Plans - PR FS Route 27 Slide Site FAA.pdf
PDF 23 MB Posted
- Attached to
- El Yunque National Forest Federal contract opportunity
- Solicitation number
- 693C73-21-B-000017
About this file
This solicitation notice seeks bids for a federal construction project to repair two landslides on Route 27 in El Yunque National Forest in Puerto Rico. The project scope includes constructing an anchored soldier pile wall, gabion wall, rock buttress, excavating and grading approximately 0.15 mile of roadway, and other miscellaneous work. The project value is estimated between $5 million to $10 million. Bids are due on a date specified in the solicitation to be issued around June 29, 2021. The solicitation is available through www.beta.sam.gov using keyword search "693C73". Interested vendors must register on the site but no interested vendors list will be maintained. Annual representations and certifications must be completed on www.beta.sam.gov and http://www.dol.gov/vets/vets4212.htm. The soliciting agency is the Department of Transportation Federal Highway Administration.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Results of the Bid Opening - PR FS ROUTE 27 SLIDE SITE FAA.pdf | ||
| Amendment 0004 - PR FS ROUTE 27 SLIDE SITE FAA.pdf | ||
| Amendment 0003 - PR FS ROUTE 27 SLIDE SITE FAA.pdf | ||
| Amendment 0002 - PR FS ROUTE 27 SLIDE SITE FAA.pdf | ||
| Amendment 0001 - PR FS ROUTE 27 SLIDE SITE FAA.pdf | ||
| FP14_Eng.pdf | ||
| Report_Geotechnical.pdf | ||
| VETS-4212 - Form - 2021.pdf | ||
| IFB Solicitation - PR FS Route 27 Slide Site FAA.pdf | ||
| Categorical Exclusion Form (NEPA).pdf | ||
| ADV_Bidders Qualifications Form.doc | DOC document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE
PR
PROJECT
SHEET
NUMBER
A01
OF TRAN§POR TA TION
PR FS ROUTE 27
SLIDE SITE FAA
PROJECT
PR FS ROUTE 27 SLIDE SITE FAA FEDERAL AVIATION ADMINl§TRA TION
N
EL
N
1 ISLA DE CULEBRA
SCALE IN MILES
KEY MAP OF PUERTO RICO ISLA DE VIEQUES
DESCRIPTION OF PROJECT
IMPROVEMENT: This project consists of constructing an anchored soldier pile wall, gabion wall, rock buttress, roadway excavation and embankment, roadway overlay of approximately 0.15 mile of roadway FS-27 at the ridge landslide location, and other miscellaneous work.
PROJECT LENGTH: 0.15
(MILES)
LANE MILES: 0.30
ROAD: WIDTH SURFACE
FS-27 18' +/- 3-Inch ACP
DESIGN DESIGNATION:
ADT (2021) < 50
ADT (2041) < 50
DHV <5
D 50/50
%Truck <5%
V (MPH) 30
C/A None e(max) Match in-kind
SPECIFICATIONS:
"Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects", FP-14.
BASE
N/A
SUBGRADE
N/A
NI-----------------------�
• Project Manager Highway Design Manager Lead Designer ,:1--�--�-+--����--�-----�-----<
� Victor Carreras Tiffany Wheeler Ricardo Reyes
YUNQUE NATIONAL FOREST
PLANS FOR PROPOSED
PROJECT PR FS ROUTE 27
SLIDE SITE FAA
RECONSTRUCTION OF LANDSLIDE ALONG FS-27 MILE POST 1.1
EL YUNQUE NATIONAL FOREST
RIO GRANDE AND NAGUABO MUNICIPALITIES, PUERTO RICO
Rio Grande t>ista Aoberto s.1nche2 ��
Bartolo
Pefla Pobre
PR-191
PR-930
Baiio Grande Poo
PR-9938 ---- •
El Yun1:1ue
National Forest
Qllle3\
Rio Blanco
PROJECT
PR FS ROUTE 27 SLIDE SITE FAA
Luquillo El Conqu11 tador, A Waldorf Astoria Reson
N i Ramos
'<a
@ Fajardo
0 , v (fil) ,ff ,.o s �
@I
"' Ceiba
@ ._Ci:IB,4.
Aguas Claras rM-%9 "IAauAao
Roosevelt Roads
Naguabo
NO SCALE
Sheet No.
A0l
A02-A03
A04
A05-A06
A07
B01-B05
C0l
C02-C04
D01-D02
D03
D04-D05
D06-D07
K0l
M0l
M02-M03
ROl-Rll
501-520
T01-T09
U01-U30
INDEX TO SHEETS
Description
Title Sheet
Symbols And Abbreviations
Location Map And Temporary Traffic Control
Survey Information
Horizontal Alignment Description
Typical Sections
Tabulation of Quantities
Summaries And Schedules
Plans
Gabion Wall Profile
Soldier Pile Wall Profile
Construction Entrance Plan
Drainage Cross Section
Erosion And Sediment Control Narrative
Erosion And Sediment Control Plans
Wall Plans
Standards And Details
Roadway Cross Sections - Rock Buttress And Gabion Wall
Roadway Cross Sections - Reconstruction of Landslide
Know what's below.
Call before you dig.
811 or 1-800-552-7001 www.va811.com
PLANS PREPARED BY
EASTERN FEDERAL LANDS HIGHWAY DIVISION
ASHBURN, VIRGINIA
JUNE 2021
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve original ground outside diameter out to out on center normal crown north mon.
min.
monument minimum spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south spa.
shldr.
sec.
SC
SADT
S
NC
N
OG
OD
o. to o.
o. c.
pvmt.
PT
PST
PSC
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
rte.
rt. or RT reqd.
reinf.
rdwy.
R/W
R.
R route right required reinforcement roadway right-of-way range radius symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph
V vertical point of intersection vehicles per hour design speed
W west sym.
STS
struc.
stiff.
stgr.
std.
Sta.
ST
SS
SRS
1 6
1 6
SEC.
SEC.
N
RBAR
0.00EL. E
N 0
NO. DATE BY REVISIONS
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
SYMBOLS AND ABBREVIATIONS
EL YUNQUE NATIONAL FOREST
drwg(s).
dist.
diaph.
diag.
dia.
DHV
D drawing(s) distance diaphragm diagonal diameter design hourly volume diameter expansion joint excavation edge of water edge of road equation edge of pavement embankment elevation elevation with number superelevation rate east flg.
fin.
flange finish exp. jt.
exc.
EW
ER
EQ or eq.
EP
emb.
elev.
e
E ftg.
galv.
ga.
HW
hex.
hdwl.
ID
jt.
footing galvanized gage (gauge) high water hexagon headwall inside diameter joint lat.
lam.
L latitude lamination length of curve
LW
lt. or LT
Ls
LPSM
long.
low water left length of spiral lump sum longitudinal
NOTE:
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
Section Line
Section Corner (Found, Projected)
Section Line4
Section Corner (Found, Projected)4
Section Line16
Section Corner (Found, Projected)16
Property Line w/Found Property Corner
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
BLM Lands Boundary
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Railroad
Trail
Fiber Roll or Wattle
Silt Fence
Intermittent Drainage or Small Creek
Large Creek or River
Lake, Pond or Reservoir; Marshland
Spring or Seep
Treeline; Individual Trees, Pine
Material Source; Bore Hole; Test Pit
Spot Elevation; Coordinate Grid Tick
Control Point (Terrestrial and GPS); Jump Hub
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Concrete Barrier
Slope Stake Limits
Delineators
Signs (single, double post; portable)
Transition
Toe of Fill
Top of Cut
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Pipe Culvert with Drop Inlet
Box Culvert
Underground Utilities
Overhead/Above Ground Utilities
STEAM = steam, T = telephone, TV = CATV, W = water
P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use, Miscellaneous Utility Features
UP = transformer or junction box, WF = water fountain
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap θs Ø ∆c appr.
AH
ADT
abut.
brg.
br.
BP
BM
BK
ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
clr.
cc or c. to c.
spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment bearing bridge balance point bench mark back centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center
M.P.
M.L.
mile post main line
EXISTING PROPOSED
DI
Sheet 1 of 2
:2
A
M
M a rc h
B a s e .B
.U S
P R
O J E
C T
S
F S
\P R
\R o u te
S lid e S it e
F A
A \H
W Y
D
E S
\C A
D D
\A
P R
F
S -2
S lid e
S it e
F
A A s y m
.d g n
STATE PROJECT
NUMBER
SHEET
PR
SLIDE SITE FAA
PR FS ROUTE 27
A02
AREA PATTERN PROJECT SPECIFIC SYMBOLS AND ABBREVIATIONS:
U.S. DEPARTMENT OF TRANSPORTATION EL YUNQUE NATIONAL FOREST
SYMBOLS AND ABBREVIATIONS
MGS - Midwest Guardrail System
ACP - Asphalt Concrete Pavement
- Boring Symbol
FOTS - Fiber Optic Transmission System
HDPE - High-Density Polyethylene
SDR - Standard Dimension Ratio Pavement Removal / Roadway Obliteration
Full Depth Pavement
Sidewalk Asphalt/Concrete
Mill and Overlay
Overlay
Silt Fence
Diversion Berm
Drainage Divide
Check Dam
Sheet 2 of 2
STATE PROJECT
NUMBER
SHEET
SHEET
PR
SLIDE SITE FAA
A03
:4
M a y
S
H E
E T
P R
O J E
C T
S
F S
\P R
\R o u te
S li d e S it e F
A A
\H W
Y D
E S
\C A
D D
\A P
R F
S -2
S li d e S it e F
A A s y m
.d g n
PR FS ROUTE 27 SLIDE SITE FAA
PROJECT
E 884789.2690
N 819622.3350
8+45 to 16+45
N A
G U
A B
O
R Í O G
R A
N D
E
N A
G U
A B
O
R Í O G
R A
N D
E
Torre Britton
Britton Trail
Torre Mount
Catarata de la Mina
LUQUILLO
SIERRA DE
FOREST
NATIONAL
EL YUNQUE
F S -2
F S -2
9-RP
1-
RP
s o c a c I oi R
1-RP
8399-
RP
91-RPaniM al e d o íR s e y e m a
M oí
R
NO SCALE
by the CO. See Detail E157-A.
3. Place on-site concrete washout structure as directed
CO before using any locations for staging.
traffic as a staging area. Obtain approval from the authorized contractors, use the single lane closed to that area is not available due to use by other located at the entrance of FS-27 as a staging area. If
2. Use the parking area before the yellow “Navy”gate the CO.
635-8A, for temporary traffic control as directed by lane closure with stop signs, according to Detail ET landslide, use water-filled barriers along with single
1. When constructing rock buttress, gabion walls, and
NOTES:
as Staging Area Parking area to use
To
PR-
3 ( Nor th
T o P
R -3
S o u th
SCALE IN FEET
0 500 1000
N
N
1- P
R
1- P
R
F S -2
U.S. DEPARTMENT OF TRANSPORTATION EL YUNQUE NATIONAL FOREST
TEMPORARY TRAFFIC CONTROL
LOCATION MAP AND
:1
P a y
L o c a ti o n M a p
P
R O
J E
C T
S
F S
\P R
\R o u te
S lid e S it e F
A A
\H W
Y D
E S
\C A
D D
\A P
R F
S -2
S lid e S it e F
A A lo c .d g n
STATE PROJECT
NUMBER
SHEET
PR
SLIDE SITE FAA
A04
NO SCALE
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
clockwise rotation.
Azimuth shown is based on north axis at
NOTE:
SURVEY INFORMATION SHEET
Sheet 2 of 2
:2
M a r c h
B a s e .B
P R
O J E
C T
S
F S
\P R
\R o u te
S li d e S it e F
A A
\H W
Y D
E S
\C A
D D
\A -A
P
R F
S -2
S li d e S it e F
A A s u r.
d g n
STATE PROJECT
NUMBER
SHEET
PR
SLIDE SITE FAA
A06
N
SL1006
REBAR
N
N
REBAR
REBAR
NTS
NTS
NTS
N
SL1003
PK
N
N
REBAR
REBAR
NTS
NTS
NTS
SL1006
FS-2
SL1003
.4
.2
SL1004
SL1005
F S -2
SL1003
DH2
T P S
TPS
TP
S
NAIL
SL1003
PK
F S -2
F S -2
R C P
10.33'
A Z 128.34°
35.22'
AZ 265.97°
.0 1'
A Z 2.
8.77'
AZ 275.79°
.1
A Z
.4
EMH
EMH
SL1004
REBAR
SL1005
REBAR
.3 5'
AZ
.6 1°
.0
A Z
.9
.6
A Z .1
.4
A Z .2 ° 1
.1
A Z
.4
.6
A Z .0
26.
97'
AZ 7
3.3
3°
.8
A Z
.6
25.37'
AZ 85.07°
FS-27
.8
A Z
.1
SL1001
NAIL
TOP
PVC
REBAR
REBAR
REBAR
REBAR
REBAR
.1
T O C
P
.6
A Z .5
AZ 292.04°
AZ 123.97°
AZ 96.64°
48.57'
64.02'
18.39'
.5
A Z
.0
.1 5'
A Z 0.
NAIL
EP
66.06
'TO CP 200
AZ 80.
51°
A Z
.6
.6
FR
O
M C
P
A Z .5
.1
F R
O M C
P S
L
A Z
.6
REBAR
REBAR
REBAR
.6
FR
O
M C
P 2
A Z .0 °7
.7
T O C
P
.9
T O C
P
A Z
.7
A Z
.3
66.06
'FROM CP 200
AZ 80.
51°
.6
T O C
P
A Z .5
.5
T O C
P
A Z
.9
.9
TO
C
P
A Z .2
74.4'
TO CP 2006
AZ 86.36°
.1
T O C
P
A Z
.2
° 7
.3
T O C
P
A Z
.2
.43
TO
CP 2
.9
TO
C
P
A Z .6
AZ
.2°
A Z
.1
.1
T O C
P
COR
PLATE
STEEL
COR
PLATE
STEEL
.1
T O C
P
A Z
.8
30.09'
TO CP 2004
AZ 120.63°
.2
T O C
P
A Z
.0
P
V C
WEL
N
REBAR
NTS
T P S
REBAR
REBAR
.7
F R
O M C
P
.9
F R
O M C
P
A Z
.7
.6
TO
C
P 2
A Z .0
113.27'
TO CP 2010
AZ 86.58°
.5
T O C
P
A Z
.9
A Z
.2
.3
F R
O M C
P
A Z
.6
A Z
.3
.6
T O C
P
.3
F R
O M C
P
A Z
.3
N
REBAR
NTS
T P S
REBAR
REBAR
.7
F R
O M C
P
.9
F R
O M C
P
A Z
.7
.6
TO
C
P 2
A Z .0
113.27'
TO CP 2010
AZ 86.58°
.5
T O C
P
A Z
.9
A Z
.2
.3
F R
O M C
P
A Z
.6
A Z
.3
.6
T O C
P
.3
F R
O M C
P
A Z
.3
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
SHEET
PR
SLIDE SITE FAA
A07
:4
M a y
A
P R
O J E
C T
S
F S
\P R
\R o u te
S li d e S it e F
A A
\H W
Y
D E
S \C
A D
D \A
P
R
F S
-2
S li d e
S it e
F A
A a lg
.d g n
DESCRIPTION
HORIZONTAL ALIGNMENT
NOTES:
C
(Match existing edge)
Travelway
Slope varies
Existing ground (typ.)
L
PROPOSED:
EXISTING:
Asphalt tack coat
Varies
Paving geotextile
7. See Section 303 for shoulder reconditioning requirements.
pavement.
6. Maintain final elevation of shoulders to match edge of
3.B.
and 625. Cover with rolled erosion control product, Type except pavement areas in accordance with Sections 624
5. Place conserved topsoil and mulch on all disturbed areas approved by the CO.
conditions encountered at time of construction as
4. Determine patching limits and location based on to beginning construction.
locations. Field verify the duct bank trench locations prior approximate. See the plans for approximate duct bank
The dimensions of existing duct bank detail are
3. Do not disturb the existing duct bank owned by the FAA.
elevation as shown in Detail E401-01.
2. Construct pavement transitions to match existing roadway roadway surface.
1. Clearing and grubbing limits exclude width of existing
8+45.13 TO 16+45.94
OVERLAY
ASPHALT CONCRETE PAVEMENT
Sheet 1 of 5
Profile grade
DUCT BANK DETAIL
see Note 7
Shoulder reconditioning (typ.)
Varies and Note 3)
(see Duct Bank Detail do not disturb
Existing duct bank, Shoulder Shoulder
VariesVari es
8+45.13 to 9+40.00
Do not disturb historic gutter
8+45.13 to 9+63.00
Do not disturb historic ditch
Slope varies
(see Note 4 and Typical Section, sheet 5 of 5)
Asphalt Concrete Pavement Patch, Type 1
2-inch depth -inch NMSA2
ACP, Marshall mix, Class A, (Type IV, straightedge), 2-inch depth -inch NMSA2
ACP, Marshall mix, Class A, Existing Concrete
3-inch duct spacer (typ.)
6-inch by 10-inch duct bank with high voltage cable 4-inch dia. SDR-13.5 HDPE middle w/
2-inch dia. SDR-13.5 HDPE FOTS duct
Proposed pavement overlay Existing pavement in
TYPICAL SECTION
Limits of construction
3'-0"3'-0"
12"
Trench
:2
M a r c h
B a s e .B
P R
O J E
C T
S
F S
\P R
\R o u te
S li d e S it e F
A A
\H W
Y D
E S
\C A
D D
\C P
R F
S -2
S li d e S it e F
A A q n t.
d g n
STATE PROJECT
NUMBER
SHEET
PR
SLIDE SITE FAA
B01
CL
EXISTING:
Existing ground (typ.)
(see Note 2)
Limit of excavation line
(see Note 2)
Roadway excavation
Grade to drain
9+90.00 TO 10+10.00
ROCK BUTTRESS INSTALLATION
(see Note 5)
Construct rock buttress retaining wall (see Note 6)
Do not disturb historic curb and requirements.
10. See Section 303 for shoulder reconditioning pavement.
9. Maintain final elevation of shoulders to match edge of
3.B.
and 625. Cover with rolled erosion control product, Type except pavement areas in accordance with Sections 624
8. Place conserved topsoil and mulch on all disturbed areas required to fit inside as approved by the CO.
determine the diameter of the underdrain pipe extension
7. Field verify the size of the existing diameter of the pipe to excavation.
excavation plan to the CO for approval prior to starting
Locate the historic wall foundation and submit an the void behind the wall before any excavation is started.
area of the historic wall foundation with grout and backfill wide, by 5 feet long, by 7 feet high. Fill the undermined backfill material with an approximate dimension of 3 feet
12-inch deep, by 30-foot length). The wall also has lost
6. The historic wall is undermined (4-foot wide by 6-inch to field conditions as directed by the CO.
the width of the base of the rock buttress to meet existing
5. See Section 252 for rock buttress requirements. Adjust as determined by the CO.
course above Geotextile, Class 2, Type C on the shoulder widen the lane by placing 6-inch depth aggregate surface closures. If a 10-foot travelway cannot be maintained, minimum lane width of 10 feet at all times during lane stop signs according to Detail ET 635-8A. Maintain a
4. Perform temporary traffic control single lane closures with to beginning construction.
locations. Field verify the duct bank trench locations prior approximate. See the plans for approximate duct bank
The dimensions of existing duct bank detail are
3. Do not disturb the existing duct bank owned by the FAA.
Subsection 208.03 for the excavation requirements.
and excavation quantities. See Section 204 and
2. The excavation slope was assumed at 1V:1H for design roadway surface.
1. Clearing and grubbing limits exclude width of existing
Sheet 2 of 5
1V:1.5H
(min.)
ee
Profile grade
Class 1, Type E
Separation-stabilization geotextile, (see Note 6) area with grout
Fill the undermined
(min.)
Asphalt tack coat
Paving geotextile
PROPOSED:
18" 24"
4'-0"
3'-0" see Note 10
Shoulder reconditioning (typ.)
(Match existing edge)
Travelway
(see Duct Bank Detail and Note 3) do not disturb
Existing duct bank, DUCT BANK DETAIL
Varies
Do not disturb existing pipe (typ.)
Underdrain pipe extension (See Note 7)
Existing Concrete
3-inch duct spacer (typ.)
6-inch by 10-inch duct bank with high voltage cable 4-inch dia. SDR-13.5 HDPE middle w/
2-inch dia. SDR-13.5 HDPE FOTS duct
Proposed pavement overlay Existing pavement
2-inch depth -inch NMSA2
ACP, Marshall mix, Class A, (Type IV, straightedge), 2-inch depth -inch NMSA2
ACP, Marshall mix, Class A, Limits of construction
12"
SHEET
B02
STATE PROJECT
NUMBER
SHEET
PR
SLIDE SITE FAA
:0
D e c e m b e r
B
P R
O J E
C T
S
F S
\P R
\R o u te
S li d e S it e F
A A
\H W
Y
D E
S \C
A D
D \B
-B
P R
F
S -2
S li d e
S it e
F A
A ty p
.d
CL
(typ.)
ty p
(see Note 6)
Gabion basket (typ.)
10+10.00 TO 10+40.00
GABION WALL AND ROCK BUTTRESS INSTALLATION
1V:1.5H
Existing ground (typ.)
(see Note 2)
Limit of excavation line
Granular backfill, (AASHTO NO. 57 stone)
Class 1, Type E
Separation-stabilization geotextile, (see Note 5)
Construct rock buttress approval.
water from draining into the excavation to the CO for
9. Submit a stormwater management plan to prevent surface
8. Install underdrain according to Section 605.
3.B, including the top of gabion baskets.
and 625. Cover with rolled erosion control product, Type except pavement areas in accordance with Sections 624
7. Place conserved topsoil and mulch on all disturbed areas
E253-A for gabion basket assembly requirements.
the CO for approval prior to starting excavation. See Detail historic wall foundation and submit an excavation plan to maintained within 6 feet of the top of the wall. Locate the granular backfill as the wall is constructed so that the fill is
6. For the gabion wall construction, place and compact proposed gabion basket location.
CO. Do not disturb existing 18-inch RCP adjacent to the buttress to meet existing field conditions as directed by the requirements. Adjust the width of the base of the rock
5. See Section 252 and Detail E252-01A for rock buttress as determined by the CO.
course above Geotextile, Class 2, Type C on the shoulder widen the lane by placing 6-inch depth aggregate surface closures. If a 10-foot travelway cannot be maintained, minimum lane width of 10 feet at all times during lane stop signs according to Detail ET 635-8A. Maintain a
4. Perform temporary traffic control single lane closures with to beginning construction.
locations. Field verify the duct bank trench locations prior approximate. See the plans for approximate duct bank
The dimensions of existing duct bank detail are
3. Do not disturb the existing duct bank owned by the FAA.
208.03 for the excavation requirements.
excavation quantities. See Section 204 and Subsection
2. The excavation slope is assumed at 1V:1H for design and roadway surface.
1. Clearing and grubbing limits exclude width of existing
(see Note 2)
Roadway excavation
Grade to drain
NO SCALE
gutter (see Note 10)
Install concrete curb and
Sheet 3 of 5
C roadway elevationL
(AASHTO NO. 57 stone)
Granular backfill, 1V:2H or flatter
Class 1, Type E
Separation-stabilization geotextile, (see Note 8) collector pipe
Install 4-inch dia. perforated PVC
Class 1, Type E stabilization geotextile, Separation-
(min.)
e
EXISTING:
Profile grade and Note 3)
(see Duct Bank Detail do not disturb
Existing duct bank, see Note 12
Shoulder reconditioning (typ.)
3'
16'-4"
3'-0"9'-0"
.6
15'-0"
(min.)
(Match existing edge)
Travelway
DUCT BANK DETAIL
Asphalt tack coat
Aggregate base, grading C or D, 6-inch depth
Separation-stabilization geotextile, Class 2, Type E
8+45.13 TO 16+45.94
Typical Section
See Asphalt Concrete Pavement Overlay
PROPOSED:
e
Existing Concrete
3-inch duct spacer (typ.)
6-inch by 10-inch duct bank with high voltage cable 4-inch dia. SDR-13.5 HDPE middle w/
2-inch dia. SDR-13.5 HDPE FOTS duct
Proposed pavement overlay Existing pavement
Class 1, Type E
Separation-stabilization geotextile,
12. See Section 303 for shoulder reconditioning requirements.
pavement.
11. Maintain final elevation of shoulders to match edge of the CO.
gabion wall and rock buttress installation for approval by existing curb and gutter dimensions adjacent to the
10. Provide new curb and gutter dimensions to match the
2-inch depth -inch NMSA2
ACP, Marshall mix, Class A, 2-inch depth -inch NMSA2
ACP, Marshall mix, Class A, Limits of construction
12"
SHEET
B03
STATE PROJECT
NUMBER
SHEET
PR
e c e m b e r
B
P R
O J E
C T
S
F S
\P R
\R o u te
S li d e S it e F
A A
\H W
Y
D E
S \C
A D
D \B
-B
P R
F
S -2
S li d e
S it e
F A
A ty p
.d
Sheet 1 of 5)
(see Typical Section, Pavement Overlay
See Asphalt Concrete
(see Note 2)
Limit of excavation line
(see Note 2)
Roadway excavation
Select borrow
(typ.)
Existing ground
CL
1V:
2H o r fla tt er
Select borrow
12+77.39 TO 14+61.80
RECONSTRUCTION OF LANDSLIDE ALONG FS-27
Geomembrane Gabion rock (see Note 6)
625. Cover with rolled erosion control product, Type 3.B.
except pavement areas in accordance with Sections 624 and
9. Place conserved topsoil and mulch on all disturbed areas
8. See Subsection 207.07 for geomembrane application.
galvanized pipe straps as approved by the CO.
605.03. Attach 6-inch outlet pipe to timber lagging by use of
7. Install collector and outlet pipes according to Subsection
6. Furnish gabion rock conforming to Subsection 705.01(c)(2).
information.
5. See Wall Plans (R sheets) for wall details and installation determined by the CO.
above Geotextile, Class 2, Type C on the shoulder as the lane by placing 6-inch depth aggregate surface course closures. If a 10-foot travelway cannot be maintained, widen minimum lane width of 10 feet at all times during lane stop signs according to Detail ET 635-8A. Maintain a
4. Perform temporary traffic control single lane closures with construction.
the duct bank trench locations prior to beginning the plans for approximate duct bank locations. Field verify dimensions of existing duct bank detail are approximate. See
3. Do not disturb the existing duct bank owned by the FAA. The anchored soldier pile wall construction.
2. See Sections 204 and 208 for the excavation requirements of roadway surface.
1. Clearing and grubbing limits exclude width of existing
DETAIL A
(see Note 5)
Proposed Wall
(perforated)
6-inch collector pipe
Impermeable geomembrane
Ground anchor (typ.) (see Note 5)Wall panel (see Note 5)
Drilled shaft (see Note 5)
(AASHTO #57 Stone)
Granular backfill see Notes 7
6-in outlet pipe (non-perforated)
1V:
2H o r fla tt er m a x
2% product, Type 3.B
Rolled erosion control
SECTION A-A
Gabion rock
(see Note 8) geomembrane
Impermeable
Select borrow
Sheet 4 of 5
VariesVaries
Profile grade
1V:2H or flatter
A
A
1V:10H or flat ter
(where shown in plans) type 2, class A steel posts
Install guardrail system MGS, (see Duct Bank Detail and Note 3)
Existing duct bank, do not disturb gutter (see Note 11)
Install concrete curb and
3'-0"
" 1
4'-0"
43'-3"
6'-0"
2'-0"
See Detail A
DUCT BANK DETAIL
Slope varies
2%
Existing Concrete
3-inch duct spacer (typ.)
6-inch by 10-inch duct bank with high voltage cable 4-inch dia. SDR-13.5 HDPE middle w/
2-inch dia. SDR-13.5 HDPE FOTS duct
Proposed pavement overlay Existing pavement see Notes 7
(non-perforated)
6-in outlet pipe daylight location geomembrane at
Do not wrap the the CO.
gabion wall and rock buttress installation for approval by existing curb and gutter dimensions adjacent to the
11. Provide new curb and gutter dimensions to match the for approval.
water from draining into the excavation areas to the CO
10. Submit a stormwater management plan to prevent surface min 2'
15'± to 20'±
12"
SHEET
B04
STATE PROJECT
NUMBER
SHEET
PR
D e c e m b e r
B
P R
O J E
C T
S
F S
\P R
\R o u te
S li d e S it e F
A A
\H W
Y
D E
S \C
A D
D \B
-B
P R
F
S -2
S li d e
S it e
F A
A ty p
.d
NOTE:
approved by the CO.
conditions encountered at time of construction as
Determine patching limits and location based on
Sheet 5 of 5
C
12"
L Road m in
(see Typical Section, sheet 1 of 5)
Asphalt concrete pavement overlay thickness if the existing pavement is less
(match depth of existing asphalt) or 4" min.
Asphalt Concrete Pavement Patch, Type 1
FULL DEPTH PATCH, TYPE 1
ASPHALT PAVEMENT, BASE, AND SUBGRADE
SECTION A-A
PLAN DETAIL
ASPHALT PAVEMENT PATCH
Minor Crushed Aggregate
Backfill with min. 6"
Limit of Undercut Class 2, Type E Separation-stabilization geotextile, Tack coat (typ.)
Existing Ground face full depth (typ.)
Saw cut vertical
Existing Pavement
Pavement replacement limits to edge of pavement of pavement, remove <24" from the edge If the patch limit is to distress parallel/perpendicular Patch saw cut
Pavement Distress
2-inch depth
Marshall mix, Class A, Place in 2 equal lifts, ACP, 12"
V a r ie s
Varies
SHEET
B05
STATE PROJECT
NUMBER
SHEET
PR
e c e m b e r
B
P R
O J E
C T
S
F S
\P R
\R o u te
S li d e S it e F
A A
\H W
Y
D E
S \C
A D
D \B
-B
P R
F
S -2
S li d e
S it e
F A
A ty p
.d
TABULATION OF QUANTITIES
C01
SHEET
PR
SLIDE SITE FAA
C01
M a y
C
P R
O J E
C T
S
F S
\P R
\R o u te
S li d e S it e F
A A
\H W
Y D
E S
\C A
D D
\C P
R F
S -2
S li d e S it e F
A A q n t.
d
Sheet 1 of 3
SUMMARIES AND SCHEDULES
:2
M a r c h
B a s e .B
P R
O J E
C T
S
F S
\P R
\R o u te
S li d e S it e F
A A
\H W
Y D
E S
\C A
D D
\C P
R F
S -2
S li d e S it e F
A A q n t.
d g n
STATE PROJECT
NUMBER
SHEET
PR
SLIDE SITE FAA
C02
Sheet 2 of 3
C03
SHEET
PR
SLIDE SITE FAA
C03
M a y
C
P R
O J E
C T
S
F S
\P R
\R o u te
S li d e S it e F
A A
\H W
Y D
E S
\C A
D D
\C P
R F
S -2
S li d e S it e F
A A q n t.
d
Sheet 3 of 3
C04
SHEET
PR
SLIDE SITE FAA
C04
M a y
C
P R
O J E
C T
S
F S
\P R
\R o u te
S li d e S it e F
A A
\H W
Y D
E S
\C A
D D
\C P
R F
S -2
S li d e S it e F
A A q n t.
d
255025
REBAR
REBAR
SL1005
W/CAP
REBAR
High Voltage Cable (LEV C)
2"&4"SDR w/ 13.5 HD PE FOTS Duct &
SL1004
W/CAP
REBAR
WEEPHOLE
4"Ø
SL1003PK
EMH
NAIL
NAIL
NAIL
EMH
NAIL
FS
-2
FS-27
IN
V 2574.78'
IN
V 2561.76'
18"x98.68'RCP
SL1
W /C
APREBAR
P V C1
.5 "Ø2
BEGIN PROJECT
SCALE IN FEET
0 20 40
E 884362.4364
N 819955.9829
8+45.13
Match existing line and grade
Begin ACP overlay
Existing and proposed EOP (typ.)
FS Route 27 CL
Limits of cut/fill (typ.)
Do not disturb existing underground utility NOTES:
roll and silt fence locations and limits of disturbance.
6. See Erosion and Sediment Control Plan sheets for fiber
Marking Summary sheet and Detail E634-03.
locations as approved by the CO. See Pavement
5. When installing new pavement markings adjust requirements.
4. See Detail E253-A for gabion basket assembly requirements.
3. See Section 252 and Detail E252-01A for rock buttress
E401-01.
2. Construct pavement transitions as shown in Detail existing field conditions.
1. Adjust limits of work as directed by the CO to meet
See Note 3
9+90 to 10+40
Construct rock buttress
See Note 4
10+10 to 10+40
Install gabion wall
See Detail E609-01A
10+10 to 10+70 match edge of existing curb and gutter
Begin curb and gutter
N do not disturb
Existing manhole, curb and retaining wall
Do not disturb existing historic
See Detail ET 617-20 type MGS tangent
Install terminal section, See Detail E251-A
10+80, RT
curb and gutter, 60 tons
Install Class 3 riprap at end of
See Detail E609-01
12+00 to 14+80
Begin curb and gutter
302 sqyd to improve sight distance
Clearing and grubbing, Clean culvert in place, 98 lnft
U.S. DEPARTMENT OF TRANSPORTATION
PLAN
8+45.13 TO 12+50.00
.0
C
.1
.9
.1
P O
B
M a tc h li n e e = ___
L = 112.18'
T = 61.52'
R = 110.00'
Δ = 58°26'01" (RT)
PI 9+34.52C1
C1
:2
M a y
D
S h e e t]
P
R O
J E
C T
S
F S
\P R
\R o u te
S lid e S it e F
A A
\H W
Y D
E S
\C A
D D
\D -D
P
R F
S -2
S lid e S it e F
A A p ln
.d g n
STATE PROJECT
NUMBER
SHEET
PR
SLIDE SITE FAA
D01
NAIL
REBAR2012
REBAR
REBAR
REBAR2002
REBAR
REBAR
REBAR
SL100
NAIL
EMH
REBAR
NAIL
REBARWELL
REBAR
High Voltage Cable (LEV C)
2"&4"SDR w/ 13.5 HD PE FOTS Duct &
REBAR
NAIL
FS-2
FS-27
V C x .5
IN
V
.0
END PROJECT
E 884972.3385
N 819487.673
16+45.94
Match existing line and grade
End ACP overlay
Existing and proposed EOP (typ.)
Limits of cut/fill (typ.)
FS Route 27 CL
Do not disturb existing underground utility
NOTES:
SCALE IN FEET
0 20 40
(see R sheets for more information)
Reconstruction of landslide along FS Route 27
N do not disturb
Existing well, do not disturb
Existing manhole, do not disturb
Existing pipe, See Detail ET 617-20
12+25 to 15+00
(where shown in plans), 275 lnft class A steel posts
Install guardrail system MGS, type 2, See Detail ET 617-20 type MGS tangent
Install terminal section, 14+80, LT
Add inlet Type 5b approved by the CO.
construction work does not affect the utility as temporary shoring as needed to ensure proposed
Protect existing electrical duct bank and provide 8.
approved by the CO.
conditions encountered at time of construction as
7. Determine patching limits and location based on roll and silt fence locations and limits of disturbance.
6. See Erosion and Sediment Control Plan sheets for fiber
Marking Summary sheet and Detail E634-03.
locations as approved by the CO. See Pavement
5. When installing new pavement markings adjust overlay.
materials prior to placing asphalt concrete pavement
4. Remove pavement markings or other deteterious information.
3. See wall construction plans (R sheets) for more
E401-01.
2. Construct pavement transitions as shown in Detail existing field conditions.
1. Adjust limits of work as directed by the CO to meet
15+03, RT
end of culvert, 7 tons
Install Class 2 riprap at
(see Note 7 and Typical Section, sheet 5 of 5)
13+60 to 14+30, LT
Asphalt concrete pavement patch, Type 1
14+80, LT
end of culvert, 14 tons
Install Class 2 riprap at
Drainage Cross Section pipe culvert, 39 See Note 8 and
Install 24-inch elliptical concrete
U.S. DEPARTMENT OF TRANSPORTATION
PLAN
12+50.00 TO 16+45.94
.3
.4
.9
P
E
5 1
M a tc h li n e
C2 e = ___
L = 97.01'
T = 48.51'
R = 2,000.00'
Δ = 02°46'45" (RT)
PI 12+93.49
C2
C3 e = ___ L = 174.11' T = 89.42' R = 310.00'
Δ = 32°10'49" (LT)
PI 15+50.78
C3
22'-0" 9
:2
M a y
D
S h e
P
R O
J E
C T
S
F S
\P R
\R o u te
S lid e S it e F
A A
\H W
Y D
E S
\C A
D D
\D -D
P
R F
S -2
S lid e S it e F
A A p ln
.d g n
STATE PROJECT
NUMBER
SHEET
PR
SLIDE SITE FAA
D02
1. See Typical Sections for more information.
2. The wall profile view is facing the back of the gabion wall.
All offsets are based on the front of the wall.
10+10.00 10+40.00
Underdrain
-11.697%
HLSD = 117.59'
K = 17
175' VC
U.S. DEPARTMENT OF TRANSPORTATION
GABION WALL PROFILE
10+10.00 TO 10+40.00
9+60 9+70 9+80 9+90 10+00 10+10 10+20 10+30 10+40 10+50 10+60 10+70 10+80 10+90
2,540
2,545
2,550
2,555
2,560
2,565
2,570
2,575
2,580
2,585
2,590
BEGIN WALL
END WALL
EL 2567.92
Proposed top of rock buttress
Top of gabion wall (typ.)
Excavation = 855 cuyd
Backfill = 350 cuyd
EL 2570.09
EL 2561.12
Offset -16.33'
10+10.00
2,540
2,545
2,550
2,555
2,560
2,565
2,570
2,575
2,580
2,585
2,590
EL 2567.10
EL 2564.11
EL 2564.93
EL 2561.94
2,535
2,530
2,525
2,520
2,515
2,535
2,530
2,525
2,520
2,515
Proposed ground at front of rock buttress
Profile grade
Existing ground
EL 2558.95
Offset -16.33'
10+40.00
9+90.00
Begin rock buttress
:3
J u n e
D
P r o f il e
S h e
P R
O J E
C T
S
F S
\P R
\R o u te
S li d e S it e F
A A
\H W
Y D
E S
\C A
D D
\D P
R F
S -2
S li d e S it e F
A A p ln
.d g n
STATE PROJECT
NUMBER
SHEET
PR
SLIDE SITE FAA
D03
1. See Typical Sections for more information.
2.The wall profile view is facing the back of the soldier pile wall. All offsets are based on the front of the wall.
12+77.26
Min. 2%
Begin wall
3. Location of geomebrane outlets are at the same location as the vertical non-perforated pvc pipes attached to the wall.
M a tc h li n e
.8
U.S. DEPARTMENT OF TRANSPORTATION
SOLDIER PILE WALL PROFILE
12+77.26 TO 13+86.80
12+50 12+60 12+70 12+80 12+90 13+00 13+10 13+20 13+30 13+40 13+50 13+60 13+70 13+80
2,540
2,545
2,550
2,555
2,560
2,565 wall (typ.)
soldier pipe
Top of
Excavation = 9,805 cuyd
Backfill = 4,430 cuyd
EL 2547.36
2,535
2,530
2,525
2,520
2,515
2,510
2,505
2,500
2,495
2,490
BEGIN WALL
EL 2529.36
Offset -45.19'
12+77.26
EL 2525.36
Offset -45.02'
12+83.12
EL 2522.36
Offset -44.87'
12+88.99
EL 2509.36
Offset -44.33'
13+47.80
Existing ground at centerline
17'-6" 17'-6" 35'-6" 18'-0" 18'-0"3'-0"
(perforated) (typ.)
6-inch collector pipe
(typ.)
(Non-perforated)
6-inch collector pipe
Profile grade ground
Proposed
EL 2518.36
Offset -44.74'
12+94.85
156' VC
K = 28.98
SSD = 278.84'
.5
EL 2514.36
Offset -44.62'
13+00.72
-1.421%
2,540
2,545
2,550
2,555
2,560
2,565
2,535
2,530
2,525
2,520
2,515
2,510
2,505
2,500
2,495
2,490
:2
M a y
D
P r o f il e
S h e
P R
O J E
C T
S
F S
\P R
\R o u te
S li d e S it e F
A A
\H W
Y D
E S
\C A
D D
\D -D
P
R F
S -2
S li d e S it e F
A A p ln
.d g n
STATE PROJECT
NUMBER
SHEET
PR
SLIDE SITE FAA
D04
14+61.80
End wall
Min. 2%
NOTES:
vertical non-perforated pvc pipes attached to the wall.
Location of geomebrane outlets are at the same location as the 3.
All offsets are based on the front of the wall.
The wall profile view is facing the back of the soldier pipe wall.2.
See Typical Sections for more information.1.
M a tc h li n e
.8
U.S. DEPARTMENT OF TRANSPORTATION
SOLDIER PILE WALL PROFILE
13+86.80 TO 14+61.80
END WALL
2,540
2,545
2,550
2,555
2,560
2,565
2,535
2,530
2,525
2,520
2,515
2,505
2,500
2,495
2,490
2,510
13+90 14+00 14+10 14+20 14+30 14+40 14+50 14+60 14+70 14+80
EL 2528.36
Offset -44.68'
14+61.80
EL 2523.36
Offset -44.66'
14+55.80
EL 2518.36
Offset -44.64'
14+49.80
EL 2513.36
Offset -44.63'
14+43.80
EL 2542.36
Excavation = 9,805 cuyd
Backfill = 4,430 cuyd wall (typ.)
soldier pipe
Top of
Existing ground at centerline
18'-0" 18'-0" 18'-0" 18'-0" 3'-0"
(typ.)
pipe (perforated)
6-inch collector
(Non-perforated) (typ.)
6-inch collector pipe ground
Proposed
Profile grade
-6.791%
2,540
2,545
2,550
2,555
2,560
2,565
2,535
2,530
2,525
2,520
2,515
2,505
2,500
2,495
2,490
2,510
:2
M a y
D
P r o f il e
S h e
P R
O J E
C T
S
F S
\P R
\R o u te
S li d e S it e F
A A
\H W
Y D
E S
\C A
D D
\D -D
P
R F
S -2
S li d e S it e F
A A p ln
.d g n
STATE PROJECT
NUMBER
SHEET
PR
SLIDE SITE FAA
D05
255025
REBARWELL
REBAR
SL1005
W/CAP
REBAR
SL1004
W/CAP
REBAR
REBAR
WEEPHOLE
4"Ø
SL1003PK
NAIL
NAIL
NAIL
NAIL
FS
-2
FS-27
IN
V 2574.78'
IN
V 2561.76'
18"x98.68'RCP
SL1
W /C
APREBAR
SCALE IN FEET
0 20 40
Existing and Proposed EOP (typ.)
FS Route 27 CL
Limits of cut/fill (typ.)
N the proposed work
See the Typical Sections for
(see Detail E157-01)
Temporary stabilized construction exit
9+90 to 10+40
Rock buttress work
NOTES:
roll and silt fence locations and limits of disturbance.
4. See Erosion and Sediment Control Plan sheets for fiber area to tie in to adjacent slopes as directed by the CO.
temporary stabilized construction exit and grade the
3. When construction activities are complete, remove the construction exit.
clearing or earth disturbing activities for the stabilized approved by the CO and USFS prior to beginning any adjust location to meet existing field conditions as construction exit is approximate. Field verify and
2. The shown location of the temporary stabilized the CO.
1. Do not disturb existing trees without prior approval of
CONSTRUCTION ENTRANCE PLAN
:5
M a y
D
S h e
P R
O J E
C T
S
F S
\P R
\R o u te
S li d e S it e F
A A
\H W
Y D
E S
\C A
D D
\D -D
P
R F
S -2
S li d e S it e F
A A p ln
.d g n
STATE PROJECT
NUMBER
SHEET
PR
SLIDE SITE FAA
D06
5 24
NAIL
REBAR
REBAR2012
REBAR
REBAR
REBAR2002
REBAR
REBAR
REBAR
NAIL
REBARWELL
REBAR
SL1005
W/CAP
REBAR
REBAR
NAIL FS-27
SCALE IN FEET
0 20 40
N
(see Detail E157-01)
Temporary stabilized construction exit
Limits of cut/fill (typ.)
Existing and Proposed EOP (typ.)
the proposed work
See the Typical Sections for
FS Route 27 CL
NOTES:
roll and silt fence locations and limits of disturbance.
4. See Erosion and Sediment Control Plan sheets for fiber area to tie in to adjacent slopes as directed by the CO.
temporary stabilized construction exit and grade the
3. When construction activities are complete, remove the construction exit.
clearing or earth disturbing activities for the stabilized approved by the CO and USFS prior to beginning any adjust location to meet existing field conditions as construction exit is approximate. Field verify and
2. The shown location of the temporary stabilized the CO.
1. Do not disturb existing trees without prior approval of
12+71.39 to 14+61.8 LT
Soldier Pile Wall
CONSTRUCTION ENTRANCE PLAN
:5
M a y
D
S h e
P R
O J E
C T
S
F S
\P R
\R o u te
S li d e S it e F
A A
\H W
Y D
E S
\C A
D D
\D -D
P
R F
S -2
S li d e S it e F
A A p ln
.d g n
STATE PROJECT
NUMBER
SHEET
PR
SLIDE SITE FAA
D07
1%
Proposed CL
El. = 2550.23
See Detail E251-03
15+03.84, RT
Install class 2 riprap at culvert outlet, 7 tons
Existing Ground
Offset = 13.00'
El. =2545.50'
14+85.15
Invert inlet
Offset = 26.00'
El. =2544.49'
15+03.84
Invert Outlet
1:4
Length = 39.00'
Skew = 26°41'28" Lt
See Detail E604-04
Construct inlet, Type 5B
Grade to drain directed by the CO.
under the duct bank as
Place 12-inch depth of grout
Existing duct bank trench, do not disturb
14+92.01
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
2,500 2,500
2,510 2,510
2,520 2,520
2,530 2,530
2,540 2,540
2,550 2,550
2,560 2,560
2,570 2,570
24" Elliptical Concrete Pipe Culvert
14+80, LT
Install Class 2 riprap at inlet, 14 tons
Grade to drain
.5
DRAINAGE CROSS SECTION
-3.6% 3.6%
4'
9'-0"
:2
M a y
.0
S h e
P R
O J E
C T
S
F S
\P R
\R o u te
S lid e S it e
F A
A \H
W Y
D
E S
\C A
D D
\K
P R
F
S -2
S lid e
S it e
F
A A d ra in
.d g n
STATE PROJECT
NUMBER
SHEET
PR
SLIDE SITE FAA
K01 does not leave the project site. Perimeter controls include fiber roll, silt fence, and other specified measures.
Prior to any clearing, grubbing, or excavation, construct perimeter controls to ensure that disturbed sediment equipment will be subject to inspection by the CO for plant invasive species at the forest entrance.
Prior to mobilizing vehicles and construction equipment to the project site, all vehicles and construction
Phase I Establish Perimeter Controls
Sequence of Construction
Direct storm water to vegetated buffer areas and do not discharge directly into surface waters.
measures.
Do not allow any construction equipment to operate on or access the down-slope side of the perimeter control
Do not allow construction vehicles to track sediment outside the project limits.
No construction access will be permitted through a wetland or waterway.
Officer (CO).
Do not modify the type, size, or location of any control or practice without prior approval from the Contracting for Construction of Roads and Bridges on Federal Highway Projects, FP-14, and the Special Contract Requirements.
measures consist of soil erosion control measures which are also defined and outlined in the Standard Specifications sedimentation of rivers, streams, and impoundments such as lakes, reservoirs, bays, and coastal waters. The
The work consists of applying measures throughout the life of the project to control erosion and to minimize the
The Erosion & Sediment Control Narrative is meant as a guideline for preventing erosion and controlling sediment.
General Guidelines
Response Center at 1-800-424-8802.
requirements under 40 CFR 112. Report spills large enough to discharge to surface waters to the National
Develop and implement a Spill Prevention Control and Countermeasures (SPCC) plan following the material according to Federal, State, and local regulations.
waste materials. Do not dispose of hazardous waste materials into the on-site dumpsters. Dispose of
Store all hazardous waste materials in appropriate and clearly marked containers away from other non-battery fluid. If feasible, conduct these activities in a covered area to avoid contact with storm water.
maintenance could generate spills, leaks, and hazardous wastes like motor oil, diesel, gasoline, and
Hazardous waste will not be generated from normal construction activities. Equipment fueling and containers. Collect and store all waste in dumpsters, or in metal or plastic drums, as appropriate.
Solid waste generated from the project will consist of construction debris, garbage, and empty prevent contamination from fuels, lubricants, hydraulic fluids, or other toxic materials.
Inspect and maintain on a regular basis, all mechanized equipment used in or near surface water to
Waste, garbage, sanitary waste
Soaps, solvents used for vehicle washing
Fuels, oils, equipment-related compounds
Wash-water from concrete, paint, curing compounds, and other construction materials
The following discharges are prohibited:
Prohibited Discharges
No new impervious surface will be created. The Runoff Coefficient will remain unchanged after construction.
the project is approximately 3.04 acres. The receiving waters are Río Mameyes and Río Icacos.
Soil disturbing activities include clearing and grubbing, and roadway grading. The total disturbed area for other miscellaneous work.
and embankment, roadway overlay of approximately 0.15 mile of roadway FS-27 at the ridge landslide location, and
This project consists of constructing an anchored soldier pile wall, gabion wall, rock buttress, roadway excavation
Project Description
Record the inspection date and summary of findings within 24 hours of completing a site inspection.
roadways, replenish stone or replace it completely. Immediately sweep any sediment on roadway.
greater. If vehicles passing through stabilized exit continue to track sediment onto adjacent
Stabilized construction exit - Inspect every 7 calendar days and after a storm event of 0.5 inch or damaged by equipment. Check staples and stakes to make sure they are securely in the ground.
event for damage and erosion beneath the matting. Replacement of matting may be necessary if
Rolled erosion control product - Inspect matting after every significant rainfall (0.5 inch or greater) ensure that no materials leave the washout area. Remove concrete materials and dispose of the offsite.
On-site concrete washout structure: Inspect for damage regularly. Immediately repair any damage to clogged. Clean clogged inlet protection or replace clogged or damaged inlet protection as necessary.
Inlet protection - Inspect to ensure that inlet protection remains firmly in place and is not damaged or of inspection.
the fiber roll when it reaches half the height of the device. Replace damaged fiber roll within 24 hours
Fiber roll / Silt fence - Inspect weekly and after each runoff event. Remove sediment deposits from end of the day.
0.25 inches or more, and daily during wet weather. Repair or replace any damaged measures by the
Check and maintain erosion control measures once every 7 days and within 24 hours after a rain of according to Section 157, the details shown in the plans, and the individual permitting requirements.
Unless stated otherwise, construct and maintain all vegetated and structural erosion control practices
Maintenance and Inspection Procedures
Remove all other perimeter controls when directed by the CO.
Remove fiber roll only after all upslope areas are stabilized and vegetation is well established.
Remove all devices used for dewatering.
Inspect, clean, and repair all culvert outlet protection, riprap basins, and stabilized channels.
where vegetation has not established.
Where necessary, replace eroded topsoil and re-apply permanent turf establishment to disturbed areas
Finish grading, place riprap, and apply permanent turf establishment to any remaining disturbed areas.
After completion of roadway construction, do the following as directed by the CO:
Phase III Final Construction / Stabilization areas.
Provide watering for dust control within the construction limits, on active haul roads, and in pits and staging stockpiles remaining in place longer than 14 days within 7 days of stockpiling.
Provide fiber roll around all stockpiled excavated roadway material. Apply temporary turf establishment to culverts.
and are stabilized (with vegetation, riprap, or pavement) before routing drainage through completed
Upon completion of culverts, ensure that culvert entrances, outlets, and outlet channels are at final grade
Install inlet protection prior to diverting water through inlets.
runoff.
At the end of each day’s grading operations, shape earthwork to minimize and control erosion from storm within 7 days. Apply permanent turf establishment to the finished slopes according to Section 625.
Apply temporary turf establishment in disturbed areas that will remain exposed for over 14 calendar days
Erosion and Sediment Control plans. Install fiber roll in ditches along the roadway.
Apply intermediate controls during rough grading operations. Install fiber roll in areas called out in the
Phase II Intermediate Controls
U.S. DEPARTMENT OF TRANSPORTATION
CONTROL NARRATIVE
EROSION AND SEDIMENT
:0
M a y
E
S C
N a rr a ti v
P R
O J E
C T
S
F S
\P R
\R o u te
S lid e S it e
F A
A \H
W Y
D
E S
\C A
D D
\M
P R
F
S -2
S lid e
S it e
F
A A e s n a rr a ti v e
.d g n
STATE PROJECT
NUMBER
SHEET
PR
SLIDE SITE FAA
M01
255025
WEEPHOLE
4"Ø
70 NAIL
NAIL
NAIL
FS
-2
FS-27
IN
V 2574.78'
IN
V 2561.76'
18"x98.68'RCP
P V C1
.5 "Ø2
BEGIN PROJECT
SCALE IN FEET
0 20 40
E 884362.4364
N 819955.9829
8+45.13
Match existing line and grade
Begin ACP overlay
See Detail E157-04
9+60, LT
protection, 25 Lnft
Install fiber roll for inlet
Limits of construction (typ.)
See Detail E157-04
9+60 to 11+05, LT
Install fiber roll, 145 Lnft NOTES:
N
See Detail E157-04
10+72 to 12+50, RT
Install fiber roll, 178 Lnft
FS Route 27 CL of disturbance.
4. Do not allow construction equipment outside the limits directed by the CO. See Detail E629-01.
3. Install RECP on disturb areas except the roadway as approved by the CO.
and adjust to meet existing field conditions as
2. Install silt fence and fiber roll as shown in the plans prior approval of the CO.
installation and other work may be permitted with the CO. Minor clearing for silt fence and fiber roll
1. Do not disturb existing trees without prior approval of
See Detail E157-02
9+90 to 12+36, RT
Install silt fence, 290 Lnft
Existing and proposed EOP (typ.)
See Detail E157-02
10+91 to 12+50, LT
Install silt fence, 159 Lnft
Limits of disturbance (typ.)
See Detail E252-01A
9+90 to 10+40, RT
Install rock buttress
See Detail E251-A
10+80, RT
curb and gutter, 39 tons
Install Class 2 riprap at end of
See Detail E157-01
Temporary stabilized construction exit
See Detail E157-01
Temporary stabilized construction exit
CONTROL PLAN
EROSION AND SEDIMENT
8+45.13 TO 12+50.00
.0
.1
P
B
M a tc h li n e
:5
M a y
D
S h e
P R
O J E
C T
S
F S
\P R
\R o u te
S li d e S it e F
A A
\H W
Y
D E
S \C
A D
D \M
-M
P R
F
S -2
S li d e
S it e
F A
A p ln
.d g n
STATE PROJECT
NUMBER
SHEET
PR
SLIDE SITE FAA
M02
5 24
2465 24652009
NAIL
REBAR2012
REBAR
REBAR
REBAR2002
REBAR
REBAR
REBAR
SL100
NAIL
EMH
REBAR
NAIL
REBARWELL
REBAR
High Voltage Cable (LEV C)
2"&4"SDR w/ 13.5 HD PE FOTS Duct &
REBAR
NAIL
FS-2
FS-27
V C x .5
IN
V
.0
END PROJECT
E 884972.3385
N 819487.673
16+45.94
Match existing line and grade
End ACP overlay
See Detail E157-04
12+50 to 16+46, RT
Install fiber roll, 396 Lnft
Limits of disturbance (typ.)
FS Route 27 CL
See Detail E157-04
12+50 to 16+46, LT
Install fiber roll, 94 Lnft
NOTES:
SCALE IN FEET
0 20 40
(see R sheets for more information)
Reconstruction of landslide along FS Route 27
N
NOTES:
of disturbance.
4. Do not allow construction equipment outside the limits directed by the CO. See Detail E629-01.
3. Install RECP on disturb areas except the roadway as the CO.
adjust to meet existing field conditions as approved by
2. Install silt fence and fiber roll as shown in the plan and prior approval of the CO.
installation and other work may be permitted with the CO. Minor clearing for silt fence and fiber roll
1. Do not disturb existing trees without prior approval of
Existing and proposed EOP (typ.)
See Detail E157-02
12+50 to 15+53, LT
Install silt fence, 389 Lnft
Limits of construction (typ.)
See Detail E251-03
15+03, RT
Install Class 2 riprap at end of culvert, 7 tons
See Detail E157-01
Temporary stabilized construction exit
14+80, LT
Install Class 2 riprap at inlet, 14 tons
12+50.00 TO 16+45.94
CONTROL PLAN
EROSION AND SEDIMENT
.4
.9
P
E
5 1
M a tc h li n e
:5
M a y
D
S h e
P R
O J E
C T
S
F S
\P R
\R o u te
S li d e S it e F
A A
\H W
Y
D E
S \C
A D
D \M
-M
P R
F
S -2
S li d e
S it e
F A
A p ln
.d g n
STATE PROJECT
NUMBER
SHEET
PR
SLIDE SITE FAA
M03
R01
-M a y -2 f h f l1 f il e s e r v e .f lh d .f h w a .d o t.
g o v d a ta P
R O J E
C T
S F
S P
R R o u te
S li d e
S it e
F
A A B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
GENERAL NOTES AND INDEX
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
A C
T U
A L F I L E R F S P
R R o u te
S li d e S it e F
A A
G N .D
G N th
MATERIALS:
Concrete:
Structural Steel:
Field verify all dimensions prior to ordering materials.
Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14.
Construction:
DESIGN LOADS:
Seismic:
GENERAL NOTES:
Design:
AASHTO LRFD Bridge Design Specifications, 9 Edition, 2020
SPECIFICATIONS:
No Scale
Seismic Zone = 4
Site Class = E
Long Period Spectrum Acceleration, SD1 = 0.647 g
Site Coefficient (Fv) = 3.189
Long Period Acceleration at 1.0 seconds (S1) = 0.203 g
Short Period Spectrum Acceleration, SDS = 0.905 g
Site Coefficient (Fa) = 1.469
Short Period Acceleration at 0.2 seconds (SS) = 0.615 g
Spectrum Acceleration, As = 0.363 g
Site Coefficient (Fpga = 1.275)
Peak Ground Acceleration (PGA) = 0.285 g
Furnish Class A (AE) for drilled shaft and precast concrete lagging panels with f'c = 4.5 ksi at 28 days.
INDEX OF WALL PLAN SHEETS
Boring Log
Anchor Details
Wall Details - 4
Wall Details - 3
Wall Details - 2
Wall Details - 1
Pile Elevations Table
Plan and Elevation - 2
Plan and Elevation - 1
Site Plan
General Notes and Index
SHEET NO. SHEET TITLE
Design Assumptions:
Backfill angle of internal friction = 28°
Soil weight of backfill: 120 pcf
Concrete: 150 pcf th
Galvanize all piles and steel after fabrication according to AASHTO M111.
Provide all welding according to AASHTO/AWS Bridge Welding Code D1.5, 7 edition with 2019 interim revision.
Furnish XS steel pipe conforming to ASTM A53, Type F.
Furnish all structural steel conforming to ASTM A572, grade 50 steel.
Reinforcing Steel:
Ground Anchors:
pu s (f = 270 ksi, nominal A = 0.217 sq. in per strand)
Furnish AASHTO M203 low-relaxation, seven wire steel strands.
Provide 2-inch cover for reinforcing steel unless otherwise noted.
Furnish reinforcing steel conforming to AASHTO M31, Grade 60 deformed.
Timber:
Pressure treat all timber in accordance with the latest AWPA U1. Provide use category UC4C timber.
STATE PROJECT
NUMBER
SHEET
PR
SITE FAA
PR FS ROUTE 27 SLIDE
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
CP CP NM
DRAWN BY
George Choubah of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-129811
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
MILE POST 1.1
RECONSTRUCTION OF LANDSLIDE ALONG FS-27
EL YUNQUE NATIONAL RAINFOREST
May 2021
R02 f h f l1 f il e s e r v e .f lh d .f h w a .d o t.
g o v d a ta P
R O J E
C T
S F
S P
R R o u te
S li d e
S it e
F
A A B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
-M a y -2
95 24
15+0014+00 13+00
RoadwayCL
Begin Wall
Sta. 12+77.26
A C
T U
A L F I L E R F S P
R R o u te
S li d e S it e F
A A S I T
E P
L A
N .D
G N
1 2 3 4 5 6 7 8 9 10 11 12 27 28 29 30 31 32
Sta. 14+61.80
End Wall
SITE PLAN
CL Ground anchor (Typ.)
13 14 15 16 17 18 19 20 21 22 23 24 25 26
" = 1'-0"32
N
STATE PROJECT
NUMBER
SHEET
PR
SITE FAA
PR FS ROUTE 27 SLIDE
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
CP CP NM
DRAWN BY
George Choubah of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-129811
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
MILE POST 1.1
RECONSTRUCTION OF LANDSLIDE ALONG FS-27
EL YUNQUE NATIONAL RAINFOREST
May 2021
S41°16'20"E e = ___
'97.01L =
'48.51T =
'2,000.00R =
(RT)02°46'45"Δ =
12+93.49PI
PC
PC
PT
High Voltage Cable (LEV C) 2"&4"SDR w/ 13.5 HD PE FOTS Duct &
R03 f h f l1 f il e s e r v e .f lh d .f h w a .d o t.
g o v d a ta P
R O J E
C T
S F
S P
R R o u te
S li d e
S it e
F
A A B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
-M a y -2
Notes:
PLAN AND ELEVATION - 1
A C
T U
A L F I L E R F S P
R R o u te
S li d e S it e F
A A P
E
.D
G N
PLAN
ELEVATION
15Pile Number =
Key:
" = 1'-0"16
(Typ.)
lagging panels
Precast concrete
(Typ.)
Anchor
Ground
15 14 13
8 7 6 5 4 3
15 14 13 12 11 10 9 8 7 6 5 4 3
14 Spa. @ 6'-0" = 84'-0"3'-0"
2 1
(Typ.)
HP 14 x 73
D r il le d s h a ft
M in
Sta. 12+77.26
Begin Wall
(Typ.)
lagging panels
Precast concrete
(Typ.)
HP 14 x 73
T y p
(Typ.)
" Dia. weep drain2
(Typ.)
timber lagging
3" Treated number 2, "Ground Anchor ID 3,2".
number. Example for pile number 3 and ground anchor
Identify ground anchor by the pile number and ground anchor 4.
elevations.
See "PILE ELEVATIONS TABLE" sheet for pile stations and 3.
concrete lagging wall details and timber lagging details.
- 3" and "WALL DETAILS - 4" sheets for additional precast
See "WALL DETAILS - 1", "WALL DETAILS - 2", "WALL DETAILS 2.
details.
See "ANCHOR DETAILS" sheet for additional ground anchor 1.
STATE PROJECT
NUMBER
SHEE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .