This document provides an amendment to a federal solicitation and related questions and clarifications. The amendment revises plan sheets for a project to repair two landslides along Forest Service Route 27 in El Yunque National Forest, Puerto Rico. Specifically, the amendment replaces wall detail sheet R09 and provides a summary of bidder questions and agency responses. The project scope includes constructing an anchored soldier pile wall, gabion wall, rock buttress, roadway work, and other miscellaneous construction. The estimated price range is $5 million to $10 million. The bid due date of August 5, 2021 remains unchanged. The Eastern Federal Lands Highway Division of the Federal Highway Administration issued the solicitation on behalf of the project owner, the U.S. Forest Service.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Results of the Bid Opening - PR FS ROUTE 27 SLIDE SITE FAA.pdf | ||
| Amendment 0003 - PR FS ROUTE 27 SLIDE SITE FAA.pdf | ||
| Amendment 0002 - PR FS ROUTE 27 SLIDE SITE FAA.pdf | ||
| Amendment 0001 - PR FS ROUTE 27 SLIDE SITE FAA.pdf | ||
| Report_Geotechnical.pdf | ||
| VETS-4212 - Form - 2021.pdf | ||
| IFB Solicitation - PR FS Route 27 Slide Site FAA.pdf | ||
| FP14_Eng.pdf | ||
| Plans - PR FS Route 27 Slide Site FAA.pdf | ||
| Categorical Exclusion Form (NEPA).pdf | ||
| ADV_Bidders Qualifications Form.doc | DOC document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
693C7321B000017 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
ASHBURN VA 20147
ATTN:CONSTRUCTION
693C73
SUITE E2-3-300
QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
ASHBURN VA 20147
ATTN:ACQUISITIONS
693C73
SUITE E2-3-300
QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
See Block 1407/29/20210004
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/29/2021
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Project PR FS ROUTE 27 SLIDE SITE FAA
The purpose of this Amendment is to:
1) Revise the Plans as follows:
a) Replace Sheet R09.
b) See Amendment No. 4 Amended Plan Sheets and Plan Sheet Changes Summary for details.
2) Provide a summary of responses to questions/clarifications asked by potential bidders.
The Bid Opening date of August 5, 2021 at 2:00 p.m. EST remains unchanged.
15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Amendment No. 0004
Info Page 1 of 1
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Project PR FS ROUTE 27 SLIDE SITE FAA
El Yunque National Forest Reconstruction of Landslide Along FS-27 Mile Post 1.1
Solicitation: 693C73-21-B-000017
The purpose of this Amendment is to:
1) Revise the Plans as follows:
a) Replace Sheet R09.
b) See Amendment No. 4 Amended Plan Sheets and Plan Sheet Changes Summary for details.
2) Provide a summary of responses to questions/clarifications asked by potential bidders.
The Bid Opening date of August 5, 2021 at 2:00 p.m. EST remains unchanged.
R09 f h f l1 f il e s e r v e .f lh d .f h w a .d o t.
g o v d a ta P
R O J E
C T
S F
S P
R R o u te
S li d e
S it e
F
A A B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P la n
R e v is io n P
R O J E
C T
S .d g n
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
-J u l- :5
P M
Notes:
A C
T U
A L F I L E R F S P
R R o u te
S li d e S it e F
A A
W A
L L D
E T
A I L S .D
G N
WALL DETAILS - 4
SECTION E-ETYPICAL STONE FACING OF PANELS
(See Note 3) pipe weep drain non-corrosive
" Dia. 2
(See Note 3) pipe weep drain non-corrosive
" Dia. 2
" = 1'-0"2
E
E
A
A
B
B
PANEL C
"8 35'-3 D
D
7"
7" 7"
"8 35'-3
1'-8" 1'-8"
"8 35'-3
"8 35'-3
PANEL B
PANEL A-1 PANEL A-2
SECTION C-C SECTION D-D
s p a c e s
E q u a l
C
C
SECTION B-BSECTION A-A
7"
#5 Rebar
"4 35 Spa. @ 11
R e b a r
S p a
#5 Rebar
"4 35 Spa. @ 11
#5 Rebar
"4 35 Spa. @ 11
R e b a r
S p a
R e b a r
S p a pattern arranged in a random
Large-sized flagstones
STONE FACING EXAMPLE
(See Note 1 and 2) form liner (Typ.)
all panels by using a
Form stone facing in of panel
Front face of panel
Front face of panel
Front face of panel
Front face
Furnish geotextile filter conforming to Subsection 714.01(a).4.
reinforcement.
Adjust weephole location to avoid interference with 3.
EXAMPLE" detail.
2. Furnish form liner to match stone pattern in "STONE FACING to manufacturer's recommendation and Subsection 552.03.
Form stone facing in all panels by using a form liner according 1.
(See Note 4)
Geotextile filter, Class 1, Type E
1 07/29/21 CP Revised subsection requierement in Note 1
STATE PROJECT
NUMBER
SHEET
PR
SITE FAA
PR FS ROUTE 27 SLIDE
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
CP CP NM
DRAWN BY
George Choubah of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-129811
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
MILE POST 1.1
RECONSTRUCTION OF LANDSLIDE ALONG FS-27
EL YUNQUE NATIONAL RAINFOREST
May 2021
Plan Sheet changes 1 of 1
Plan Sheet changes
1. Delete Wall Details - 4, Sheet R09, and substitute the amended Wall Details - 4, Sheet R09.
a) Revised Note 1 to correct referenced subsection.
Questions/Clarifications
Questions/Clarifications
Bidders can send written questions or inquiries for clarification to: eflhd.contracts@dot.gov.
Questions can be submitted at any time, but questions with 10 days of the bid opening may not be answered or answered in time for the bidder to properly incorporate the responses into their bids.
1. Can you provide Subsection 725.19 for Stone Facing? It is referenced in Note 1 of plan sheet R09 and it was not included in the specifications.
Response: The note in the plans is incorrect. Please refer to Subsection 552.03 of the Special Contract Requirements for the information. This amendment corrects plan sheet R09.
| U.S. DEPARTMENT OF TRANSPORTATION |
| FEDERAL HIGHWAY ADMINISTRATION |
| EASTERN FEDERAL LANDS HIGHWAY DIVISION |
| Amendment No. 0004 |
| Solicitation: 693C73-21-B-000017 |
File details come from the government source that posted it. Updated .