe nd en ce D riv e, S ui te
N ew B ra un fe ls
, T ex as
(P ) 8
/6
.3
(F ) 8
/6
.3
Te xa s Su rv ey
F irm
Te xa s
En gi ne er in g
Fi rm
F -1
Au st in
W
H ig hw ay
, S ui te
Au st in
, T ex as
(P ) 5
/4
.3
(F ) 5
/4
.7
IH
-1
A
N D
F M
W A
TE
R
L
IN
E
EX
TE
N
SI
O
N
SE
G U
IN
E
C O
N O
M
IC
D
EV
EL
O
PM
EN
T C
O R
PO
R
A
TI
O N
SE
G
U
IN
, T
EX
A S
PL
A
N A
N D
P R
O
FI
LE
S
TA
. 4
7+
T O
3+
G
-P
1W L_
PL
AN
&P R
O
FI
LE
AS
S
H O
W N
6/
/2
5H C
JD
M
SHEET
H C
G -0
-0
0 30' 60'
0 30' 60'
HORIZONTAL
0 6' 12'
VERTICAL
6/
/2
IS
SU
E
FO
R B
ID
SC
H C
NOTES:
2024 M icrosoft Corporation © 2024 M axar © CNES (2024) Distribution Airbus DS
© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS
© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS
REV:
FI
LE
C H
EC
KE
D B
Y:
SC
AL
E:
D R
AW
N
B Y:
D
AT
E R
EV
IS
IO
N
S D
ES
C
R
IP
TI
O
N C
H K'
D
BY
R
EV
D
AT
E:
PR
. N O
D
ES
IG
N
ED
B
Y:
w w w .tr ih yd ro .c om
N ew
B ra un fe ls
In de pe nd en ce D riv e, S ui te
N ew B ra un fe ls
, T ex as
(P ) 8
/6
.3
(F ) 8
/6
.3
Te xa s Su rv ey
F irm
Te xa s
En gi ne er in g
Fi rm
F -1
Au st in
W
H ig hw ay
, S ui te
Au st in
, T ex as
(P ) 5
/4
.3
(F ) 5
/4
.7
IH
-1
A
N D
F M
W A
TE
R
L
IN
E
EX
TE
N
SI
O
N
SE
G U
IN
E
C O
N O
M
IC
D
EV
EL
O
PM
EN
T C
O R
PO
R
A
TI
O N
SE
G
U
IN
, T
EX
A S
PL
A
N A
N D
P R
O
FI
LE
S
TA
. 5
3+
T O
0+
G
-P
1W L_
PL
AN
&P R
O
FI
LE
AS
S
H O
W N
6/
/2
5H C
JD
M
SHEET
H C
G -0
-0
0 30' 60'
0 30' 60'
HORIZONTAL
0 6' 12'
VERTICAL
6/
/2
IS
SU
E
FO
R B
ID
SC
H C
FI
LE
C H
EC
KE
D B
Y:
SC
AL
E:
D R
AW
N
B Y:
D
AT
E R
EV
IS
IO
N
S D
ES
C
R
IP
TI
O
N C
H K'
D
BY
R
EV
D
AT
E:
PR
. N O
D
ES
IG
N
ED
B
Y:
w w w .tr ih yd ro .c om
N ew
B ra un fe ls
In de pe nd en ce D riv e, S ui te
N ew B ra un fe ls
, T ex as
(P ) 8
/6
.3
(F ) 8
/6
.3
Te xa s Su rv ey
F irm
Te xa s
En gi ne er in g
Fi rm
F -1
Au st in
W
H ig hw ay
, S ui te
Au st in
, T ex as
(P ) 5
/4
.3
(F ) 5
/4
.7
IH
-1
A
N D
F M
W A
TE
R
L
IN
E
EX
TE
N
SI
O
N
SE
G U
IN
E
C O
N O
M
IC
D
EV
EL
O
PM
EN
T C
O R
PO
R
A
TI
O N
SE
G
U
IN
, T
EX
A S
PL
A
N A
N D
P R
O
FI
LE
S
TA
. 6
0+
T O
5+
G
-P
1W L_
PL
AN
&P R
O
FI
LE
AS
S
H O
W N
6/
/2
5H C
JD
M
SHEET
H C
G -0
-0
0 30' 60'
0 30' 60'
HORIZONTAL
0 6' 12'
VERTICAL
6/
/2
IS
SU
E
FO
R B
ID
SC
H C
FI
LE
C H
EC
KE
D B
Y:
SC
AL
E:
D R
AW
N
B Y:
D
AT
E R
EV
IS
IO
N
S D
ES
C
R
IP
TI
O
N C
H K'
D
BY
R
EV
D
AT
E:
PR
. N O
D
ES
IG
N
ED
B
Y:
w w w .tr ih yd ro .c om
N ew
B ra un fe ls
In de pe nd en ce D riv e, S ui te
N ew B ra un fe ls
, T ex as
(P ) 8
/6
.3
(F ) 8
/6
.3
Te xa s Su rv ey
F irm
Te xa s
En gi ne er in g
Fi rm
F -1
Au st in
W
H ig hw ay
, S ui te
Au st in
, T ex as
(P ) 5
/4
.3
(F ) 5
/4
.7
IH
-1
A
N D
F M
W A
TE
R
L
IN
E
EX
TE
N
SI
O
N
SE
G U
IN
E
C O
N O
M
IC
D
EV
EL
O
PM
EN
T C
O R
PO
R
A
TI
O N
SE
G
U
IN
, T
EX
A S
PL
A
N A
N D
P R
O
FI
LE
S
TA
. 6
5+
T O
9+
G
-P
1W L_
PL
AN
&P R
O
FI
LE
AS
S
H O
W N
6/
/2
5H C
JD
M
SHEET
H C
G -0
-0
0 30' 60'
0 30' 60'
HORIZONTAL
0 6' 12'
VERTICAL
6/
/2
IS
SU
E
FO
R B
ID
SC
H C
CONTRACTOR TO FILL ANNULAR SPACE
CREATED BY BORING OPERATION WITH
NON-SHRINK GROUT
REV:
FI
LE
C H
EC
KE
D B
Y:
SC
AL
E:
D R
AW
N
B Y:
D
AT
E R
EV
IS
IO
N
S D
ES
C
R
IP
TI
O
N C
H K'
D
BY
R
EV
D
AT
E:
PR
. N O
D
ES
IG
N
ED
B
Y:
w w w .tr ih yd ro .c om
N ew
B ra un fe ls
In de pe nd en ce D riv e, S ui te
N ew B ra un fe ls
, T ex as
(P ) 8
/6
.3
(F ) 8
/6
.3
Te xa s Su rv ey
F irm
Te xa s
En gi ne er in g
Fi rm
F -1
Au st in
W
H ig hw ay
, S ui te
Au st in
, T ex as
(P ) 5
/4
.3
(F ) 5
/4
.7
W A
TE
R
D
ET
A
IL
S (1
O F
2)
IH
-1
A
N D
F M
W A
TE
R
L
IN
E
EX
TE
N
SI
O
N
SE
G U
IN
E
C O
N O
M
IC
D
EV
EL
O
PM
EN
T C
O R
PO
R
A
TI
O N
SE
G
U
IN
, T
EX
A S
G
-P
1W L_
D
ET
AI
LS
AS
S
H O
W N
6/
/2
5H C
JD
M
SHEET
H C
G -0
-0
1 EXISTING UTILITY OFFSET DETAIL
SCALE: NONE 2 WATER BACKFILL DETAIL
SCALE: NONE 3 THRUST BLOCK DETAILS
SCALE: NONE 4 STANDARD VALVE INSTALLATION
SCALE: NONE
5 FIRE HYDRANT ASSEMBLY
SCALE: NONE 6 STREET TRENCH FLOWABLE FILL
SCALE: NONE
7 CONCRETE SIDEWALK SECTION
SCALE: NONE 8 INSTALLATION OF PIPE IN BORE
SCALE: NONE
6/
/2
IS
SU
E
FO
R B
ID
JD
M H
C
PIPE SIZE
(INCHES)
BEND ANGLE
(DEG)
RESTRAINED LENGTH
IN FEET, WHEN TEST
PRESSURE = 200 PSI
RESTRAINED LENGTH
IN FEET, WHEN TEST
PRESSURE = 150 PSI
6 90 23 17 6 45 9 7 6 22.5 5 3 6 11.25 2 2 8 90 30 22 8 45 12 9 8 22.5 6 4 8 11.25 3 2
12 90 43 32 12 45 18 13 12 22.5 8 6 12 11.25 4 3 16 90 63 47 16 45 26 20 16 22.5 13 10 16 11.25 7 5 24 90 85 64 24 45 35 27 24 22.5 17 13 24 11.25 9 7
RESTRAINED LENGTH FOR BENDS
NOTES:
PIPE SIZE
(INCHES)
SMALL SIZE
(INCHES)
RESTRAINED
LENGTH IN FEET,
WHEN TEST
PRESSURE = 200 PSI
RESTRAINED
LENGTH IN FEET,
WHEN TEST
PRESSURE = 150 PSI
6 4 30 23 8 4 55 42 8 6 32 24
12 4 95 71 12 6 80 60 12 8 58 43 16 4 131 98 16 6 120 90 16 8 104 78 16 12 60 45 24 16 110 83
RESTRAINED LENGTH FOR REDUCERS
NOTES:
PIPE SIZE
(INCHES)
RESTRAINED
LENGTH IN FEET,
WHEN TEST
PRESSURE = 200 PSI
RESTRAINED
LENGTH IN FEET,
WHEN TEST
PRESSURE = 150 PSI
4 42 32 6 59 44 8 77 58
12 109 82 16 142 106 24 202 151
NOTES:
RESTRAINED LENGTH FOR DEAD
ENDS/INLINE VALVES
PIPE SIZE
(INCHES)
BRANCH
SIZE
(INCHES)
LENGTH OF
RUN (FEET)
RESTRAINED
LENGTH IN FEET,
WHEN TEST
PRESSURE = 200 PSI
RESTRAINED
LENGTH IN FEET,
WHEN TEST
PRESSURE = 150 PSI
6 4 0 42 31 6 4 5 7 1 6 4 10 1 1 6 6 0 59 44 6 6 5 35 20 6 6 10 11 1 8 4 0 42 31 8 4 5 1 1 8 6 0 59 44 8 6 5 28 13 8 6 10 1 1 8 8 0 77 58 8 8 5 53 34 8 8 10 30 11 8 8 15 6 1
12 4 0 42 31 12 4 5 1 1 12 6 0 59 44 12 6 5 13 1 12 6 10 1 1 12 8 0 77 58 12 8 5 42 23 12 8 10 7 1 12 8 15 1 1 12 12 0 109 82 12 12 5 86 59 12 12 10 63 35 12 12 15 39 12 16 4 0 42 32 16 4 5 1 1 16 6 0 59 44 16 6 5 1 1 16 8 0 78 58 16 8 5 39 20 16 8 10 1 1 16 12 0 110 83 16 12 5 84 57 16 12 10 59 31 16 12 15 33 6 16 12 20 7 1 16 16 0 142 106 16 16 5 123 87 16 16 10 104 68 16 16 15 85 49 16 16 20 65 30 24 24 5 169 119 24 24 10 136 86 24 24 15 103 53 24 24 20 70 20
RESTRAINED LENGTH FOR TEES
NOTES:
1. RESTRAINED LENGTH CALCULATIONS FOR
PVC PIPE BEDDED IN COMPACTED
GRANULAR MATERIAL EXTENDING TO THE
TOP OF THE PIPE. NATIVE SOIL MATERIAL
IS ASSUMED TO BE INORGANIC CLAY OF
HIGH PLASTICITY. DEPTH OF BURY IS
ASSUMED TO BE 4 FEET.
2. THESE CALCULATIONS ARE PROVIDED
FOR REFERENCE. THE RESTRAINED
LENGTH SHALL BE DESIGNED BASED
UPON THE CONDITIONS ENCOUNTERED
DURING INSTALLATION.
3. ALL JOINTS WITHIN THE RESTRAINED
LENGTH SHALL BE RESTRAINED.
NOTES:
1. BACKFILL ALL EXTERIOR
METAL SURFACES IN SILICA
SAND
2. ALL REINFORCING BARS IN
THE REACTION BLOCK SHALL
BE NO. 4
PLAN VIEW
SECTION VIEW (A-A)
REV:
FI
LE
C H
EC
KE
D B
Y:
SC
AL
E:
D R
AW
N
B Y:
D
AT
E R
EV
IS
IO
N
S D
ES
C
R
IP
TI
O
N C
H K'
D
BY
R
EV
D
AT
E:
PR
. N O
D
ES
IG
N
ED
B
Y:
w w w .tr ih yd ro .c om
N ew
B ra un fe ls
In de pe nd en ce D riv e, S ui te
N ew B ra un fe ls
, T ex as
(P ) 8
/6
.3
(F ) 8
/6
.3
Te xa s Su rv ey
F irm
Te xa s
En gi ne er in g
Fi rm
F -1
Au st in
W
H ig hw ay
, S ui te
Au st in
, T ex as
(P ) 5
/4
.3
(F ) 5
/4
.7
1 BEND RESTRAINED LENGTH DESIGN
SCALE: NONE 2 REDUCER RESTRAINED LENGTH DESIGN
SCALE: NONE 3 VALVE AND DEAD END RESTRAINED LENGTH DESIGN
SCALE: NONE
4 TEE RESTRAINED LENGTH DESIGN
SCALE: NONE
W A
TE
R
D
ET
A
IL
S (2
O F
2)
G
-P
1W L_
D
ET
AI
LS
_S H
T1
AS
S
H O
W N
6/
/2
5H C
JD
M
SHEET
H C
G -0
-0
6 AUTOMATIC FLUSH VALVE ASSEMBLY
SCALE: NONE5 COMMERCIAL DRIVEWAY SECTIONS
SCALE: NONE 7 3-INCH COMBINATION AIR-VACUUM RELEASE VALVE
SCALE: NONE
6/
/2
IS
SU
E
FO
R B
ID
JD
M H
C
8 CONCRETE CURB AND GUTTER
SCALE: NONE
IH
-1
A
N D
F M
W A
TE
R
L
IN
E
EX
TE
N
SI
O
N
SE
G U
IN
E
C O
N O
M
IC
D
EV
EL
O
PM
EN
T C
O R
PO
R
A
TI
O N
SE
G
U
IN
, T
EX
A S
FINISH GRADE - MATCH
SLOPE, THICKNESS, AND
TYPE OF EXISTING
MATERIAL
SAND
DETAIL NOTES:
1. SEE PLANS FOR CONDUIT TYPES AND QUANTITIES.
2. LOCATE ALL UNDERGROUND UTILITIES PRIOR TO TRENCHING.
DETAIL NOTES:
EDISON2336FPB 2'-0"x3'-0"x3'-0" FlatwallPull Box
EdisonUGS#215.1 Copyright ©2008
EDISON26436FPB 2'-6"x4'-0"x3'-0" FlatwallPull Box
EdisonUGS#220.1 Copyright ©2008
REV:
FI
LE
C H
EC
KE
D B
Y:
SC
AL
E:
D R
AW
N
B Y:
D
AT
E R
EV
IS
IO
N
S D
ES
C
R
IP
TI
O
N C
H K'
D
BY
R
EV
D
AT
E:
PR
. N O
D
ES
IG
N
ED
B
Y:
w w w .tr ih yd ro .c om
N ew
B ra un fe ls
In de pe nd en ce D riv e, S ui te
N ew B ra un fe ls
, T ex as
(P ) 8
/6
.3
(F ) 8
/6
.3
Te xa s Su rv ey
F irm
Te xa s
En gi ne er in g
Fi rm
F -1
Au st in
W
H ig hw ay
, S ui te
Au st in
, T ex as
(P ) 5
/4
.3
(F ) 5
/4
.7
G
-P
1W L_
D
ET
AI
LS
AS
S
H O
W N
6/
/2
5H C
SC
SHEET
H C
G -0
-0
C O
M M
U N
IC
A
TI
O
N D
ET
A
IL
S
6/
/2
IS
SU
E
FO
R B
ID
SC
H C
1 CONDUIT BACKFILL DETAIL
SCALE: NONE 2 CONDUIT STREET TRENCH FLOWABLE FILL
SCALE: NONE 3 2'X3'X3' PULL BOX
SCALE: NONE 4 2.5'X4'X3' PULL BOX
SCALE: NONE
IH
-1
A
N D
F M
W A
TE
R
L
IN
E
EX
TE
N
SI
O
N
SE
G U
IN
E
C O
N O
M
IC
D
EV
EL
O
PM
EN
T C
O R
PO
R
A
TI
O N
SE
G
U
IN
, T
EX
LE
C H
EC
KE
D B
Y:
SC
AL
E:
D R
AW
N
B Y:
D
AT
E R
EV
IS
IO
N
S D
ES
C
R
IP
TI
O
N C
H K'
D
BY
R
EV
D
AT
E:
PR
. N O
D
ES
IG
N
ED
B
Y:
w w w .tr ih yd ro .c om
N ew
B ra un fe ls
In de pe nd en ce D riv e, S ui te
N ew B ra un fe ls
, T ex as
(P ) 8
/6
.3
(F ) 8
/6
.3
Te xa s Su rv ey
F irm
Te xa s
En gi ne er in g
Fi rm
F -1
Au st in
W
H ig hw ay
, S ui te
Au st in
, T ex as
(P ) 5
/4
.3
(F ) 5
/4
.7
ER
O
SI
O
N C
O N
TR
O
L D
ET
A
IL
S
1 STABILIZED CONSTRUCTION ENTRANCE
SCALE: NONE 2 ROCK BERM
SCALE: NONE 3 SILT FENCE
SCALE: NONE 4 TREE PROTECTION CONSTRUCTION FENCE
SCALE: NONE
5 STORM SEWER INLET PROTECTION
SCALE: NONE
G
-P
1W L_
D
ET
AI
LS
AS
S
H O
W N
6/
/2
5H C
JD
M
SHEET
H C
G -0
-0
NOTE:
AS NEEDED TO PROVIDE MIN. NECESSARY WORK SPACE IF LESS THAN 5 FEET, THEN ADD BOARDS STRAPPED TO TRUNK.
6 TREE PROTECTION - WOOD SLATS DETAIL
SCALE: NONE
6/
/2
IS
SU
E
FO
R B
ID
JD
M H
C
IH
-1
A N
D F
M
W
A
TE
R L
IN
E
EX
TE
N
SI
O N
SE
G
U
IN
E C
O N
O M
IC
D
EV
EL
O
PM
EN
T
C O
R
PO
R A
TI
O
N
SE
G U
IN
, T
EX
LE
C H
EC
KE
D B
Y:
SC
AL
E:
D R
AW
N
B Y:
D
AT
E R
EV
IS
IO
N
S D
ES
C
R
IP
TI
O
N C
H K'
D
BY
R
EV
D
AT
E:
PR
. N O
D
ES
IG
N
ED
B
Y:
w w w .tr ih yd ro .c om
N ew
B ra un fe ls
In de pe nd en ce D riv e, S ui te
N ew B ra un fe ls
, T ex as
(P ) 8
/6
.3
(F ) 8
/6
.3
Te xa s Su rv ey
F irm
Te xa s
En gi ne er in g
Fi rm
F -1
Au st in
W
H ig hw ay
, S ui te
Au st in
, T ex as
(P ) 5
/4
.3
(F ) 5
/4
.7
G
-P
1W L_
D
ET
AI
LS
AS
S
H O
W N
6/
/2
5H C
JD
M
SHEET
H C
G -0
-0
TR
A
FF
IC
C O
N
TR
O L
A N
D B
A R
R
IC
A D
E D
ET
A
IL
6/
/2
IS
SU
E
FO
R B
ID
JD
M H
C
IH
-1
A N
D F
M
W
A
TE
R L
IN
E
EX
TE
N
SI
O N
SE
G
U
IN
E C
O N
O M
IC
D
EV
EL
O
PM
EN
T
C O
R
PO
R A
TI
O
N
SE
G U
IN
, T
EX
| Sheets and Views |
| 1 PROJECT LOCATION AND INDEX OF SHEETS |