This amendment modifies a solicitation for reconstruction work along Forest Service Route 27 in El Yunque National Forest in Puerto Rico. The project involves repairing two landslides at milepost 1.1 through construction of an anchored soldier pile wall, gabion wall, rock buttress, roadway excavation and embankment, and approximately 0.15 miles of roadway overlay. The amendment revises subsection 565.07 of the special contract requirements to allow an alternative testing and inspection method for drilled shafts, in lieu of CSL testing. It also provides responses to bidder questions, including allowing the alternative method for verifying drilled shaft integrity. The bid opening date of August 5, 2021 at 2:00 PM EST is unchanged. The estimated price range for the project is $5-10 million. The solicitation is issued by the Eastern Federal Lands Highway Division of the Federal Highway Administration for the Federal Aviation Administration.

View the file

Other files for this federal contract opportunity

Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

693C7321B000017 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

ASHBURN VA 20147

ATTN:CONSTRUCTION

693C73

SUITE E2-3-300

QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

ASHBURN VA 20147

ATTN:ACQUISITIONS

693C73

SUITE E2-3-300

QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

See Block 1407/28/20210003

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

06/29/2021

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Project PR FS ROUTE 27 SLIDE SITE FAA

The purpose of this Amendment is to:

1) Revise the Special Contract Requirements (J Pages) as follows:

a) Modify Subsection 565.07 requirements.

b) See Amendment No. 3 Special Contract Requirements (SCR) Changes for details.

2) Provide a summary of responses to questions/clarifications asked by potential bidders.

The Bid Opening date of August 5, 2021 at 2:00 p.m. EST remains unchanged.

15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Amendment No. 0003

Info Page 1 of 1

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

Project PR FS ROUTE 27 SLIDE SITE FAA

El Yunque National Forest Reconstruction of Landslide Along FS-27 Mile Post 1.1

Solicitation: 693C73-21-B-000017

The purpose of this Amendment is to:

1) Revise the Special Contract Requirements (J Pages) as follows:

a) Modify Subsection 565.07 requirements.

b) See Amendment No. 3 Special Contract Requirements (SCR) Changes for details.

2) Provide a summary of responses to questions/clarifications asked by potential bidders.

The Bid Opening date of August 5, 2021 at 2:00 p.m. EST remains unchanged.

SCR changes 1 of 1

Special Contract Requirement (SCR) changes

1. Add the following to Section 565 of the SCR, page J-33:

565.07. Add the following after the first paragraph:

As an alternative to the CSL testing, the contractor can submit an alternate testing and inspection method for the approval of the CO to verify integrity of the drilled shaft and ensure that the work meets design depth and diameter requirements.

Questions/Clarifications

Questions/Clarifications

Bidders can send written questions or inquiries for clarification to: eflhd.contracts@dot.gov.

Questions can be submitted at any time, but questions with 10 days of the bid opening may not be answered or answered in time for the bidder to properly incorporate the responses into their bids.

1. The CLS test is not feasible on this Drill shaft configuration. There is no space for CSL tube and probes lectures. Please reconsider an exception to this requirement.

Response: Subsection 565.07 is being modified in this amendment to allow the contractor to submit an alternate testing and inspection method for the approval of the CO to verify integrity of the drilled shaft and ensure that the work meets design depth and diameter requirements. Refer to the Special Contract Requirement (SCR) changes document for additional information.

U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Amendment No. 0003
Solicitation: 693C73-21-B-000017

File details come from the government source that posted it. Updated .