Plans - NP SER PMS FY24(1).pdf
PDF 12 MB Posted
- Attached to
- Canaveral National Seashore - NP SER PMS FY24(1)
- Solicitation number
- 693C73-25-B-000001
About this file
This document appears to be a set of plans related to the Canaveral National Seashore for fiscal year 2024. The associated federal contract opportunity is a solicitation issued by the Department of Transportation Federal Highway Administration for services related to the Canaveral National Seashore. Bids for this solicitation are due by 2:00 p.m. on October 3, 2024. The solicitation does not provide additional details on the specific products or services required, pricing terms, set asides, or other salient information. As this document appears to be only plans without addressing required contract deliverables, no further summary can be provided.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DESCRIPTION OF PROJECT
16.33 Miles
work.
concrete pavement, full depth patching, and other miscellaneous include Type 2 micro surfacing, SAMI, thin lift overlay of asphalt identified roadways and parking areas. These activities
This project consists of the pavement preservation of
Project Manager Lead DesignerHighway Design Manager
32.3 Miles
(See Location Maps)
PROJECT NP SER PMS FY24(1)
N
KEY MAP
STATE OF FLORIDA
SCALE IN MILES
MELBOURNE
FT. LAUDERDALE
MIAMI
FORT MYERS
ST. PETERSBURG
TALLAHASSEE
JACKSONVILLE
ORLANDO
PROJECT NP SER PMS FY24(1)
NO SCALE
CANAVERAL NATIONAL SEASHORE
NATIONAL PARK SERVICE
U.S. DEPARTMENT OF THE INTERIOR
ROADS AND PARKING AREAS
PAVEMENT PRESERVATION OF PARK
FLORIDA
BREVARD, VOLUSIA COUNTIES
Alazar FelekeRamnik Satasiya
IMPROVEMENT
PROJECT LENGTH
LANE MILES
Iqbal Imam/Linnacy Zia
N
PLANS PREPARED BY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
JULY, 2024
ASHBURN, VIRGINIA
EASTERN FEDERAL LANDS HIGHWAY DIVISION
R
E N
O R
A I
N
N
ST F
R
I
D
D E P A
T
NTOFT A SP
T T
O
U
TE
ATESO
AM
E R
IC
A
M
100% PLANS
ROAD:
PLANS FOR PROPOSED PROJECT
NP SER PMS FY24(1)
Call Sunshine811 prior to digging:
811 or (800) 432-4770 (FL) www.sunshine811.com
NATIONAL
PARK
SERVICE
INDEX TO SHEETS
SPECIFICATIONS:
and Bridges on Federal Highway Projects", FP-14.
"Standard Specifications for Construction of Roads
Title Sheet
Symbols And Abbreviations
Location Map
Typical Sections
Summaries and Schedules
Temporary Traffic Control
DESCRIPTION
SHEET
NO
A01
A02-A03
A04-A07
B01-B05
C04-C10
N01-N03
S01-S13 Standards And Details
M01 Erosion and Sediment Control Narrative
C01-C03 Tabulation of Quantities
A08-A09 Project Schedule & Route Identification
:4
P
M
J u ly
U S
S u r2
D
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\A -N
P S
E R
P M
S F
Y (1 tt l.
d g n
:5
J u ly
S h e e t
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\A -N
P S
E R
P M
S F
Y (1 tt l.
d g n
PROJECT
NUMBER
SHEET
PROJECT
NUMBER
SHEET
A01
NPS Drwg No. 639/192370 NPS PMIS Nos. 335036 and 335037
NP SER PMS FY24(1)
0.00EL.
BH TP
mon.
min.
max.
MP
MOD
ML
monument minimum maximum mile post modification main line
No.
NMSA
NC
N number nominal maximum size aggregate normal crown north
OG
OD
o. to o.
ohwm
o. c.
original ground outside diameter out to out ordinary high water mark on center pvmt.
PT
PST
PSC
PS
prop.
POT
POS
POE
POC
POB
pl.
PI
PGL
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral proposed point on tangent point on spiral point of ending point on curve point of beginning plate point of intersection profile grade line point of curve to spiral point of compound curve point of curve rte.
rt. or RT reqd.
reinf.
RECP
rdwy.
R/W
R.
R route right required reinforcement rolled erosion control product roadway right-of-way range radius spa.
shldr.
sec.
SC
SADT
S spacing, spaces or spaced shoulder section point of spiral to curve seasonal average daily traffic south sidewalk symmetrical solid white point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent stopping sight distance point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot
S/W sym.
SW or SDW
STS
struc.
stiff.
stgr.
std.
Sta.
ST
SSD
SS
SRS
sqyd sqft typ.
Ts
TS
traf.
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral traffic thread temporary bench mark township tangent distance
VPI
vph var.
VC
V vertical point of intersection vehicles per hour varies vertical curve design speed
W west sidewalk symmetrical solid white point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent stopping sight distance point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot
S/W sym.
SW or SDW
STS
struc.
stiff.
stgr.
std.
Sta.
ST
SSD
SS
SRS
sqyd sqft
1 6
1 6
SEC.
SEC.
E
N 0
00000
JH
RBAR
NO. DATE BY REVISIONS
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION CANAVERAL NATIONAL SEASHORE
flg.
fin.
flange finish θs Ø ∆c
DY or DTY DW or DTW
DSY
drwg(s).
dist.
diaph.
diag.
dia.
DHV
D ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
CL
cc or c. to c.
BW
brg.
br.
BP
BM
bldg.
BL
BK
Asph
ASC
appr.
AMD
AH
Agg
ADT
ACP
abut.
spiral central angle diameter curve central angle total central angle dotted yellow dotted white double solid yellow drawing(s) distance diaphragm diagonal diameter design hourly volume directional distribution factor centers curve to spiral continuous construction joint connection concrete column corrugated metal pipe centerline center to center broken white bearing bridge balance point bench mark building baseline back asphalt aggregate surface course approach amendment ahead aggregate average daily traffic asphalt concrete pavement abutment expansion joint excavation existing edge of water equivalent single axle load edge of road equation edge of travel way edge of shoulder edge of pavement embankment elevation electric superelevation rate east exp. jt.
exc.
ex. or exist.
EW
ESAL
ER
EQ or eq.
EOT
EOS
EOP
emb.
elev.
elec.
e E
HW
HLSD
hex.
hdwl.
inv.
INF
ID
K jt.
high water headlight sight distance hexagon headwall invert infinite inside diameter
K-Value joint lat.
lam.
L latitude lamination length of curve
LW
lt. or LT Ls
LPSM
long.
LOD
low water left length of spiral lump sum longitudinal Limits of Disturbance ftg.
gnd or grnd galv.
GAB
ga.
HW
HLSD
hex.
hdwl.
footing ground galvanized graded aggregate base gage (gauge) high water headlight sight distance hexagon headwall
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
Section Line
Section Corner (Found, Projected)
Section Line4
Section Corner (Found, Projected)4
Section Line16
Section Corner (Found, Projected)16
Property Line w/Found Property Corner
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
BLM Lands Boundary
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Railroad
Trail
Intermittent Drainage or Small Creek
Large Creek or River
Lake, Pond or Reservoir
Spring or Seep
Treeline; Individual Trees
Material Source; Bore Hole; Test Pit
Spot Elevation; Coordinate Grid Tick
Control Point (Terrestrial and GPS); Jump Hub
Sheet 1 of 2
:3
A
J u ly
S
H E
E T
M
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\A
-A
-N P
S E
R P
M S
F Y
(1 s y m
.d g n
SYMBOLS AND ABBREVIATIONS
PROJECT
A02
N
AREA PATTERN
PROJECT SPECIFIC SYMBOLS AND ABBREVIATIONS:
U.S. DEPARTMENT OF TRANSPORTATION CANAVERAL NATIONAL SEASHORE
Fiber Roll or Wattle
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Concrete Barrier
Slope Stake Limits
Delineators
Signs (single, double post; portable)
Transition
Toe of Fill
Top of Cut
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Pipe Culvert with Drop Inlet
Box Culvert
Underground Utilities
Overhead/Above Ground Utilities
STEAM = steam, T = telephone, TV = CATV, W = water
P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use, Miscellaneous Utility Features
UP = transformer or junction box, WF = water fountain
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
EXISTING PROPOSED
DI
Pavement Removal / Roadway Obliteration
Full Depth Pavement
Sidewalk Asphalt/Concrete
Mill and Overlay
Overlay
Silt Fence
Diversion Berm
Drainage Divide
Check Dam
Limits of Disturbance
Stress Absorbing Membrane InterlayerSAMI single solid yellowSSY single solid whiteSSW
Bipartisian Infrastructure LawBIL
National Park ServiceNPS
Sheet 2 of 2
:3
J u ly
S H
E E
T
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\A
-A
-N P
S E
R P
M S
F Y
(1 s y m .d g n
SYMBOLS AND ABBREVIATIONS
PROJECT
A03
(CANA)
PMS FY24(1)
Project: NP SER
U.S. DEPARTMENT OF TRANSPORTATION CANAVERAL NATIONAL SEASHORE
NO SCALE
Sheet 1 of 4
NOTE:
Coordinate with the CO before using any location for the staging area.
:3
J u n e
L o c a ti o n
M a p
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\A
-A
-N P
S E
R P
M S
F Y
(1 lo c a ti o n m a p
.d g n
LOCATION MAP
PROJECT
A04
NO SCALE
SEE DETAIL IN A06
AREA 1
SEE DETAIL IN A07
AREA 2
U.S. DEPARTMENT OF TRANSPORTATION
KEY MAP
Sheet 2 of 4
CANAVERAL NATIONAL SEASHORECANAVERAL NATIONAL SEASHORE
NOTE:
Coordinate with the CO before using any location for the staging area.
:0
J u n e
K e y
M
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\A
-A
-N P
S E
R P
M S
F Y
(1 lo c a ti o n m a p
.d g n
LOCATION MAP
PROJECT
A05
AREA 1
See Key Map on Sheet A05
U.S. DEPARTMENT OF TRANSPORTATION
AREA 1
Sheet 3 of 4
CANAVERAL NATIONAL SEASHORECANAVERAL NATIONAL SEASHORE
NOTE:
Coordinate with the CO before using any location for the staging area.
:0
J u n e
M a
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\A
-A
-N P
S E
R P
M S
F Y
(1 lo c a ti o n m a p
.d g n
LOCATION MAP
PROJECT
A06
See Key Map on Sheet A05
U.S. DEPARTMENT OF TRANSPORTATION
AREA 2
Sheet 4 of 4
CANAVERAL NATIONAL SEASHORE
NOTE:
Coordinate with the CO before using any location for the staging area.
:0
J u n e
M a
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\A
-A
-N P
S E
R P
M S
F Y
(1 lo c a ti o n m a p
.d g n
LOCATION MAP
PROJECT
NUMBER
SHEET
A07
NPS PMIS Nos 335036 and 335037 NPS Drwa No 639/192370
PROJECT
SHEET
NUMBER
NP SER PMS FY24(1) ADS
AREA 1
PROJECT SCHEDULE & ROUTE IDENTIFICATION
Access GPS Coordinates
Length Lane Treatment Sheet Schedule Route No. Route Name Area (sqft)
Type (miles) (miles) Type Number Begin_Lat Begin_Long End_Lat End_Long
A Public CANA-0013 AD APOLLO BEACH ROAD 28.938791 -80.831823 28.857815 -80. 776368 6.60 745747 .00 6.600 SAMI A06
B Public CANA-0010 PD PLAYALINDABEACH ROAD 28.651089 -80.629753 28.702334 -80.667464 4.3 469973.00 4.3 Micro-Surf. A07
B Public CANA-0300 PD PLAYALINDA ACCESS ROAD 28.643446 -80.696526 28.651011 -80.629772 4.22 572637.00 8.44 Micro-Surf. A07
C Public CANA-0205 AD ELDORA LOOP ROAD 28.919756 -80.818209 28.909252 -80.811186 1.21 94554.00 1.210 SAMI A06
C Public CANA-0931 AD PARKING #1 28.936932 -80.829901 - - - 49482.00 0.85 SAMI A06
C Public CANA-0932 AD PARKING #2 28.910947 -80.812153 - - - 12839.00 0.22 SAM! A06
C Public CANA-0933 AD PARKING #3 28.898409 -80.803473 - - - 12984.00 0.22 SAM! A06
C Public CANA-0934 AD PARKING #4 28.885101 -80.794418 - - - 12667.00 0.22 SAM! A06
I C Public CANA-0937 AD PARKING #7 28.912321 -80.817991 - - - 10660.00 0.18 SAMI A06
C Public CANA-0938 AD PARKING #8 28.909493 -80.818462 - - - 13557.00 0.23 SAMI A06
I C Public CANA-0939 AD PARKING #9 28.908661 -80.815325 - - - 8874.00 0.15 SAMI A06
I
I
I
NO. DATE BY REVISIONS
U.S. DEPARTMENT OF TRANSPORTATION CANAVERAL NATIONAL SEASHORE
FEDERAL HIGHWAY ADMINISTRATION
OFFICE OF FEDERAL LANDS HIGHWAY
PROJECT SCHEDULE & ROUTE
IDENTIFICATION
AREA 1
Sheet 1 of 2
SHEET
NUMBER
NP SER PMS FY24(1) A09
AREA2
PROJECT SCHEDULE & ROUTE IDENTIFICATION
GPS Coordinates Length Sheet
Schedule Access
Route No. Route Name Area (sqft) Lane Treatment
Type (miles) (miles) Type Number Begin_Lat Begin_Long End Lat End _Long
D Public CANA-0901 PD PARKING # 1 28.654932 -80.632110 - - - 28772.00 0.49 Thin-Lift A07
D Public CANA-0902 PD PARKING #2 28.656909 -80.633404 - - - 36304.00 0.62 Thin-Lift A07
D Public CANA-0903 PD PARKING #3 28.659059 -80.635044 - - - 31067.00 0.53 Thin-Lift A07
D Public CANA-0904 PD PARKING #4 28.661045 -80.636472 - - - 39969.00 0.69 Thin-Lift A07
D Public CANA-0905 PD PARKING #5 28.66691 -80.640706 - - - 33407.00 0.57 Thin-Lift A07
D Public CANA-0906 PD PARKING #6 28.66922 -80.642375 - - - 38741.00 0.67 Thin-Lift A07
D Public CANA-0907 PD PARKING #7 28.671862 -80.644300 - - - 34681.00 0.60 Thin-Lift A07
E Public CANA-0935AZ AD PARKING #5 A 28.858492 -80. 776827 - - - 2997.00 0.05 Thin-Lift A06
E Public CANA-0935B Z AD PARKING #5 B 28.858294 -80. 776821 - - - 1494 0.03 Thin-Lift A06
E Public CANA-0935CZ AD PARKING #5 C 28.858054 -80.776497 - - - 2939.00 0.05 Thin-Lift A06
E Public CANA-0940 AD BOAT RAMP PARKING 28.934882 -80.829162 - - - 32553.00 0.56 Thin-Lift A06
E Public CANA-0941 AD TURTLE MOUND PARKING 28.930173 -80.825432 - - - 6359.00 0.11 Thin-Lift A06
E Public CANA-0945 AD VISITOR CENTER PARKING 28.927142 -80.824252 - - - 18936.00 0.33 Thin-Lift A06
F Admin CANA-0914 PD RANGER STATION PARKING 28.927142 -80.824252 - - - 13201.00 0.23 Thin-Lift A07
G Public CANA-0900 PD PLAYALINDA ENTRANCE PULL OFF 28.644498 -80.684386 - - - 3810.00 0.07 Thin-Lift A07
G Public CANA-0908 PD PARKING #8 28.678298 -80.648793 - - - 43430.00 0.75 Thin-Lift A07
I G Public CANA-0909 PD PARKING #9 28.685656 -80.654895 - - - 29732.00 0.51 Thin-Lift A07
G Public CANA-0910 PD PARKING # 10 28.68828 -80.65703 - - - 30054.00 0.52 Thin-Lift A07 I
G Public CANA-0911 PD PARKING #11 28.694453 -80.661720 - - - 13174.00 0.23 Thin-Lift A07
G Public CANA-0912 PD PARKING #12 28.697773 -80.664165 - - - 16057.00 0.28 Thin-Lift A07
G Public CANA-0913 PD PARKING #13 28.701631 -80.66698 - - - 12742.00 0.22 Thin-Lift A07
G Public CANA-0915 PD COUNTACT STATION RV PULL OUT 28.645186 -80.683258 - - - 2816.00 0.05 Thin-Lift A07
G Public CANA-0916 PD VISTA #1 28.646125 -80.677429 - - - 7412.00 0.13 Thin-Lift A07
G Public CANA-0917 PD VISTA #2 28.65078 -80.667898 - - - 12278.00 0.21 Thin-Lift A07
G Public CANA-0918 PD VISTA #3 28.651933 -80.663457 - - - 6586.00 0.11 Thin-Lift A07 I
G Public CANA-0919 PD VISTA #4 28.651769 -80.65996 - - - 6363.00 0.11 Thin-Lift A07
G Public CANA-0920 PD VISTA #5 28.651715 -80.644599 - - - 9647.00 0.17 Thin-Lift A07 I
G Public CANA-0921 PD VISTA #6 28.651873 -80.640358 - - - 4592.00 0.08 Thin-Lift A07
I G Public CANA-0922 PD VISTA #7 28.651724 -80.635857 - - - 5264.00 0.09 Thin-Lift A07
G Public CANA-0923 PD VISTA #8 28.651837 -80.632876 - - - 5284.00 0.09 Thin-Lift A07
G Public CANA-0947 PD EDDY CREEK PARKING 28.675494 -80.647876 - - - 29197.00 0.50 Thin-Lift A07
NO. DATE BY REVISIONS
U.S. DEPARTMENT OF TRANSPORTATION CANAVERAL NATIONAL SEASHORE
FEDERAL HIGHWAY ADMINISTRATION
OFFICE OF FEDERAL LANDS HIGHWAY
PROJECT SCHEDULE & ROUTE
IDENTIFICATION
Sheet 2 of 2 cross slope Match existing
Limits of disturbance
STRESS ABSORBING MEMBRANE INTERLAYER (SAMI)
PAVEMENT PRESRVATION TYPICAL SECTION
See Pavement / Surface Summary Sheets For Roadway or Surface Dimensions
Roughness)
1.125" depth, <0.3 Million ESAL, Type IV inch Nominal Maximum Size Aggregate (NMSA), -8
Thin Lift Asphalt Concrete Pavement (Gyratory Mix, Existing asphalt pavement
Existing aggregate base
Existing asphalt surface cross slope Match existing
Existing ground (typ.)
See Note 3
Chip Seal,Type 1C stations within project limits.
Do not disturb existing loop detectors or count treatment.
materials prior to placing pavement preservation
Remove pavement markings or other deleterious preservation treatment operations.
and all other appurtenances during all pavement
Protect all curbs, sidewalks, manholes, water valves, pavement preservation treatment.
according to Detail E414-01A prior to applying
Pavement Patch Typical Section and seal/fill cracks
Patch surface according to Asphalt Concrete the CO. See Detail E157-04.
Install fiber rolls for inlet protection as directed by
5.
4.
3.
2.
1.
NOTES:
construction at no additional cost to the Government.
replacement. Replace wheelstops damaged during wheelstops during removal, storage, and
Take reasonable precautions to prevent damage to damaged, as determined and directed by the CO.
wheelstops or place new wheelstops if previously preservation treatment is complete, reset existing parking or roadway surface. After pavement preservation treatment is applied to the entire the area to be treated to ensure the pavement
Remove wheelstops and clean debris located within
Limit work to the footprint of existing pavement.
8.
7.
6.
NOT TO SCALE
C L
Tack Coat
Sheet 1 of 5
U.S. DEPARTMENT OF TRANSPORTATION
CHIP SEAL
CANAVERAL NATIONAL SEASHORE
:2
J u ly
B
C h ip
S e l)
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\B
-B
-N P
S E
R P
M S
F Y
(1
T Y
P .d g n
TYPICAL SECTIONS
PROJECT
B01 cross slope Match existing
Limits of disturbance
MICRO SURFACING
Existing ground (typ.)
NOTES:
See Pavement / Surface Summary Sheets For Roadway or Surface Dimensions
Micro Surfacing, Type 2
Existing asphalt pavement
Existing aggregate base
Existing asphalt surface
NOT TO SCALE
treatment.
materials prior to placing pavement preservation
Remove pavement markings or other deleterious preservation treatment operations.
and all other appurtenances during all pavement
Protect all curbs, sidewalks, manholes, water valves, pavement preservation treatment.
according to Detail E414-01A prior to applying
Pavement Patch Typical Section and seal/fill cracks
Patch surface according to Asphalt Concrete the CO. See Detail E157-04.
Install fiber rolls for inlet protection as directed by
5.
4.
3.
2.
1.
construction at no additional cost to the Government.
replacement. Replace wheelstops damaged during wheelstops during removal, storage, and
Take reasonable precautions to prevent damage to damaged, as determined and directed by the CO.
wheelstops or place new wheelstops if previously preservation treatment is complete, reset existing parking or roadway surface. After pavement preservation treatment is applied to the entire the area to be treated to ensure the pavement
Remove wheelstops and clean debris located within
Limit work to the footprint of existing pavement.
8.
7.
6.
C L
Sheet 2 of 5
U.S. DEPARTMENT OF TRANSPORTATION
MICRO SURFACING
CANAVERAL NATIONAL SEASHORE
:0
J u ly
B
M ic r o
S u r f a c in g
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\B
-B
-N P
S E
R P
M S
F Y
(1
T Y
P .d g n
TYPICAL SECTIONS
PROJECT
B02
Limits of disturbance
THIN LIFT
See Pavement / Surface Summary Sheets For Roadway or Surface Dimensions
IV Roughness)
(NMSA), 1.125" depth, <0.3 Million ESAL, Type inch Nominal Maximum Size Aggregate -8
Mix, Thin Lift Asphalt Concrete Pavement (Gyratory
Existing asphalt pavement
Existing aggregate base
Existing asphalt surface cross slope Match existing
Existing ground (typ.)
Tack Coat treatment.
materials prior to placing pavement preservation
Remove pavement markings or other deleterious preservation treatment operations.
and all other appurtenances during all pavement
Protect all curbs, sidewalks, manholes, water valves, pavement preservation treatment.
according to Detail E414-01A prior to applying
Pavement Patch Typical Section and seal/fill cracks
Patch surface according to Asphalt Concrete the CO. See Detail E157-04.
Install fiber rolls for inlet protection as directed by
5.
4.
3.
2.
1.
NOTES:
roadway elevations according to Detail E401-01.
Construct pavemet transitions to match existing construction at no additional cost to the Government.
replacement. Replace wheelstops damaged during wheelstops during removal, storage, and
Take reasonable precautions to prevent damage to damaged, as determined and directed by the CO.
wheelstops or place new wheelstops if previously preservation treatment is complete, reset existing parking or roadway surface. After pavement preservation treatment is applied to the entire the area to be treated to ensure the pavement
Remove wheelstops and clean debris located within
Limit work to the footprint of existing pavement.
9.
8.
7.
6.
NOT TO SCALE
C
Sheet 3 of 5
U.S. DEPARTMENT OF TRANSPORTATION
THIN LIFT
CANAVERAL NATIONAL SEASHORE
:2
J u ly
B
O v e r la y
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\B
-B
-N P
S E
R P
M S
F Y
(1
T Y
P .d g n
TYPICAL SECTIONS
PROJECT
B03 to Section 418.
Patch asphalt concrete pavement areas according with the CO.
encountered at time of construction and verify
Determine patching limits based on conditions by the CO. See Detail E157-04.
Install fiber rolls for inlet protection as directed
C
12" 12"
V a r ie s
L Road to distress
Patch saw cut parallel/perpendicular
Pavement replacement limits to edge of pavement of pavement, remove
<24" from the edge
If the patch limit is
PLAN VIEW
ASPHALT CONCRETE PAVEMENT PATCH
m in
NOTES:
Pavement Distress full depth (typ.)
Saw cut vertical face
Remove pavement to expose subbase perimeter (typ.)
Apply tack coat to patch
3' min.
Varies
SECTION A-A
Asphalt concrete pavement, type I
(match depth of existing asphalt) or 4" min.
thickness if the existing pavement is less.
Place in 2 equal lifts, min.
Apply tack coat between asphalt lifts
ASPHALT CONCRETE PAVEMENT PATCH, TYPE 2
See Pavement Preservation Typical Section for final surface treatment
Existing Ground (typ.)
NOT TO SCALE
pavement (typ.)
Existing asphalt concrete
3.
2.
1.
Sheet 4 of 5
U.S. DEPARTMENT OF TRANSPORTATION
PAVEMENT PATCHING
CANAVERAL NATIONAL SEASHORE
:3
J u ly
B
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\B
-B
-N P
S E
R P
M S
F Y
(1
T Y
P .d g n
TYPICAL SECTIONS
PROJECT
B04
<Jl ffi <Jl
C.
z
M
NO. DATE BY
See Pavement Preservation Typical Section, - - - Asphalt Concrete Overlay, ¾-inch NMSA
Mill existing asphalt concrete pavement - (See Transitional Milling Table) gutter or walkway r:::
Existing asphalt concrete pavement
- Existing base Existing concrete �
-7-� c--- -t
LI)
- =±-�====:c-�f�-p�=7
L---- - -
REVISIONS
L---------------------
Asphalt Pavement Milling
Width Varies I (See Transitional Ml1/ing Table)
VIEWA
TRANSITIONAL MILLING TABLE
Milling depth Milling width
(in) (ft) *
0 to 1 3
1 to 2 6
2 to 3 9
3 to 4 12
* See Notes 2, 3, and 4
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
OFFICE OF FEDERAL LANDS HIGHWAY
NOTTO SCALE
NPS PMIS Nos. 335036 and 335037 NPS Drwc No. 639/192370
PROJECT SHEET
NUMBER
NP SER PMS FY24(1) BOS
NOTES:
1. Construct roadway pavement transitions to match existing roadway elevations according to Detail E401-01.
For parking areas, refer to the notes below and the Transitional Milling Table.
2. Match existing sidewalk, ADA ramps and gutter elevations by milling according to View A and Transitional Milling Table or as directed by the CO. Transition to existing pavement elevations according to Detail E401-01.
3. Extend milling width at ADA accessible ramps to ensure that there is no more than a 5 percent grade at any direction of the ramp approach.
4. Extend milling at accessible parking spaces and aisle to ensure the finished treatment will have a slope no steeper than 2.08 percent in any direction unless existing slope is steeper than 2.08 percent. If existing slope is steeper than 2.08 percent, extend milling so finished treatment will have a slope no steeper than existing in any direction.
CANAVERAL NATIONAL SEASHORE
TYPICAL SECTIONS
TRANSITIONAL MILLING
Sheet 5 of 5
SHEET
NUMBER
NP SER PMS FY24(1) cot
SCHEDULE A
Estimated Quantities
Line Pay Item
Item Pay Item Description Unit No.
Number Bid
Schedule
A0lO0 15101-0000 MOBILIZATION LPSM ALL
A0ll0 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
A0120 15401-0000 CONTRACTOR TESTING LPSM ALL
A0130 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 50
A0140 20302-2600 REMOVAL OF PAVEMENT MARKINGS LNFT 75,000
A0160 40702-0300 CHIP SEAL, TYPE lC SQYD 90,000
A0170 41201-0000 TACK COAT TON 75
A0180 41301-0600 ASPHALT PAVEMENT MILLING, 2-INCH DEPTH SQYD 850
A0190 41401-2000 CRACKS, CLEANING AND SEALING LNFT 3,000
A0200 41801-2000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 2 SQYD 60
A0220 43102-0000 SQYD 90,000
THIN LIFT ASPHALT CONCRETE PAVEMENT (GYRATORY MIX, 3/8-INCH NOMINAL
MAXIMUM SIZE AGGREGATE, 1.125" DEPTH, <0.3 MILLION ESAL, TYPE IV ROUGHNESS)
A0230 63401-0500 PAVEMENT MARKINGS, TYPE C, SOLID LNFT 75,000
A0240 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM ALL
A0250 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN EACH 2
A0260 63701-0000 FIELD OFFICE EACH 1
SCHEDULE B
Estimated
Quantities Line
Pay Item Item Pay Item Description Unit
No.
Number Bid
I
Schedule
B0100 15101-0000 MOBILIZATION LPSM ALL
B0110 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
I
B0120 15401-0000 CONTRACTOR TESTING LPSM ALL
B0130 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 50
I B0140 20302-2600 REMOVAL OF PAVEMENT MARKINGS LNFT 92,000
B0150 40901-2000 MICRO SURFACING, TYPE 2 SQYD 125,000
B0160 41301-0600 ASPHALT PAVEMENT MILLING, 2-INCH DEPTH SQYD 1,200
I
B0170 41401-2000 CRACKS, CLEANING AND SEALING LNFT 400
I
B0180 41801-2000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 2 SQYD 300
B0190 63401-0500 PAVEMENT MARKINGS, TYPE C, SOLID LNFT 95,000
B0200 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM ALL
B0210 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN EACH 2
NO. DATE BY REVISIONS
U.S. DEPARTMENT OF TRANSPORTATION CANAVERAL NATIONAL SEASHORE
FEDERAL HIGHWAY ADMINISTRATION
OFFICE OF FEDERAL LANDS HIGHWAY
TABULATION OF QUANTITIES
Sheet 1 of 3
U.S. DEPARTMENT OF TRANSPORTATION CANAVERAL NATIONAL SEASHORE
Sheet 2 of 3
:4
J u ly
Q u a n ti ty
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\C N
P S
E R
P M
S F
Y (1 q ty
.d g n
TABULATION OF QUANTITIES
PROJECT
C02
U.S. DEPARTMENT OF TRANSPORTATION CANAVERAL NATIONAL SEASHORE
Sheet 3 of 3
:4
J u ly
Q u a n ti ty
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\C
N P
S E
R P
M S
F Y
(1 q ty
.d g n
TABULATION OF QUANTITIES
PROJECT
C03
U.S. DEPARTMENT OF TRANSPORTATION
Sheet 1 of 7
CANAVERAL NATIONAL SEASHORE
:3
J u ly
P a v e m e n
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\C N
P S
E R
P M
S F
Y (1 q ty
.d g n
SUMMARIES AND SCHEDULES
PROJECT
C04
Sheet 2 of 7
U.S. DEPARTMENT OF TRANSPORTATION CANAVERAL NATIONAL SEASHORE
:3
J u ly
P a v e m e
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\C
N P
S E
R P
M S
F Y
(1 q ty
.d g n
SUMMARIES AND SCHEDULES
PROJECT
C05
Sheet 3 of 7
U.S. DEPARTMENT OF TRANSPORTATION CANAVERAL NATIONAL SEASHORE
:3
J u ly
P a v e m e
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\C N
P S
E R
P M
S F
Y (1 q ty
.d g n
SUMMARIES AND SCHEDULES
PROJECT
C06
U.S. DEPARTMENT OF TRANSPORTATION
Sheet 4 of 7
CANAVERAL NATIONAL SEASHORE
:4
J u ly
P a v e m e n t M a r k in
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\C N
P S
E R
P M
S F
Y (1 q ty
.d g n
SUMMARIES AND SCHEDULES
PROJECT
C07
Sheet 5 of 7
U.S. DEPARTMENT OF TRANSPORTATION CANAVERAL NATIONAL SEASHORE
:4
J u ly
P a v e m e n t M a r k
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\C N
P S
E R
P M
S F
Y (1 q ty
.d g n
SUMMARIES AND SCHEDULES
PROJECT
C08
Sheet 6 of 7
U.S. DEPARTMENT OF TRANSPORTATION CANAVERAL NATIONAL SEASHORE
:4
J u ly
P a v e m e n t M a r k
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\C N
P S
E R
P M
S F
Y (1 q ty
.d g n
SUMMARIES AND SCHEDULES
PROJECT
C09 il' i--
I
I
I
I
I
NO. DATE BY
PERMANENT SIGN SUMMARY
LOCATION Schedule D Schedule E Schedule G
0:: PANEL SIZE Pay Item Pay Item Pay Item w
>- 63304-0100 63304-0100 63304-0100 :E I-
.. SIGNS, SIGNS, SIGNS,
z MUTCD SIGN TEXT :c I- COLOR COMBINATION
I-
NO. :i::: C( z STEEL STEEL STEEL w I-
C, w <C I- C
0:: ::::, PANELS, PANELS, PANELS,
::::, � w C( 0' TYPE 3 TYPE 3 TYPE 3 0 :i:::
0:: w SHEETING SHEETING SHEETING
C
STATION
Ill Inch Inch Sqft SQFT SQFT SQFT
CANA-
RS-104 Recreational Vehicle 24 24 4.00 White on Brown 3 12.0
CANA-
R8-3a NO PARKING 18 24 3.00 Red on White 2 6.0
CANA-
R8-3a NO PARKING 18 24 3.00 Red on White 1 3.0
Subtotal this Sheet 12.0 6 3
CONSTRUCTION SIGN SUMMARY
PANEL SIZE
>- Section 635 I-
:i::: I- I-
:i::: C( COLOR COMBINATION z TEMPORARY SIGN TEXT I- C, w <C REMARKS
C � ::::, TRAFFIC
� w C( 0' CONTROL SIGNS :i:::
(in) (in) (sqft) SQFT
BIL Sign 72 48 24 White on Green 2 48 See Detail E635-15
ROAD CLOSED 48 30 10 Black on White 2 20 R11-2 PARKING CLOSED 48 30 10 Black on White 2 20 R11-2 (Modified)
ROAD CLOSED AHEAD 36 36 9 Black on Orange 2 18 W20-3
PARKING CLOSED AHEAD 36 36 9 Black on Orange 2 18 W20-3 (Modified)
ONE LANE ROAD AHEAD 36 36 9 Black on Orange 2 18 W20-4
FLAGG ER 36 36 9 Black on Oranqe 2 18 W20-7
Subtotal this Sheet 160
Note: Construct and erect all signs in accordance with the "Manual on Uniform Traffic Control Devices" (MUTCD), latest edition. * For information only
REVISIONS U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
OFFICE OF FEDERAL LANDS HIGHWAY
NPS PMIS Nos 335036 and 335037 NPS Drwa No 639/192370
PROJECT SHEET
NUMBER
NP SER PMS FY24(1) ClO
NOTES:
1. Construct and erect all signs in accordance with the "Manual on Uniform Traffic Control Devices" (MUTCD), latest edition.
2. Traffic control devices including barricades, type 3 may be used as approved by the CO.
3. Place all temporary traffic control signs within the NPS right of way.
4. Install permanent signs in accordance with the "Manual on Uniform Traffic Control Devices" (MUTCD), latest edition.
5. Refer to Detail E633-03 for installation of sign post.
CANAVERAL NATIONAL SEASHORE
SUMMARIES AND SCHEDULES
Sheet 7 of 7 ii'
Project Description
This project consists of the pavement preservation of identified roadways and parking areas.
These activities include pavement Type 2 micro surfacing, SAMI, thin lift overlay of asphalt concrete pavement, full depth patching, and other miscellaneous work.
Soil disturbing activities are minimal in the project and do not exceed 1 acre. If more than 1 acre will be disturbed, contact the CO before any disturbance.
No new impervious surface will be created by the reconstructed roadway. The receiving waterbody will be Atlantic Ocean.
Prohibited Discharges
The following discharges are prohibited:
Wash-water from concrete, paint, curing compounds, and other construction materials Fuels, oils, equipment-related compounds Soaps, solvents used for vehicle washing Waste, garbage, sanitary waste
Inspect and maintain on a regular basis, all mechanized equipment used in or near surface water to prevent contamination from fuels, lubricants, hydraulic fluids, or other toxic materials.
Solid waste generated from the project will consist of construction debris, garbage, and empty containers. Collect and store all waste in dumpsters, or in metal or plastic drums, as appropriate.
Hazardous waste will not be generated from normal construction activities. Equipment fueling and maintenance could generate spills, leaks, and hazardous wastes like motor oil, diesel, gasoline, and battery fluid. If feasible, conduct these activities in a covered area to avoid contact with storm water.
Store all hazardous waste materials in appropriate and clearly marked containers away from other non waste materials. Do not dispose of hazardous waste materials into the on-site dumpsters. Dispose of material according to Federal, State, and local regulations.
Develop and implement a Spill Prevention Control and Countermeasures (SPCC) plan following the requirements under 40 CFR 112. Report spills large enough to discharge to surface waters to the National Response Center at 1-800-424-8802.
General Guidelines
The Erosion & Sediment Control Narrative is meant as a guideline for preventing erosion and controlling sediment.
The work consists of applying measures throughout the life of the project to control erosion and to minimize the sedimentation of rivers, streams, and impoundments such as lakes, reservoirs, bays, and coastal waters. The measures consist of soil erosion control measures which are also defined and outlined in the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14, and the Special Contract Requirements.
Do not modify the type, size, or location of any control or practice without prior approval from the Contracting Officer (CO).
No construction access will be permitted through a wetland or waterway.
Do not allow construction vehicles to track sediment outside the project limits.
Do not allow any construction equipment to operate on or access the down-slope side of the perimeter control measures.
Direct storm water to vegetated buffer areas and do not discharge directly into surface waters.
Sequence of Construction
Phase I Establish Perimeter Controls
Prior to any clearing, grubbing, or excavation, construct perimeter controls to ensure that disturbed sediment does not leave the project site. Perimeter controls include fiber roll and other specified measures outside the construction limits.
NO. DATE BY REVISIONS
:;i1----+-- -----l----+-- - - - - - - - - -- - - - -----I
NPS PMIS Nos 335036 and 335037 NPS Drwa No 639/192370
PROJECT
NP SER PMS FY24(1)
Phase II Intermediate Controls
Apply intermediate controls during rough grading operations. Install fiber roll in areas surrounding the culverts.
Apply temporary turf establishment in disturbed areas that will remain exposed for over 14 days within 7 days. Apply permanent turf establishment to the finished slopes according to Section 625.
At the end of each day's grading operations, shape earthwork to minimize and control erosion from storm runoff.
Install inlet protection prior to diverting water through inlets.
Upon completion of culverts, ensure that culvert entrances, outlets, and outlet channels are at final grade and are stabilized (with vegetation, riprap, or pavement) before routing drainage through completed culverts.
Provide watering for dust control within the construction limits, on active haul roads, and in pits and staging areas.
Phase III Final Construction / Stabilization
After completion of roadway construction, do the following as directed by the CO:
Remove fiber roll only after all upslope areas are stabilized and vegetation is well established.
Remove all other perimeter controls when directed by the CO.
Maintenance and Inspection Procedures
Unless stated otherwise, construct and maintain all vegetated and structural erosion control practices according to Section 157, the details shown in the plans, and the individual permitting requirements.
Check and maintain erosion control measures once every 7 days and within 24 hours after a rain of
0.25 inches or more, and daily during wet weather. Repair or replace any damaged measures by the end of the day.
SHEET
NUMBER
MOl
Inlet protection - Inspect to ensure that inlet protection remains firmly in place and is not damaged or clogged. Clean clogged inlet protection or replace clogged or damaged inlet protection as necessary.
Record the inspection date and summary of findings within 24 hours of completing a site inspection.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
OFFICE OF FEDERAL LANDS HIGHWAY
CANAVERAL NATIONAL SEASHORE
EROSION AND SEDIMENT
CONTROL NARRATIVE
See Detail E635-15.
3. Place Bipartisan Infrastructure Law Sign at the beginning and end of project.
2. See Section 635 for temporary traffic control requirements.
1. See Sheet N02 for temporary traffic control closure details.
:5
J u ly
N
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\N
-N
-N P
S E
R P
M S
F Y
(1 tt c .d g n
PROJECT
N01
NP SER PMS FY24(1)
NO. DATE BY REVISIONS
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
TEMPORARY TRAFFIC CONTROL
Sheet 1 of 3
CANAVERAL NATIONAL SEASHORE
Varies
500'
500'
(Mounted on Type 3 Barricade)
48"x30"
R11-2 (Modified)
(Mounted on Type 3 Barricade)
48"x30"
R11-2 (Modified)
TYPICAL PARKING AREA CLOSURE
Barricade Type 3 (typ.)
PARKING
CLOSED
PARKING
CLOSED
CLOSED
PARKING
AHEAD
36"x36"
W20-3 (Modified)
36"x36"
W20-3 (Modified)
CLOSED
PARKING
AHEAD
:5
J u ly
T E
M P
O R
A R
Y T
R A
F F
IC
C
O N
T R
O
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\N
-N
-N P
S E
R P
M S
F Y
(1 tt c .d g n
PROJECT
N02
NP SER PMS FY24(1)
NO. DATE BY REVISIONS
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
TEMPORARY TRAFFIC CONTROL
Sheet 2 of 3
CANAVERAL NATIONAL SEASHORE
500' 500'
TYPICAL ROAD CLOSURE
Barricade Type 3 (typ.)
36"x36"
W20-3
CLOSED
ROAD
AHEAD
36"x36"
W20-3
CLOSED
ROAD
AHEAD
500' 500'
R11-2
Road Closed
R11-2
Road Closed
CLOSED
ROAD
500 FT
(Mounted on Type 3 Barricade)
W20-3 MOD
CLOSED
ROAD
500 FT
(Mounted on Type 3 Barricade)
W20-3 MOD
Cent�r Rdc::=====------=;..._- Coqurna Pi Hd
Begin Project nt
- -t
Pla:,,allnda Bear.n R
C .
a:
""fl er:
0..
('Z Ill a.
NO. DATE BY
Ill
REVISIONS
�1------1--- --l--__, _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __, 1---------1----+-__, ________________ __, Nl-------1-- - --l--__, _ _ _ _ _ _ __ _ _ _ _ _ __ ___, �1---------1-- - --l--__, _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __, NW
39tl'i st.
u.
Cl
-0
1, N
€aruveral
End Project
John F Kennedy
Sp,.-.::e Center
--iH.nppy Creek Rd
NPS PMIS Nos. 335036 and 335037 NPS Drw No. 639/192370
NOTES:
PROJECT
NP SER PMS FY24(1)
1. Install temporary traffic control devices for advanced signing prior to beginning construction activities and maintain devices through the completion of all work or as directed by the CO.
2. Space signs at intervals of 350 feet minimum, unless noted otherwise. Obtain approval from the CO for the final location and spacing of temporary traffic control devices.
3. Layout traffic control devices for lane closure with flagger according to Standard 635-6.
4. Coordinate with the CO for lat/long of the beginning and ending of the project.
5. Plan shows CANA-0300 Playalinda Beach Access road.
IPCMSI
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
OFFICE OF FEDERAL LANDS HIGHWAY
Portable Changeable Message Sign
CANAVERAL NATIONAL SEASHORE
SHEET
NUMBER
N03
TEMPORARY TRAFFIC CONTROL
ADVANCED SIGNING PLAN
Sheet 3 of 3 L......L.--....L-..J... ______________ .....J"--------------------------------------1....-----------....i..--------------------------
2%
3%
4%
5%
33'
22'
16'
13'
INLET PROTECTION
set under drain inlet.
Non-woven filter fabricFl ow
FlowFlow
Fl ow
F lo w
F lo w
PLAN VIEW
Area
Undisturbed
Flow
Flow
** Adjust spacing as approved based on site conditions
* Do not install check dams on grades below 2%
50'
33'
25'
20'
PLAN VIEW
FIBER ROLL CHECK DAM
20 ft
15 ft
10 ft1V:2H or Steeper
1V:4H - 1V:2H downslope stakes equidistant between
Upslope stake, place
Flow
8' max
Flow
4' max
Contour line (typ.)
E157-04 height of roll2 1to
Wood mulch or compost
See Note 6
Wood stake (typ.)
See Note 6
Wood stake (typ.)
See Note 11 ends and 36" o.c. (typ.)
Gravel bag weights at
See Note 6
Wood stake (typ.)
FIBER ROLL CHECK DAM CROSS SECTIONS
V-DITCH TRAPEZOIDAL DITCH
ENTRENCHED INSTALLATION
FIBER ROLL ISOMETRIC VIEW
requirements of Subsection 713.13.
Provide gravel bag weights meeting the inlet protection detail.
use gravel bags to support them as shown on the
When fiber rolls are required on paved surfaces, months after installation.
installation and photodegradable fiber rolls 12
Replace biodegradable fiber rolls 6 months after one-half the height of the exposed fiber roll.
Remove sediment deposits when accumulation is ends 12 inches minimum and stake.
When more than one fiber roll is needed, overlap
Subsection 713.08(a).
Furnish wood stakes meeting the requirements of ground and 3 inches protruding above the roll.
length to attain a minimum of 12 inches into the section of 2-inch x 2-inch and of sufficient
Use wood stakes with a minimum nominal cross alignment.
least 8 feet upslope at 45 degrees to the main contours. Extend both ends of the fiber roll at
Place fiber rolls on level grade and parallel to along the fiber roll.
mulch or compost on uphill side of the slope
For untrenched installation, blow or hand place the fiber roll.
1-inch that may interfere with proper function of including rocks, clods, and debris greater than
Prior to installation, clear all obstructions a minimum 12-inch diameter.
For drain inlet protection, use fiber rolls with
Use fiber rolls with a minimum 8-inch diameter.
Subsection 713.12.
Provide fiber rolls meeting the requirements of
NOTES:
See Note 6
Wood stake (typ.)
See Note 6
Wood stake (typ.)
UNTRENCHED INSTALLATION
SLOPE MAX INTERVAL
1V:4H or Flatter
LENGTH ABOVE FIBER ROLLS
MAXIMUM ALLOWABLE SLOPE
SPACING TABLE
FIBER ROLL CHECK DAM
*GRADE
DITCH SPACING (S)
CHECK DAM
8" HIGH 12" HIGH
Downslope stake (typ.)
Upslope stake (typ.)
Downslope stake (typ.)
Upslope stake (typ.)
Downslope stake (typ.)
8" dia. (min.)
Fiber roll, 8" dia. (min.)
Fiber roll, the diameter of the roll (max.)
1Trench into ground
1' (min.)
12" dia. (min.)
Fiber roll, 8" dia. (min.)
Fiber roll, 8" dia. (min.)
Fiber roll, 8" dia. (min.)
Fiber roll, 2' (max.)
(typ.)
Fiber roll
FIBER ROLL OVERLAP
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
FIBER ROLL
EFLHD DETAIL
DETAIL APPROVED FOR USE
REVISED: SEPTEMBER 2020
APPROVED: MAY 2016
:5
J u ly
S h e
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\S td
-D e t\
S -s t1 d e ta il .d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PROJECT
S01
K VALUE TABLE (ft/in)
30 35 40 45 50 55 60 65 70 75
30 32.5 35 37.5 40 42.5 45 47.5 50 52.5
* Use a K Value of 30 for speeds less than 30 MPH.
K
(MPH) *
POSTED SPEED
NOTE:
2 inches x 42.5 ft./in. = 85 feet.
Then the minimum transition length =
Effective overlay thickness = 2 inches
If the posted speed is 55 MPH
Example :
(Minimum transition length=30 feet) applies), to obtain the transition length.
Use K*[e1-e2]=T, or K*[d1-d2]=T (whichever the posted speed of the roadway.
elevations) by the K value from the Table for
(difference between the existing and overlaid the effective overlay thickness in inches less than the value obtained by multiplying
Provide a transition length in feet that is not
E401-01
NO SCALE
Existing asphalt pavement
Existing base course
New asphalt pavement
New base course
Existing asphalt pavement
Existing base course
Remove pavement (mill)
NEW PAVEMENT
(Final course)
Asphalt overlay
(Depth equals overlay thickness)
Saw cut
Existing elevation (e2)
Overlaid elevation (e1)
(Full depth of existing asphalt pavement Saw cut
K Transition length variable (See table)
(for table e - e = effective overlay thickness)
OVERLAY
d
Existing asphalt pavement
Existing base course d1
OVERLAY - DEPTH TRANSITIONS
(depth 2)
Asphalt overlay
(depth 1)
Asphalt overlay
K Transition length (Variable, see Table)
(for Table, d - d = effective overlay thickness)
1 PAVEMENT TRANSITIONS
EFLHD DETAIL
DETAIL APPROVED FOR USE
REVISED: SEPTEMBER 2020
APPROVED: FEBRUARY 2013
:0
J u n e
S h e
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\S td
-D e t\
S -s t4 d e ta il .d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PROJECT
S02
CRACK SEALING AND FILLING
CRACK SEALING CRACK FILLING
NOTES:
from the existing surface
Squeegee excess material
4.
3.
2.
1.
crack width.
See Subsection 414.06 for minimum to ensure adhesion to existing surface.
Force crack repair material into cracks sealing and filling cracks.
manufacturer's recommendations for according to Section 414. Follow
Prepare cracks for sealing and filling
Do not overband cracks.
filling material left above the surface.
Squeegee excess crack sealing and
Greater than 1"
See Note 3
1" or less
" below existing surface 4 " to8
Fill crack with hot applied crack filler to
Seal crack with hot-applied crack sealant below existing surface " 4
" to8
Screed material to
NO SCALE
EFLHD DETAIL
CRACK SEALING AND FILLING
ASPHALT PAVEMENT
E414-01A
:0
J u ly
S h e e t-
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\S td
-D e t\
S
-s t4 d e ta il .d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PROJECT
S03
"R2
"R8
1" Grout
" Sealant 2
PLAN VIEW
SECTION B-B SECTION A-A
See Note 3
Steel rod
1" R
"4 surface
Pavement "
See Note 4
#4 Reinforcing steel (typ.)
1' (typ.)
" (typ.)16
72 A
A
BB
6' - 7'
1' 1'-6"1'1'-6"
1' 1'
" (typ.)2
" (typ.)2
PLAN VIEW
C
C
SECTION C-C
Formed hole for pin (typ.)
Formed hole for pin (typ.)
Formed hole for pin (typ.)
" Sealant 2
1" Grout
See Note 3
Steel rod
"R8
1" R
1 surface
Pavement
"R2
2" "8
"4
"4
2"
"8
4"
See Note 4
#4 Reinforcing steel (typ.)
"8
6' - 7'
' - 7
Wheelstop
W h e e lsto p
Varies obstructions as directed by the CO.
* Increase distance for wall or other
"2
HEAD-ON PARKING
ANGULAR PARKING
Edge of pavement
WHEELSTOP LAYOUT
CONCRETE WHEELSTOP WITH DRAIN
CONCRETE WHEELSTOP WITHOUT DRAIN
Stall lines
Stall lines
6" (min.)*
1' 1'1'-6" (typ.)
Edge of pavement
CONCRETE WHEELSTOP
NOTES:
3.
2.
1.
1 inch of ends of wheelstop.
Extend the reinforcing steel to within
Subsection 609.08.
-inch steel rods according to 4 steel or
Pin the wheelstops with No. 6 reinforcing the approval of the CO.
to meet manufacturer's standards with
Variations in wheelstops will be allowed perpendicular to stall lines.
Center wheelstops between and
6' - 7'
6' - 7'
"4
E609-03
4.
EFLHD DETAIL
DETAIL APPROVED FOR USE
REVISED: SEPTEMBER 2020
APPROVED: MAY 2011
:3
J u n e
S h e
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\S td
-D e t\
S -s t6 d e ta il .d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PROJECT
S04
H
W
3W
H
W 4
W 4 W 4
W
W 6
W
W
W m in
6' (min.)
m in
W
W of curb
Front face
** See Note 3
* See Note 2 pavement
Edge of
6' (min.)
m in shoulder
Edge of
6' (min.)
m in pavement
Edge of
POST TYPE
POST
SINGLE
POST
DOUBLE
POST
TRIPLE
POST
QUADRUPLE
POST SIZE TABLE
MAXIMUM SIGN AREA (SQFT)
4" x 4"
SIZE
POST
4" x 6"
6" x 6"
2" 12 ga.
2" 12 ga.
Class B
10 ga.
2" x 2"
10*
10*
10*
10*
24**
SIGN STRUCTURES
m a x
H /5 o r m a x
H /5 o r m a x
H /5 o r
SINGLE POST DOUBLE POST TRIPLE POST QUADRUPLE POST
(min.)
2'
W
ROADSIDE SIGN IN RURAL DISTRICT
WITHOUT SHOULDER WITH SHOULDER
WITH ADVISORY SPEED PLAQUE
OR RESIDENTIAL DISTRICT
ROADSIDE SIGN IN BUSINESS
Wood
U-Channel Steel
Steel
Square Tubular
Resistant Steel
Corrosion m a x
W
W
W
(typ.)
2" (max.)
(typ.)
2" (max.)
(typ.)
2" (max.)
NOTES:
additional information.
Refer to Section 2A.21 of the MUTCD, latest edition, for
U-channel steel and square tubular steel posts.
Refer to Detail E633-04 for bracing details for wood, for wood, U-channel steel and square tubular steel posts.
Refer to Detail E633-03 for breakaway support details for corrosion resistant steel posts.
Refer to Detail E633-02 for breakaway support details according to manufacturer's recommendations.
panel area is equal to 24 square feet, use slip base
For square tabular steel double posts for which the sign feet or less but W is over 4 feet, use double posts.
steel posts for which the sign panel area is 10 square
For U-channel, square tubular, and corrosion resistant
Uniform Traffic Control Devices" (MUTCD), latest edition.
Locate and set sign height according to the "Manual on
7.
6.
5.
4.
3.
2.
1.
E633-01
NO SCALE
STOP
SPEED
LIMIT
M PH
EFLHD DETAIL
DETAIL APPROVED FOR USE
REVISED: SEPTEMBER 2020
APPROVED: MAY 2011
:1
J u ly
S h e
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\S td
-D e t\
S -s t6 d e ta il .d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PROJECT
S05
Sign panel
4''Existing ground
Existing ground m in m in m a x
S e e N o te
Traffic flow
Tr af fic fl ow
Tr af fic fl ow
U-CHANNEL STEEL POST SQUARE TUBULAR STEEL POST WOOD POST
POST SIZE HOLE DIAMETER
6'' x 6''
1.5''
2''
3'
4'
4'
BREAKAWAY SIGN SUPPORT
t o s p li c e o v e r la p
Existing ground
(MIN.)
(D) m in
See Table
Holes (See Table)
WOOD AND STEEL POSTS
BREAKAWAY SIGN SUPPORT
m a x th is fa ce o f p os t)
(M ou nt si gn p an el on th is fa ce o f p os t)
(M ou nt si gn p an el on
See Notes 5 and 6
Galvanized steel corner bolt
See Notes 5 and 6
Anchor (12 ga. min.)
U-channel sign post
Square tubular sign post
Wood sign post
Stub bolts, nuts and washers
" dia. galvanized 16
Four
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
latest edition, for additional information.
Refer to Section 2A.21 of the MUTCD, details.
Refer to Detail E633-04 for sign bracing details.
Refer to Detail E633-01 for sign mounting latest edition of the MUTCD.
Signs and Markings" as specified in the standards in the "Standard Highway
For sign punching details, see the blank position.
Maintain the post assembly in a plumb accept the post size specified.
manufacturer's recommendations to
Size the anchor according to the to the manufacturer's recommendations.
the anchor with a corner bolt according
Attach the square tubular steel post to per post.
line. Do not place more than one splice line and 18 inches above the ground steel posts entirely between the ground
Position splice overlap on U-channel non-breakaway signs.
barrier. Do not place holes in posts of the clear zone or shield with approved
Place non-breakaway signs outside apart.
cannot be spaced a minimum of 7 feet if multiple posts are required and posts posts are considered to be non-breakaway
Signs requiring 6-inch by 6-inch wood signs placed behind protective barriers.
Breakaway sign support is not required for m a x
STATE PROJECT
E633-03
WOOD POST DATA TABLE
4'' x 6''
4'' x 4'' Not Required
NOTES:
NO SCALE
EFLHD DETAIL
DETAIL APPROVED FOR USE
REVISED: SEPTEMBER 2020
APPROVED: MAY 2011
:1
J u ly
S h e
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\S td
-D e t\
S -s t6 d e ta il .d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PROJECT
S06
SYMBOLS AND WORDS
PAVEMENT MARKINGS
E634-01
14"12"14"
12"30"30"
33"
27"
R
12"30"30"
33"
R
R
27"
8"
6'
(V
M
P H
(V
M
P H
(V
M
P H
(V
M
P H
4" (typ.)
4" (min.)
7'
6'
(t y p
8'
(t y p
4" (min.)
4" (typ.)
(m in
24" (min.)
3" (min.)9" R
3"R
3"R
3"R
TURN ARROW SYMBOLSTRAIGHT ARROW SYMBOL
COMBINATION SYMBOL
STRAIGHT/TURN ARROW
TRIANGLE SYMBOL
YIELD AHEAD
See Note 3 Blue background
ACCESSIBILITY SYMBOL
See Note 3 White border
(typ.
R 6"
(typ.)
TYPE
PAVEMENT MARKING AREAS
SQFT
See Note 3 Accessibility symbol
"STOP" WORD MESSAGE "YIELD" WORD MESSAGE "ONLY" WORD MESSAGE
"AHEAD" WORD MESSAGE "SCHOOL" WORD MESSAGE
6'-9"
9'-9"
3'-9" (typ.) "YIELD" Word Message Marking
"STOP" Word Message Marking
"SCHOOL" Word Message Marking
"ONLY" Word Message Marking
"AHEAD" Word Message Marking
Yield Ahead Triangle Symbol (V≥45 mph)
Yield Ahead Triangle Symbol (V<45 mph)
Turn Arrow Symbol
Straight/Turn Arrow Combination Symbol
Straight Arrow Symbol w/ Symbol, blue background, and white border w/ Symbol and blue background w/ Symbol only
Accessibility Symbol:
NO SCALE
NOTES:
3.
2.
1.
and white border
(c) w/ Symbol, blue background, background; or
(b) w/ Symbol and blue
(a) w/ Symbol only;
following configurations:
otherwise by the CO in one of the as indicated in the plans or directed Provide Accessibility Symbol marking edition.
"Standard Highway Signs", latest symbols in accordance with the Place all letters, numerals, and
Devices'' (MUTCD), latest edition.
''Manual on Uniform Traffic Control markings in accordance with the Place pavement word and symbol
EFLHD DETAIL
DETAIL APPROVED FOR USE
REVISED: SEPTEMBER 2020
APPROVED: MAY 2011
:2
J u ly
S h e
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\S td
-D e t\ S
-s t6 d e ta il .d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PROJECT
S07
Single Solid White Striping (edge striping) Single Solid White Striping (edge striping) broken white striping 4" wide
Raised Pavement Markers (typ.)
Double Solid Yellow Striping (centerline)
N
2N or less
N
Double Solid Yellow Striping (centerline) broken white striping
4" wide
Solid Yellow Striping
Single Solid White Striping (edge striping)
Single Solid Yellow Striping
N
See View A
(See Notes 2 and 3)
Raised Pavement Marker
10' 30' 10' 30'
Edge of pavement (typ.)
broken yellow striping
4" wide
3'
10' 30'
N
Edge of pavement (typ.)
broken yellow striping 4" wide
4" wide dotted white striping
10' 30'
N
3'
M
M
N
9'
9'
DOUBLE SOLID YELLOW STRIPING
BROKEN SINGLE WHITE AND
WITH RAISED PAVEMENT MARKERS
DOUBLE SOLID YELLOW STRIPING
BROKEN SINGLE WHITE AND
WITH RAISED PAVEMENT MARKERS
DOTTED WHITE STRIPING
BROKEN SINGLE YELLOW AND
DOTTED WHITE STRIPING
BROKEN SINGLE YELLOW AND
VIEW A
WITH RAISED PAVEMENT MARKERS
SINGLE SOLID YELLOW STRIPING
NOTES:
required, see Detail E634-02.
When raised pavement markers are
Detail or as directed by the CO.
with the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .